INSURANCE MANUAL FOR TNB INSURANCE FACILITY FOR MINOR PROJECTS/ WORKS (BELOW RM150 MILLION) INSURER: QBE INSURANCE (MALAYSIA) BERHAD

Size: px
Start display at page:

Download "INSURANCE MANUAL FOR TNB INSURANCE FACILITY FOR MINOR PROJECTS/ WORKS (BELOW RM150 MILLION) INSURER: QBE INSURANCE (MALAYSIA) BERHAD"

Transcription

1 INSURANCE MANUAL FOR TNB INSURANCE FACILITY FOR MINOR PROJECTS/ WORKS (BELOW RM150 MILLION) INSURER: QBE INSURANCE (MALAYSIA) BERHAD PERIOD OF FACILITY: 1 JANUARY 2014 TO 31 DECEMBER 2016 TNB/RMD/MP (Version 1)

2 TABLE OF CONTENTS 1. INTRODUCTION SUB-TOPIC PAGE NO. 2. CONSTRUCTION/ERECTION ALL RISK (CEAR) 2.1 SUMMARY OF CEAR INSURANCE POLICY TERMS & DEDUCTIBLES 2.2 INSURANCE CLAIM PROCEDURE 2.3 SUPPORTING DOCUMENTS FOR INSURANCE CLAIM 2.4 NOTIFICATION STEPS 2.5 CLAIM STEPS FOR CEAR MARINE OPEN COVER (MOC) 3.1 SUMMARY OF MOC INSURANCE POLICY TERMS 3.2 INSURANCE CLAIM PROCEDURE 3.3 SUPPORTING DOCUMENTS FOR INSURANCE CLAIM 3.4 NOTIFICATION STEPS 3.5 CLAIM STEPS FOR MOC WORKMEN COMPENSATION (WC) 4.1 SUMMARY OF WC INSURANCE POLICY TERMS 4.2 SUPPORTING DOCUMENTS FOR INSURANCE CLAIM 4.3 NOTIFICATION STEPS 4.4 CLAIM STEPS FOR WC APPENDIX 5.1 DEFINITION 5.2 MASTER POLICY i. CONSTRUCTION ERECTIOAN ALL RISK (CEAR) ii. MARINE OPEN COVER (MOC) iii. WORKMEN COMPENSATION (WC) 23 ii

3 INTRODUCTION POLICIES This insurance guideline is prepared by Risk Management Department of Tenaga Nasional Berhad (TNB), and refers to a Master Insurance Policy issued by QBE Insurance (Malaysia) Berhad to TNB and its Contractors whom are awarded to perform works with contract value less than RM150 million. Insurance master policies which are arranged by for works below RM150 million are the followings: 1. Construction Erection All Risks (CEAR) for sum insured including; Contract Value Material provided by TNB (if any) Underground properties need to be covered (if any) 2. Workmen s Compensation (WC) for sum insured involving local workmen. 3. Marine Open Cover (MOC) This guideline is to be read together with insurance policy documents and in any case of discrepancies, the wordings of the policies shall prevail. DEFINITIONS Insurer QBE Insurance (Malaysia) Berhad Deductible The amount in respect of each claim which has to be borne by the Insured. Incident Report Form The document for advising claim details, a specimen of which is contained in Appendix A. Major Incident(s) Means where physical loss or damage is reasonably estimated at the time it occurs to be likely to result in repair or replacement costs in excess of RM300,000 and/or where death or serious bodily injury has occurred. Incident(s) Means where physical loss or damage, or bodily injury, has occurred, other than Major Incident(s) Emergency A serious situation where Insured requires immediate advice / guidance on the loss occurred. Third Party Liability Claims Legal liability to third party arising from damages to third party properties or bodily injury. 1

4 2.1 SUMMARY OF CEAR INSURANCE POLICY TERMS Property Insured : Section 1 MATERIAL DAMAGE The permanent and temporary works, materials, site accommodation and/or contents, constructional plant, tools and equipment, survey and other instruments (other than site accommodation and/or contents, constructional plant, tools and equipment belonging to or the responsibility of the Contractor) and other property used or for use in carrying out in connection with the Project the Insured s own or that for which he is responsible including offsite, or in transit (by road, rail or inland waterways in connection with the Project) thereto or there from. Section 2 THIRD PARTY LIABILITY All sums which the Insured shall be legally liable for compensation or damages in respect of: (a) Accidental death of or injury. (b) Accidental damage to property. (c) Loss of use in consequence of the aforesaid, (a) and (b) Section 3 UNDERGROUND CABLES, PIPES AND OTHER FACILITIES To indemnify the Insured/Third Party to for any sudden and unforeseen physical loss or damage to Underground Cables, Pipes and Other Facilities from any cause other than those excluded under the policy. Happening within the Geographical Limits during the period of insurance (including Maintenance Period) and arising out of the carrying out of the Project. Subject to sub-limits as defined herein. Limit of Indemnity : Section 1 MATERIAL DAMAGE The Project/Contract Works (including Free Issue materials, temporary works, workers quarters, site office, and the like as per detailed our in the Interest Insured section above) Category 1 All Projects/Contract Works of up to RM50,000, in value Category 2 All Projects/Contract Works in excess of RM50,000, and up to but not exceeding RM150,000, Section 2 THIRD PARTY LIABILITY RM 5,000,000 any one occurrence unlimited in any one period. Section 3 Underground Services Minimum RM 150, of Contract Works sum Insured or Maximum RM5,000,000 any one occurrence and in the aggregate Subject to the Insured having paid the agreed extra premium. 2

5 DEDUCTIBLES APPLIED (EACH AND EVERY LOSS) No Sum Insured AOG, Natural Hazards, Landslide/Subsiden ce and Collapse Theft Third Party Property Damage (other than Underground Service Vibration, Removal & Weakening of Support Testing & Commissioning Employer's existing / surrounding Properties (other than Underground Services) Losses to any Existing Underground Cables, Pipes & Other Facilities All other causes / losses (applicable to Section 1 only) Employer Existing / Surrounding Property 1 Up to RM250,000 RM2,500 whichever is higher 15% of Loss or Min RM5,000 RM10,000 RM5,000 whichever is higher RM5,000 RM20,000 RM7,500 whichever is higher Min RM5,000 Limit RM3,000,000 2 RM250,001 to RM RM5,000 whichever is higher 15% of Loss or Min RM7,500 RM10,000 RM7,500 whichever is higher RM7,500 whichever is higher RM20,000 RM15,000 Min RM7,500 Limit RM3,000,000 3 RM10,000,001 to RM15,000,000 RM10,000 RM20,000 RM10,000 RM12,500 RM12,500 RM20,000 RM20,000 Min RM10,000 Limit RM3,000,000 4 RM15,000,001 to RM30,000,000 RM15,000 RM35,000 RM10,000 RM20,000 RM20,000 RM20,000 RM25,000 Min RM15,000 Limit RM3,000,000 5 RM30,000,001 to RM50,000,000 RM25,000 RM50,000 RM10,000 RM35,000 RM35,000 RM20,000 RM35,000 Min RM20,000 Limit RM3,000,000 6 RM50,000,001 to RM100,000,000 RM30,000 RM75,000 RM20,000 RM50,000 RM75,000 RM35,000 RM75,000 Min RM30,000 Limit RM5,000,000 7 RM100,000,001 to RM150,000,000 RM75,000 RM100,000 RM25,000 RM100,000 RM125,000 RM35,000 RM100,000 Min RM45,000 Limit RM5,000,000 3

