1 QUARTERLY REPORT For Quarter ending 30 September 2011 HIGHLIGHTS La Posada sold for US$7.5m. Napoleonville development well Dugas & Leblanc #3 commenced production in M sand. Presently producing at 205 bopd and 1.78 mmcfg per day. Abita well flow tested at commercial production rates in the lower three of nine logged hydrocarbon bearing intervals. Facilities are being constructed for production to commence in Dec. Recoverable reserves estimated at 8BCFG and thousand barrels oil. Lyons Point currently setting casing at 14,200ft, approximately 18 days to reach first reservoir target at 15,500ft. Lyons Point is a high impact prospect targeting 3 MMBC & 60 BCFG (up to 4 MMBC & 80 BCFG). Completed $2.5m rights issue. COMPANY OVERVIEW South Louisiana La Posada Discovery sold for US$7.5M D&L#3 On production at 205 bopd & 1.78 mmcfgd with reserve potential of 400,000 bbl s and 1.2 BCFG. Abita production to commence Dec -- likely recoverable reserve of 8 BCF and MMBLs Lyons Point setting casing at 14,200ft Napoleonville Salt Dome Potential for 500 BCF and 3.8 MMBO Balanced portfolio of 13 quality prospects 50 Square Miles of 3D Seismic Historical Production of 188 BCF and 20.2 MMBO. Energy Prices WTI $90.20 (BBL) Henry Hub $3.65 (MMBTU) Major Shareholders Charles Morgan 19.95% Craig Burton 10.21% Macquarie Bank 5.56% Jim Trimble 3.5% ASX Codes: GGE / GGEO Mr Charles Morgan Executive Chairman Share Price: 0.5c / 0.1c Mr Mark Freeman Executive Director Shares 3,739m Mr Stephen Keenihan Director Listed Options 1,469m (1.5c) Mr Allan Boss Director Mkt cap $18.6m Mr Jim Trimble Director Drill Program Date P50 Oil P50 Gas Lyons Point Drilling 3-4 MMBO BCF West Klondike December MMBO 6-17 BCF Abita ETA Production Dec Qtr MBO 8 BCF
2 DUGAS & LEBLANC #3 ON PRODUCTION IN M SAND Napoleonville- Dugas & Leblanc #3 Well, Assumption Parish, Louisiana, Non Operator 39.5% WI The D&L#3 M sand was successfully perforated and placed on production on 18 October 2011 with initial flow rates of 160 BOPD, 1,150 MCFD and 16 BSWPD from a 9/64 inch choke. The well is presently producing at 205 BOPD, 1.78 MMCFD and 0 BSWPD through a 10/64 inch choke. All production is presently being processed through existing facilities (see images below). The Company has estimated hydrocarbon potential in the M sand as follows: Oil (BBL) Gas (MCF) Projected Recoverable Reserve 400,000 1,200,000 The reserve potential of the M sand is expected to increase with reservoir performance data. Following further seismic and analogue interpretational work the M sand may have further updip potential of an additional BCF of gas, which if confirmed will need to be recovered from either a development well or side track to the D&L#3. Partners in the D&L#3 well are: Company WI Grand Gulf Energy Ltd 39.4% Golden Gate Petroleum Ltd 15% Other Partners 45.6% Grand Gulf Energy Limited 1292 Hay Street, West Perth WA 6005 Page 2 T +61 (0) F +61 (0) E info@grandgulf.net
3 LYONS POINT WELL DRILLING AHEAD Pruitt et al #1 Well, Lyons Prospect, Acadia Parish, Louisiana, USA- Non Operator 5% WI Highlights Lyons Point is a high impact prospect targeting 3 MMBC & 60 BCFG (up to 4 MMBC & 80 BCFG) Adjacent to Leleux Field which produced 5 MMBC and 300 BCFG from target reservoir Currently setting casing at 14,200 ft, approximately 18 days to reach first reservoir target at 15,500ft The Pruitt et al #1, the initial test well for the Lyons Point Prospect was spudded on 13 September 2011 and is presently setting casing at 14,200ft. The well is being operated by Clayton Williams Energy Inc. under a turnkey fixed cost drilling contract with Precision Drilling. The expected drilling time to reach the first target objective at 15,500ft is 18 days. The Lyons Point Prospect will be drilled to a total depth of 16,300 feet. The prospect has a closure of circa 400 acres with a most likely resource potential of 3 MMBC (Million Barrels Condensate) and 60 BCFG (Billion Cubic Feet Gas) with upside potential of 4 MMBC and 80 BCFG. The Lyons Point Prospect is a seismically defined, upthrown fault bounded structural closure. The objective section is provided by the prolific Oligocene Marginulina Texana (MT) 1, 2, and 3 Sands, which are projected to be together 700 feet thick. The MT sands are productive in several fields in the immediate surrounding area and include the nearby Leleux Field, which has cumulative production of 5 MMBC and 300 BCFG from the MT interval. The ASX participants in the Lyons Point Prospect are as below: Paying Interest % Initial Well Working Interest % Initial & Subsequent Wells Net Revenue Interest % Grand Gulf Energy Ltd (GGE) Tango Petroleum Ltd (TNP) Verus Investments Ltd (VIL) Kilgore Oil & Gas Ltd (KOG) Other COMPETENT PERSONS STATEMENT: The information in this report has been reviewed by Mark Kramer (Registered Geologist, Texas USA), who has over 36 years experience within oil and gas sector. Mark Kramer consents to the inclusion in this report of the information in the form and context in which it appears. Mark Kramer is not a full time employee of the Company. Page 3 Grand Gulf Energy Limited, 1292 Hay Street, West Perth WA 6005 T +61 (0) F +61 (0) E info@grandgulf.net
