BTS Group Holdings PCL

Size: px
Start display at page:

Download "BTS Group Holdings PCL"

Transcription

1 General Presentation NOVEMBER 2017

2 IR Contact Address: IR Department 15 th Floor, TST Tower, 21 Soi Choei Phuang, Viphavadi-Rangsit Rd. Chomphon, Chatuchak, Bangkok, Thailand Telephone: +66(0) Fax: +66(0) Website: Disclaimer This document has been prepared and distributed by the Investor Relations Department of ( BTSG ) solely for information purposes. It does not represent or constitute an offer, invitation, recommendation or solicitation to trade shares in BTSG and should not be relied on as such. Some of the information in this document has not been independently verified, and also includes information made available from public sources and other third party opinion or analyst. BTSG does not monitor or control the content of third party opinion or statements and does not endorse or accept any responsibility for the content or the use of any such opinion or statements. Thus, BTSG assumes no responsibility and makes no representations with respect to the accuracy and/or completeness of the information described herein. None of BTSG or any of its agents, or all of their respective affiliates, or representatives shall have any liability (in negligence or otherwise) for any loss howsoever arising from any use of this document or its contents or otherwise arising in connection with this document. All information contained in this document is presented as of the date indicated within, and BTSG assumes no duty to confirm, revise or update the information. Certain statements in this document may be deemed to contain forward-looking statements, including the statements included or incorporated with the words "believe", "anticipate", "estimate", "target", or "hope", or that otherwise relate to objectives, strategies, plans, intentions, beliefs or expectations or that have been constructed as statements as to future performance or events. These forward-looking statements are not guarantees of future performance and involve risks and uncertainties that could cause actual results to differ materially from historical results or those anticipated at the time the forward-looking statements are made. Thus, BTSG assumes no responsibility and makes no representations with respect to the accuracy and/or completeness of the forward-looking statements. BTSG undertakes no obligation to publicly update or revise any forwardlooking statements, whether as a result of new information, future events or otherwise. 2

3 Contents Section 1 Section 2 Section 2.1 Section 2.2 Section 2.3 Section 2.4 Section 3 Appendices BTS Group in Brief Business Segment Profiles Mass Transit Business Media Business Property Business Services Business Financial Summary Appendix 1: Core Network Ridership Appendix 2: Core Network Fare Adjustment Appendix 3: Core Network Rolling Stocks Appendix 4: Mass Transit Economic profile Appendix 5: BTSC Debenture and Syndicated Loan for the Pink and Yellow Lines Appendix 6: VGI Products Appendix 7: Residential Property Business Appendix 8: Commercial Property Business Appendix 9: BTS-W3 Term Sheet Appendix 10: 2Q 2017/18 Performance 3

4 BTS Group History 1968 Company established as Tanayong Co., Ltd. (TYONG) to operate in property development field 1992 TYONG established a wholly-owned subsidiary, Bangkok Transit System Corporation Ltd. (BTSC), which won the SkyTrain concession bid 2008 BTSC exit court supervised rehabilitation procedure 2010 TYONG acquired 94.6% of BTSC, returning Mass Transit operations to be the primary business of the Company. The Company also changed its name to BTS Group Holdings PCL (BTSG) APR 2013 BTSC sold the future Net Fare-box Revenue under its Concession Agreement to BTS Rail Mass Transit Infrastructure Fund (BTSGIF) MAR 2017 BTSC finalised the operating & maintenance (O&M) contract with KT; a wholly owned subsidiary of the BMA. The contract covers 30.8km of Green Line Northern and Southern extensions (Mo Chit Saphan Mai Khu Khot and Bearing Samut Prakarn) TYONG listed on the Stock Exchange of Thailand under Property Development sector 1991 Commercial operation of the BTS SkyTrain commenced 1999 BTSC expanded into Media business through the acquisition of 100% of VGI Global Media Co., Ltd. (VGI) 2009 BTSC signed a 30-year operating & maintenance (O&M) contract covering Green Line extensions (Saphan Taksin - Wongwian Yai - Bang Wa and Onnut - Bearing) under the purview of the Bangkok Metropolitan Administration (BMA) MAY 2012 VGI Global Media PCL, the Group s Media subsidiary, listed on the Stock Exchange of Thailand OCT 2012 Concession Contracts of the Pink (Khae Rai to Min Buri) and the Yellow Line (Lad Prao to Sam Rong), a total length of 64.9km were awarded JUN 2017 Section 1: BTS Group in Brief 4

5 Business Organisation and Shareholding Structure as of 31 August Information based on book closure date on 4 Aug 17 with total issued shares = 11,940.4mn shares 2 BTSG holds 71.6% of VGI indirectly and directly 3 Revenue from the Company recorded under Services BU 41% Kanjanapas Family 1 32% Institutional Investors 1 27% Individual Investors 1 MASS TRANSIT BUSINESS 97.46% Bangkok Mass Transit System PCL (BTSC) 51% MEDIA BUSINESS 20.57% VGI Global Media PCL (VGI) 2 PROPERTY BUSINESS 35.64% 100% U City PCL Unicorn Enterprise Co., Ltd. 100% 100% SERVICES BUSINESS Tanayong International Ltd. Tanayong Hong Kong Ltd % BTS Rail Mass Transit Growth Infrastructure Fund (BTSGIF) 75% Northern Bangkok Monorail Co., Ltd. 75% Eastern Bangkok Monorail Co., Ltd. LEGEND Listed entities Subsidiaries Associates JVs VGI Advertising Media Co., Ltd. 888 Media Co., Ltd. Point of View (POV) Media Group Co., Ltd. VGI Global Media (Malaysia) Sdn Bhd Demo Power (Thailand) Co., Ltd. Master Ad PCL Aero Media Group Co., Ltd. The ICON VGI Co., Ltd. 100% 100% 100% 100% 40% 30.69% 4.73% 30% 25% Ratburana Property Co., Ltd. Kingkaew Assets Co., Ltd. The Community One Co., Ltd. The Community Two Co., Ltd. Nine Square Property Co., Ltd. PrannaKiri Assets Co., Ltd. Thana City Golf & Sports Club Co., Ltd. Yongsu Co., Ltd. Mak8 Co., Ltd. 100% 100% 100% 100% 100% 100% 100% 100% 100% HHT Construction 51% Co., Ltd. 3 BTS Sansiri Holding 50% Seventeen Limited BTS Sansiri Holding 50% Sixteen Limited Keystone Estate 50% Co., Ltd. Keystone Management 50% Co., Ltd. Siam Paging and Communication Co., Ltd. DNAL Co., Ltd. Muangthong Assets Co., Ltd. BTS Land Co., Ltd. Tanayong Food and Beverage Co., Ltd. Tanayong Property Management Co., Ltd. Bayswater Co., Ltd. Nuvo Line Agency Co., Ltd. BTS Sansiri Holding Eighteen Limited BTS Sansiri Holding Nineteen Limited BTS Sansiri Holding Twenty Three Limited BTS Sansiri Holding Twenty One Limited BTS Sansiri Holding Twenty Two Limited BTS Sansiri Holding Fifteen Limited 100% 100% 100% 100% 100% 100% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 75.47% 50% 50% 50% 50% 50% 50% 50% 50% BTS Sansiri Holding One Limited BTS Sansiri Holding Two Limited BTS Sansiri Holding Three Limited BTS Sansiri Holding Four Limited Absolute Hotel Services Co., Ltd. 3 Absolute Hotel Services Hong Kong Ltd. 3 BTS Sansiri Holding Five Limited BTS Sansiri Holding Six Limited BTS Sansiri Holding Seven Limited BTS Sansiri Holding Eight Limited BTS Sansiri Holding Nine Limited BTS Sansiri Holding Eleven Limited BTS Sansiri Holding Twelve Limited BTS Sansiri Holding Fourteen Limited 12.26% 100% Man Food Products Co., Ltd. 100% RB Services Co., Ltd. 41% 100% 100% 51% 90% 90% 100% 60% 80% 50% 25% Rabbit Rewards Co., Ltd. Bangkok Payment Solutions Co., Ltd. Man Food Holdings Co., Ltd. Primary Kitchen Co., Ltd. Man Kitchen Co., Ltd. 69% Little Corner Co., Ltd. KMJ Co., Ltd. BSS Holdings Co., Ltd. RabbitPay System Co., Ltd. Rabbit-Line Pay Co., Ltd. 51% ATS Rabbit Special Purpose Vehicle Co., Ltd. 51% ASK Direct Group 49% Co., Ltd. 51% Rabbit Insurance Broker Co., Ltd. 49% Rabbit Internet Co., Ltd. Bangkok Smartcard System Co., Ltd. Section 1: BTS Group in Brief 5

6 BTS Group Overview 4 Business Units with Mass Transit as our Core MASS TRANSIT 2,077 2,274 2,574 Media Revenue (THB mn) 3,121 2,926 2,318 2, , FY 13/14 FY 14/15 FY 15/16 FY 16/17 * FY 2016/17:- Residential Property revenue:- THB 39mn, Commercial Property revenue : THB 578mn 4,237 FY 13/14 FY 14/15 FY 15/16 FY 16/17 *FY 2016/17:- Services revenue from provision of E&M works & train: THB 1,444mn, O&M Revenue: THB 1,661mn, Share in BTSGIF: THB 945mn, interest income from E&M and train procurement: THB 187mn MEDIA *FY 2016/17:- OOH Media revenue: THB 2,640mn, Digital Services business: THB 370mn PROPERTY SERVICES Historical operating revenues (1) Mass Transit Revenue (THB mn) 3,010 FY 13/14 FY 14/15 FY 15/16 FY 16/17 Property Revenue (THB mn) Services Revenue (2) (THB mn) 743 FY 13/14 FY 14/15 FY 15/16 FY 16/17 * FY 2016/17:- ChefMan revenue:- THB 406mn, HHT revenue : THB 213mn, BPS and Rabbit Rewards: THB 124mn Section 1: BTS Group in Brief FY 16/17 Operating EBITDA margin 50% 47% 1% -13% FY 16/17 Operating Revenue contribution 49% THB 35% 8,606mn 9% 7% FY 16/17 Operating EBITDA Contribution 62% Mass Transit Property THB 2,928mn Mass Transit Property Media Services 0% -3% 41% Media Services (1) FY ended 31 March (2) Services revenue excludes revenue of HHT Construction (Thailand) Co., Ltd. as it is consolidated as cost of project under Property business 6

7 Business Synergy and Investment Features Benefit from Rail Mass Transit Network Expansion MASS TRANSIT 66% ridership market share in Bangkok The sole concessionaire and operator of the BTS SkyTrain Core Network (Green lines), its extensions and the Bus Rapid Transit (BRT) system. BTSG is the controlling partner in the consortium that was awarded the Pink and Yellow monorail line concessions. Currently operating 38.1km (35 stations), by acquiring 4 additional lines totaling 95.7km since 1H 2017, increasing length by 3.6x compared to last year MEDIA 42% market share by media revenue 66% ridership market share in bangkok 1 VGI is the largest media company in Thailand. VGI is a multi-faceted media services company that is pioneering data-driven, targeted advertising in Thailand. VGI Enjoys uniquely exclusive long-term contracts to manage advertising space on the BTS SkyTrain Network as well as future lines secured by BTSG. PROPERTY 2 nd largest Hotel Company in Thailand operating globally Developing or acquiring residential and commercial properties predominantly in close proximity to - or directly connected with - future or existing mass transit lines to benefit from the mass transit premium through various partnerships BTSG is Thailand s 2nd largest hotel group that directly and indirectly owns, operates or manages over 15,000 keys globally * *as measured by keys under ownership, lease and management (both operating and under contract) RAIL LENGTH TARGET 4.6x 175.3KM MASS TRANSIT REV.* 9.0x THB 23.4BN 4-5 times expected increase in BTS media capacity by 2021/22 Real estate development along mass transit worth 36.3KM FY 16/17 FY 21/22E THB 2.6BN FY 16/17 FY 21/22E >15mn rabbit card holders and synergy with data from Rabbit Group THB 100bn in 5 years * excludes services revenue from provision of E&M and train and interest income from E&M and train procurement Section 1: BTS Group in Brief 7

8 Strategy and 5-Year Growth Targets Earnings Expected to Grow by 24% CAGR As a mass transit led conglomerate, the company s key focus is on securing new mass transit lines which are authorised or set by the government at both municipal and national levels. After securing additional lines, we capture further value from opportunities which cascade down to our other independently operating business units in Media, Property and Services. We actively pursue capital market opportunities that allow us to unlock further uplift from our assets or to allow us to recycle capital to finance future expansion sustainably. BU Mass transit Media Property STRATEGY 5-YEAR GROWTH DRIVERS Organic growth: 4-5% CAGR ridership growth, inflationary fare increase on Core Network (23.5km): pre-agreed O&M fee increase to Green Line extensions (12.8km) New contracts: 95.7km (Pink, Yellow, Dark Green North & South extensions) already secured taking total to 132km Target contracts for an additional 82.9km (Gold, Green West, Orange, LRT and Grey) Transit: 4-5X increase in mass transit inventory Office: new property projects under BTS, 50 new office buildings planned or under construction in Bangkok Outdoor: billboard digitalisation, M&A Aviation: 5.8% expected CAGR passenger growth in Thailand and expand to overseas Activation: cross-selling on VGI s existing network, increasing audience reach by 14X Digital Services: expand online and offline network and enriching our data depth Residential: THB 81bn in GDV of future condominium projects Commercial: additional 6,800 keys, THB 27.5bn in Gross Development Value (GDV) of future commercial property projects Land Bank: 2.3mn sqm (227 Hectares) with book value of THB 12.6bn to facilitate up to 10 years of future development MEDIA 29% MASS TRANSIT 68% 5-YEAR OPERATING REVENUE OUTLOOK CAGR 26% 5-YEAR OPERATING EBITDA OUTLOOK THB 2.5BN CAGR 39% FY 16/17 FY 21/22E CAGR 24% FY 16/17 FY 21/22E PROPERTY SERVICES 5-YEAR NET PROFIT (AFTER MI) OUTLOOK THB 2.0BN THB 26.3BN FY 21/22E THB 13.1BN THB 6.0BN 1% 2% Section 1: BTS Group in Brief 8