6 LIST OF CLAUSES AND EXCLUSION Clauses / Extensions / Warranty 1. Cessation of Work (90 days) 2. Claims preparation clause 3. Cover for Manufacturer s & Design Risk DE3 4. Strike Riot Civil Commotion 5. Cross Liability 6. Extended Maintenance (12 months from the take-over/hand) 7. Debris Removal ( Limit:15% of the total loss or maximum RM 5 mil in the aggregate) 8. Inland Transit (Limit: RM 250,000 per conveyance) 9. Destruction of Sound Property (Limit: RM500,000) 10. Escalation Clause 11. Employees Personal Effects and Tools (Limit:RM10,000) 12. Extra Charges for Overtime, Night work, work on Public Holidays, Express Freight including AirFreight (Limit: 25% of normal cost or RM1.5 mil, whichever lower for one occurrence) 13. Fire Department Service Charges (Limit: 10% of CWSI or RM750,000 whichever is lower for any one occurrence) 14. Leak & Search Cost 15. Loading and Unloading 16. Loss minimization & preventive measures (Limit: 10% of CWSI or RM500,000, whichever is lower for any one occurrence) 17. Machinery/Pair and set clause 18. Marine 50/50 clause 19. Multiple Insured clause (Non-vitiation) 20. Offsite Temporary storage and fabrication (Limit: RM10,000,000 for Equipment, RM500,000 for Cables) 21. Payment of Account 22. Plans and Specification Clause 23. Machinery/Pair and Set Clause 24. Cover for Principal s Surrounding / Existing Property (Limit:RM500,000 for 33kV cables, RM1.5mil above 33kV cables, RM5mil for Transmission Tower, RM1mil for Fibre Optic cables) 25. Professional Fees (Limit: 15% of total claim or RM2.5mil in the aggregate) 26. Public Authorities Clause (Limit: 10% of CWSI or RM500,000 whichever is lower) 27. Removal to place of safety (Maximum RM5mil in the aggregate) 28. Slope protection clause 29. Cover for Underground Cables, Pipes and Other Facilities (Limit: RM2.5mil for Power cables and RM2.5mil for Fibre Optic cables) 30. Special condition for open trenches during laying of pipelines, ducts and cables. 31. Sue and Labour 32. Temporary removal clause 33. Theft cover 34. Topping Up Clause 35. Plant and Machinery 36. Testing and Commissioning 4

7 Exclusions 1 Faulty Design 2 Wear and Tear 3 Consequential Loss 4 Money/Documents 5 Inventory Loss 6 Marine Cargo 7 Unexplained Shortage 8 Vessel/Aircraft/Vehicles 9 Contractor s Plant and Machinery 10 Sea or Air Transit 11 Wilful Act 12 Cessation Work 13 Political Risk 14 Electronic Data 15 Radioactive Contamination 16 Terrorism 17 Normal Action of Sea 5

8 2.2 INSURANCE CLAIM PROCEDURE Construction/Erection All Risk : The Insured shall upon becoming aware of any circumstances giving rise to or likely to give rise to a claim under this Policy: i. Give notice to Insurers as soon as possible but not later than 30 days and at their own expense supply full particulars and information and afford such assistance as Insurers may reasonably require; ii. iii. Give notice in the case of theft or wilful damage and render to them all reasonable assistance; Send to Insurers immediately on receipt any writ summons or other proceedings which may be commenced against the Insured; In the event of a claim being made against the Insured for which the Insured may seek indemnity under this Policy the Insured shall not negotiate pay settle admit or repudiate such claim without the written consent of the Insurers. 6

9 2.3 SUPPORTING DOCUMENTS FOR INSURANCE CLAIM Submissions of evidences to show the amount of loss suffered are important to confirm the followings: 1. The loss is covered under the policy. 2. The Insured have complied with the policy conditions. 3. The Insured is entitled to be paid for loss above deductible level and up to limits of the policy. Construction/Erection All Risk : Section 1 - Construction Material Damage The following documentations are normally required: 1. Photographs of damages before & after repair works 2. Internal incident report (damage report by engineers/supervisors) 3. Copy of the police report (incidents involving third party liability) 4. Letter/summons from third party (for claims involving damages to third party s property/bodily injury) 5. Scope of repair & costing documents to substantiate the claim, for example:- 5.1 The Specifications of Remedial Work 5.2 Method statement specifications 5.3 Relevant report ( soil test, subterranean water level test, etc) 5.4 Layout plan 6. Damage repair cost/expense documents in the form of the separate expense accounts created for each claim repair works. 7. Any additional documents that may be useful or may be requested by the Loss Adjuster. Section 2 - Third Party Liability The following documentations are normally required for claim submission: 1. Photographs of damages to third party property 2. Internal incident report (damage report by engineers/supervisors) 3. Copy of the police report (incidents involving third party liability) 4. Letter/summons from third party (for claims involving damages to third party s property/bodily injury). 5. Any additional documents that may be useful or may be requested by the Loss Adjuster. 7

10 2.4 NOTIFICATION STEPS STEP 1: 1. Check your Confirmation of Cover document for coverage period. 2. The insurance coverage will only respond the following type of claim: a. Accidental, unforeseen and sudden loss to contractor s work. b. Loss or damage to the materials or equipment intended for incorporation into the Works, but not including contractor s tools and equipment. c. Claim of loss or damage caused by third party for bodily injury or property damage. 3. Take immediate step to prevent bigger loss. In case of claim by third party, please only acknowledge receipt of letter and do not make any admission of mistake or liability. STEP 2: 1. Inform TNB Project Manager of incident. 2. TNB Project Manager or Contractor to notify claim through 3. Please call Risk Management Department in case of the following: Loss is estimated cost more than RM300,000. The incident requires immediate and urgent repair work. STEP 3: 1. Allow the Loss Adjuster appointed by Insurer, to visit to determine extend of loss. 2. Contractors shall provide supporting information, evidence, witness, document or photograph, as requested by Loss Adjuster. 3. TNB Project Manager and TNB staff shall provide supporting documents to Risk Management Department, as requested. 8

11 EMERGENCY CONTACT DETAILS Parties Name Mobile Address QBE Insurance (M) Berhad Risk Management Department Azrul Idzwan Daud Hussin / Manager Senior Manager

12 2.5 CLAIM STEPS FOR CEAR Immediately: Record evidence of loss Photograph, video or hand sketch Damages items or equipment During Repair After repair Take action to prevent bigger loss Minimise the damages Prevent further losses Immediate repair If case of claim from a Third Party,... Call Loss Adjuster for advise Do Not admit liability. Do Not say anything. Do Not discuss. Do not answer any correspondences. Forward any correspondence to Broker/Insurer. Do not admit anything to representatives or lawyer. Obtain names and addresses of any witnesses. Keep damage items or equipment List description of items Keep damaged items at site or store List down Witnesses, if any Note down: Name Contact Number Address Workers Engineers Sub-contractors 3 rd party witness Make Police Report in case of Theft Malicious Act Injury Third party property damage Third party bodily injury Death Expect Loss Adjuster visit within 24 hours... Cooperate with request for assistance Provide supporting documents. Organize documents Keep and separate expenses of... Daily labour work sheet Plant & Machinery utilisation Overhead 10

13 3.1 SUMMARY OF MOC INSURANCE POLICY TERMS Interest Insured : All types of Plant, Machinery, Equipment, Accessories and Materials (including spare parts) in connection with the design, engineering, procurement, manufacture, supply, construction, erection, installation, testing, commissioning and preparation for all Projects/Contracts as defined under the TNB Minor Works Insurance Programme Voyage : From the first commencement of the voyage at the premises of the vendor or supplier or any other including all movements in the process of packing and loading anywhere in the world (excluding all War declared areas and Sanction Countries) to the Project Site in Malaysia directly or via ports and or places in any order, via any route including transshipment by land, air, water whether customary or otherwise. Also including 90 days at consolidators and or pre-fabricators. Period in excess of 90 days held covered at rates to be agreed. Conveyance : Conveyance and vessels and/or barges by sea or water and/or by road and / or by rail and and/or by any other conveyances by land, sea or air and all connections and or locations. Cargo Limit Per Conveyance : RM10,000, any one conveyance and/or location or equivalent in other currencies. For the purpose of the above location is defined as each warehouse or place of storage or complex of buildings constituting one set of premises, including draft and rail or road conveyances at or alongside such premises. Clauses / Extensions / Warranty 1. Attachment/Termination of Transit Clause 2. Accumulation Clause 3. Cancellation Clause War Risks - 7 days Strikes Risks - 7 days except sending to/from USA which is 48 hours 4. Cancellation Clause Marine (60 days) 5. Transit Extension Clause 6. Special Replacement Clause 7. Special Replacement Clause (Duty) 8. Returned Shipment Clause 9. Paramount War Clause 10. Termination of Transit Clause (Terrorism) 11. Amended Insolvency Exclusion Clause 12. Rust, Oxidization, Discolorations Exclusion 13. Pipe work/structural Steel Cutting Clause 14. Electrical/Mechanical Derangement Clause 15. War Risks Clause /50 Clause 17. Deferred Unpacking Clause 18. General Average Clause 19. Shortage From Containers Clause 20. Packing Clause 21. Containerized Cargo Clause 22. Loading And Discharge Survey Clause 11