4 ABITA TESTED, Non Operator 20%WI (15% after payout) Highlights The 30, upper 30 Stray and 29 sands were successfully flow tested at commercial rates The well logged 171ft of net pay in 9 intervals Recoverable resources estimated at 350, ,000 barrels Oil and 8 BCFG Scheduled production Dec 2011 The well is being operated by Clayton Williams Energy Inc (NASDAQ: CWEI) in Plaquemines Parish, Louisiana. The well was drilled and completed in June 2011 and logged 171ft of net pay in 9 intervals. The Operator has undertaken an initial tricompletion of the three bottom intervals and flow test results are as follows: Sand TVD Interval (ft) Est Net Pay (ft) Gas (Mcfd) Oil/Condensate (Bcpd) Water (Bopd) 29 9,787-9, , Upper 30 9,940 9, , ,024-10, , GGE s estimate of the likely resources of this discovery (unaudited) is 7.9 BCFG and 350, ,000 bbls over 9 intervals. The Operator s decision to undertake a triple completion provides the JV with the ability to economically open and shut each interval with a wireline, reducing expensive completion workover rig requirements. Each interval will be put on production individually and produced until depletion sequentially. Following depletion of these three intervals a further three intervals will be completed in a similar manner. Targeted date of first sales for the well is scheduled for mid December. The JV is presently reviewing the need for a development well to accelerate the oil production from the 19 sand. The JV is also undertaking a technical review of the seismic and subsurface geology to determine the field extension potential for another oil and gas accumulation on the same geologic feature in the fault compartment immediately to the northeast (see map). The JV believes the discovery well crossed a critical fault (before penetrating a lower sand package) to add support to the northerly prospect. Objective sands are those found productive in the discovery well and deeper sands produced in Coquille Bay Field to the south. The prospective fault block has similar potential found in the discovery well. The lower sand package in the discovery fault block was accordingly not tested in the initial well and any future development wells may be designed to penetrate this sand. The lower sand had a pre drill estimate of 400,000 bbls of oil and is a significant producer in the adjacent field. Page 4 Grand Gulf Energy Limited 1292 Hay Street, West Perth WA 6005 T +61 (0) F +61 (0) E info@grandgulf.net
5 WEST KLONDIKE, Non Operator 10.5%WI Highlights West Klondike is targeting 2 MMBL and 6 BCF (unrisked 4.8 MMBL/17 BCF) Multiple pay sands with significant production on trend Well anticipated to spud in December and take 30 days to drill The Company has a 10.5% working interest in the West Klondike Prospect which covers an area of 640 acres in Iberville Parish, Louisiana. This prospect will be drilled to a total depth of 10,900ft and is expected to be drilled in December The West Klondike Prospect is a fault block closure which has been identified on 3D seismic data and is in close proximity to analogous offset production. The targeted sand sections are the Marg Tex, Lario and Upper and Lower Nod Blan, all of which produce in the fields highlighted on the sub regional map (Map 1). The most likely resource potential is 2 MMBL and 6 BCF gas with upside potential of 4.8 MMBL and 17 BCF gas. There is also a larger, separate, high pressure, deeper prospect in the leased area that will require a separate well. The target sands of this deeper feature (Bridas) have recently yielded a significant discovery approximately 2.5km to the NE. The Company s share of the initial well costs is 13.96% (~US$450,000) of the total (including entry costs). In a success case the Company s share of completion costs are a further US$85,000. Analogue fields Klondike Stratigraphic production from Lario Sand only 3.8 MMBO and 3.4 BCFG Happytown Field Analogous structure, timing, depth and deposition Marg Tex 5.3 MMBO & 54BCF Sayou De Glaises Field Analogous structure, timing and deposition Marg Tex 18.8 BCFG & 8.8 MMBO Page 5 Grand Gulf Energy Limited 1292 Hay Street, West Perth WA 6005 T +61 (0) F +61 (0) E info@grandgulf.net
6 La Posada Sold for US$7.5m On 23 September the Company announced the sale of its 4.75%WI in La Posada for US$7.5m. This is a significant funding milestone that has been achieved representing a material cash injection into the Company and monetising an untested development asset. The Company will continue to focus its activities on high quality exploration and development prospects. A summary of the Company s resource potential is presented below. Development Working Interest $2.5M FULLY UNDERWRITTEN ENTITLEMENTS ISSUE Net Oil ( mbo) Net Gas ( bcf) Abita 20% (15% APPO) D&L#3 39.5% Total Development Exploration Lyons Point 5% West Klondike 10.5% Desiree 52% Total Exploration 672-1, Total 902-1, On 27 th July 2011 the Company announced a fully underwritten $2.5m one for five entitlements issue together with a one for two free attaching option at 0.4 cents per share. The Rights Issue was completed in August COMPETENT PERSONS STATEMENT: The information in this report has been reviewed and signed off by Mr KC Whittemore (Registered Geologist, Texas USA), and Kevin Kenning (Registered Reservoir Engineer) with over 36 and 30 years relevant experience respectively within oil and gas sector. This report contains forward looking statements that are subject to risk factors associated with resources businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including but not limited to: price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve estimates, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates. Page 6 Grand Gulf Energy Limited 1292 Hay Street, West Perth, Western Australia 6005 T +61 (0) F +61 (0) E info@grandgulf.net