9 BTSG at a Glance PROGRESSIVE DIVIDEND POLICY Completed Minimum THB 21bn committed dividends over 3 years: No less than THB 6bn in FY 13/14 No less than THB 7bn in FY 14/15 No less than THB 8bn in FY 15/16 Current Policy: Not less than 50% of net profit (stand alone basis) HISTORICAL DIVIDEND PAYMENTS / DIVIDEND YIELD Actual dividend paid (THB mn) Dividend yield* (%) 8, % 7,073 7, % 4, % 4,716 FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 Section 1: BTS Group in Brief Committed dividend period 6.2% 7.8% * Calculated based on share price one day before the Board of Directors approval date for relevant dividend payment KEY FIGURES (as of 31 Mar 2017) EMPLOYEES (as of 31 Mar 2017) THB (mn) Mass Transit 2,160 51% Media % Property % Services % BTS Group Holdings 139 3% Total 4, % USD (mn)** Accounting revenue 9, Operating revenue 8, Operating EBITDA 2, Net income*** 2, Total assets 93,651 2,754 Excess cash and liquid investments 35,107 1,032 Cash 15, Current investments 6, Long-term investments 13, Restricted deposits Free cash flow (5,715) (168) **Source: Bank of Thailand; based on Interbank Exchange Rate of USD 1 = THB as of 7 June 2017 ***to equity holders of the parent 9

10 BTS Group Share Information SHARE INFORMATION (as of 31 Mar 2017) Stock code Outstanding shares (mn shares) 11,935.0 Treasury shares (mn shares) 95.8 Market capitalisation (THB mn) 100,850.4 Market capitalisation (USD mn) 2,935.7 Average daily traded value (THB mn) Average daily traded value (USD mn) 4.4 * As of 31 March 2017 SHARE PRICE MOVEMENT (as of 31 Mar 2017) THB BTS Turnover (RHS) BTS TB SET Index (rebased) THB mn Name % 1,200 1 MR. KEEREE KANJANAPAS S GROUP 40.9% 12M ADTV = THB 245mn BTS 1, SHARE STRUCTURE (as of 27 Feb 2017) Free float 57.4% Foreign limit 49.0% Foreign holdings (incl. NVDR) 23.0% 41.3% 0.8% 28.3% 29.6% BTS Group Kanjanapas Institutional treasury Others family investors shares TOP 10 SHAREHOLDERS (as of 27 Feb 2017) 2 THAI NVDR CO., LTD. 7.4% 3 BANGKOK BANK PUBLIC COMPANY LIMITED 4.6% 4 UOB KAY HIAN PRIVATE LIMITED 1.4% 5 HSBC (SINGAPORE) NOMINEES PTE LTD 1.3% 6 CHASE NOMINEES LIMITED 1.1% 7 STATE STREET BANK EUROPE LIMITED 0.9% 8 GIC PRIVATE LIMITED 0.7% 9 K EQUITY 70:30 LTF 0.6% 10 SOCIAL SECURITY OFFICE 0.5% TOTAL TOP 10 SHAREHOLDERS 59.4% Section 1: BTS Group in Brief 10

11 Contents Section 1 Section 2 Section 2.1 Section 2.2 Section 2.3 Section 2.4 Section 3 Appendices BTS Group in Brief Business Segment Profiles Mass Transit Business Media Business Property Business Services Business Financial Summary Appendix 1: Core Network Ridership Appendix 2: Core Network Fare Adjustment Appendix 3: Core Network Rolling Stocks Appendix 4: Mass Transit Economic profile Appendix 5: BTSC Debenture and Syndicated Loan for the Pink and Yellow Lines Appendix 6: VGI Products Appendix 7: Residential Property Business Appendix 8: Commercial Property Business Appendix 9: BTS-W3 Term Sheet Appendix 10: 2Q 2017/18 Performance 11

12 Bangkok Rail Mass Transit Network At 109.6km Bangkok s Network is Immature MASTER PLAN: 515.2KM IN 2029, 24% MARKET SHARE IN 2037 *Includes MRTA and BMA projects Sources: Office of Transport and Traffic Policy and Planning, Bangkok Metropolitan Administration OPERATING LINES: 109.6KM 109.6km 77 stations by 3 operators BTS: 38.1km (SkyTrain Green Line) BEM: 43.0km (Blue & Purple) RAIL MASS TRANSIT MARKET SHARE Seoul 51% Hong Kong 46% Singapore 40% Tokyo 36% Guangzhou 17% Bangkok 6% Source: OTP, Singapore s Land Transport Authority, Hong Kong s Transport Department, MTR Corporation Limited, SMRT Corporation Limited, Japan Statistic Bureau RAIL TRACK LENGTH PERVASION (per million population) Hong Kong 35.0 Singapore 35.6 Tokyo 42.0 Bangkok 10.2 Source: United Nations Statistics Division, BTSC, BMCL, MTR Corporation Limited, SMRT Corporation Limited, official websites of rail mass transit system in major cities DAILY RIDERSHIP MARKET SHARE IN 2016 BTS 652,156 66% BEM 273,637 28% SRT: 28.5km (Airport Rail Link) Total average Daily Ridership of 987,293 ARL 61,500 6% Section 2.1: Mass Transit Business 12

13 RECENTLY SECURED LINES 95.7KM OPERATING LINES 36.3KM BTS Lines Expanding 3.5x from 36.3km in 2016 to 132km BTS NETWORK: 132KM (112 STATIONS) EXT. ZONE 2 MO CHIT - KHU KHOT 18.2KM PINK KHAE RAI MIN BURI 34.5KM CORE NETWORK MOCHIT TO ONNUT AND NATIONAL STADIUM TO SAPHAN TAKSIN 23.5KM & 23 STATIONS CONCESSION CONTRACT ( ) 13YR O&M CONTRACT ( ) YELLOW ZONE 1: GREEN LINE EXTENSIONS CORE NETWORK MO CHIT ON NUT 17.0KM NATIONAL STADIUM SAPHAN TAKSIN 6.3KM LAD PRAO SAM RONG 30.4KM ONNUT TO BEARING AND SAPHAN TAKSIN TO BANG WA 12.8KM & 11 STATIONS 30YR O&M CONTRACT ( ) ZONE 2: NEW GREEN LINE EXTENSIONS EXT. ZONE 1 SAPHAN TAKSIN BANG WA 7.5KM EXT. ZONE 1 ONNUT BEARING 5.3KM EXT. ZONE 2 BEARING SAMUT PRAKARN 12.6KM BEARING TO SAMUTPRAKARN AND MOCHIT TO KHU KHOT 30.8KM & 25 STATIONS 26YR O&M CONTRACT ( ) PINK AND YELLOW LINES KHAE RAI TO MIN BURI AND LAD PRAO TO SAM RONG 64.9KM & 53 STATIONS 30YR PPP NET COST CONTRACT *The first station (E15, Samrong, 1.8km) of the Southern Green Line Extension from Bearing to Samutprakan began operation on 3 Apr 17. Full operation of the Southern part is targeted in Section 2.1: Mass Transit Business 13

14 00/01 01/02 02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30 30/31 31/32 32/33 33/34 34/35 35/36 36/37 37/38 38/39 39/40 40/41 41/42 42/ BTS Operating Lines 23.5km Core Network and 12.8km Green Line Existing Extension CORE NETWORK: 23.5KM ZONE 1: 12.8KM EXTENSIONS 23 stations, 23.5km located at CBD of Bangkok Inaugural Mass Transit route, operated since Dec 1999 No revenue sharing to BMA Under 30 years concession contract (net cost model) from In Apr 2013, BTSC sold the rights to net farebox revenue under its concession agreement for the BTS Skytrain Core Network until Dec 2029 to BTSGIF BTS GROUP used the proceeds to invest 1/3 units in BTSGIF (10 years lock-up) CORE NETWORK MO CHIT ON NUT 17.0KM NATIONAL STADIUM SAPHAN TAKSIN 6.3KM EXT. ZONE 1 SAPHAN TAKSIN BANG WA 7.5KM ONNUT BEARING 5.3KM RESILIENCE RIDERSHIP SINCE INCEPTION (CAGR: 9.1%) 59 16yr Farebox Revenue CAGR: 10.1% 16yr Ridership CAGR: 9.1% 79 Farebox revenue (THB bn) Ridership (mn) DISTANCE-BASED FARE (AVG = THB 28/TRIP) AUTHORISED FARE (APR 13) NEW EFFECTIVE FARE (OCT 17) PREVIOUS EFFECTIVE FARE (JUN 13) POTENTIAL FARE UPSIDE NO. OF STATIONS BTSC has operated & maintained the extensions since 2009 Pre agreed fee income with no ridership risk 30-Year O&M Contract signed in May 2012: 1. Current extensions (zone 1) of 11 stations, 12.8km 2. Core Network of 23 stations, 23.5km post concession expiry (Dec 2029 May 2042) Core Line Zone 1 Zone 1: CAGR (FY16/17-FY41/42) = 3.9% Core Line: CAGR (FY30/31-FY41/42) = 3.1% (unit: THB bn) PPP NET COST CONTRACT O&M CONTRACT Section 2.1: Mass Transit Business 14

15 PROJECT CAPEX AND FINANCING EXPECTED RIDERSHIP AND REVENUE PROJECT DETAILS BTS Recently-Secured Lines 30.8km New Extension and 64.9km Pink & Yellow Monorail Lines ZONE 2: 30.8KM NEW EXTENSIONS EXT. ZONE 2 EXT. ZONE 2 BTSC has the operated & maintained of the additional 30.8km of Green Line extensions on 31 Mar 17 Pre agreed fee income with no ridership risk 26-year O&M contract covers 30.8km of Northern and Southern Green Line Extensions (Apr 17 May 42) SOUTHERN: Bearing Samut Prakarn* (12.6km/ 9 stations) NORTHERN: Mo Chit Saphan Mai Khu Khot (18.2km/ 16 stations) *The first station (E15, Samrong) of Southern Green Line extension began operation on 3 Apr 17 O&M CONTRACT MO CHIT - KHU KHOT 18.2KM BEARING SAMUT PRAKARN* 12.6KM PINK AND YELLOW LINE MONORAIL: 64.9KM OWNERSHIP STRUCTURE BTS NORTHERN BANGKOK MONORAIL COMPANY LIMITED PINK LINE PROJECT (INCLUDE EXTENSIONS) YELLOW YELLOW LAD PRAO SAM RONG 30.4KM PINK KHAE RAI MIN BURI 34.5KM STEC 15% 75% RATCH 10% EASTERN BANGKOK MONORAIL COMPANY LIMITED YELLOW LINE PROJECT (INCLUDE EXTENSIONS) Route PPP NET COST CONTRACT WITH SUBSIDY PINK Kae Rai Min Buri YELLOW Lad Prao Sam Rong Distance / no. of stations 34.5km / km / 23 Required trains 42; 4-car train (168 cars ) 30; 4-car train (120 cars ) Contract length 30yr operation 30yr operation Daily ridership in Y1 (trips) 199k 195k Ridership CAGR (30Y) 5.2% 4.5% Average fare in Y1 (THB / trip) EBITDA margin (%) Commercial revenue 26% at early stages rising to 69% at Y30 10% of farebox revenue Total Project Cost (THB) 49.4bn 46.7bn 34% at early stages rising to 64% at Y30 15% of farebox revenue Civil Subsidy Amount (THB) 22.5bn 25.05bn Civil Subsidy Term Equal payment at 2.25bn per year for 10 years from beginning of operation Sharing to MRTA (THB) 250mn 250mn Expected CAPEX (THB) 34.5bn 32.6bn Funding (D/E) 2.2x 2.2x Equal payment at 2.505bn per year for 10 years from beginning of operation Section 2.1: Mass Transit Business 15

16 BTS Targeted Lines Interested in an additional 82.9km WESTERN ORANGE LINE TALING CHAN - THAILAND CULTURAL CENTER 17.0km EASTERN ORANGE LINE THAILAND CULTURAL CENTER - MIN BURI 22.6km 82.9KM FUTURE LINES IN THE NEXT 5 YEARS BTS TARGET ROUTE AUTHORITY DISTANCE (KM) NO. OF STATION EXPECTED OPERATING GOLD (1) KRUNG THON BURI KLONG SAN BMA GREEN EXT. (WESTERN) BANG WA - TALING CHAN BMA LRT BANG NA - SUVARNABHUMI BMA GREY (1) WATCHARAPHON THONG LO BMA ORANGE (E) ORANGE (W) THAILAND CULTURAL CENTER - MIN BURI TALING CHAN - THAILAND CULTURAL CENTER MRTA MRTA WESTERN GREEN LINE EXT. BANG WA - BOROMMARATCHACHONNANI 7.0km GOLD LINE GREY LINE WATCHARAPHON THONG LO (PHASE 1) 16.3km KRUNG THON BURI KLONG SAN (PHASE 1) 1.7km LRT BANG NA SUVARNABHUMI 18.3Km OTHER ROUTE AUTHORITY DISTANCE NO. OF EXPECTED (KM) STATION OPERATING HUA LAMPHONG BLUE MRTA BANG KHAE BLUE BANG SUE - THA PRA MRTA BLUE BANG KHAE BHUDHAMONTHON 4 MRTA DARK RED BANG SUE - RANGSIT SRT DARK RED BANG SUE HUA LUM HONG SRT LIGHT RED PURPLE (SOUTHERN) BANG SUE PHAYATHAI MAKKASAN HUAMAK SRT TAO POON RAT BURANA MRTA TOTAL Under construction (including Extension Zone 2, total of 104.9km under construction) BTS Group Earnings Presentation Section 2.1: Mass Transit Business 16