14 23. Labels Clause 24. Brands Clause 25. Trade Marked Cartons Clause 26. Fumigation Clause 27. Deliberate Damage Pollution Hazard Clause 28. Civil Authority Clause 29. Debris Removal Clause 30. Letter of Credit Clause 31. General Loss or Damage Survey Clause 32. Partial Loss Clause 33. Subrogation Clause 34. Declaration Basis Clause 35. Errors and Omissions Clause 36. Arbitration Clause 37. Extra Costs Clause 38. Willful Misconduct or Gross Negligence Clause 39. Cargo ISM Endorsement including Cargo ISM Forwarding Charges Clause 40. Airfreight Replacement Clause 41. Law and Practice 42. Adjustment and Settlement of Claims Clause 43. Definition of Critical Items Clause 44. Critical/Item Separation Clause 45. Survey Warranty Endorsement 46. Payment on Account Clause 47. Non Contribution Clause 48. On Deck and Over Aged Vessels Clause 49. Process Clause 50. Loss Payee Clause 51. Notice of Cancellation Clause 52. Condition Precedent to Liability Endorsement 53. Fraudulent Claims Clause 54. Subrogation Waiver Clause (excluding Equipment Manufacturers & Suppliers) 55. Multiple Assured Clause 56. Sanctions Limitations and Exclusion Clause 57. Co-Insurance and Leader Clause 58. Premium Warranty Endorsement 12

15 3.2 INSURANCE CLAIM PROCEDURE Marine Open Cover/ Transportation Insurance : Insured is to adhere to the following measures during the claim:- i. Obtain an exception report - where pilferage or damage is apparent, request for it before taking delivery. ii. Do not give a clean receipt - for goods where there is damage or the packing is in a damaged condition (Please write down remarks of damage in the delivery order) iii. Examine goods for hidden damage - within three working days of receipt. iv. Upon sight of damage - within three working days of receipt write to vessel's agents/carriers/port authorities and other relevant parties for holding them responsible for the loss/damage. v. Leave the goods in their packing until a survey had been made. If the goods have to be unpacked, keep aside the packaging for surveyor's inspection. vi. Check container for any leaks and have the damage independently witnessed before releasing the container. vii. Check container seal - to ensure it remains intact and the seal number agrees with shipping documents. If the original seal is found to be broken, apply immediately for joint survey with the carriers and port authority before removing the container from the port area. Do everything necessary to minimize the lo 13

16 3.3 SUPPORTING DOCUMENTS FOR INSURANCE CLAIM Marine Open Cover/ Transportation Insurance : To submit the following documents as soon as possible:- 1. Original Bill of Lading 2. Original or Certified copy of supplier's invoice 3. Packing List 4. Insured's Claim Bill 5. Inward/Outward Survey Report 6. Green Copy of port inward cargo charges note 7. Letter to shippers, carriers, forwarding agents and port authority for holding them responsible and their reply. 8. Lorry Consignment notes/delivery chits 9. Inward/Outward Tally Sheets (Missing Cargo Claims) 14

17 3.4 NOTIFICATION STEPS STEP 1: 4. Check your Confirmation of Cover document for coverage period. 5. The insurance coverage will only respond the following type of claim: d. Accidental, unforeseen and sudden loss to contractor s work. e. Loss or damage to the materials or equipment intended for incorporation into the Works, but not including contractor s tools and equipment. f. Claim of loss or damage caused by third party for bodily injury or property damage. 6. Take immediate step to prevent bigger loss. In case of claim by third party, please only acknowledge receipt of letter and do not make any admission of mistake or liability. STEP 2: 7. Inform TNB Project Manager of incident. 8. TNB Project Manager or Contractor to notify claim through 9. Please call Risk Management Department in case of the following: Loss is estimated cost more than RM300,000. The incident requires immediate and urgent repair work. STEP 3: 4. Allow the Loss Adjuster appointed by Insurer, to visit to determine extend of loss. 5. Contractors shall provide supporting information, evidence, witness, document or photograph, as requested by Loss Adjuster. 6. TNB Project Manager and TNB staff shall provide supporting documents to Risk Management Department, as requested. 15

18 EMERGENCY CONTACT DETAILS Parties Name Mobile Address QBE Insurance (M) Berhad Risk Management Department Azrul Idzwan Daud Hussin / Manager Senior Manager

19 3.5 CLAIM STEPS FOR MOC Write to parties involved in transit Hold responsible for damage to cargo Transporters Port authorities Carriers / shipping agents Inspect goods Do Not give clean receipts for doubtful condition... except under written protest Co-operate with Loss Adjuster or Surveyor Finalize insurance loss report Obtain insurance claim payment 17

20 4.1 SUMMARY OF WC INSURANCE POLICY TERMS Individual Declared Project/Contract : Period of Insurance (POI) as expressed in the Letter of Award but not more than thirty six (36) months from date of possession of contract site or commencement of insurance, whichever is earlier. NOTE Notwithstanding the above, any extension(s) of period of cover is automatic and shall run in tandem with the corresponding. contract works policy (where applicable) insofar as it relates to cover during the erection, testing and commissioning and maintenance period. Description of Employees Insured : a) Civil Works (Code : A) Project risks include all kinds of construction works, civil in nature not involving much mechanical works. Minimal exposure to theft losses given the relatively inexpensive project materials used. The more material risks would be that of impact damage to the works, underground services and existing/surrounding properties. b) Minor engineering/electrical and other mechanical works (Code : B) Other types of mechanical/engineering project works but less prone to theft losses given the location of site, nature of work and value of projects materials used. C) Substation, cabling and overhead distribution and transmission lines (33kV and above) (Code : C) Project works employing much mechanical. & engineering works; whereby project materials are of significant value and are therefore highly susceptible to theft losses particularly if isolated from reasonably populated areas. Estimated Annual Wages Common Law Liability Limit Clauses / Extensions / Warranty : Ten Percent (10%) of Contract Value : RM5,000, Jurisdiction clause basis of sum insured endorsement 2. SOCSO employees extension 3. Loss notification clause 4. Endorsement w60a (amended) 5. Endorsement w Endorsement w Endorsement w Endorsement w Endorsement w Endorsement a & b 11. Employee to employee extension clause 18

21 4.2 SUPPORTING DOCUMENTS FOR INSURANCE CLAIM Workmen Compensation : The following documentations are normally required for claim submission: 1. Claim form 2. Copy of Police Report 3. Medical Report (Labour Form 90 - supplied by Labour Office) 4. Death Certificate (death cases only) 5. Post Mortem Report (death cases only) 6. Original bills and receipts 7. Salary Chit / Voucher 8. Any additional documents that may be useful or may be requested by the Loss Adjuster. 19