7 Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity GRAND GULF ENERGY LTD ABN Quarter ended ( current ) September 2011 Consolidated statement of cash flows Cash flows related to operating activities Current Year to date 1.1 Receipts from product sales and related debtors Payments for (a) exploration & evaluation (b) development (c) production (d) administration 1.3 Dividends received 1.4 Interest and other items of a similar nature (393) (1,072) (11) (232) (393) (1,072) (11) (232) 1 1 received 1.5 Interest and other costs of finance paid (18) (18) 1.6 Insurance pre-payment (refundable) 1.7 Other (provide details if material) Net Operating Cash Flows (1,194) (1,194) Cash flows related to investing activities 1.8 Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a) prospects (b) equity investments (c) other fixed assets 7,173 7, Loans to other entities 1.11 Loans repaid by other entities 1.12 Other (provide details if material) 7,173 7,173 Net investing cash flows 1.13 Total operating and investing cash flows (carried forward) 5,979 5,979 + See chapter 19 for defined terms. 30/9/2001 Page 1
8 1.13 Total operating and investing cash flows (brought forward) 5,979 5,979 Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. 2,493 2, Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1,050 1, Repayment of borrowings (1,764) (1,764) 1.18 Dividends paid 1.19 Costs of Capital (134) (134) Net financing cash flows 1,645 1,645 Net increase (decrease) in cash held 7,624 7, Cash at beginning of /year to date Exchange rate adjustments to item Cash at end of 8,254 8,254 Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities Current $A' Aggregate amount of payments to the parties included in item Aggregate amount of loans to the parties included in item Explanation necessary for an understanding of the transactions Payments include consulting and directors fees, provision of a serviced office and accounting services. $80,000 of amounts included in sec 1.23 costs relates to fees outstanding for the year end 30 June Non-cash financing and investing activities 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows Nil 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest Nil + See chapter 19 for defined terms. Page 2 30/9/2001
9 Financing facilities available Add notes as necessary for an understanding of the position. Amount available 3.1 Loan facilities Amount used 3.2 Credit standby arrangements Estimated cash outflows for next 4.1 Exploration and evaluation 4.2 Development 4.3 Production 4.4 Administration Total 1,765 Reconciliation of cash Reconciliation of cash at the end of the (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. 5.1 Cash on hand and at bank Current Previous 8, Deposits at call 5.3 Bank overdraft 5.4 Other (provide details) Total: cash at end of (item 1.22) 8, Changes in interests in mining tenements 6.1 Interests in mining tenements relinquished, reduced or lapsed Tenement reference Nature of interest (note (2)) Interest at beginning of Interest at end of La Posada Held through to Subsidiary Interests in mining tenements acquired or increased West Klondike Lyons Point Held through to Subsidiary Held through to Subsidiary See chapter 19 for defined terms. 30/9/2001 Page 3
10 Issued and quoted securities at end of current Description includes rate of interest and any redemption or conversion rights together with prices and dates. 7.1 Preference + securities (description) 7.2 Changes during (a) Increases through issues (b) Decreases through returns of capital, buy-backs, redemptions Total number Number quoted Issue price per security (see note 3) (cents) Amount paid up per security (see note 3) (cents) Ordinary securities 3,739,805,994 3,739,805, Changes during (a) Increases through issues (b) Decreases through returns of capital, buy-backs Convertible debt securities (description) 7.6 Changes during (a) Increases through issues (b) Decreases through securities matured, converted 7.7 Options Unlisted Options 623,300, ,500 45, , ,000,000 1,000,000 40,000,000 75,000, ,300, ,500 $0.004 $0.015 Exercise price $0.04 $0.04 $0.04 $0.05 $0.009 $0.009 $0.004 $0.015 Expiry date 18 Sep Dec June Nov Mar May 2014 Listed Options 1,469,545,952 1,469,545,952 $ June Issued during 7.9 Exercised during 7.10 Expired during 311,650, ,650,541 $ June , ,500 $ June See chapter 19 for defined terms. Page 4 30/9/2001
11 7.11 Debentures (totals only) 7.12 Unsecured notes (totals only) 7.13 Partly paid shares Compliance statement 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4). 2 This statement does give a true and fair view of the matters disclosed. Sign here:... Date: 27/10/ (Director/Company secretary) Print name:... Notes 1 The ly report provides a basis for informing the market how the entity s activities have been financed for the past and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report. 2 The Nature of interest (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities. 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report. + See chapter 19 for defined terms. 30/9/2001 Page 5
12 5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with. == == == == == + See chapter 19 for defined terms. Page 6 30/9/2001
QUARTERLY REPORT. For Quarter ending 31 DECEMBER 2012 HIGHLIGHTS DRILLING & EXPLORATION PROGRAM PRODUCTION AND DEVELOPMENT PROGRAM.