17 82.9KM BTS TARGETED LINES 95.7KM AWARDED LINES Timeline of BTS Upcoming Lines and CAPEX Significant Upcoming Revenue Expected in the Next 5 years SOUTHERN GREEN LINE EXTENSION: 12.6KM NORTHERN GREEN LINE EXTENSION: 18.2KM EXPECTED CAPEX (THB BN) E&M TRAINS WORKS EXPECTED TIMELINE FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY ended 31 March FY 23/24 DEC /42 DEC /42 EXPECTED REVENUE (THB BN P.A.) FAREBOX O&M REVENUE REVENUE (Y1) PINK LINE: 34.5KM YELLOW LINE: 30.4KM CIVIL + TRAINS + E&M CIVIL + TRAINS + E&M EARLY 18 APR /52 EARLY 18 APR / (Y1) WESTERN GREEN LINE EXTENSION: 7.0KM 2.1 BY 2018 BY 2020 GOLD LINE PHASE 1: 1.7KM 0.4 BY 2017 BY 2019 LRT: 18.3KM BY 2017 BY 2022 GREY LINE PHASE 1: 16.3KM 12.9 TRAINS + E&M BY 2018 BY 2022 ORANGE LINE: 39.6KM TOTAL CAPEX/FINANCING BTS Group Earnings Presentation Section 2.1: Mass Transit Business 33.3 TRAINS + E&M THB 151.4bn with D/E up to 2.5x MID 2017 BY 2018 START CIVIL WORKS CONSTRUCTION CONSTRUCTION PERIOD START FULL OPERATION OPERATION YEAR, UP UNTIL EXPECTED OPEN BID BIDDING & CONSTRUCTION PERIOD BY 2023 NOTE: 1 Under the terms of the contract signed on 28 June 2016 with Krungthep Thanakom (KT) - a wholly owned subsidiary of the BMA (Bangkok Metropolitan Administration). BTSC is pre-financing E&M provision and installation. KT will repay the costs of E&M works in a lump sum amount after four years after contract signing date. 2 Project cost (excluding interest expenses) for the Pink and Yellow based on MRTA submission and BTS owns 75% equity stake in JV Cos. Calculation based on D/E ratio at 2.2x (equity required of THB 21bn). The JV Cos will receive civil work subsidy from the MRTA of THB 22.5bn (for the Pink Line) and THB 25.05bn (for the Yellow Line) for 10 years from beginning of operation. 3 Assume O&M revenue of THB 140mn/km p.a. 17

18 Contents Section 1 Section 2 Section 2.1 Section 2.2 Section 2.3 Section 2.4 Section 3 Appendices BTS Group in Brief Business Segment Profiles Mass Transit Business Media Business Property Business Services Business Financial Summary Appendix 1: Core Network Ridership Appendix 2: Core Network Fare Adjustment Appendix 3: Core Network Rolling Stocks Appendix 4: Mass Transit Economic profile Appendix 5: BTSC Debenture and Syndicated Loan for the Pink and Yellow Lines Appendix 6: VGI Products Appendix 7: Residential Property Business Appendix 8: Commercial Property Business Appendix 9: BTS-W3 Term Sheet Appendix 10: 2Q 2017/18 Performance 18

19 Focusing on the Highest Growth Media Segments OOH and Online 5 YRS HISTORICAL ADVERTISING SPENDING (THB bn) Rising in infrastructure, urbanisation and increasing number of people who spend time outdoor were driven the growth of Thailand OOH Media. 121bn 120bn 114bn 113bn 1% 1% 1% 107bn 1% 4% 4% 6% 5% 8% 2% 9% 9% 8% 5% 19% 18% 11% 24% 23% 16% 60% 2012/ / / / /17 TV Traditional media OOH media Cinema Online Source: The Nielsen (Thailand) Co., Ltd. OOH MARKET SHARE: VGI GROUP VS PEERS VGI controls almost half of the OOH media market share. Thanks to our continuing organic growth and participating in M&A. 6,189 3, % 62% 7,231 Section 2.2: Media Business 68% Shutdown BKK Coup d etat 6,393 6,244 4, % 2, % 2, % 3, % 3, % 3, % 7,834 4,297 3, % 3, / / / / /17 VGI Group Revenue Peers 69% 66% Mourning effect % 45.2% ADVERTISING MARKET 5 YRS CAGR (2011/ /17) The accelerated growth of online and OOH media fueled by migration to mobile devices and increased consumer media exposure as people spend more time out of home. VGI s Focus Online OOH Total industry Cinema Analogue TV Traditional media In-store -14.8% VGI GROUP S FOCUS 1-6.0% -8.3% -4.2% 0.2% 10.1% 27.5% 1 Traditional Media includes Radio, Newspapers, Magazines Our focus has proven to be the fastest growth media sector OOH (Out-of-Home) Thailand s no. 1 transit media with 60% of market share The sole player in office building media with 162 Grade A&B buildings under management Strong nationwide footprint in outdoor media with >2,200 billboards Thailand s no. 2 aviation media with 20% market share Online Thailand s no. 1 activation operator with 70% market share The first mover in Thailand who established the integrated online and offline media platform 19

20 A Well-Diversified Out-of-Home Media Business VGI GROUP 100.0% 33.7% 30.0% 40.0% 90.0% 90.0% COMPANY SEGMENT VGI MACO AERO MEDIA DEMO POWER BSS & BSSH TRANSIT OFFICE OUTDOOR AVIATION ACTIVATION PAYMENT SERVICES GEOGRAPHICAL ACTIVITY BKK, Thailand KL, Malaysia BKK, Thailand Nationwide, Thailand KL, Malaysia Nationwide, Thailand Nationwide, Thailand Nationwide, Thailand Nationwide, Thailand MARKET SHARE & NETWORK 60% market share 31.0km, BKK 51.0km, Malaysia 75% market share 166 office building 242 condominium 30% market share >2,200 billboards 20% market share 13 airports 70% market share >1,000 stores 7.8mn cardholders 2.9mn active holders 33mn LINE users 2.2mn LINE pay users 22mn insurance premium/ month 900mn outstanding loan AUDIENCE REACH PER DAY >770,000, BKK >150,000, KL >500,000 >1,212,000 >333,000 >500,000 >20mn >100,000 KEY GROWTH AREA Additional inventory from BTS s new line extensions Grade B&C and upcountry market To convert 10% of static billboards to digital screens Expand to airports South East Asia Potential expansion in BTS stations and office buildings Expand Rabbit card & Rabbit Line Pay network Expand insurance and micro loan network Rabbit s data 2016/17 REVENUE * THB 2,681mn THB 371mn SEGMENT OOH Media Platform Digital Services Section 2.2: Media Business 20

21 Our Media Capacity will reach THB 7.3bn With Multi-Channel Audience Reach Media capacity of THB 6.8bn (as of July 2017) TRANSIT THB 3.0bn 30 BTS stations 208 carriages >4,000 static displays 2,029 digital screens 8,800 sq.m. merchandising space OFFICE THB 0.6bn 166 office buildings 242 residential buildings 200,000 sq.m. in chamchuri square OUTDOOR THB 1.4bn 1,065 static billboards 256 PTT posters 21 LED screens and 255 LCD screens 636 street furniture panels AVIATION ACTIVATION DIGITAL SERVICES THB 0.5bn THB 1.0bn THB 0.3bn 13 airports (342 LCDs) 2,500 trolleys 57 jetbridges sale agent for 76 aircrafts 3,000 salespeople 360 exclusive stores 275 brand clients 77 provinces nationwide Banner Advertising Direct Targeted Marketing Section 2.2: Media Business 21

22 Digital Services: Synergy between VGI and Rabbit Rabbit Platform s Database OFFLINE PAYMENT: RABBIT CARD The E-money service provider with a common ticketing system supporting BTS and BRT. BSS system also encompass other forms of public transportation as well as retail, service and tourism sectors. Use on BTS SkyTrain & BRT Use in retail stores 8.1mn Rabbit cards in circulation (as of Sep 2017) 133 brand partners >4,400 card readers ONLINE PAYMENT: RABBIT LINE PAY A mobile e-wallet solution embedded in the leading chat messenger application. 2.4mn users >425 online merchants LARGE PARTNERS NETWORK BUILT SERVICES BUSINESS JV with AEON: THB 900mn outstanding loans Micro loan through the joint venture with AEON Rabbit Insurance Broker: THB 22mn gross written premiums Insurance aggregator services on Rabbit Finance website and also a licensed broker for insurance products. Rabbit Daily: 7mn monthly visits Online lifestyle publisher, providing social news and entertainment content and advertorials Co-branded Card: BBL co-branded card & AIS-Rabbit card Issued by financial institutions or corporations that wish to add Rabbit functionality to credit card, debit card, or other card types or devices Section 2.2: Media Business 22

23 COLLECT PROCESS DISTRIBUTE Evolving into a Data Centric Media Hypermarket Offering Targeted Advertising and Proactive Media Sales OFFLINE awareness TRANSIT OFFICE OUTDOOR AVIATION DIGITAL ACTIVATION MONETISING DATA THROUGH OUR MEDIA PLATFORMS AUDIENCE TARGETING AUTOMATED MEDIA PLANNING CROSS CHANNEL TARGETING AD. EFFECTIVENESS RESEARCH DATA ANALYTICS & SEGMENT CREATION Adaptive conversion Payment platform Data type: Demographic, spending, location, travel Data source: BTS station/ BRT Retail merchant Supermarket/ store Rabbit Line Pay Service platform Data type: Demographic, spending, financial Data source: Insurance aggregator website Micro loan offering through the partnership with AEON Online platform Data type: Lifestyle, interest Data source: Online brand partners Published content in ONLINE engagement Section 2.2: Media Business 23

24 Solid Growth Opportunities Upside from BTS rail mass transit expansion and monetisation of Rabbit s data 3.8X EXPECTED INCREASE IN BTS TRAIN CAPACITY 4.9X EXPECTED INCREASE IN BTS STATION CAPACITY 2016/ /22 E 2016/ /22 E CORE + EXTENSION GREEN (SOUTHERN) NONE 60 GREEN (NORTHERN) NONE 84 GREEN EXT. (WESTERN) NONE 32 PINK NONE 132 YELLOW NONE 104 GREY (PHASE I) NONE 72 LRT NONE 64 CORE + EXTENSION GREEN (SOUTHERN) NONE 9 GREEN (NORTHERN) NONE 16 GREEN EXT. (WESTERN) NONE 6 PINK NONE 30 YELLOW NONE 23 GREY (PHASE I) NONE 15 LRT NONE 14 TOTAL X MN TARGETED ADVERTISING VIEWERS New extensions are expected to add more than 1 million passengers daily. Together with our existing networks, the exposure to VGI advertising is expected to increased by 2.9X. 772, , X increased 1,997,000 1,065,000 Ridership from New extensions Ridership from VGI s existing network 616 (secured lines) Unoccupied inventory Occupied inventory TOTAL X 147 FIRST PHASE OF MONETISING RABBIT S DATA AND PLATFORM To create targeted media through Rabbit s data across BTS s existing and future media platform Improved occupancy by monetising rabbit s data and BTS platform 20% 80% 5% 95% 113 (secured lines) Successful case: 11 STREET Station Sponsorship (launched in February 2017) Innovative Rabbit Media has partnered with 11 STREET, which stimulates the 3 key senses touch, sight and sound. Leveraging on the data analysis of travel behavior coupled with strategically selected VGI s media 2015/ / /22 3YRS AVG. 2017/ /21 Section 2.2: Media Business 24

25 Contents Section 1 Section 2 Section 2.1 Section 2.2 Section 2.3 Section 2.4 Section 3 Appendices BTS Group in Brief Business Segment Profiles Mass Transit Business Media Business Property Business Services Business Financial Summary Appendix 1: Core Network Ridership Appendix 2: Core Network Fare Adjustment Appendix 3: Core Network Rolling Stocks Appendix 4: Mass Transit Economic profile Appendix 5: BTSC Debenture and Syndicated Loan for the Pink and Yellow Lines Appendix 6: VGI Products Appendix 7: Residential Property Business Appendix 8: Commercial Property Business Appendix 9: BTS-W3 Term Sheet Appendix 10: 2Q 2017/18 Performance 25

26 Property Market Overview Slowing Down, but Resilient Near Mass Transit Lines BANGKOK CONDO LAUNCHES Units 18,000 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 Millions of Visitors Total 51,150 61% Total 50,105 56% Q 2Q 3Q 4Q Average Take-up Rate (RHS) Source: Colliers International (Thailand) INTERNATIONAL TOURIST ARRIVALS % % Total Tourist Arrivals to Thailand Source: Department of Tourism, Ministry of Sports and Tourism Section 2.3: Property Business Total 34,666 Total 39,046 66% 64% 62% 60% 58% 56% 54% 52% 50% AVG. LAUNCH PRICES AND TAKE-UP RATES BY DISTANCE TO BTS Baht/sq.m 0-200m (CAGR +24.0%) m (CAGR +13.4%) 300, ,000m (CAGR +22.6%) Over 1,000m (CAGR +9.8%) 250, , , ,000 50,000 Source: Colliers International Thailand THB/Night 4,000 3,500 3,000 2,500 2,000 1,500 1, ,975 2,993 3,019 1, % 46% 64% 58% 65% 47% 63% 52% 63% 70% 60% 51% 48% 48% 78% 1, % 2, % 70% 76% BANGKOK HOTEL PERFORMANCE METRICS Source: CBRE Occupancy 3,231 3,152 3,287 3, % 90% 2,404 2,475 2,635 80% 1, % 75.3% 77.5% 70% 60% 61.9% 50% ADR RevPAR Occupancy (RHS) 40% 26