22 4.3 NOTIFICATION STEPS STEP 1: 1. Check your Confirmation of Cover document for coverage period. 2. The insurance coverage will only respond the following type of claim: g. Accidental, unforeseen and sudden loss to contractor s work. h. Loss or damage to the materials or equipment intended for incorporation into the Works, but not including contractor s tools and equipment. i. Claim of loss or damage caused by third party for bodily injury or property damage. 3. Take immediate step to prevent bigger loss. In case of claim by third party, please only acknowledge receipt of letter and do not make any admission of mistake or liability. STEP 2: 1. Inform TNB Project Manager of incident. 2. TNB Project Manager or Contractor to notify claim through 3. Please call Risk Management Department in case of the following: Loss is estimated cost more than RM300,000. The incident requires immediate and urgent repair work. STEP 3: 1. Allow the Loss Adjuster appointed by Insurer, to visit to determine extend of loss. 2. Contractors shall provide supporting information, evidence, witness, document or photograph, as requested by Loss Adjuster. 3. TNB Project Manager and TNB staff shall provide supporting documents to EWRM Department, as requested. 20

23 EMERGENCY CONTACT DETAILS Parties Name Mobile Address QBE Insurance (M) Berhad Risk Management Department Azrul Idzwan Daud Hussin / Manager Senior Manager

24 4.4 CLAIM STEPS FOR WC Record Information Date and place of accident Brief circumstances of accident Nature of injury In-patient or out-patient Call Broker/Insurer for advise Report to Labor Office For compliance with Workmen Compensation Act. Medical report Send to Labour Office for assessment 22

25 5.1 Definitions Insurer QBE Insurance (Malaysia) Berhad Deductible Incident Report Form The amount in respect of each claim which has to be borne by the Insured. The claim details submitted through PRMS Major Incident(s) Incident(s) Emergency Third Party Liability Claims Means where physical loss or damage is reasonably estimated at the time it occurs to be likely to result in repair or replacement costs in excess of RM300,000 and/or where death or serious bodily injury has occurred. Means where physical loss or damage, or bodily injury, has occurred, other than Major Incident(s) A serious situation where Insured requires immediate advice / guidance on the loss occurred. Legal liability to third party arising from damages to third party properties or bodily injury. 23

QBE Construction Package. A comprehensive construction and engineering insurance cover

QBE Construction Package. A comprehensive construction and engineering insurance cover QBE Construction Package A comprehensive construction and engineering insurance cover Introducing QBE Construction Package QBE Construction Package insurance provides comprehensive protection for contractors

More information

QBE Construction Package. A comprehensive construction and engineering insurance cover

QBE Construction Package. A comprehensive construction and engineering insurance cover QBE Construction Package A comprehensive construction and engineering insurance cover Introducing QBE Construction Package QBE Construction Package insurance provides comprehensive protection for contractors

More information

HAZARDOUS WASTE AGREEMENT

HAZARDOUS WASTE AGREEMENT HAZARDOUS WASTE AGREEMENT This Agreement, made and entered into as of this day of, 20, by and between Alaska Marine Lines, Inc., a Washington corporation, ("Carrier") with its principal place of business

More information

South China Insurance Erection All Risks Policy (B)

South China Insurance Erection All Risks Policy (B) South China Insurance Erection All Risks Policy (B) 102.08.20 (102) 華產企字第 247 號函備查 Whereas the Insured named in the Schedule hereto has made to the South China Insurance Co., Ltd (hereinafter called the

More information

CHUBB INSURANCE COMPANY OF EUROPE SE

CHUBB INSURANCE COMPANY OF EUROPE SE CHUBB INSURANCE COMPANY OF EUROPE SE 106 Fenchurch Street, London EC3M 5NB, England Telephone: +44 (0) 20 7956 5000 Facsimile: +44 (0) 20 7956 5900 Website: www.chubb.com/uk MARINE CARGO INSURANCE POLICY

More information

ERECTION ALL RISKS INSURANCE POLICY

ERECTION ALL RISKS INSURANCE POLICY Bajaj Allianz General Insurance Company Limited Issuing office : ERECTION ALL RISKS INSURANCE POLICY WHEREAS the insured named in the Schedule hereto had made to BAJAJ ALLIANZ GENERAL INSURANCE COMPANY

More information

Marine Cargo Open Policy

Marine Cargo Open Policy Please read this Open Policy carefully upon receipt and promptly request for any necessary amendments Marine Cargo Open Policy Policy Number : Insured : Period : 10-14-GO00XXXX ABC Trading Co., Ltd. From

More information

b) Nuclear reaction, nuclear radiation or radioactive contamination.

b) Nuclear reaction, nuclear radiation or radioactive contamination. ERECTION ALL RISKS INSURANCE POLICY WORDINGS WHEREAS the insured named in the Schedule hereto had made to..insurance Co. Ltd., (hereinafter called the Company ) a written proposal by completing a Proposal

More information

Single Marine Cargo. Policy Wording

Single Marine Cargo. Policy Wording Single Marine Cargo Policy Wording Contents ZU10606 - V5 06/13 - CGEL-007553-2013 Welcome to Zurich About Zurich... 2 Duty of Disclosure... 2 Non-disclosure or Misrepresentation... 2 Our contract with

More information

Insurances. National Certificates of Currency

Insurances. National Certificates of Currency Insurances National Certificates of Currency HIGH LEVEL INSURANCE SUMMARY Contract Works Material Damage J Hutchinson Pty Ltd trading as Hutchinson Builders and others as per the policy Including and all

More information

Single Marine Cargo Insurance. Policy Wording

Single Marine Cargo Insurance. Policy Wording Single Marine Cargo Insurance Policy Wording Page 2 of 8 Schedule Contents About our Single Marine Cargo Insurance About Zurich... 2 How to apply for this insurance... 2 Our contract with you... 2 Your

More information

Standard Trading Conditions of Vietnam Logistics Business Association (VLA) (was amended in Congress VI)

Standard Trading Conditions of Vietnam Logistics Business Association (VLA) (was amended in Congress VI) Standard Trading Conditions of Vietnam Logistics Business Association (VLA) (was amended in Congress VI) I. GENERAL PRINCIPLES 1. These Standard Trading Conditions here below referred to as TSTC shall

More information

D11MA *1*01. emarine ZAISHADATUL AKMA

D11MA *1*01. emarine ZAISHADATUL AKMA BIB INSURANCE BROKERS SDN BHD (30129M) Suite 1909, 19 th Floor, Wisma MPL, Jalan Raja Chulan, 50200 Kuala Lumpur Tel No : 603-2141-3422 Fax No : 603-2142-3835 PLACEMENT SLIP (Final Confirmation) This transaction

More information

CONTENT S ANNUAL MARINE TRANSIT POLICIES COMMON SCHEDULE... 3 ENDORSEMENTS... 5 ANNUAL MARINE CARGO POLICY WORDING... 7 POLICY A CHINA-WIDE COVER... 8

CONTENT S ANNUAL MARINE TRANSIT POLICIES COMMON SCHEDULE... 3 ENDORSEMENTS... 5 ANNUAL MARINE CARGO POLICY WORDING... 7 POLICY A CHINA-WIDE COVER... 8 Chubb Cargo Plus Policy Annual Transit Cargo Insurance Policy Wording and Common Schedule Chubb Cargo Facultative Reinsurance Agreement Insured Organisation: As per Marine policy from Cargo Facultative

More information

HERPORT SINGAPORE PTE LTD. STANDARD TRADING CONDITIONS Effective 1/1/2015

HERPORT SINGAPORE PTE LTD. STANDARD TRADING CONDITIONS Effective 1/1/2015 HERPORT SINGAPORE PTE LTD. STANDARD TRADING CONDITIONS Effective 1/1/2015 1. In these Conditions, the following words have the following meanings: "Company" means HERPORT SINGAPORE PTE LTD. "Customer"

More information

Standard Trading Conditions - Gebruder Weiss Hong Kong Limited

Standard Trading Conditions - Gebruder Weiss Hong Kong Limited Standard Trading Conditions - Gebruder Weiss Hong Kong Limited 1. In these Conditions, the following words have the following meanings: "Company" means GEBRUDER WEISS HONG KONG LIMITED. "Customer" means