QUARTERLY REPORT For Quarter ending 31 DECEMBER 2012 Activity HIGHLIGHTS Desiree Discovery (35.6% WI) Electric Logs confirmed net pay of 80ft in Cris R II & III. Well has been completed and awaiting unitization
More informationQUARTERLY REPORT. For Quarter ending 30 June 2013 HIGHLIGHTS DRILLING & EXPLORATION PROGRAM PRODUCTION AND DEVELOPMENT PROGRAM.
QUARTERLY REPORT For Quarter ending 30 June 2013 HIGHLIGHTS Desiree on Production (35.6% WI) The Hensarling #1 commenced production on 3 July 2013. The well commenced production at 330 bbls per day. Production
More informationDRILLING & EXPLORATION PROGRAM
QUA ARTERLY REPORT For Quarter ending 30 SEPTEMBER 2012 HIGHLIGHTS Desiree Rig is on location with well due to spud shortly. Desiree is targeting up too 1 million bbls oil and 30 BCF gas. Activity Desiree,
More informationQUARTERLY REPORT. For Quarter ending 31 March 2011 HIGHLIGHTS COMPANY OVERVIEW. Napoleonville Salt Dome
QUARTERLY REPORT For Quarter ending 31 March 2011 Napoleonville Salt Dome Potential for 500 BCF and 3.8 MMBO Balanced portfolio of 13 quality prospects 50 Square Miles of 3D Seismic Historical Production
More informationQ u ar te r ly Rep or t
Q u ar te r ly Rep or t For Quarter ending 31 December 2014 HIGHLIGHTS Quarterly net production was 18,075 bbls of oil and 18,794 Mcf of gas with gross revenue of A$1,944,633. The Company entered into
More informationQ u ar te r ly Rep or t
Q u ar te r ly Rep or t For Quarter ending 30 June 2016, HIGHLIGHTS Cash Flow Analysis Annual $AUD M Production Sales 5.2 Production Costs * (1.71) Operating Costs (0.70) Net Operating Proceeds 2.2 * Production
More informationQUARTERLY REPORT. For Quarter ending 30 JUNE 2012 HIGHLIGHTS DRILLING & EXPLORATION PROGRAM PRODUCTION AND DEVELOPMENT PROGRAM.
QUARTERLY REPORT For Quarter ending 30 JUNE 2012 Activity HIGHLIGHTS Austin Bayou presently drilling ahead at 9,648ft to a planned TD of 11,500ft. Leduc due to spud mid August Quarterly production at 14,038
More informationQ u ar te r ly Rep or t
Q u ar te r ly Rep or t For Quarter ending 30 June 2017 HIGHLIGHTS Cash Flow Analysis June Quarter Annual $AUD 000 $AUD 000 Production Sales 798 2,915 Production Costs * (278) (1,226) Operating Costs (145)
More informationGRAND GULF ENERGY LIMITED
INTERIM REPORT FOR THE HALF YEAR ENDED 31 December 1 CONTENTS DIRECTORS REPORT 3-7 AUDITOR S INDEPENDENCE DECLARATION 8 CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER 9 COMPREHENSIVE INCOME CONSOLIDATED
More informationQuarterly Report for the quarter ending 31 March 2013
Quarterly Report for the quarter ending 31 March 2013 Fairway wells increase net production by over 300% since January Sydney #1 completed as Fusselman producer flowing oil and gas at 130 BOPD + 180 mcfgd
More informationFor personal use only
31 October 2011 Manager of Company Announcements ASX Limited Level 8 Exchange Plaza 2 The Esplanade PERTH WA 6000 By E Lodgement QUARTERLY REPORT Period Ended 30 September 2011 BOARD & MANAGEMENT Mr Greg
More informationAppendix 5B. Quarter ended ( current quarter ) December Receipts from product sales and related debtors - -
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10, 17/12/10. Name of entity
More informationAppendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8
More informationQuarterly Report for the quarter ending
Quarterly Report for the quarter ending e 31 December 2012 Darwin #1 commences oil and gas production Darwin #2 successfully reentered testing program underway Drilling at highly prospective Sydney #1
More informationQuarterly Report Ending 30 September 2010
Quarterly Report Ending 30 September 2010 Merta #1 fracture stimulated in Cook Mountain Sands. Pine Pasture #3 preparations for drilling complete drilling scheduled for November. Other New Ventures opportunities
More informationTarget Energy Limited. Report for the Quarter Ending 31 December 2009
Key Events Target Energy Limited Report for the Quarter Ending 31 December 2009 Snapper #A3 commenced production in November currently flowing at approx 1.2 mmcfgd. Target increased its interest in East
More informationFor personal use only
Mining exploration entity ly report Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity Australian
More informationAppendix 5B Mining exploration entity and oil and gas exploration entity quarterly report. Appendix 5B
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8
More informationTarget Energy Limited. Report for the Quarter Ending 31 March 2010
Key Events Target Energy Limited Report for the Quarter Ending 31 March 2010 Completion of Merta #1 well at Highway 71 prospect continuing. Pine Pasture daily production remains stable at approximately
More informationAppendix 5B. Quarter ended ( current quarter ) September Receipts from product sales and related debtors - -
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity REGALPOINT
More informationAppendix 5B. Brazilian Metals Group Limited. Quarter ended ( current quarter ) March 2011
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity Brazilian