27 Property Portfolio and Business Strategy Substantial Development Potential of Assets for Long-Term Value PROPERTY BOOK VALUE BREAKDOWN LAND: OVER 800,000M² OF POTENTIAL NEAR MASS TRANSIT LINES * Adjusted for equity stake BTS-Sansiri JV THB 13.8bn Keystone JV THB 0.8bn Bayswater JV THB 4.3bn 2% HOTEL PORTFOLIO 37% 11% Under No. of Hotels No. of Keys Ownership BTS Group 55 8,490 Owned % 1% Total Book Value as of 30 Sep 17: THB 37.7bn 32% 12% 5% Residential THB 0.5bn Commercial THB 4.5bn Land Bank THB 1.8bn U City THB 12.0bn * Hotels under AHS Projects and Properties a. The LINE Jatujak Mochit b. The LINE Sukhumvit 71 c. The LINE Ratchathewi d. The LINE Asoke-Ratchada e. The BASE Garden Rama 9 f. The LINE Pradipat g. The LINE Sukhumvit 101 h. KHUN BY YOO i. The BASE Petkasem 29 j. The Grand k. The Royal Place II l. TST Tower Office Building m. U Sathorn Hotel n. Thana City Golf & Sports Club o. Park Ramindra Condo p. Eastin Grand Sathorn Hotel Land Bank BTS Group Land Bank Bayswater JV Land Bank U City Land Bank Charansanitwong 21.9 rai (3.5 ha) Projects and Properties Residential Projects & Properties (a - k) i Bayswater JV 48.8 rai (7.8 ha) Commercial Properties (l - n) U City Residential Projects (o) f l a c j k p m d Ku Kot 56.5 rai (9.4 ha) h o b g e n Thana City & Keystone JV rai (57.1 ha) Leased % Keystone JV Land Bank U City Commercial Properties (p) Managed 52 8,313 50%* U City 39 7,381 Owned 21 3,545 36% Leased 6 1,258 36% Managed 12 2,578 36% Grand Total 94 15,871 Section 2.3: Property Business ATTRACTIVE LAND BANK FOR LONG-TERM DEVELOPMENT Owners Total Area (Rai) Total Area (sq.m) BTS Group Plc 1, ,833,022.0 Bayswater JV ,051.2 U City Plc ,444.8 Total 1, ,348,518.0 Includes Upcountry, BKK & Vicinities land bank, not equity stake adjusted) * Data as of 30 Sep 17 27

28 Residential & Commercial Property Developments Accumulating a Portfolio for Future Growth PARTNERSHIP ROADMAP To develop 25 projects with THB 100bn worth of condominiums along the current and future mass transit lines through the JV with Sansiri with an expected NPAT margin 12% & equity IRR 17% Project value (THB mn) Est. Transfer Start The LINE Jatujak Mo Chit 5,813 Sep 2017 The LINE Sukhumvit 71 1,999 Sep 2016 The LINE Ratchathewi 2,945 Jun 2018 Project value (THB mn) Est. Transfer Start The LINE Asoke-Ratchada 3,016 Dec 2018 The BASE Garden Rama 9 2,340 Sep 2018 The LINE Pradipat 5,890 Dec 2019 The LINE Sukhumvit 101 4,651 Dec 2019 KHUN BY YOO Thonglor 12 4,068 Nov Target to launch at least 4 projects with a total value of THB 12bn Project value (THB mn) Est. Transfer Start THE BASE Phetkasem 29 1,985 Dec 2019 THE LINE Sathorn 3,653 Aug 2020 MULTI-FACETED COMMERCIAL PROPERTY BUSINESS Divested 3 assets to U City for total consideration of THB 9.4bn in exchange for a 35.64% stake. U City aims to develop or acquire a portfolio of recurring income-generating assets predominantly near mass transit lines 2016 Acquired 3 overseas assets GRACECHURCH STREET UNDERWOOD STREET Details Office building, on 33 Gracechurch Street in London, UK Net leaseable area: 9,701 sqm Office building on 6-14 Underwood Street in London, UK Net leaseable area: 2,388 sqm VIENNA HOUSE Pan-European hotel portfolio, hotel management company and associated brands Over 6,700 keys in 9 European countries Investment value 2017 & 2018 Target to launch 2 local projects with a total value of THB 19.5bn PHAYATHAI COMPLEX MOCHIT COMPLEX Details Project: 51 levels of mixed use complex building comprising retail, office, 4 stars hotel and premium serviced residence Gross Floor Area: 120,395 sqm Project: Twin 36 levels office complex building comprising retail, office and rooftop sports center Gross Floor Area: 170,649 sqm GBP 74.3mn, or THB 3,436mn GBP 7.3mn, or THB 328.6mn GBP 170mn, or THB 6,336mn Project value THB 9.5bn THB 10bn Timeline Estimated rental income GBP 4.0mn, or THB 175mn GBP 1.2mn, or THB 52mn EUR 115mn, or THB 4.4bn and estimated EBITDA of EUR 26mn or THB 1bn Groundbreaking in June 2017 Target completion: 2021 Target construction start in 2018 Expected completion in 2022 Section 2.3: Property Business 28

29 Property Update Rationale - U City is the dedicated BTS Group property vehicle CURRENT SITUATION Unclear segregation of property business (and in some case conflict of interest) between BTS Group and U City and inefficient resource allocation U City has limited growth opportunities and limited residential opportunities OBJECTIVE: U City becomes the dedicated property vehicle for BTS Group KEY RESTRUCTURING TRANSACTION: 1 2 Entire Business Transfer (EBT) of Unicorn Enterprises (UE) U City Capital Increase 3 Disposal of U City Assets OUR ACTION 100% 35.64% UNICORN ENTERPRISE (UNICORN OR UE) To eliminate potential conflict between U City and BTSG property business Unicorn will discontinue its business, dissolve and liquidate after the EBT BTSG will grant ROFR, Call Option and Management Agreement and/or Sales Agency Agreement to U City on assets remaining at BTSG Property for sale (mostly sold out) Joint venture i.e. JV Sansiri, Property-related services Hospitality Projects and land banks under study Hospitality BENEFIT TO BTSG & U CITY U City becomes the dedicated property development and investment vehicle for BTSG As U City s current property business is limited to hotels and office rental, new assets to be acquired from Unicorn will allow U City to expand its revenue stream and serve larger base of customers International school, AHS Land banks Other assets More efficient resource allocation and better management of property business Consolidation of property opportunities in one vehicle allows for higher efficiency and economies of scale in each business Office buildings Office buildings Expected gain to BTS Group from restructuring transaction is approx. THB 2,000mn (after elim) upon transaction completion in 4Q 2017/18 Section 2.3: Property Business 29

30 Property Restructuring Restructuring transaction structure UE Entire Business Transfer (EBT) U City Capital Increase U City Asset Divestment 100% UE Subsidiary shares in companies Joint venture shares i.e. JV Sansiri, International school, AHS 1 EBT 35.64% Preferred shares issued to UE (PP) UE to transfer all selected assets and shareholder loans to U City in exchange for new shares (and warrants) in U City Assets value: THB 12,917mn (as of 30 Jun 2017) BTSG loan: THB 10,745mn (as of 30 Jun 2017) Value of preferred shares issued to UE (PP): THB 2,172mn RO Strategic Investor Repayment of SH Loan PP RO 35.64% U City Shareholder U City plans to repay all shareholder loan from BTSG (from EBT) with proceeds from capital increase Private Placement (PP) Preferred shares and warrants PP to Bangkok Bank (Strategic investor) Right Offering (RO) Preferred shares and warrants RO to all shareholders including strategic investor 2 RO Projects and land banks under study Phaya Thai Project Mochit Project Land banks Assets from EBT Subsidiary shares Joint venture shares Hospitality Hotel and hotel management Office rental Property for sale* Hotel Condominium Some land bank *Assets to be divested (value of approx. THB 3bn) Anantara Chiang Mai Resort and Spa AVANI Khon Kaen Hotel & Convention Centre Anantara Chiang Mai Serviced Suites Park Aran Boulevard Commercial Building Project Park Ramindra Condominium Land banks in Charansanitwong & Chonburi Land in Nakhon Ratchasima 3 #1 and #2 will be conditional upon each other voluntarily propose to shareholder for approval Note: - Certain assets under UE that will not be transferred to U City but will be transferred to BTSG prior to the transaction - To ensure sufficient funding, U City is currently securing bank facility in case of proceeds from PP and RO are lower than shareholder loans Section 2.3: Property Business 30

31 Contents Section 1 Section 2 Section 2.1 Section 2.2 Section 2.3 Section 2.4 Section 3 Appendices BTS Group in Brief Business Segment Profiles Mass Transit Business Media Business Property Business Services Business Financial Summary Appendix 1: Core Network Ridership Appendix 2: Core Network Fare Adjustment Appendix 3: Core Network Rolling Stocks Appendix 4: Mass Transit Economic profile Appendix 5: BTSC Debenture and Syndicated Loan for the Pink and Yellow Lines Appendix 6: VGI Products Appendix 7: Residential Property Business Appendix 8: Commercial Property Business Appendix 9: BTS-W3 Term Sheet Appendix 10: 2Q 2017/18 Performance 31

32 Services Business Strategic Support and Business Incubator CHEFMAN RESTAURANTS Premium Chinese restaurant chain managed by Man Kitchen As of 31 Mar 2017, 11 existing branches: 3 dine-in branches, 1 take-away branch, 3 Chairman by Chef Man (Hong Kong Café concept), 1 private dining concept under M Krub restaurant, 1 Man Kitchen buffet, and 2 The Round Table restaurants Eastin Grand Sathorn Branch Thana City Branch In June 2017, Chef Man added a new strategic JV partner Bangkok Ranch (BR), a listed and leading purveyor of duck meat through a capital increase. BR s extensive food processing expertise will enable Chef Man to scale-up its business domestically and internationally. ABSOLUTE HOTEL SERVICES (AHS) Joint venture originally founded between BTS and HHT Construction, a major HK contractor AHS is within the top 4 management companies based in Thailand based on number of keys under management and number of rooms under management together with Minor, Centara and Onyx. Fastest growing YOY management company in Thailand (in terms of properties and keys under management) Provide a unique range of hospitality and consultancy services with tailor-made, client-, owner- and developer-centric solutions Currently manages 3 to 5 star hotels under U Hotels & Resorts, Eastin Grand Hotels, Eastin Easy, and Eastin Hotels & Residences and Travelodge brands in Thailand, Vietnam, Laos, Indonesia, India, Oman and Europe. BTS Group Bangkok Ranch Chef Man 41% Man Food Holdings 41% 18% Number of hotels Number of rooms >9,350 11,500 BTSG and BR have an option to increase stake up to 42.5% in Man Food Holdings. Expected final shareholding in Man Food Holdings of 42.5% : 42.5% : 15% between BTS Group : BR : Chef Man Section 2.4: Services Business Under AHS contracts 2016/ /18E 32

33 Contents Section 1 Section 2 Section 2.1 Section 2.2 Section 2.3 Section 2.4 Section 3 Appendices BTS Group in Brief Business Segment Profiles Mass Transit Business Media Business Property Business Services Business Financial Summary Appendix 1: Core Network Ridership Appendix 2: Core Network Fare Adjustment Appendix 3: Core Network Rolling Stocks Appendix 4: Mass Transit Economic profile Appendix 5: BTSC Debenture and Syndicated Loan for the Pink and Yellow Lines Appendix 6: VGI Products Appendix 7: Residential Property Business Appendix 8: Commercial Property Business Appendix 9: BTS-W3 Term Sheet Appendix 10: 2Q 2017/18 Performance 33

34 BTS Group Financial Performance FY 16/17 OPERATING REVENUE & EBITDA CONTRIBUTION Note: Revenue and EBITDA excludes equity income from Sansiri JV, U City, Bayswater JV, Keystone JV OPERATING REVENUE COMPARISON (YoY) (THB mn) 35.0% 6, % 7.2% THB 49.2% THB 8,606mn 61.9% 40.8% 2,928mn (1) Operating EBITDA excludes non-recurring items but includes share of profit (loss) from BTSGIF (2) Net income attributable to equity holders of the parent (3) Operating EBITDA/finance cost (4) Interim and Final dividends, calculated on annual basis using BTS TB closing share price on the date of the Board of Directors meeting approving the relevant dividend (5) Interest bearing debt - cash and cash equivalent and liquid investment Section 3: Financial Summary (2.8)% 0.1% Mass Transit Media Property Services 1,663 65% 691 (279) % -31% 51% 8, /16 FY Mass Transit Media Property Services 2016/17 FY CONSOLIDATED P&L (THB MN) FY 16/17 FY 15/16 FY 14/15 FY 13/14 Operating revenues 8,606 6,280 7,102 8,532 Accounting revenues 9,618 10,069 8,126 23,468 Operating expenses 4,142 2,489 3,163 4,147 Non-recurring items 1,907 2, ,971 EBITDA 4,117 6,254 4,937 10,334 Operating EBITDA (1) 2,928 2,693 2,836 3,100 Net income (2) 2,004 4,134 2,944 12,598 DEBT INFORMATION (THB MN) 31 MAR MAR MAR MAR 14 Interest bearing debt 38,310 9,283 4,556 6,655 Adj. net debt (5) 6,051 (6,012) (20,755) (31,106) KEY FINANCIAL RATIOS FY 16/17 FY 15/16 FY 14/15 FY 13/14 Profitability ratios (%) Gross operating profit margin 51.9% 60.4% 55.5% 51.4% SG&A to operating sales ratio 24.6% 24.6% 22.0% 19.5% Accounting EBITDA margin 41.2% 59.7% 52.0% 73.% Operating EBITDA margin (1) 34.0% 42.9% 39.9% 36.3% Recurring net profit margin (%) 20.1% 33.7% 34.7% 25.4% Liquidity ratio Current ratio (times) 1.43x 0.81x 3.96x 4.36x Leverage (Times) Total liability to total asset 0.52x 0.28x 0.22x 0.22x Total liability to total equity 1.07x 0.39x 0.28x 0.29x Interest bearing debt to equity 0.85x 0.20x 0.09x 0.11x Adj. net debt (5) to equity 0.13x (0.13)x (0.40)x (0.52)x Adj. net debt (5) to operating EBITDA 2.07x (2.23)x (7.32)x (10.03)x Interest coverage (3) 4.53x 9.30x 7.03x 4.94x Per share ratios Book value per share (THB) Dividend yield (4) 4.00% 7.75% 6.38% 7.37% 34