More information

ABA Film Services Ltd. Terms and Conditions of Hire

ABA Film Services Ltd. Terms and Conditions of Hire ABA Film Services Ltd Terms and Conditions of Hire 1 INTERPRETATION 1.1 In these conditions the following words have the following meanings: Contract means a contract which incorporates these conditions

More information

TERMS AND CONDITIONS OF SALE AND/OR HIRE OF PRODUCTS

TERMS AND CONDITIONS OF SALE AND/OR HIRE OF PRODUCTS TERMS AND CONDITIONS OF SALE AND/OR HIRE OF PRODUCTS 1 1.1 2 2.1 2.2 2.3 3 3.1 INTERPRETATION In these conditions the following words have the following meanings: Contract means a contract which incorporates

More information

Engineering Project Insurance Policy

Engineering Project Insurance Policy Type 1: Material Damage Third Party Liability Engineering Project Insurance Policy Contents Page # 1 Principle Operative Clauses 3 2 The Schedule 2.1 The Insured 3 2.2 The Contract 3 2.3 The Construction

More information

KARNATAKA STATE DRUGS LOGISTICS AND WAREHOUSING SOCIETY

KARNATAKA STATE DRUGS LOGISTICS AND WAREHOUSING SOCIETY KARNATAKA STATE DRUGS LOGISTICS AND WAREHOUSING SOCIETY STANDARD FIRE & SPECIAL PERILS POLICY All Properties of KSDLW including BUILDINGS - Warehouse Administrative offices PLANT & MACHINERY - All fixed

More information

LOSS OF OR DAMAGE TO EQUIPMENT FOR A SUM OR VALUE SUFFICIENT TO PROVIDE FOR THEIR REPLACEMENT AT THE SITE.

LOSS OF OR DAMAGE TO EQUIPMENT FOR A SUM OR VALUE SUFFICIENT TO PROVIDE FOR THEIR REPLACEMENT AT THE SITE. Risks and Insurances THE PROVIDES THESE INSURANCES FROM THE INSURANCE TABLE THE AMOUNT OF COVER FOR INSURANCE IN RESPECT OF LOSS OF OR DAMAGE TO PROPERTY (EXCEPT THE WORKS, PLANT AND MATERIALS AND EQUIPMENT)

More information

DHL GLOBAL FORWARDING TERMS AND CONDITIONS

DHL GLOBAL FORWARDING TERMS AND CONDITIONS DHL GLOBAL FORWARDING TERMS AND CONDITIONS These service terms and conditions constitute a legally binding agreement between Company and "Customer". In case a DHL Transport Document is issued, the terms

More information

DELAY IN START UP INSURANCE (MARINE)

DELAY IN START UP INSURANCE (MARINE) DELAY IN START UP INSURANCE (MARINE) (The terms and conditions including the wording provided are the proposed wordings and the final terms and conditions would be identical to those provided by the Reinsurer

More information

PHOTOGRAPHIC GOODS RENTAL/HIRE SERVICE TERMS AND CONDITIONS

PHOTOGRAPHIC GOODS RENTAL/HIRE SERVICE TERMS AND CONDITIONS PHOTOGRAPHIC GOODS RENTAL/HIRE SERVICE TERMS AND CONDITIONS These terms and conditions ( Terms ) set out the legal terms and conditions upon which Jessops Europe Limited (England and Wales company number

More information

HALLIBURTON GENERAL TERMS AND CONDITIONS. HALLIBURTON Halliburton as used herein is defined as Halliburton Energy Services, Inc.

HALLIBURTON GENERAL TERMS AND CONDITIONS. HALLIBURTON Halliburton as used herein is defined as Halliburton Energy Services, Inc. HALLIBURTON Halliburton as used herein is defined as Halliburton Energy Services, Inc. PAYMENT TYPES If Customer does not have an approved open account with Halliburton or if Customer has an approved account

More information

Monsoon Production Services, LLC Lease/Rental Agreement Terms and Conditions

Monsoon Production Services, LLC Lease/Rental Agreement Terms and Conditions Monsoon Production Services, LLC Lease/Rental Agreement Terms and Conditions Indemnity. Lessee/Renter ( You ) agree to defend, indemnify, and hold Monsoon Production Services, LLC, their officers, employees

More information

Addendum Clauses referred to in Charterers Certificates of Entry or Endorsement Slips.

Addendum Clauses referred to in Charterers Certificates of Entry or Endorsement Slips. Addendum Clauses referred to in Charterers Certificates of Entry or Endorsement Slips. This Addendum contains full wordings of clauses which may be incorporated, where contractually agreed, in the terms

More information

Allianz Insurance plc. Complete Cargo. Policy Details (including Policy Summary pages 1-5)

Allianz Insurance plc. Complete Cargo. Policy Details (including Policy Summary pages 1-5) Allianz Insurance plc Complete Cargo Policy Details (including Policy Summary pages 1-5) Complete Business Policy Details Policy Summary This is a Policy Summary only and does not contain full terms and

More information

1.1 The headings to the clauses are for reference purposes only and shall not aid in the interpretation of the clauses to which they relate.

1.1 The headings to the clauses are for reference purposes only and shall not aid in the interpretation of the clauses to which they relate. 1. Interpretation 1.1 The headings to the clauses are for reference purposes only and shall not aid in the interpretation of the clauses to which they relate. 1.2 At the discretion of the Company, the

More information

CONTRACTORS ALL RISK POLICY WORDINGS

CONTRACTORS ALL RISK POLICY WORDINGS CONTRACTORS ALL RISK POLICY WORDINGS Future Generali India Insurance Company Limited, Corporate & Registered Office : 6th Floor, Tower - 3, Indiabulls Finance Center, Senapati Bapat Marg, Elphinstone Road,

More information

Maintenance Conditions

Maintenance Conditions 1. Conclusion of contract, General 1.1. If an unquestioned written order confirmation exists, this is decisive for the content of the contract and the scope of the repair/installation. Subsidiary agreements

More information

MIMOS TENDER NO. : CB2/T/2013 APPENDIX 1 : CURRENT INSURANCE COVERAGE

MIMOS TENDER NO. : CB2/T/2013 APPENDIX 1 : CURRENT INSURANCE COVERAGE MIMOS TENDER : CB2/T/2013 1.0 INDUSTRIAL ALL RISKS INSURANCE: Section 1 Material damage to all movable/immovable property (ies) including but not limited to contents, fixtures & fittings and equipment

More information

PERMIT TO ENTER YOU ARE REQUIRED TO COMPLY WITH THE ENDORSEMENTS AND DETAILS SHOWN ON THIS PERMIT

PERMIT TO ENTER YOU ARE REQUIRED TO COMPLY WITH THE ENDORSEMENTS AND DETAILS SHOWN ON THIS PERMIT PERMIT TO ENTER PERMIT NO: YOU ARE REQUIRED TO COMPLY WITH THE ENDORSEMENTS AND DETAILS SHOWN ON THIS PERMIT KIWIRAIL OFFICE DETAILS OFFICE: Area Office, KiwiRail Network, CONTACT: PHONE NO: Mob Fax PROTECTION

More information

Conditions for the Carriage of Goods by Road

Conditions for the Carriage of Goods by Road Conditions for the Carriage of Goods by Road The Conditions set down the basis on which the Carrier will carry goods for the Customer (definitions of Carrier and Customer are given in Condition 1). The

More information

STANDARD TERMS AND CONDITIONS

STANDARD TERMS AND CONDITIONS STANDARD TERMS AND CONDITIONS 1. Parties to this Agreement 1. In these conditions ( these Conditions ) WPDT means Wilson Power And Distribution Technologies Pvt. Ltd. and Customer means the person entering

More information

COMMERCIAL VEHICLE INSURANCE POLICY

COMMERCIAL VEHICLE INSURANCE POLICY COMMERCIAL VEHICLE INSURANCE POLICY WHEREAS the Insured by a proposal and declaration, which shall be the basis of this contract and is deemed to be incorporated herein has applied to the Company for the

More information

Open Cargo insurance policy

Open Cargo insurance policy Open Cargo Open Cargo insurance policy registered in England & Wales number 1112892 with registered office at 100 Leadenhall Street, London EC3A 3BP. Authorised by the Prudential Regulation Authority and

More information

SPECIFICATION E.C.B MARINE CONSEQUENTIAL LOSS INSURANCE (DELAY IN START-UP)

SPECIFICATION E.C.B MARINE CONSEQUENTIAL LOSS INSURANCE (DELAY IN START-UP) SPECIFICATION (DELAY IN START-UP) RISKS COVERED 1. This insurance will indemnify the Insured in respect of their Gross Profit as defined herein ascertained in the manner hereinafter provided, during the

More information

TERMS OF SALE. or, if no date is specified, 14 Working Days after the date of the written quotation (unless extended by NZ Steel in writing).