More informationSeptember 2012 Quarterly Activity Report 31 October 2012
September 2012 Quarterly Activity Report 31 October 2012 Company Snapshot ASX Code: PYM Recent price: $0.077 (26 October 2012) Cash on hand: $1,284,000 Shares outstanding: 259,360,278 Market Capitalisation:
More informationAppendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity
More informationMining exploration entity quarterly report
Appendix 5B Mining exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity Predictive Discovery Ltd ABN 11 127
More informationAppendix 5B. Mining exploration entity and oil and gas exploration entity
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8
More informationAppendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) December 2011
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity BERKELEY RESOURCES
More informationQuarterly Report for the quarter ending 31 December 2015
Quarterly Report for the quarter ending 31 December 2015 1. Operations Texas Fairway Project Howard & Glasscock Counties (Target 35% 60% WI) Partial Sale of Interest in Fairway Project On 31 December 2015,
More informationSeptember Quarterly Activity Report
ASX Release Date: 31 October 2017 September Quarterly Activity Report Summary The Company is actively seeking and evaluating new prospective projects Production continues from the West Klondike project
More informationAppendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) June 2014
Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity NIUMINCO GROUP LIMITED ABN 44 009 163 919 30 June 2014 Quarter ended ( current ) Consolidated statement
More informationQuarterly Report for the Period Ended 31 March 2014
Quarterly Report for the Period Ended 31 March 2014 Highlights As previously reported, permitting of the proposed Byron Energy SM6 #1 well ( SM6 #1 ) on the South Marsh Island Block 6 ( SMI 6 ) commenced
More informationTarget Energy Limited. Report for the Quarter Ending 31 December 2008
Key Events Target Energy Limited Report for the Quarter Ending 31 December 2008 Production at Pine Pasture #2 (East Chalkley) continues at approx 120 BOPD. Production from Snapper wells averages 2.4 mmcfgd
More informationAppendix 5B. Mining exploration entity quarterly report
Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 1/6/10, 17/12/10 Rule 5.3 SOUTHERN CROSS EXPLORATION N.L. QUARTER ENDED ("Current Quarter") : 31st MARCH 2016 Consolidated Statement
More informationAppendix 5B. Quarter ended ( current quarter ) June 2011
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity AusNiCo Limited
More informationFor personal use only
Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity
More informationMining exploration entity quarterly report. Quarter ended ( current quarter ) December 2012
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity ASCOT RESOURCES LIMITED ABN Quarter ended ( current ) 85 146 530 378 31
More informationAppendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) March 2009
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity Axiom Mining Ltd ARBN
More informationFor personal use only
Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of entity
More informationAxiom Mining Limited. Cash Flow Report Appendix 5B. For the Quarter Ended 30 June 2010
Axiom Mining Limited Cash Flow Report Appendix 5B For the Quarter Ended 30 June 2010 Axiom Mining Limited ( Axiom ASX:AVQ) hereby releases it s Appendix 5B in accordance with the ASX Listing Rules. This
More informationMining exploration entity and oil and gas exploration entity quarterly report
Rule 5.5 Appendix 5B Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name
More informationAppendix 5B. Mining exploration entity and oil and gas exploration entity
Mining exploration entity and oil and gas exploration entity ly report Appendix 5B Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8
More informationFor personal use only
Mining exploration entity and oil and gas exploration entity ly report Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,
More informationAppendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) JUNE 2013
Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10, 17/12/10. Name of entity SUN RESOURCES NL ABN Quarter ended ( current ) 69 009 196 810 30 JUNE 2013 Consolidated statement
More informationFor personal use only
Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013 Name of
More informationAppendix 5B. Mining exploration entity quarterly report
Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 1/6/10, 17/12/10 Rule 5.3 SOUTHERN CROSS EXPLORATION N.L. QUARTER ENDED ("Current Quarter") : 30th September 2015 Consolidated
More informationGrand Gulf Energy Limited. Annual Financial Report
Grand Gulf Energy Limited ABN 22 073 653 175 Annual Financial Report for the financial year ended 30 June 2017 CONTENTS Corporate Directory 1 Operating and Financial Review 2-10 Directors Statutory Report
More informationAppendix 5B. Mindax Limited. Quarter ended ( current quarter ) June 2012