35 Balance Sheet ASSET BREAKDOWN (THB MN) 65,259 93,651 Cash 31 Mar 16: THB 2.36bn 31 Mar 17: THB 15.09bn LIABILITIES AND EQUITY BREAKDOWN (THB MN) 65,259 93,651 Gross Debt 31 Mar 16: THB 9.28bn 31 Mar 17: THB 38.31bn 10,191 16% 26,705 29% Current Investments 31 Mar 16: THB 4.67bn 31 Mar 17: THB 6.38bn 12,560 19% 18,636 5,799 9% 29,833 20% 32% Adjusted Net Debt* 31 Mar 16: THB (6.0)bn 31 Mar 17: THB 6.05bn 55,069 84% 66,947 71% 31-Mar Mar-17 Total current assets Total non-current assets SHAREHOLDERS EQUITY Long-Term Investments 31 Mar 16: THB 9.75bn 31 Mar 17: THB 13.52bn Restricted Deposits 31 Mar 16: THB 1.27bn 31 Mar 17: THB 0.12bn DILUTION IMPACT 46,901 72% 31-Mar-16 Total current liabilities Total shareholders' equity 45,182 48% 31-Mar-17 Total non-current liabilities ***** Issued Ordinary Shares 31 Mar 16: 11,929.3mn 31 Mar 17: 11,935.0mn *Calculated based on interest bearing debt - cash and cash equivalent and liquid investment Registered Capital (15,928.9mn THB 4.0) Issued and paid-up (11,935.0mn THB 4.0) THB mn 63,716 47,740 ESOP Type Outstanding warrants (mn) Exercise ratio (warrant : share) Exercise price (THB) BTS-WA N.A. 1 : 0.17** 4.177** Outstanding shares reserved for warrants (mn) N.A. (expired) % Dilution BTS-WB : % N.A. Others 1,618 Retained earnings (Deficits) (6,198) Total Shareholders Equity 45,182 BTS-WC : % BTS-W3 3, : , % Total 3, % as of 31 Mar 2017 ** Adjusted under the conditions as stated in the terms and conditions of the warrants as of 31 Mar 2017 Section 3: Financial Summary 35

36 2017/18 BTS Group Targets & CAPEX Guidance FY 2017/18 BTS GROUP TARGETS FY 2017/18 CAPEX of THB BN MASS TRANSIT 2-4% Ridership Growth (revised) 2% Average Fare Increase (revised) 10-12% Train O&M Revenue* Growth THB 6-9bn Services Revenue of E&M Works & Rolling Stocks Procurement for Green Line South and North extensions 5,460-8,160 THB bn 1, Mass Transit THB 3,500-5,250mn E&M Green Line South and North extensions THB 1,900-2,850mn New rolling stocks THB 60mn Normal CAPEX Media & Services THB 340mn VGI CAPEX THB 210mn MACO CAPEX THB 150mn Rabbit Group CAPEX MEDIA SERVICES THB 4,000mn** Targeted Media Revenue 9.2mn Rabbit Cards in Circulation Property THB 880mn Thana City & other improvements THB 300mn Investment property in Thana City THB 270mn Land acquisition PROPERTY THB 650mn Commercial Property Revenue THB 200mn Share of Net Profit from BTS- SIRI JVs *Train O&M revenue includes 1 st station of Green Line South: E15 which was opened on 3 April 2017 **Based on VGI financial statements that included Rabbit Group performance (3-year restatement under common control basis) BTSG CAPEX excludes: Real estate development cost for Property business Investment in BTS-SIRI project (net) of THB 1,500mn Investment in international school project of THB 200mn BTSGIF CAPEX of THB 620mn includes mainly:- i. rolling stocks of THB 197mn ii. AFC upgrade of THB 157mn iii. Radio upgrade of THB 156mn) excludes construction of new station: S4 (which is recorded as investment in NRTA) Section 3: Financial Summary 36

37 Contents Section 1 Section 2 Section 2.1 Section 2.2 Section 2.3 Section 2.4 Section 3ction 3 Appendices BTS Group in Brief Business Segment Profiles Mass Transit Business Media Business Property Business Services Business Financial Summary Appendix 1: Core Network Ridership Appendix 2: Core Network Fare Adjustment Appendix 3: Core Network Rolling Stocks Appendix 4: Mass Transit Economic profile Appendix 5: BTSC Debenture and Syndicated Loan for the Pink and Yellow Lines Appendix 6: VGI Products Appendix 7: Residential Property Business Appendix 8: Commercial Property Business Appendix 9: BTS-W3 Term Sheet Appendix 10: 2Q 2017/18 Performance 37

38 Appendix 1: Core Network Ridership Uninterrupted Revenue Growth and Resilient Under Pressure GROWTH (16 YRS) Farebox revenue CAGR: 10.1% Ridership CAGR: 9.1% Farebox revenue (THB bn) Ridership (mn) Ridership +2.4% YoY Fare +1.3% YoY 00/01 01/02 02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17 Dec 99: BTS SkyTrain service opening INITIAL GROWTH RIDERSHIP CAGR (3 YRS): 21% Appendix 1: Core Network Ridership May 09: Opening of Silom Line extension Jul 04: Opening of Bangkok MRT System (Blue line) May 10: Opening of Bangkok BRT; Thai political protests Mar 07: First fare rate increase STABLE GROWTH RIDERSHIP CAGR (5 YRS): 5% Aug 10: Opening of Airport Rail Link Aug 11: On Nut Bearing extension opening Oct Nov 11: Floods Apr 13: Sale of net farebox revenue to BTSGIF Jun 13: Fare increase Nov 13: Thai political protests Dec 13: Wongwian Yai Bang Wa extension opening FASTER GROWTH RIDERSHIP CAGR (8 YRS) 7% Jan-Mar 14: Bangkok Shutdown May 14: Martial law Oct 16: The passing of His Majesty King Bhumibol Aug 16: Opening of Bangkok MRT System (Purple line) 38

39 Appendix 2: Core Network Fare Adjustment Flexibility to Increase Fares FARE ADJUSTMENT MECHANISM EFFECTIVE FARE Can be adjusted no more than once every 18 months by making announcement to BMA and public 30 days in advance Must not exceed the Authorised fare AUTHORISED FARE Normal situation: upon change of Bangkok s CPI >=5%, may adjust up to 7% (No approval required) Special situation: upon change of CPI (>= 9%), USD/THB foreign exchange rate, interest rate or electricity costs (BMA approval required) HISTORICAL AVERAGE FARE RIDERSHIP BY TICKET TYPES (FY 2016/17) CAGR 5 yr (2012/13 to 2016/17) = 2.4% CAGR 12 yr (2005/06 to 2016/17)= 2.2% THB / Trip DISTANCE-BASED FARE (BY NO. OF STATIONS) NO. OF STATIONS 30-DAY PASS (STUDENT)* 6% AVG FARE THB FARE PRICE (THB) 33.0 AUTHORISED FARE (APR 2013) NEW EFFECTIVE FARE (OCT 2017) PREVIOUS EFFECTIVE FARE (JUN 2013) POTENTIAL FARE UPSIDE ONE-DAY PASS 1% AVG FARE THB DAY PASS (ADULT)* 28% AVG FARE THB 26.5 SJT 36% AVG FARE THB 30.6 PURSE (STV)* 29% AVG FARE THB / / / / / / / / / / / /17 * Counted as Rabbit (63%) Appendix 2: Core Network Fare Adjustment 39

40 Appendix 2: Core Network Fare Adjustment Increased from 1 October 2017 Fare of SJT, Rabbit monthly pass and Rabbit senior tickets in the Core Network will be increased from 1 October 2017 onwards For Rabbit Purse Card (Stored Value Card: STV), the fare will remain as the previous effective fare of THB until 31 March 2018 Expected FY 17/18 average fare increased by 2% to THB 28.5 per trip SINGLE JOURNEY TICKET (SJT): 35% OF TICKET TYPES Number of Station Present Oct RABBIT SENIOR Number of Station Present Oct RABBIT MONTLY PASS ADULT: 28% OF TICKET TYPES Present THB/Trip 1 Oct 15 Trips Trips Appendix 2: Core Network Fare Adjustment FARE PRICE (THB) AUTHORISED FARE (APR 2013) NEW EFFECTIVE FARE (OCT 2017) PREVIOUS EFFECTIVE FARE (JUN 2013) POTENTIAL FARE UPSIDE NO. OF STATIONS 40 Trips 1, , Trips 1, , RABBIT MONTLY PASS STUDENT: 6% OF TICKET TYPES Present THB/Trip 1 Oct 15 Trips Trips Trips Trips

41 Appendix 3: Core Network Rolling Stocks Enlarging Our Fleet for Future Growth CURRENT FLEET NO. OF TRAINS TOTAL CARRIAGES FROM X SIEMENS Already full operated in Oct 2011 Already operated in May 2013 X CRRC SIEMENS Already fully operated in Feb 2014 X5 20 TOTAL CURRENT FLEET X CRRC FLEET EXPANSION NO. OF TRAINS TOTAL CARRIAGES INDICATIVE CAPEX (THB mn) FROM To be delivered in FY 18/19 To be delivered in FY 19/20 X22 88 X24 96 ~THB 9.8bn* SIEMENS CRRC TOTAL FUTURE FLEET X *THB 22bn BTSC debenture was issued in Nov 2016 to accommodate the purchase of new fleet and fund electrical and mechanical systems (E&M) for the Northern (Mo Chit to Khu Khot; 18.2km, 16 stations) and Southern (Bearing to Samut Prakarn; 12.6km, 9 stations) Green Line extensions. **Passenger per hour per direction ***Based on 4-car trains and assume 2.4min headway (Sukhumvit Line) SYSTEM DESIGN CAPACITY OF 50,000 PPHPD** CURRENT CAPACITY OF 25,000*** PPHPD Appendix 3: Core Network Rolling Stocks 41

42 Appendix 4: Mass Transit Economic profile O&M Contract & PPP Net Cost ECONOMIC PROFILE (O&M CONTRACT) Rolling stocks Investment O&M revenue YEAR KEY ASSUMPTIONS 1) 30-year contract from operating date 2) O&M revenue* of approx. THB 140mn/km in FY 16/17 with growth rate of 3.5% p.a. 3) EBITDA margin of 40% *O&M revenue includes revenue from provision of operating services and interest income under concession agreement ECONOMIC PROFILE (PPP NET COST WITH SUBSIDY) YEAR Reimburse from gov't (civil) E&M Civil works Farebox revenue KEY ASSUMPTIONS 1) 3-4 year investment in civil and E&M works (includes rolling stock) 2) 10-year repayment from gov t for civil works 3) Receive farebox revenue and commercial revenue (30-year contract from operating date) Appendix 4: Mass Transit Economic profile 42

43 Appendix 5: BTSC Debenture & Syndicated Loan Agreement CAPEX for newly-awarded lines - secured by debt financing NEW GREEN LINE EXTENSIONS PINK AND YELLOW LINES 3 November 2016: BTSC was approved by the Securities and Exchange Commission, Thailand (SEC) to issue up to THB 22,000mn senior unsecured debentures. The bonds will be issued in four tranches due in 2019, 2021, 2023, and Amount up to Tenor Rating Rationale THB 22bn 3, 5, 7, 10 years (NC5) A / Stable by Fitch and TRIS Issuance Date 10 November 2016 Purchase new rolling stocks and electrical and mechanical system (E&M) for the Northern and Southern Green Line extensions 10 October 2017: BSR JV signed the syndicated loan agreement between Bangkok Bank, Siam Commercial Bank and Krungthai Bank at a total value of up to THB 63.4bn. Credit Facilities Syndicate Banks Total of THB 63.36bn THB 31.68bn for Pink Line THB 31.68bn for Yellow Line Bangkok Bank, Krung Thai Bank, Siam Commercial Bank Loan Term 17 years and 3 months spread across 15 payments starting from first operation date Rationale Financing of both Pink and Yellow lines Tenor Amount up to Coupon Rate 3-year THB 5.5bn 2.46% 5-year THB 2.2bn 2.85% 7-year THB 4.1bn 3.30% 10-year (NC5) THB 10.2bn 3.87% Total THB 22bn 3.31% (average) Appendix 5: BTSC Debenture and Syndicated Loan for the Pink and Yellow Lines 43

44 Appendix 6: VGI Products BTS-related Media and Office Building & Residential Media Products TRAIN INSIDE-TRAIN OFFICE BUILDING MERCHANDISING STATION Appendix 6: VGI Products 44

45 Appendix 6: VGI Products Outdoor Media and Aviation Media Products BILLBOARD AIRPORT LED SCREEN STREET FURNITURE CREATIVE PRODUCTION AVIATION: JET BRIDGE Appendix 6: VGI Products 45

46 Appendix 7: Residential Property Business Launches of BTS-Sansiri Projects ACTIVE RESIDENTIAL PROJECTS UNDER SIRI JV Project Name Presale Period Project Value (THB mn) Units Avg. Price per sqm (THB) Sold Construction Progress* Est. Transfer Start Est. Transfer Completion Foreign Participation THE LINE Jatujak Mochit May , k 97% 100% Sep 2017 May % THE LINE Sukhumvit 71 Aug , k 94% 100% Sep 2016 Jan % THE LINE Ratchathewi Oct , k 98% 90% May 2018 Sep % THE LINE Asoke-Ratchada Jun , k 99% 44% Oct 2018 Jan % THE BASE Garden Rama 9 Sep , k 91% 53% Jun 2019 Sep % THE LINE Pradipat Nov , k 67% 4% Dec 2019 May % THE LINE Sukhumvit 101 Nov , k 57% 9% Dec 2019 Apr % KHUN BY YOO Thonglor 12 Nov , k 64% 10% May 2020 Aug 2020 No Roadshow THE BASE Phetkasem 29 Jun , k 68% 6% Feb 2020 Jun % THE LINE Sathorn Nov , k 100% 0% Aug 2020 Feb % Total/Weighted Average 36,360 5, k 82% 23% In FY 2017/18, Target to launch at least 4 projects with THB 12bn worth of projects. Appendix 7: Residential Property Business 46