TERMS OF SALE. or, if no date is specified, 14 Working Days after the date of the written quotation (unless extended by NZ Steel in writing). New Zealand Steel s Terms of Sale set out below ( Terms ) are the terms applying to all sales of New Zealand Steel products in New Zealand. Effective as at 1 July 2016 1 APPLICATION 1.1 These Terms shall

More information

UNITED NATIONS CARGO INSURANCE, CARGO INSURANCE. Restricted Cover

UNITED NATIONS CARGO INSURANCE, CARGO INSURANCE. Restricted Cover Page 1 sur 8 UNITED NATIONS CARGO INSURANCE, CARGO INSURANCE Restricted Cover A. - COVERAGE 1 This insurance covers physical loss of or damage to the insured cargo caused by 1.1 vessel or craft being stranded,

More information

Terms and Conditions for provision of Supply

Terms and Conditions for provision of Supply Terms and Conditions for provision of Supply 1. The Contract "Law" means: 1.1 The Contract is constituted by: these Terms and Conditions; the Purchase Order; and any present or future requirements of any

More information

Cargo single transit. your stuff. love. A. Policy statement. Policy wording. A2. Institute of London underwriters clauses. A1.

Cargo single transit. your stuff. love. A. Policy statement. Policy wording. A2. Institute of London underwriters clauses. A1. love your stuff Cargo single transit A. Policy statement A2. Institute of London underwriters clauses A1. Introduction In consideration of the payment of the premium, as agreed, We undertake to insure

More information

CONDITIONS OF CONTRACT. The Builder must execute and complete the Works in a workmanlike manner and ensure the Works are adequately supervised.

CONDITIONS OF CONTRACT. The Builder must execute and complete the Works in a workmanlike manner and ensure the Works are adequately supervised. CONDITIONS OF CONTRACT 1. RESPONSIBILITY OF BUILDER The Builder must execute and complete the Works in a workmanlike manner and ensure the Works are adequately supervised. 2. WORK PERFORMED OR MATERIALS

More information

Smeg UK Terms and Conditions of Trading

Smeg UK Terms and Conditions of Trading Smeg UK Terms and Conditions of Trading 1) General A. In these Terms and Conditions the Company means Smeg (UK) Limited; the Customer means any company, firm, or individual with whom the Company concludes

More information

Road Haulage Association Limited CONDITIONS OF CARRIAGE 1998 Effective 1 September 1998

Road Haulage Association Limited CONDITIONS OF CARRIAGE 1998 Effective 1 September 1998 Road Haulage Association Limited CONDITIONS OF CARRIAGE 1998 Effective 1 September 1998 PLEASE NOTE THAT THE CUSTOMER WILL NOT IN ALL CIRCUMSTANCES BE ENTITLED TO COMPENSATION, OR TO FULL COMPENSATION,

More information

Vero Marine Carriers' Legal Liability Wording

Vero Marine Carriers' Legal Liability Wording Vero Marine Carriers' Legal Liability Wording CCLB 0917 Note: individual policies may not include all the coverage sections shown in this sample wording Limited Carrier s Risk section We cover your liability

More information

Worth WorldWide Logistics, Pvt. Ltd.

Worth WorldWide Logistics, Pvt. Ltd. Worth WorldWide Logistics, Pvt. Ltd. STANDARD TRADING CONDITIONS CONDITIONS PART I: GENERAL CONDITIONS Application 1. (A) Subject to sub-clause below, all services of the Company whether gratuitous or

More information

Business Insurance Hired in plant section

Business Insurance Hired in plant section Business Insurance Hired in plant section Contents of this section Meaning of defined terms 1 What is covered 3 What is not covered 4 Section conditions 6 Hired in plant Your policy schedule will show

More information

PREMIER LIABILITY ENDORSEMENT DESCRIPTION. Additional Insured Coverage...9. Bail Bonds...7. Blanket Waiver of Subrogation...13

PREMIER LIABILITY ENDORSEMENT DESCRIPTION. Additional Insured Coverage...9. Bail Bonds...7. Blanket Waiver of Subrogation...13 PREMIER LIABILITY ENDORSEMENT TABLE OF CONTENTS DESCRIPTION PAGE Additional Insured Coverage...9 Bail Bonds...7 Blanket Waiver of Subrogation...13 Bodily Injury and Property Damage...1 Care, Custody or

More information

THE NEW INDIA ASSURANCE COMPANY LIMITED

THE NEW INDIA ASSURANCE COMPANY LIMITED THE NEW INDIA ASSURANCE COMPANY LIMITED Registered & Head Office- 87, M.G. Road, Fort, Mumbai-400001. PRODUCT LIABILITY POLICY 1. OPERATIVE CLAUSE : WHEREAS the Insured named in the Schedule hereto and

More information

APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO.

APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO. APPENDIX B WASHINGTON SUBURBAN SANITARY COMMISSION PROCUREMENT OFFICE INSURANCE AND BONDING CONTRACT NO. 1. INSURANCE REQUIREMENTS A. INSURANCE: The Contractor shall be required to maintain insurance for

More information

SPECIAL TERMS. AIG Europe Limited Rappresentanza Generale per l Italia - Via della Chiusa, Milano

SPECIAL TERMS. AIG Europe Limited Rappresentanza Generale per l Italia - Via della Chiusa, Milano SPECIAL TERMS Art. 2 INSURED CARGO This policy is understood to apply to all uninsured cargo for which the customer has used the MBE SafeValue service which consists of: - collection of the object from

More information

Cargo Open Transit. Policy wording. A. Policy statement. B. Risks covered additional clauses. A1. Introduction

Cargo Open Transit. Policy wording. A. Policy statement. B. Risks covered additional clauses. A1. Introduction Cargo Open Transit Policy wording A. Policy statement A1. Introduction In consideration of the payment of the premium, as agreed, We undertake to insure the Goods for the transits, as specified in the

More information

Standard Trading Terms & Conditions of High Seas Maritime Agency Ltd.

Standard Trading Terms & Conditions of High Seas Maritime Agency Ltd. Standard Trading Terms & Conditions of High Seas Maritime Agency Ltd. All transactions entered into between High Seas Maritime Agency Ltd. (hereinafter "High Seas") in connection with or arising out of

More information

SIMPLY CARGO. Your Institute Clauses

SIMPLY CARGO. Your Institute Clauses SIMPLY CARGO Your Institute Clauses 1/1/09 INSTITUTE CARGO CLAUSES (A) RISKS COVERED Risks 1. This insurance covers all risks of loss of or damage to the subject-matter insured except as excluded by the

More information

TERMS AND CONDITIONS OF PURCHASE

TERMS AND CONDITIONS OF PURCHASE TERMS AND CONDITIONS OF PURCHASE This Order (as defined below) is the Company s offer to purchase the Goods (as defined below). Unless otherwise expressly agreed in writing these are the only conditions

More information

PLANT ALL RISKS INSURANCE POLICY

PLANT ALL RISKS INSURANCE POLICY PLANT ALL RISKS INSURANCE POLICY WHEREAS the insured by a proposal and declaration, which shall be the basis of this policy and is deemed to be incorporated herein has applied to the company for the insurance