Mining exploration entity ly report Appendix 5B Rule 5.3 Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity Mindax Limited
More informationQuarterly Cash Flow Report
Quarterly Cash Flow Report 30 April 2012 Company Announcements Office Australian Securities Exchange Limited Quarterly Cash Flow Report The Company s Appendix 5B Quarterly Cash Flow Statement for the Quarter
More informationQUARTERLY REPORT. HIGHLIGHTS Indonesia. Australia. Corporate. COMPANY UPDATE Indonesia Operations. For the period ended 31 December 2014
QUARTERLY REPORT For the period ended 31 December 2014 HIGHLIGHTS Indonesia In November 2014, the Minister of Energy and Mineral Resources, Sudirman Said, publically confirmed that the Pase oil and gas
More informationKey Petroleum Ltd ACN
ACN 120 580 618 QUARTERLY REPORT FOR PERIOD ENDED 31 DECEMBER 2012 UPDATES ON PETROLEUM EXPLORATION ACTIVITIES FOCUS AND STRATEGY FOR KEY PETROLEUM LIMITED FOR THE QUARTER Key Petroleum Limited ( Key )
More information$120,000 received from exercising put option. East Kambalda (Aztec Dome) tenement application granted.
ASX Announcement 30 July 2014 Quarterly Report: June 2014 ABN: 45 116 153 514 ASX: TMX HIGHLIGHTS $120,000 received from exercising put option. East Kambalda (Aztec Dome) tenement application granted.
More informationAppendix 5B. Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 COALBANK LIMITED
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity COALBANK LIMITED ABN Quarter ended ( current ) 20 075 877 075 31 December
More informationFor personal use only
Mining exploration entity and oil and gas exploration entity ly report Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,
More informationFor personal use only
Mining exploration entity and oil and gas exploration entity ly report Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97,
More informationAppendix 5B. Mining exploration entity quarterly report. Consolidated statement of cash flows. Current quarter $A 000
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity ATTILA RESOURCES LIMITED ABN Quarter ended ( current ) 53 142 165 080
More informationDecember 2014 Quarterly Activity Report 29 January 2015
December 2014 Quarterly Activity Report 29 January 2015 Company Snapshot ASX Code: Recent price: Cash on hand: PYM A$0.007 A$8.4 million Shares outstanding: 907,380,397 Options: 458,340,516 (A$0.02 exercise
More informationKAROON GAS AUSTRALIA LTD ABN QUARTERLY REPORT FOR THE QUARTER ENDED 31 MARCH 2010 AND APPENDIX 5B
KAROON GAS AUSTRALIA LTD ABN 53 107 001 338 QUARTERLY REPORT FOR THE QUARTER ENDED 31 MARCH 2010 AND APPENDIX 5B Review of Operations Highlights: Poseidon2 exploration well in the Browse Basin completed
More informationFor personal use only
COMPANY INFORMATION RED SKY ENERGY LIMITED ABN [94 099 116 275] COMPANY DIRECTORS Kerry Smith: Executive Chairman Clinton Carey: Managing Director Russell Krause: Non Exec Director Bill Rinehart: Non Exec
More informationCorporate 30 September 2014 cash balance of $1.590M Cost Reduction Program delivers significant savings to the Company in Australia and Indonesia
QUARTERLY REPORT For the period ended 30 September 2014 HIGHLIGHTS Indonesia The Directors of Triangle and the Governor of Aceh met on 17th October 2014 to confirm their joint commitment to secure the
More informationFor personal use only
Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity International Coal Limited ABN Quarter ended ( current ) 65 149 197 651 31 March 2015
More informationFor personal use only
Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity HARANGA RESOURCES LIMITED ABN Quarter ended ( current ) 83 141 128 841 31 December 2010 Consolidated
More informationMining exploration entity quarterly report. Quarter ended ( current quarter ) March 2013
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity ASCOT RESOURCES LIMITED ABN Quarter ended ( current ) 85 146 530 378 31
More informationMining exploration entity and oil and gas exploration entity quarterly report
Rule 5.5 Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10, 17/12/10, 01/05/2013
More informationMarch 2015 Quarterly Activity Report 30 April 2015
March 2015 Quarterly Activity Report 30 April 2015 Company Snapshot ASX Code: Recent price: Cash on hand: PYM A$0.007 A$6.1 million Shares outstanding: 907,380,397 Options: 458,340,516 (A$0.02 exercise
More informationQuarterly Report for the Period Ended 31 December 2015
Quarterly Report for the Period Ended 31 December 2015 Highlights Byron secured a multiwell farm out deal with Otto Energy Limited ( Otto ) on Gulf of Mexico ( GOM ) properties; Otto has committed to drill
More informationAppendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) MARCH 2010
Mining exploration entity ly report Appendix 5B (Rule 5.3) Mining exploration entity ly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity PO VALLEY ENERGY
More informationFor personal use only
Suite 1502, Tower B, 799 Pacific Highway, Chatswood NSW 2067 Tel. (02) 9411 6033 Fax (02) 9411 6066 www.malachite.com.au Mining exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8.