47 Appendix 8: Commercial Property Business U City Office Buildings 33 GRACECHURCH STREET OFFICE Situated within the heart of the City of London, fronting the western side of Gracechurch Street, one of the City s main thoroughfares, and benefits from close walking distances to underground stations Bank and Monument 6-14 UNDERWOOD COMMERCIAL STREET OFFICE PROPERTY Situated within the heart of the tech city area of London and is less than 650 meters from Old Street Roundabout, known as Silicon Roundabout due to the increasing number of technology, media and telecommunications companies choosing to relocate to the area. The property also benefits from excellent transport links (underground, rail and bus services) Ownership 145-year lease expiring on 18 Jan 2162 Building Specifications Comprehensively refurbished and extended in 2007 NFA: 9,701 sqm Lettable Area Office: 7,125 sqm Retail: 1,798 sqm Storage: 778 sqm Tenants 7 tenants Average unexpired lease term of 7.90 years Rental Price* Expected annually: GBP 4.0mn (THB 174.0mn) 1 Average of approx. GBP 400/sqm (THB 18,700/sqm) 1 Ownership 38-year lease expiring in 25 Dec 2055 Building Specifications Comprise with three attractive Victorian warehouse buildings NFA: 2,731 sqm over basement, ground and three upper floors. Lettable Area Tenants Office: 2,731 sqm 1 Single tenant Rental Price* Expected annually: GBP 1.2 mn (THB 52.0mn) 1 Average of approx. GBP 480/sqm (THB 20,880/sqm) 1 Capital Invested Purchase Price of GBP 74.3mn plus Acquisition Cost of GBP 1.8mn (Total THB 3,310.0 mn) 1 Capital Invested Purchase Price of GBP 7.3mn plus Acquisition Cost of GBP 0.8mn (Total THB 352.4mn) 1 1 Exchange rate at THB 43.5 per GBP as of 31 May 2017 Appendix 8: Commercial Property Business 47

48 Appendix 8: Commercial Property Business U City Future Projects PHATATHAI COMPLEX Service Apartment NFA: 7,532 sq.m. Hotel Facilities NFA: 852 sq.m. MOCHIT COMPLEX Office Tower I NFA: 35,135 sqm Hotel 397 keys NFA: 14,111 sq.m. Retail NFA: 7,096 sq.m. Office Tower II NFA: 35,135 sqm Office 12 floors NFA: 22,452 sq.m. Retail NFA: 5,040 sqm Project value Land Area Location GFA NFA THB 9.5bn 7.3 Rai or 1.2 Ha (11,749.6 sqm) Adjacent to 2 mass transit stations: BTS Phayathai Station and Airport Rail Link 120,395 sqm 52,043 sqm Equity IRR 9-10% Project value Land Area Location GFA NFA THB 10.0bn 11.1 Rai or 1.8 Ha (17,719 sqm) Adjacent to 2 mass transit stations: BTS Mo-chit Station and MRT Chatuchak Park Station 170,649 sqm 75,310 sqm Equity IRR 9-10% Status Constructing Status Preliminary design Project period months Project period 42 months Construction period 3Q Q 2021 Starts Completion Construction period 2018 Mid 2022 Starts Completion Appendix 8: Commercial Property Business 48

49 Appendix 9: BTS-W3 Term Sheet WARRANTS TERMS AND CONDITIONS TICKER BTS-W3 TERMS 5 YEARS ISSUE DATE 1 NOV 2013 EXPIRY DATE 1 NOV 2018 EXERCISE PERIOD QUARTERLY STARTING FROM DEC 2016 TO SEP 2018 WITH THE LAST EXERCISE DATE ON 1 NOV 2018 (TOTAL 9 TIMES) WARRANT PRICE - ALLOCATION NO. OF WARRANTS EXERCISE RATIO EXERCISE PRICE EXPECTED MAXIMUM PROCEEDS TO EXISTING SHAREHOLDERS AT THE RATIO OF 3 EXISTING BTS SHARES : 1 BTS-W3 3,944,626,464 UNITS 1 BTS-W3 TO 1 NEW COMMON SHARE OF BTS THB PER SHARE THB 47,336MN Appendix 9: BTS-W3 Term Sheet 49

50 Appendix 10: 2Q 2017/18 Financial Highlights PROFITABILITY Operating EBITDA was THB 875mn, increasing by THB 252mn or 40% YoY as a result of the improvements in operating performance of Mass Transit and Media businesses Pre-tax recurring profit (before MI) of THB 640mn, a growth of 11% YoY Reported net profit (before MI) rose by 19% YoY to THB 741mn mainly from higher recurring profit, extra-gain from Chef Man restructuring, partially offset with higher finance cost and increase in share of net loss from associates/jvs BALANCE SHEET Balance sheet strength: THB 30.5bn cash & liquid investments* Low leverage: adjusted net D/E** ratio at 0.30x *Cash and liquid investments include cash bal. of THB 9.0bn, current investments of THB 8.8bn and L/T liquid investments of THB 12.7bn **Adjusted Net Debt = Interest Bearing Debt - Cash and Cash Equivalent and Liquid Investment CASH FLOW Fully enter investment Phase; including: Pink & Yellow Lines civil works and E&M works (THB 6.2bn) and Green Line extension E&M works and train procurement (THB 1.2bn) Net cash received from debt financing of THB 6.0bn Cash received from JV partners (STEC, RATCH) of THB 1.75bn for 25% equity investment in pink and yellow line projects BTS Group Earnings Presentation Appendix 10: BTSG 2Q 2017/18 Financial Performance 50

BTS Group Holdings PCL

BTS Group Holdings PCL GENERAL PRESENTATION APRIL 2018 IR Contact Address: IR Department 15 th Floor, TST Tower, 21 Soi Choei Phuang, Viphavadi-Rangsit Rd. Chomphon, Chatuchak, Bangkok, Thailand 10900 Telephone: +66(0) 2273

More information

BTS GROUP HOLDINGS PCL

BTS GROUP HOLDINGS PCL BTS GROUP HOLDINGS PCL INVESTOR PRESENTATION OCTOBER 2018 IR Contact Address: IR Department 15 th Floor, TST Tower, 21 Soi Choei Phuang, Viphavadi-Rangsit Rd. Chomphon, Chatuchak, Bangkok, Thailand 10900

More information

BTS GROUP HOLDINGS PCL

BTS GROUP HOLDINGS PCL BTS GROUP HOLDINGS PCL INVESTOR PRESENTATION FEBRUARY 2019 IR Contact Address: IR Department 15 th Floor, TST Tower, 21 Soi Choei Phuang, Viphavadi-Rangsit Rd. Chomphon, Chatuchak, Bangkok, Thailand 10900

More information

BTS GROUP HOLDINGS PCL

BTS GROUP HOLDINGS PCL BTS GROUP HOLDINGS PCL 2 Q 2 0 1 7 / 1 8 E AR N I N G S P R E S E N TAT I O N 14 N O V E M B E R 2 0 1 7 Disclaimer Investment involves risk. Prospective should understand the characteristics of Securities

More information

BTS Group Holdings PCL

BTS Group Holdings PCL GENERAL PRESENTATION FEBRUARY 2016 IR Contacts Address: IR Department 15 th Floor, TST Tower, 21 Soi Choei Phuang, Viphavadi-Rangsit Rd. Chomphon, Chatuchak, Bangkok, Thailand 10900 Telephone: +66(0) 2273

More information

BTS GROUP HOLDINGS PCL

BTS GROUP HOLDINGS PCL 3Q 2016/17 FINANCIAL HIGHLIGHTS Mass Transit Operation & Maintenance (excluding interest income from train procurement) revenue increased 4.1% YoY to THB 410.9mn from the contractually agreed increase

More information

U CITY PCL 1Q 2018 EARNINGS PRESENTATION

U CITY PCL 1Q 2018 EARNINGS PRESENTATION 1Q 2018 EARNINGS PRESENTATION 17 MAY 2018 IR CONTACT Address: U City Public Company Limited IR Department 20 th Floor, TST Tower, 21 Soi Choei Phuang, Viphavadi-Rangsit Rd. Chomphon, Chatuchak, Bangkok,

More information

BTS GROUP HOLDINGS PCL

BTS GROUP HOLDINGS PCL 1Q 2018/19 HIGHLIGHTS Services revenue from the provision of E&M works and the train procurement service for the Southern and Northern Green Line extensions of THB 926mn was recorded in 1Q 2018/19 Mass

More information

BTS Group Holdings PCL

BTS Group Holdings PCL GROUP GENERAL PRESENTATION AUGUST 2014 IR Contacts Address: IR Department 15 th Floor, TST Tower, 21 Soi Choei Phuang, Viphavadi-Rangsit Rd. Chomphon, Chatuchak, Bangkok, Thailand 10900 Telephone: +66(0)

More information

BTS GROUP HOLDINGS PCL

BTS GROUP HOLDINGS PCL 3Q 14/15 FINANCIAL HIGHLIGHTS Quarterly ridership; 56.4mn trips in 3Q 14/15, 4.7% growth YoY and 3.3% growth QoQ Average fare also increased 0.4% YoY to THB 26.9 per trip Share of net profit from investment

More information

VGi GLOBAL MEDIA PCL. No. 1 Out-of-Home Media Company in Thailand. 2016/17 Factsheet

VGi GLOBAL MEDIA PCL. No. 1 Out-of-Home Media Company in Thailand. 2016/17 Factsheet VGi GLOBAL MEDIA PCL No. 1 Out-of-Home Media Company in Thailand 2016/17 Factsheet VGi Global Media PCL 2 KEY INVESTMENT FEATURES Exclusive long-term mass transit contracts with consistent growth Unique,

More information

BTS Group Holdings PCL

BTS Group Holdings PCL BTS Group Holdings PCL 12/13 earnings presentation 15 February 2013 prepared by Investor Relations department Disclaimer Investment involves risk. Prospective should understand the characteristics of Securities

More information

BTS GROUP HOLDINGS PCL

BTS GROUP HOLDINGS PCL FY 2016/17 FINANCIAL HIGHLIGHTS Mass Transit Operation & Maintenance (excluding interest income from train procurement) revenue increased 4.2% YoY to THB 1,661.0mn from the contractually agreed increase

More information

BTS Group Holdings PCL

BTS Group Holdings PCL 14 August 2015 Disclaimer Investment involves risk. Prospective should understand the characteristics of Securities and study information about BTS Group Holdings Public Company Limited (the Company )

More information

Annual Report BTS Rail Mass Transit Growth Infrastructure Fund (BTSGIF)

Annual Report BTS Rail Mass Transit Growth Infrastructure Fund (BTSGIF) Annual Report For Period from 1 April 2015 to 31 March 2016 Table of Contents Part 1 The Fund s Operation Part 2 Management and Good Governance 1. Fund Information 2 1.1 Name, Type, Fund Capital and 2

More information

BTSGIF General Presentation September 2018

BTSGIF General Presentation September 2018 September 2018 Disclaimer This is not prospectus of BTS Rail Mass Transit Growth Infrastructure Fund ( BTSGIF or the Fund ). Investment in the Funds contains certain risk. Before investing, please carefully

More information

BTS Group Holdings Public Company Limited and its subsidiaries Report and consolidated financial statements 31 March 2016

BTS Group Holdings Public Company Limited and its subsidiaries Report and consolidated financial statements 31 March 2016 BTS Group Holdings Public Company Limited and its subsidiaries Report and consolidated 31 March 2016 Independent Auditor s Report To the Shareholders of BTS Group Holdings Public Company Limited I have

More information

BTS GROUP HOLDINGS PCL

BTS GROUP HOLDINGS PCL FY 14/15 FINANCIAL HIGHLIGHTS Ridership increased 1.9% YoY to 218.7mn trips. Average fare also increased 1.6% YoY to THB 26.9 per trip Share of net profit from investment in BTSGIF for FY 14/15 reached

More information

BTSGIF General Presentation June 2017

BTSGIF General Presentation June 2017 June 2017 Disclaimer This is not prospectus of BTS Rail Mass Transit Growth Infrastructure Fund ( BTSGIF or the Fund ). Investment in the Funds contains certain risk. Before investing, please carefully

More information

BTSGIF General Presentation September 2017

BTSGIF General Presentation September 2017 September 2017 Disclaimer This is not prospectus of BTS Rail Mass Transit Growth Infrastructure Fund ( BTSGIF or the Fund ). Investment in the Funds contains certain risk. Before investing, please carefully

More information

BTSGIF General Presentation April 2018

BTSGIF General Presentation April 2018 April 2018 Disclaimer This is not prospectus of BTS Rail Mass Transit Growth Infrastructure Fund ( BTSGIF or the Fund ). Investment in the Funds contains certain risk. Before investing, please carefully

More information

BTS GROUP HOLDINGS PCL

BTS GROUP HOLDINGS PCL 2Q 14/15 FINANCIAL HIGHLIGHTS Quarterly ridership; 54.6mn trips in 2Q 14/15, 2.1% growth YoY and 6.6% growth QoQ Average fare also increased 0.6% YoY to THB 26.6 per trip Share of net profit from investment

More information

BTS GROUP HOLDINGS PCL

BTS GROUP HOLDINGS PCL FY 13/14 FINANCIAL HIGHLIGHTS Record ridership on BTS SkyTrain achieved; 8.9% ridership growth to 214.7mn trips (within target growth range of 7 10%) Average fare also increased 6.5% YoY to THB 26.4 per