More information

marine single transit cargo imports and exports insurance policy

marine single transit cargo imports and exports insurance policy marine single transit cargo imports and exports insurance policy Marine Single Transit Cargo Imports and Exports insurance policy Your duty of disclosure Before You enter into a contract of general insurance

More information

CUSTOMER IDENTIFICATION CUSTOMER NAME: STREET ADDRESS: CITY: STATE: ZIP: TELEPHONE: FAX: TYPE OF BUSINESS:

CUSTOMER IDENTIFICATION CUSTOMER NAME: STREET ADDRESS: CITY: STATE: ZIP: TELEPHONE: FAX: TYPE OF BUSINESS: CUSTOMER IDENTIFICATION AGREEMENT FOR SERVICES & CREDIT CUSTOMER CORPORATION PARTNERSHIP SOLE PROPRIETORSHIP LIMITED LIABILITY CO STATE OF ORIGIN STREET P.O. BOX: CITY: STATE: ZIP: TELE FAX: TYPE OF BUSINESS:

More information

7/14/16. Hendry County Purchase Order Terms and Conditions

7/14/16. Hendry County Purchase Order Terms and Conditions Hendry County Purchase Order Terms and Conditions 1. Offer The order set forth in the Purchase Order is subject to cancellation by HENDRY COUNTY without notice if not accepted by VENDOR within fourteen

More information

Contractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties.

Contractor for any and all liability, costs, expenses, fines, penalties, and attorney s fees resulting from its failure to perform such duties. SUBCONTRACT AGREEMENT THIS SUBCONTRACT, made this day of, 20 by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter "Subcontractor") with an office

More information

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT

SAMPLE DOCUMENT SUBCONTRACT AGREEMENT SUBCONTRACT AGREEMENT THIS SUBCONTRACT, made this day of by and between (hereinafter "Contractor"), with an office and principal place of business at and (hereinafter "Subcontractor") with an office and

More information

ELECTRONIC EQUIPMENT INSURANCE (EEI)

ELECTRONIC EQUIPMENT INSURANCE (EEI) ELECTRONIC EQUIPMENT INSURANCE (EEI) The term electronic equipment is used for all systems which generally require very low voltage and power. These equipments are generally quiet in their operation. EEI

More information

HDFC ERGO General Insurance Company Limited

HDFC ERGO General Insurance Company Limited 2010 INLAND TRANSIT (RAIL/ROAD/AIR) CLAUSE A (ALL RISKS) RISKS COVERED RISK CLAUSE 1. This insurance covers all risks of loss or damage to the subject-matter insured except as excluded by the provisions

More information

1.2 The insurance covers liability that results from act or omission during the period the insurance is in force.

1.2 The insurance covers liability that results from act or omission during the period the insurance is in force. GENERAL CONDITIONS FOR INSURANCE OF FREIGHT FORWARDER'S LIABILITY IN CONNECTION WITH THE GENERAL CONDITIONS OF THE NORDIC ASSOCIATION OF FREIGHT FORWARDERS, EFFECTIVE AS OF JUNE 1, 1998 (NSAB 2000) These

More information

Terms of Entry ( ToE )

Terms of Entry ( ToE ) Terms of Entry ( ToE ) THESE ARE THE TERMS UPON WHICH PORTS OF AUCKLAND LIMITED ( POAL ) AGREES TO ALLOW YOU ( ENTRANT ) ACCESS TO ITS PREMISES 1.0 DEFINITIONS 1.1. In these ToE, unless the context otherwise

More information

TERMS & CONDITIONS OF HIRE General Terms

TERMS & CONDITIONS OF HIRE General Terms General Terms The rates of hire, delivery and collection will be specified in writing in the form of a quotation. Verbal estimates may be given as a guide only and may be varied in writing later. The period

More information

BNSF LOGISTICS TRANSLOADING AND CROSS-DOCKING PROVIDER TERMS AND CONDITIONS

BNSF LOGISTICS TRANSLOADING AND CROSS-DOCKING PROVIDER TERMS AND CONDITIONS BNSF LOGISTICS TRANSLOADING AND CROSS-DOCKING PROVIDER TERMS AND CONDITIONS The following Terms and Conditions are applicable to the transloading or cross-docking of any pallet, container, package, piece,

More information

JLT Marine Cargo Insurance Facility Wording. Distinctive. Choice.

JLT Marine Cargo Insurance Facility Wording. Distinctive. Choice. JLT Marine Cargo Insurance Facility Wording Distinctive. Choice. Table of Contents Introduction...1 Agreement...2 Law and Practice...3 Definitions...4 Conditions of Cover...5 Breach of Warranty & Exclusion

More information

MOTOR INSURANCE (TRANSLATION ONLY) GENERAL CONDITIONS

MOTOR INSURANCE (TRANSLATION ONLY) GENERAL CONDITIONS MOTOR INSURANCE (TRANSLATION ONLY) GENERAL CONDITIONS Subject to coverage, conditions and exclusions of this policy and endorsements attached to this policy, the Company agrees with the Insured as follows:

More information

Burglary Insurance Policy Wordings

Burglary Insurance Policy Wordings Burglary Insurance Policy Wordings 1 of 7 Burglary Insurance Policy In consideration of Your having paid the premium for the policy period stated in the Schedule or for any further period of insurance

More information

CARRIER S LEGAL LIABILITY INSURANCE:

CARRIER S LEGAL LIABILITY INSURANCE: CARRIER S LEGAL LIABILITY INSURANCE: The legal rights and liabilities in respect of carriage of goods by road is governed by the provisions of the carrier s Act 1865. Goods may be carried at Owner s risk

More information

marine annual cargo imports and exports insurance policy *See inside front cover

marine annual cargo imports and exports insurance policy *See inside front cover marine annual cargo imports and exports insurance policy Insurer *See inside front cover * This policy is available through shareholders of Steadfast Group Limited. Steadfast Group Limited is an unlisted

More information

Product description Valid as of 1 January 2015.

Product description Valid as of 1 January 2015. Product description Valid as of 1 January 2015. Cargo insurance Financially significant damage may be caused to goods during transport. It is recommended to insure transport risks to avoid interruptions

More information

Rail Owner Controlled Insurance Program Manual

Rail Owner Controlled Insurance Program Manual Rail Owner Controlled Insurance Program Manual Addendum No. 4 to June 2013 Edition (Updated 08-21-17) Update to Section 5 Enrolled and Excluded Contractor Required Coverage for Package P Contract Section

More information

2 nd Edition September 2005 (Second Edition of CIDB document 1020)

2 nd Edition September 2005 (Second Edition of CIDB document 1020) Supply of Goods (Short Contract) 2 nd Edition September 2005 (Second Edition of CIDB document 1020) CIDB Supply of Goods (Short Contract) September 2005, Second Edition of CIDB document 1020 SUPPLY OF

More information

LCIS Transit Policy for Artists Marine Cargo Wording Distinctive. Choice.

LCIS Transit Policy for Artists Marine Cargo Wording Distinctive. Choice. LCIS Transit Policy for Artists Marine Cargo Wording 2015 Distinctive. Choice. Table of Contents Introduction... 1 Agreement... 2 Law and Practice... 3 Definitions... 4 Conditions of Cover... 5 Breach

More information

************************************************* Marine Cargo Insurance *************************************************

************************************************* Marine Cargo Insurance ************************************************* ************************************************* Marine Cargo Insurance ************************************************* Salient Features AN OVERVIEW OF RISKS TO WHICH THE CARGO IS EXPOSED DURING TRANSPORTATION

More information

TERMS AND CONDITIONS OF TRADE. Introduction

TERMS AND CONDITIONS OF TRADE. Introduction TERMS AND CONDITIONS OF TRADE Introduction 1. These terms and conditions shall apply to all Carriage performed or undertaken by the Company and to every contract of Carriage entered into by the Company.