More informationFor personal use only
Mining exploration entity ly report Rule 5.3 Mining exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity EMPIRE RESOURCES
More informationQUARTERLY ACTIVITIES REPORT
31 st July 2012 Australian Securities Exchange 2 The Esplanade PERTH WA 6000 ASX Code: RAI QUARTERLY ACTIVITIES REPORT 30 JUNE 2012 HIGHLIGHTS Legal challenge successfully defended Acquisition of a strategic
More informationASX Release. 30 April Activities Report Period Ending 31 March Highlights. Operational
ASX Release 30 April 2012 Activities Report Period Ending 31 March 2012 Highlights Operational Chorbane Permit, onshore Tunisia Sidi Dhaher1 discovery A rig contract with Dietswell SA, for the provision
More informationFor personal use only
ASX ANNOUNCEMENT 29 April 2013 Perpetual Resources Limited Quarterly Cash Flow and Activity Statement For Quarter Ended March 2013. Perpetual Resources Limited ( Perpetual ) during the was admitted to
More informationFor personal use only
31 October 2017 ABN 96 009 217 154 ASX Limited Electronic lodgement Summary September 2017 Quarterly Activity Report Successful private placement to sophisticated investors in Australia raised $752,378
More informationJune 2016 Quarterly Report
29 July 2016 June 2016 Quarterly Report GUNUNG ROSA HIGH GRADE GOLD, SILVER AND BASE METAL PROJECT WEST JAVA PROVINCE, INDONESIA Map 1: The Gunung Rosa IUP is located in Indonesia s West Java Province,
More informationQuarterly Report for the quarter ending 31 December 2017
Quarterly Report for the quarter ending 31 December 2017 1. Operations Texas Fairway Project Howard & Glasscock Counties (Target 35% 60% WI) Divestment Program Target and its partners are assessing options
More informationFor personal use only
ABN 90 118 710 508 Ground Floor 1 Havelock Street West Perth WA 6000 t: +61 8 9488 5220 f: +61 8 324 2400 www.citation.net.au info@citation.net.au 30 October 2015 ASX Announcement September 2015 Quarterly
More informationQUEST PETROLEUM NL AND ITS CONTROLLED ENTITIES ABN
HALF YEAR FINANCIAL REPORT FOR THE PERIOD ENDED 31 DECEMBER 2010 CORPORATE DIRECTORY Directors Brett Mitchell Executive Director James Malone Non Executive Chairman Mark Freeman Non Executive Director
More informationKAROON GAS AUSTRALIA LTD ABN QUARTERLY REPORT FOR THE QUARTER ENDED 31 MARCH 2011 AND APPENDIX 5B
KAROON GAS AUSTRALIA LTD ABN 53 107 001 338 QUARTERLY REPORT FOR THE QUARTER ENDED 31 MARCH 2011 AND APPENDIX 5B Review of Operations Highlights: Interpretation of 2,828 square kilometres of 3D seismic
More informationFor personal use only
Formerly OGI Group Ltd QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDING 31 DECEMBER 2014 HIGHLIGHTS The Board of Directors of Mustang Resources Ltd (ASX:OGI) ( Mustang or the Company ) is pleased to provide
More informationFor personal use only
30 July 2012 Companies Announcements Office Australian Stock Exchange Limited Dear Sir/Madam, We enclose the Mining Exploration Entity Report for World Oil Resources Limited (ASX:WLR) for the ended 30
More informationASX & Media Release TRIANGLE ENERGY (GLOBAL) LIMITED
ASX CODE: TEG ASX & Media Release TRIANGLE ENERGY (GLOBAL) LIMITED Quarterly Activities Report and Appendix 5B For the 3 months ended 30 September 2010 Triangle Energy (Global) Limited ABN 52 110 411 428
More informationQUARTERLY REPORT for the period ended 30 June 2018
0 FINANCIAL HIGHLIGHTS QUARTERLY REPORT for the period ended 30 June 2018 - Average net production for the quarter ended 30 June 2018 was 528 barrels of oil equivalent per day, up 20% from the quarter
More informationFor personal use only
29 January 2016 December 2015 Quarterly Report HIGHLIGHTS Canning Basin Victory1 well and Senagi1 well completed in Fitzroy Blocks Canning Basin new prospective resource estimation for Basin Centred Gas
More informationFor personal use only
ASX: WEL QUARTERLY REPORT For the period ended 31 December 2018 Winchester Energy field production & operations area, Permian Basin, Nolan County, West Texas Page 1 HIGHLIGHTS Total revenue was US$227,347.