More information

BTSGIF General Presentation September 2016

BTSGIF General Presentation September 2016 September 2016 Disclaimer This is not prospectus of BTS Rail Mass Transit Growth Infrastructure Fund ( BTSGIF or the Fund ). Investment in the Funds contains certain risk. Before investing, please carefully

More information

U CITY PCL MANAGEMENT DISCUSSION & ANALYSIS 1Q MAY Q 2018 KEY FINANCIAL HIGHLIGHTS

U CITY PCL MANAGEMENT DISCUSSION & ANALYSIS 1Q MAY Q 2018 KEY FINANCIAL HIGHLIGHTS 1Q 2018 KEY FINANCIAL HIGHLIGHTS Total revenue rose significantly by 222.5% YoY to THB 1,481mn, predominantly due to the consolidation of the acquired hotel business in Europe (Vienna House), the improving

More information

BTSGIF General Presentation March 2017

BTSGIF General Presentation March 2017 March 2017 Disclaimer This is not prospectus of BTS Rail Mass Transit Growth Infrastructure Fund ( BTSGIF or the Fund ). Investment in the Funds contains certain risk. Before investing, please carefully

More information

BTSGIF General Presentation March 2018

BTSGIF General Presentation March 2018 March 2018 Disclaimer This is not prospectus of BTS Rail Mass Transit Growth Infrastructure Fund( BTSGIF or the Fund ). Investment in the Funds contains certain risk. Before investing, please carefully

More information

U CITY PCL FY 2017 EARNINGS PRESENTATION

U CITY PCL FY 2017 EARNINGS PRESENTATION FY 217 EARNINGS PRESENTATION 21 FEBRUARY 218 IR CONTACT Address: U City Public Company Limited IR Department 2 th Floor, TST Tower, 21 Soi Choei Phuang, Viphavadi-Rangsit Rd. Chomphon, Chatuchak, Bangkok,

More information

Table of Contents. Page

Table of Contents. Page Table of Contents Invitation to the Extraordinary General Meeting of Shareholders No. 1/2017 1 Registration Form (Please bring this form on the meeting date) (Enclosure 1) Page Please see the document

More information

Disclaimer. For more information relating to the Fund, please visit or

Disclaimer. For more information relating to the Fund, please visit   or Disclaimer This document is not an offer of securities for sale into the United States or elsewhere. The securities referred to herein havenot been and will not be registered under the U.S. Securities

More information

Opinion of the Independent Financial Advisor Regarding the Disposal and Acquisition of Assets

Opinion of the Independent Financial Advisor Regarding the Disposal and Acquisition of Assets This English translation has been prepared solely for the convenience of foreign shareholders of BTS Group Holdings Public Company Limited. The Thai language version is the definitive and official document

More information

VGi Global Media PCL. General and Business Update Presentation May 2014

VGi Global Media PCL. General and Business Update Presentation May 2014 VGi Global Media PCL General and Business Update Presentation May 2014 IR Contacts IR Department: Ms. Tisakorn Youngmod Ms. Napat Buchasuk Ms. Chama Savetbodi Telephone: +66(0) 2273 8639 +66(0) 2273 8636

More information

Prepared by Investor Relations Department VGI Global Media Plc. VGI Global Media Plc

Prepared by Investor Relations Department VGI Global Media Plc. VGI Global Media Plc 1Q 2018/19 Analyst Presentation 15 August 2018 Disclaimer Investment involves risk. Prospective should understand the characteristics of Securities and study information about VGI Global Media Public Company

More information

BTS Group Holdings PCL

BTS Group Holdings PCL 13 February 2014 Disclaimer Investment involves risk. Prospective should understand the characteristics of Securities and study information about BTS Group Holdings Public Company Limited (the Company

More information

VGi GLOBAL MEDIA PLC.

VGi GLOBAL MEDIA PLC. MEDIA INDUSTRY AND BUSINESS IMPACT ANALYSIS 1Q 14/15 VS 1Q 15/16 THAI ADVERTISING SPENDING (THB MN) MEDIA INDUSTRY MARKET SHARE (1Q 14/15 VS 1Q 15/16) Industry TV Newspapers Radio Cinema Magazines Transit

More information

AT A GLANCE. 2Q 2018/19 (For the quarter ended 30 Sep 2018) Our City Our Future 1. Dear Investment Community,

AT A GLANCE. 2Q 2018/19 (For the quarter ended 30 Sep 2018) Our City Our Future 1. Dear Investment Community, AT A GLANCE MASS TRANSIT 90% SHARE INFORMATION i Shares Outstanding Free Float Par Value Market Capitalisation YTD daily traded value iv Stock Identifiers Stock Exchange Symbol Bloomberg / Reuters REVENUE

More information

VGi GLOBAL MEDIA PCL.

VGi GLOBAL MEDIA PCL. MEDIA INDUSTRY AND BUSINESS IMPACT ANALYSIS THAI ADVERTISING SPENDING VS VGI REVENUE (THB mn) 35,000 33,000 31,000 29,000 27,000 25,000 23,000 21,000 19,000 17,000 15,000 32,200.0 30,869.2 31,520.7 30,764.8

More information

AT A GLANCE. 3Q 2018/19 (For the quarter ended 31 Dec 2018) Our City Our Future 1. Dear Investment Community,

AT A GLANCE. 3Q 2018/19 (For the quarter ended 31 Dec 2018) Our City Our Future 1. Dear Investment Community, AT A GLANCE SHARE INFORMATION i Shares Outstanding Free Float Par Value Market Capitalisation YTD daily traded value iv Stock Identifiers Stock Exchange Symbol Bloomberg / Reuters 11,845.2mn shares vii

More information

VGi Global Media PCL 1Q 13/14 EARNINGS VGI BOARD OF DIRECTOR S MEETING NO. 5/ JUNE August May 2014

VGi Global Media PCL 1Q 13/14 EARNINGS VGI BOARD OF DIRECTOR S MEETING NO. 5/ JUNE August May 2014 VGi Global Media PCL 1Q 13/14 4Q & FY Earnings 13/14 Presentation Earnings Review 21 May 2014 1 August 2013 1Q 13/14 EARNINGS VGI BOARD OF DIRECTOR S MEETING NO. 5/2013 30 JUNE 2013 Prepared by Investor

More information

ANNUAL REPORT 2013/14. BTS Rail Mass Transit Growth Infrastructure Fund

ANNUAL REPORT 2013/14. BTS Rail Mass Transit Growth Infrastructure Fund ANNUAL REPORT 2013/14 BTS Rail Mass Transit Growth Infrastructure Fund BTSGIF ANNUAL REPORT 2013/14 BTSGIF ANNUAL REPORT 2013/14 03 Table of Contents 1.0 Introduction 1.1 Messages from the Management Company

More information

BTS Group Holdings Public Company Limited

BTS Group Holdings Public Company Limited (-Translation-) December 12, 2014 Subject: Attention: Information Memorandum on the Acquisition and Disposal of Assets of BTS Group Holdings Public Company Limited : Schedule 2 Shareholders of BTS Group

More information

VGi GLOBAL MEDIA PLC MEDIA INDUSTRY AND BUSINESS IMPACT ANALYSIS IMPORTANT EVENTS IN 1Q 2017/18 MANAGEMENT DISCUSSION & ANALYSIS 1Q 2017/18 2 AUG 2017

VGi GLOBAL MEDIA PLC MEDIA INDUSTRY AND BUSINESS IMPACT ANALYSIS IMPORTANT EVENTS IN 1Q 2017/18 MANAGEMENT DISCUSSION & ANALYSIS 1Q 2017/18 2 AUG 2017 MEDIA INDUSTRY AND BUSINESS IMPACT ANALYSIS Advertising spending declined by.3% YoY to 26,85mn in Q 207/8. The TV sector with the highest market share at 66.3% fell 3.7% YoY to THB 7,359mn and Traditional

More information

1Q FY 15/16 (For the quarter ended 30 Jun 2015) FROM THE EDITOR

1Q FY 15/16 (For the quarter ended 30 Jun 2015) FROM THE EDITOR MASS TRANSIT 39% SERVICES 11% AT A GLANCE SHARE INFORMATION i Shares Outstanding 11,919.3mn shares vii Free Float v 57.4% Par Value THB 4.0 / Share vi Market Capitalisation THB 117.5bn / USD 3.4bn ii YTD

More information

Currently, Titanium Compass Sdn Bhd manages advertising on 19 stations and 25 trains on the SBK Line.

Currently, Titanium Compass Sdn Bhd manages advertising on 19 stations and 25 trains on the SBK Line. MEDIA INDUSTRY The Thai advertising market has been shaped by major changes over the past few years. Traditional media such as television, newspaper, magazine and radio has been in steady decline, while

More information

INFRASTRUCTURE FUND KNOWING INFRASTRUCTURE FUND

INFRASTRUCTURE FUND KNOWING INFRASTRUCTURE FUND INFRASTRUCTURE FUND KNOWING INFRASTRUCTURE FUND Infrastructure fund is a mutual fund allowing the country to finance the large infrastructure projects, e.g. electricity, water, airfields, transportation

More information

Independent Auditor s Report To the Shareholders of BTS Group Holdings Public Company Limited

Independent Auditor s Report To the Shareholders of BTS Group Holdings Public Company Limited BTS Group Holdings Public Company Limited and its subsidiaries Report and consolidated 31 March 2013 Independent Auditor s Report To the Shareholders of BTS Group Holdings Public Company Limited I have

More information

BTS Group Holdings Public Company Limited and its subsidiaries Report and interim consolidated financial statements for the three-month period ended

BTS Group Holdings Public Company Limited and its subsidiaries Report and interim consolidated financial statements for the three-month period ended BTS Group Holdings Public Company Limited and its subsidiaries Report and interim consolidated for the three-month period ended 30 June Independent Auditor s Report on Review of Interim Financial Information

More information

BTS Group Holdings Public Company Limited and its subsidiaries Report and consolidated financial statements 31 March 2014

BTS Group Holdings Public Company Limited and its subsidiaries Report and consolidated financial statements 31 March 2014 BTS Group Holdings Public Company Limited and its subsidiaries Report and consolidated 31 March 2014 Independent Auditor s Report To the Shareholders of BTS Group Holdings Public Company Limited I have

More information

1Q 13/14 Earnings Presentation 15 August 2013

1Q 13/14 Earnings Presentation 15 August 2013 1Q 13/14 Earnings Presentation 15 August 2013 Disclaimer This is not prospectus of BTS Rail Mass Transit Growth Infrastructure Fund ( BTSGIF or the Fund ). Investment in the Funds contains certain risk.

More information

VGI Global Media PLC. Operating Results for 4Q and FY 2012/13. Translation. Management Discussion & Analysis 4Q and FY 12/13

VGI Global Media PLC. Operating Results for 4Q and FY 2012/13. Translation. Management Discussion & Analysis 4Q and FY 12/13 Operating Results for 4Q and FY 2012/13 Please find following the management discussion and analysis for VGI Global Media Public Company Limited and subsidiaries ( VGI or the Company ) for 4Q and FY 2012/13

More information

Quarterly Meeting 1/ Q18 & 2018 Performance & Outlook

Quarterly Meeting 1/ Q18 & 2018 Performance & Outlook Quarterly Meeting 1/2019 4Q18 & 2018 Performance & Outlook 27 February 2019 The views expressed here contain some information derived from publicly available sources that have not been independently verified.

More information

BEM: Business Overview

BEM: Business Overview Bangkok Expressway and Metro Public Company Limited (BEM) February 2019 BEM: Business Overview Road Rail Commercial Development Investment Total Expressway SES 38.5 Kms. Sector C+ 32 Kms. SOE 16.7 Kms.

More information

Operating Results for 1Q 13/14

Operating Results for 1Q 13/14 Operating Results for 1Q 13/14 Please find following the management discussion and analysis for VGI Global Media Public Company Limited and subsidiaries ( VGI or the Company ) for the 3 months ended 30

More information

Closed-end retail infrastructure fund, which offers the investments units to the general investors..

Closed-end retail infrastructure fund, which offers the investments units to the general investors.. - Information Memorandum - Infrastructure Fund Project of BTS Rail Mass Transit Growth Infrastructure Fund (BTSGIF) Name of Management Company Location of Management Company BBL Asset Management Co., Ltd.