More information

STANDARD TERMS AND CONDITIONS FOR THE SALE OF GOODS ALL MARKETS EXCEPT OIL AND GAS

STANDARD TERMS AND CONDITIONS FOR THE SALE OF GOODS ALL MARKETS EXCEPT OIL AND GAS STANDARD TERMS AND CONDITIONS FOR THE SALE OF GOODS ALL MARKETS EXCEPT OIL AND GAS 1. Scope of Application These terms and conditions of sale ( T&C ) apply to all sales by our company ( Supplier ) of goods

More information

DIRECT LOGISTICS India Pvt Ltd

DIRECT LOGISTICS India Pvt Ltd DIRECT LOGISTICS India Pvt Ltd Company's Standard Trading Conditions TERMS & CONDITIONS Due to the length of these conditions, it is unlikely that they will be able to be printed on one side of paper and,

More information

CONTRACTOR'S PLANT & MACHINERY INSURANCE POLICY

CONTRACTOR'S PLANT & MACHINERY INSURANCE POLICY Bajaj Allianz General Insurance Company Limited Issuing office : CONTRACTOR'S PLANT & MACHINERY INSURANCE POLICY Downloaded from www.insureatclick.com - IMD Code : 10000006 WHEREAS the insured named in

More information

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT

WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT WESTERN RIVERSIDE COUNCIL OF GOVERNMENTS EQUIPMENT PURCHASE AGREEMENT This Equipment Purchase Agreement ( Agreement ) is entered into this day of, 20, by and between the Western Riverside Council of Governments,

More information

ESKOM MARINE the resultant additional insurance premium (if any) is agreed; and

ESKOM MARINE the resultant additional insurance premium (if any) is agreed; and Employer Policies and Procedures Shipping Policy & Procedure ESKOM MARINE Rev 4_0309 1. Qualifying Sea Vessels and Sea Vessel Age Limitation 1.1 The Employer-procured Marine Insurance Policy (herein the

More information

AKRON TRADE AND TRANSPORT

AKRON TRADE AND TRANSPORT AKRON TRADE AND TRANSPORT GENERAL TERMS AND CONDITIONS FOR SALE OF MARINE FUELS 1. DEFINITIONS: In this Agreement (as hereinafter defined) the following terms shall have the following meanings unless the

More information

Swiss Re Engineering Project Insurance Policy

Swiss Re Engineering Project Insurance Policy Swiss Re Engineering Project Insurance Policy Project Insurance Policy 2007 Contents Page Principal Operative Clauses 4 Schedule 6 A. Insured 6 B. Project 6 C. Territorial Limits 7 D. Period of Insurance

More information

Contract means the contract for the purchase and/or sale and/or hire of the Goods and/or the supply of Services.

Contract means the contract for the purchase and/or sale and/or hire of the Goods and/or the supply of Services. TERMS & CONDITIONS OF BUSINESS 1 Interpretation 1.1 In these conditions: Company means. Conditions means the standard terms and conditions of business set out in this document and (unless the context otherwise

More information

P O L I C Y N O SAM Aero AS AVIATION WORKSHOP AND PRODUCTS LIABILITY INSURANCE. Insurance period: (both days included)

P O L I C Y N O SAM Aero AS AVIATION WORKSHOP AND PRODUCTS LIABILITY INSURANCE. Insurance period: (both days included) P O L I C Y N O. 102622 SAM Aero AS AVIATION WORKSHOP AND PRODUCTS LIABILITY INSURANCE Insurance period: 13.07.2016 12.07.2017 (both days included) W. R. Berkley Insurance Norway NUF Henrik Ibsens gt 100

More information

FATIGUE TECHNOLOGY INC. PURCHASE ORDER TERMS AND CONDITIONS DATED JANUARY 4, 2006

FATIGUE TECHNOLOGY INC. PURCHASE ORDER TERMS AND CONDITIONS DATED JANUARY 4, 2006 FATIGUE TECHNOLOGY INC. PURCHASE ORDER TERMS AND CONDITIONS DATED JANUARY 4, 2006 1. CONTRACT. Fatigue Technology Inc. s, hereinafter called FTI, purchase order, or change order to a purchase order, collectively

More information

ALL TRAILERS - TERMS & CONDITIONS OF HIRE

ALL TRAILERS - TERMS & CONDITIONS OF HIRE ALL TRAILERS - TERMS & CONDITIONS OF HIRE GENERAL CONDITIONS FOR HIRE AND SALE OF PRODUCTS 1 INTERPRETATION 1.1 In these conditions the following words have the following meanings: "Contract" means a contract

More information

"Consignee" means the person or company to whom the Carrier contracts to deliver the Consignment.

Consignee means the person or company to whom the Carrier contracts to deliver the Consignment. TERMS AND CONDITIONS FOR DELIVERY SERVICES 11th February 2015 Mistybridge Ltd. trading as Central Despatch Services and/or Crawfords Delivery Services and/or CDS (hereinafter referred to as "the Carrier")

More information

GENERAL TERMS AND CONDITONS of Afvalstoffen Terminal Moerdijk B.V.

GENERAL TERMS AND CONDITONS of Afvalstoffen Terminal Moerdijk B.V. October 2016 GENERAL TERMS AND CONDITONS of Afvalstoffen Terminal Moerdijk B.V. Article 1 Applicability of General Terms and Conditions 1 These General Terms and Conditions are applied by Afvalstoffen

More information

General Terms and Conditions of Sale

General Terms and Conditions of Sale General Terms and Conditions of Sale April 2016 0 CONTENTS Clause Heading Page 1 Definitions and Interpretation...1 2 Basis of Contract...1 3 Description of the Goods and Services...2 4 Delivery and Acceptance

More information

Standard Terms & Conditions

Standard Terms & Conditions Standard Terms & Conditions Valid from 1 st February 2010 1. PARTIES 1.1 PORTS OF AUCKLAND LIMITED of Auckland. 1.2 The USER as defined. See clause 12. 2. 2.1 Ports of Auckland Limited, referred to as

More information

1 In these Domestic Sub-Contract Conditions the following expressions and terms shall have the meanings given below:

1 In these Domestic Sub-Contract Conditions the following expressions and terms shall have the meanings given below: DOMESTIC SUB-CONTRACT CONDITIONS These are the Domestic Sub-Contract Conditions referred to by the Articles of Agreement to which they are attached. In the event that these Domestic Sub-Contract Conditions

More information

INSTITUTE CARGO CLAUSES (A)

INSTITUTE CARGO CLAUSES (A) 1/1/82 INSTITUTE CARGO CLAUSES (A) RISKS COVERED 1. This insurance covers all risks of loss of or damage to the subject-matter insured except as provided in Clauses 4, 5, 6 and 7 below. 2. This insurance

More information

MARINE AND AVIATION DEPARTMENT

MARINE AND AVIATION DEPARTMENT MARINE POLICY- CARGO WHEREAS it has been proposed to AYALON INSURANCE COMPANY LTD. As per Schedule attached herewith: As well in their own name as for and in name and names of all and every other person

More information

Terms and Conditions for Bulk Shipments by Barge or Vessel

Terms and Conditions for Bulk Shipments by Barge or Vessel Shell Chemicals Terms and Conditions for Bulk Shipments by Barge or Vessel Where necessary, Seller will furnish Buyer with Safety Data Sheets ( SDS ), which include health, safety, security and environment

More information

AUTOMOBILE LIABILITY & PHYSICAL DAMAGE COVERAGE AGREEMENT PART A GENERAL

AUTOMOBILE LIABILITY & PHYSICAL DAMAGE COVERAGE AGREEMENT PART A GENERAL AUTOMOBILE LIABILITY & PHYSICAL DAMAGE COVERAGE AGREEMENT PART A GENERAL I. The TASB Risk Management Fund (Fund) provides coverage as outlined in this Automobile Liability & Physical Damage Coverage Agreement.

More information

INSTITUTE CARGO CLAUSES (B)

INSTITUTE CARGO CLAUSES (B) These clauses are purely illustrative. Different policy conditions may be agreed. The specimen clauses are available to any interested person upon request. In particular: (a) in relation to any clause

More information