More informationASX ANNOUNCEMENT. Operations Report March Quarter 2012
Suite 2, 16 Ord Street WEST PERTH WA 6005 T: +61 8 9429 2900 F: +61 8 94861011 www.padangresources.com.au ASX ANNOUNCEMENT The directors of Padang Resources Ltd ( Padang, PXR or the Company ) have pleasure
More informationFor personal use only
Information Technology Solutions GOLDEN GATE PETROLEUM LTD Quarterly Activities Report For the three months ended 31 December 2012 COMPANY INFORMATION Golden Gate Petroleum Ltd ABN 34 090 074 785 COMPANY
More informationFor personal use only QUARTERLY REPORT & APPENDIX 5B IПB DECEMBER 2014 IPB PETROLEUM LTD (ABN )
QUARTERLY REPORT & APPENDIX 5B IПB IPB PETROLEUM LTD (ABN 52 137 387 350) DECEMBER 2014 Date: 30 January 2015 IΠB IPB Petroleum 30 January 2015 (ASX CODE: IPB) DECEMBER 2014 QUARTERLY REPORT SUMMARY OF
More informationFor personal use only
Quarterly Report & Appendix 5B Exalt Resources Ltd 31 December 2014 Exploration General The Company has continued to explore opportunities for the quarter ended 31 December 2014. In particular, the Company
More informationAppendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5 Mining exploration entity and oil and gas exploration entity ly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16 Name
More informationAppendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter ) June 2012
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity CENTAURUS METALS LIMITED ABN Quarter ended ( current ) 40 009 468 099 30 June 2012 Consolidated
More informationQUARTERLY REPORT & APPENDIX 5B
ASX: TEG 30 April 2014 ASX Release QUARTERLY REPORT & APPENDIX 5B Triangle Energy (Global) Limited ( Triangle or the Company ) is pleased to present its quarterly report for the period ended 31 March 2014.
More informationQUARTERLY ACTIVITIVES REPORT
ASX ANNOUNCEMENT ABN 13 086 972 429 26 April 2018 QUARTERLY ACTIVITIVES REPORT FOR THE THREE MONTHS ENDING 31 MARCH 2018 Nickelore Limited (ASX: NIO) (Nickelore or the Company) is pleased to present this
More informationRE: QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER
Activities Report Quarter Ended 30 September 2010 21 October 2010 Company Announcements Office ASX Limited RE: QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2010 As part of its expansion
More informationQUARTERLY ACTIVITIES REPORT TO 30 SEPTEMBER 2009 HIGHLIGHTS
45 Ventnor Avenue, West Perth WA 6005 PO Box 829, West Perth WA 6872 (08) 9389 4450 Fax: (08) 9389 4400 0418 928 180 wayne@eagleeyemetals.com ABN 11 113 931 105 30 October 2009 The Company Announcements
More informationJUNE 2014 QUARTERLY REPORT AND APPENDIX 5B
JUNE 2014 QUARTERLY REPORT AND APPENDIX 5B Corporate Activity Highlights Up to US$800 million sale of Karoon s 40% interest in WA315P and WA398P to Origin. In addition, Origin is responsible for all costs
More informationFor personal use only
3D Oil Limited 3D Oil Limited Level 5, 164 Flinders Lane Melbourne VIC 3000 Tel: +61 3 9650 9866 Fax: +61 3 9639 1960 www.3doil.com.au QUARTERLY ACTIVITIES REPORT FOR THE THREE MONTHS ENDED 30 JUNE 2013
More informationAppendix 5B. Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5 Mining exploration entity and oil and gas exploration entity quarterly report Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
More informationAppendix 5B. Mining exploration entity quarterly report GINDALBIE METALS LTD. Quarter ended ( current quarter ) SEPTEMBER 2007
Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity GINDALBIE METALS LTD ABN Quarter ended ( current ) 24 060 857 614 30 SEPTEMBER 2007 Consolidated statement
More informationFor personal use only
29 January 2016 December 2015 Quarterly Report GUNUNG ROSA HIGH GRADE GOLD, SILVER AND BASE METAL PROJECT WEST JAVA PROVINCE, INDONESIA Map 1: The Gunung Rosa IUP is located in Indonesia s West Java Province,
More informationAppendix 5B. Mining exploration entity quarterly report. Quarter ended ( current quarter )
Appendix 5B Rule 5.3 Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10. Name of entity Magnis Resources Limited ABN Quarter ended ( current ) 26 115 111 763 31 March 2016
More informationAppendix 5B. Quarter ended ( current quarter ) March 2013
Appendix 5B Rule 5.3 Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10 Name of entity StrataX Energy Limited ARBN Quarter ended ( current ) 160 885 343 31 March
More informationQuarterly Report for the Period Ended 30 September 2018
Quarterly Report for the Period Ended 30 September 2018 Summary Byron s share of oil and gas production (net sales volume) for the September 2018 quarter was 131,867 barrels of oil and 160,648 mmbtu of