More information

CPN Retail Growth Leasehold REIT. Invest ASEAN Singapore March 2018

CPN Retail Growth Leasehold REIT. Invest ASEAN Singapore March 2018 CPN Retail Growth Leasehold REIT Invest ASEAN Singapore 2018 27 28 March 2018 Disclaimer The information contained in this presentation is for information purposes only and does not constitute an offer

More information

Thailand s Innovation Financing for Infrastructure

Thailand s Innovation Financing for Infrastructure Thailand s Innovation Financing for Infrastructure Wachiraya Permbhusri Director of PPP Bureau The State Enterprise Policy Office Policy Dialogue on Infrastructure Financing Strategies for Sustainable

More information

Hürriyet Investor Presentation. July 2007

Hürriyet Investor Presentation. July 2007 Hürriyet Investor Presentation July 2007 1 Notice This presentation does not constitute an offer or invitation to purchase or subscription for any securities and no part of it shall form the basis of or

More information

The Secretary to the Meeting introduced the Directors, the Executives and the Advisors who attended the Meeting today as follows:

The Secretary to the Meeting introduced the Directors, the Executives and the Advisors who attended the Meeting today as follows: Limited ( BBLAM ), a subsidiary of Bangkok Bank Public Company Limited, may be the management company of the infrastructure fund. Therefore, Bangkok Bank Public Company Limited, a major shareholder and

More information

Shin Corporation. Macquarie Thailand Corporate Day. Building a stronger portfolio. Mrs.Siripen Sitasuwan President & Group CFO

Shin Corporation. Macquarie Thailand Corporate Day. Building a stronger portfolio. Mrs.Siripen Sitasuwan President & Group CFO Shin Corporation Macquarie Thailand Corporate Day Mrs.Siripen Sitasuwan President & Group CFO November 30 December 2, 2005 Building a stronger portfolio SHIN Corporation Mkt cap of Bt 111.7bn* (US$2.7bn)

More information

Investor Presentation. For 2016

Investor Presentation. For 2016 Investor Presentation For 216 Bangkok Bank 1. Operating Environment 2. Our Financial Results 216 3. Bangkok Bank s Position 4. Our Key Focus & Strategy 2 The Thai Economy: Steady Trend of Moderate Recovery

More information

FROM THE EDITOR AT A GLANCE. 1Q 11/12 (3 months ending 30 th June 2011) Our City Our Future 1. Dear Investment Community,

FROM THE EDITOR AT A GLANCE. 1Q 11/12 (3 months ending 30 th June 2011) Our City Our Future 1. Dear Investment Community, 1Q 11/12 (3 months ending 30 th June 2011) AT A GLANCE Share Information 1 Shares Outstanding 57,188.3mn shares Free Float 5 51.02% Par Value THB 0.64 / Share Market Capitalisation THB 39.5bn/ USD 1.31

More information

BTS Rail Mass Transit Growth Infrastructure Fund (BTSGIF)

BTS Rail Mass Transit Growth Infrastructure Fund (BTSGIF) 5 April 2013 THAILAND EQUITY Investment Research Thailand Research Team 66 2862 9999 ext 2030 Unrated Target Price THB12.60 Infrastructure Fund BTSGIF is a close-ended infrastructure fund with initial

More information

Thailand s Infrastructure Investment Plans

Thailand s Infrastructure Investment Plans Thailand s Infrastructure Investment Plans Thailand Focus 2014: Competencies & Growth Potential Conference Wednesday Aug 27, 2014 : 2.30-3.20 p.m. Ballroom Grand Hyatt Erawan Mr. Suwit Rojanavanich Bond

More information

CENTER OF LIFE. Opportunity Day. for the 2Q18 financial results. The Stock Exchange of Thailand 20 Aug Central Pattana Public Company Limited

CENTER OF LIFE. Opportunity Day. for the 2Q18 financial results. The Stock Exchange of Thailand 20 Aug Central Pattana Public Company Limited CENTER OF LIFE Opportunity Day for the 2Q18 financial results The Stock Exchange of Thailand 2 Aug 218 Bangkok, Thailand Central Pattana Public Company Limited Agenda Topics of Discussion 2Q18 Highlights

More information

SET Opportunity Day # 4/2017

SET Opportunity Day # 4/2017 SET Opportunity Day # 4/2017 3Q17 & Performance & Outlook 16 November 2017 1 2017 ERAWAN. All rights reserved. The views expressed here contain some information derived from publicly available sources

More information

Value Creation Section

Value Creation Section Value Creation Section Domestic Business Value Proposition Enrich the daily lives of our customers by providing financial products and services attuned to life stages and lifestyles. Financial Needs Main

More information

Quarterly Meeting# 4/2016

Quarterly Meeting# 4/2016 Quarterly Meeting# 4/2016 3Q16 & 9M16 Performance & Outlook 16 November 2016 The views expressed here contain some information derived from publicly available sources that have not been independently verified.

More information

Opportunity day 26 March 2019

Opportunity day 26 March 2019 2018 YEAR-ENDED RESULTS Opportunity day 26 March 2019 DISCLAIMER The information contained in this material has been prepared by Singha Estate Public Company Limited ( S or Singha Estate ) solely for information

More information

2017 GENERAL MEETING. Arnaud Lagardère General and Managing Partner. 4 May 2017

2017 GENERAL MEETING. Arnaud Lagardère General and Managing Partner. 4 May 2017 2017 GENERAL MEETING Arnaud Lagardère General and Managing Partner 4 May 2017 CONTENTS 1 2 3 4 OUR MARKETS AND TRENDS OUR GROUP TODAY OUR VALUE CREATION STRATEGY OUR PERFORMANCE 5 OUR OUTLOOK 2 OUR MARKETS

More information

Company Update. Benefiting from using an IP platform. Yuexiu Property (123 HK)

Company Update. Benefiting from using an IP platform. Yuexiu Property (123 HK) Company Update Ronney Cheung Analyst ronney.cheung@samsungfn.com +852 3411 3709 Wee Liat Lee Analyst weeliat.lee@samsungfn.com +852 3411 3716 Benefiting from using an IP platform WHAT S THE STORY? Event:

More information

Financing Megaprojects In The Rail Sector. Andreas Klocke, Head of KfW Regional Office, Bangkok

Financing Megaprojects In The Rail Sector. Andreas Klocke, Head of KfW Regional Office, Bangkok Financing Megaprojects In The Rail Sector Andreas Klocke, Head of KfW Regional Office, Bangkok Agenda 1. Background to KfW 2. PPP and the allocation interests and risks 3. Examples of PPP projects in the

More information

CP ALL Public Company Limited. FY2013: Presentation Results

CP ALL Public Company Limited. FY2013: Presentation Results CP ALL Public Company Limited FY2013: Presentation Results February 2014 Financial Highlights Units: MB Company Only 4Q12 4Q13 %Chg 2012 2013 %Chg Total Revenue 53,189 57,984 +9.0% 194,695 217,495 +11.7%

More information

CPN Retail Growth Leasehold Property Fund

CPN Retail Growth Leasehold Property Fund CPN Retail Growth Leasehold Property Fund 4 th Quarter 2011 and Full Year 2011 Financial Results 21 th March 2011 Important Notice The information contained in this presentation is for information purposes

More information

Research analyst : Pornthipa Rayabsangduan Analyst Registration No. : ,

Research analyst : Pornthipa Rayabsangduan Analyst Registration No. : , SIRI Residential Property Sansiri Non-rated THAILAND C API T AL NOM UR A SECU RITI ES COMPANY QUICK COMMENT We recently visited Sansiri (SIRI). The company is continuing with its expansion strategy that

More information

Foxtons Preliminary results presentation For the year ended December 2018

Foxtons Preliminary results presentation For the year ended December 2018 Foxtons Preliminary results presentation For the year ended December 2018 Important information This presentation includes statements that are, or may be deemed to be, forward-looking statements. These

More information

1H 19 Investor Presentation February 2019

1H 19 Investor Presentation February 2019 1H 19 Investor Presentation February 2019 1 About Raiz Raiz (formerly Acorns) is a mobile first micro-investing platform via mobile phone or web app, which allows customers to invest in a portfolio of

More information

NLSN 2Q 2011 Investor Presentation

NLSN 2Q 2011 Investor Presentation NLSN 2Q 2011 Investor Presentation Forward Looking Statements The following discussion contains forward-looking statements, including those about Nielsen s outlook and prospects, in the meaning of the

More information

Company Presentation Nine Months Ending September 30, November 2013

Company Presentation Nine Months Ending September 30, November 2013 Company Presentation Nine Months Ending September 30,2013 11 November 2013 Strong and Well-Diversified Business Portfolio JG SUMMIT HOLDINGS, INC. FOOD PROPERTY AIR TRANSPORT 55.7% Market Cap: US$6.44B

More information

Agenda. 1. Highlights 9M 2013 Results. 2. Financials. 3. Conclusion

Agenda. 1. Highlights 9M 2013 Results. 2. Financials. 3. Conclusion 1November 2013 Legal Disclaimer Information in this presentation may involve guidance, expectations, beliefs, plans, intentions or strategies regarding the future. These forward-looking statements involve

More information

Quarterly Meeting # 2/2015

Quarterly Meeting # 2/2015 Quarterly Meeting # 2/2015 1Q15 Performance & Outlook 18 May 2015 The views expressed here contain some information derived from publicly available sources that have not been independently verified. No

More information

NLSN 4Q and FY 2011 Investor Presentation

NLSN 4Q and FY 2011 Investor Presentation NLSN 4Q and FY 2011 Investor Presentation Forward Looking Statements The following discussion contains forward-looking statements, including those about Nielsen s outlook and prospects, in the meaning

More information

PTG Energy Company Limited Management Discussion and Analysis Year 2017

PTG Energy Company Limited Management Discussion and Analysis Year 2017 PTG Energy Company Limited Management Discussion and Analysis Year 2017 Executive Summary Market Summary and Business Performance in 2017 Year 2017 was a challenging year, with fuel consumption through

More information

L.P.N. Development - LPN

L.P.N. Development - LPN 1QCY13 net profit up 22% y-y Bloomberg Reuters LPN TB LPN.BK Report type: Company Results Company Overview LPN is engaged in the business of real estate development with focus on residential condominium

More information

Fixed Income Investor Presentation August 2016

Fixed Income Investor Presentation August 2016 InterContinental O2, London Fixed Income Investor Presentation August 2016 Table of contents 1. Introduction to IHG p3 2. Our Strategy p7 3. Financial Performance p13 DISCLAIMER RECIPIENTS ATTENTION IS

More information

Economic outlook. Bangkok Bank position. Strategic priorities and targets

Economic outlook. Bangkok Bank position. Strategic priorities and targets 20110721 1 Topics 1 2 3 Economic outlook Bangkok Bank position Strategic priorities and targets 2 GDP growth outlook remains strong 6 Baht trn 4 +2.5% 2.3% +7.8% +4 5% +3.2% +2.6% 2 0 2008 2009 2010 2011f

More information

Economic outlook. Bangkok Bank position. Strategic priorities and targets

Economic outlook. Bangkok Bank position. Strategic priorities and targets 20110603 1 Topics 1 2 3 Economic outlook Bangkok Bank position Strategic priorities and targets 2 GDP growth outlook remains strong 6 Baht trn 4 +2.5% 2.3% +7.8% +4 5% +3.0% 2 0 2008 2009 2010 2011f 1Q11(A)

More information

Agenda. 1. Highlights FY 2012 Results. 2. Operational Performance Priorities for Financials. 5. Conclusion

Agenda. 1. Highlights FY 2012 Results. 2. Operational Performance Priorities for Financials. 5. Conclusion 1MARCH 2013 Legal Disclaimer Information in this presentation may involve guidance, expectations, beliefs, plans, intentions or strategies regarding the future. These forward-looking statements involve

More information

Goldman Sachs and Gao Hua China Investment Frontier Conference 2011

Goldman Sachs and Gao Hua China Investment Frontier Conference 2011 Goldman Sachs and Gao Hua China Investment Frontier Conference 2011 1 Forward-looking statements This presentation and subsequent discussion may contain certain forward-looking statements with respect

More information

Investor Presentation. December 2013

Investor Presentation. December 2013 Investor Presentation December 2013 24.02.2014 Table of Contents 1. Thai economy 2. Strengthening bank and client base 3. BBL s financial results Thai economy in 2014-2015 Thailand is facing short-term

More information

DXB Entertainments PJSC

DXB Entertainments PJSC DXB Entertainments PJSC Q3 and 9M 2018 Earnings Release Presentation 6 November 2018 Disclaimer PRESENTATION AND ITS CONTENTS ARE NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY

More information

Full year and Q results March 15, 2017

Full year and Q results March 15, 2017 Full year and Q4 2016 results March 15, 2017 Disclaimer This document and its related communication ( Presentation ) have been issued by windeln.de SE and its subsidiaries ( Company ) and do not constitute

More information

For personal use only

For personal use only Click to edit Master text styles IDP Education FY16 Results Presentation Twelve months to 30 June 2016 11 February 2016 Important notice and disclaimer Click Disclaimer to edit Master text styles The material

More information

Bank of America Merrill Lynch The Future of Financials Conference. November 6, Citi Investor Relations

Bank of America Merrill Lynch The Future of Financials Conference. November 6, Citi Investor Relations Citi Investor Relations Bank of America Merrill Lynch The Future of Financials Conference November 6, 2018 Francisco Aristeguieta CEO, Citigroup Asia Pacific Agenda Franchise Overview Asia Institutional

More information

Airports of Thailand AOT

Airports of Thailand AOT Airports of Thailand AOT Promising growth in flight & passenger numbers Bloomberg Reuters AOT.TH AOT9 Report type: Company Update Company Overview AOT s main business lines are managing, operating and

More information

Year-end results. 18 May

Year-end results. 18 May Year-end results 18 May Highlights for the year Strong operational performance Good performance across all areas of activity Deepened our core franchise Sound levels of corporate client and private client

More information

Investor PRESENTATION. May Conrad Bora Bora Nui, French Polynesia

Investor PRESENTATION. May Conrad Bora Bora Nui, French Polynesia Investor PRESENTATION May 2018 Conrad Bora Bora Nui, French Polynesia HLT VALUE PROPOSITION Hilton's scale, global presence and leading brands at multiple price points drive a network effect delivering

More information

BTS Rail Mass Transit Growth Infrastructure Fund Report and financial statements For the period from 17 April 2013 (date of registration) to 31 March

BTS Rail Mass Transit Growth Infrastructure Fund Report and financial statements For the period from 17 April 2013 (date of registration) to 31 March BTS Rail Mass Transit Growth Infrastructure Fund Report and financial statements For the period from 17 April 2013 (date of registration) to 31 March 2014 Independent Auditor's Report To the Unitholders

More information

SET Opportunity Day # 4/2011

SET Opportunity Day # 4/2011 SET Opportunity Day # 4/211 & Performance & Outlook 17 November 211 1 The views expressed here contain some information derived from publicly available sources that have not been independently verified.

More information

2014 Financial Performance EV Results Strategic Priorities

2014 Financial Performance EV Results Strategic Priorities The financial information contained herein has not been completely reviewed by our external auditor. Therefore, no assurance is provided that our financial statements are fully accurate, and thus our final

More information

Las Vegas Sands Corp. 1Q12 Financial Results. April 25, 2012

Las Vegas Sands Corp. 1Q12 Financial Results. April 25, 2012 Las Vegas Sands Corp. 1Q12 Financial Results April 25, 2012 Forward Looking Statements This presentation contains forward looking statements that are made pursuant to the Safe Harbor Provisions of the

More information