1 Understanding Public Construction Contracts Katherine Lynn, Director

2 Working Together

3 Architect Owner Consultants The team shares the vision but each brings different value to the team. Engineers Contractor Subcontractor

4 OWNER State Agency Building Commission Finance State Fire Marshall Risk Management ARCHITECT Engineers Special Consultants CONTRACTOR Subcontractors Suppliers Fabricators Bonding Company Insurance Company

5 Roles and Responsibilities of the Owner Awarding Authority RFP s and A/E selection process Negotiating agreements Determination of low bidder and award of contract Funding Program/project requirements

6 Roles and Responsibilities of Architect Perform work in responsible manner Design to budget Design to code Coordinate design team Inspections for compliance with design Familiarity with Building Commission s procedures Make recommendations to Owner Administer construction contract

7 Roles and Responsibilities of Contractor Familiarity with Building Commission s procedures Bidding Construction in accordance with plans Communication Delays Differing site conditions Other construction issues

8 Role of the Building Commission Regulatory Agency Building codes Compliance with building codes Compliance with ADA Compliance with Energy Code Compliance with State Law Compliance with Manual of Procedures Bidding General Conditions termination, change orders, delays, dispute resolution Standard Articles extra services, billing/invoicing for services

9 Purpose Building Commission created in 1945 Code of Alabama 1975, Title Authorized and directed to adopt, promulgate, and enforce a State Building Code and to keep the code updated and consistent with acceptable architectural and engineering practices

10 Purpose of Building Commission Enforces minimum building code for state buildings, schoolhouses, hotels and motels and motion picture theaters (Title )

11 Purpose of Building Commission Responsible for reviewing plans and specifications for compliance with handicapped accessibility standards prescribed by the State Fire Marshall for public buildings and facilities (Title and )

12 Purpose of Building Commission Enforces minimum energy conservation code for new and renovated state buildings (Title )

13 Powers and Duties of Building Commission Supervises, administers and inspects construction and improvement projects for state agencies and departments, Postsecondary Education, PSCA, and similar authorities

14 Powers and Duties of Building Commission Provides periodic inspections of state funded projects including locally funded K-12 public school projects

15 Building Commission s Manual of Procedures Code Requirements Plan Review and Submittal Requirements Design Professional Services Fee Schedule Forms and Contract Documents Bidding and Award Contract Administration Inspections Special Procedures for PSCA and Other Authorities

16 State Building Code 2009 International Building Code 2009 International Plumbing Code 2009 International Mechanical Code 2009 International Fuel Gas Code 2009 International Fire Code 2011 National Electrical Code ASHRAE (Energy Code) 2008 ICC 500 ICC/NSSA Standard for the Design and Construction of Storm Shelters 2010 Americans with Disability Act Standards

17 Building Commission Procedures Architect Agreement Approval State Agencies Postsecondary PSCA Other Bond Authorities Plan Approval Process Final plans must be approved before bids are received Construction Contract Approval State Agencies Postsecondary PSCA Other Bond Authorities Inspection Process Pre- Construction Required Inspections Certificate of Substantial Completion

18 Mandatory Plan Review Plans and specifications must be approved before receiving bids Plan review process allow 30 days Code of Alabama 1975, Title 41, Section b) It shall be unlawful for any state building or construction or any public schoolhouse which does not conform to the requirements of the building code to be erected or acquired.

19 Mandatory Plan Review Life Safety Issues Fire protection Egress requirements Emergency lighting Adequate plumbing fixtures Adequate ventilation Accessibility Energy efficiency Other code requirements

20 Building Commission s Required Inspections Pre-Construction Conference Notice to Proceed Pre-Roofing Conference Above-Ceiling Inspection Final Inspection Certificate of Substantial Completion Occupancy by Owner Year-end Inspection

21 Building Commission Role by Project Type Type of Project Funding Source Plan Review Approvals Required Contract Review Inspections Reference State Agency State Appendix A-1 County or City School PSCA Appendix A-2 County or City School Local Appendix A-4 Private School Private Appendix A-6 Postsecondary PSCA Appendix A-2 Postsecondary Local Appendix A-3 Higher Education PSCA Appendix A-2 Higher Education Local Appendix A-5 Hotels/Motels Private Appendix A-6 Motion Picture Theaters Private Appendix A-6 Local Government Buildings Local ADA Only Appendix A-7 Pre-Assembled/Portable Buildings for State State Appendix A-8 Lease/Lease-Purchased by State State Appendix A-9

22 OWNER State Agency Building Commission Finance State Fire Marshall Risk Management ARCHITECT Engineers Special Consultants CONTRACTOR Subcontractors Suppliers Fabricators Bonding Company Insurance Company

23 Architectural/Engineering Services

24 Procurement of A/E Services Public Works Law Code of Alabama 1975, Title 39, Section (d) Exempt from competitive bidding Qualifications-based selection process shall not engage in actual construction, repair, renovation, or maintenance of the public works with their own forces, by contract, subcontract, purchase order, lease or otherwise.

25 Qualification and Experience Factors Per Title (3) Specialized expertise demonstrated by the proposed project approach Resources available to perform the work in timely manner Past performance including quality of work, ability to meet schedules, cost control, and contract administration Availability and familiarity with project location Proposed project management techniques Ability and proven history in handling special project contracts

26 BUILDING GROUPS OF THE SCHEDULE Group I: Industrial buildings without special facilities, parking structures and repetitive garages, simple loft type structures, warehouses exclusive of automated equipment, and other similar utilitarian type buildings. Group II: Armories, apartments, cold storage facilities, dormitories, exhibition halls, hangers, manufacturing/industrial plants, office buildings without tenant improvements, printing plants, public markets, and service garages. Group III: College classroom facilities, convention facilities, correctional and detention facilities, extended care facilities, gymnasiums (simple, prefabricated-pre-engineered, minimum types shall be classified under Group II), hospitals, institutional dining halls, laboratories, libraries, medical schools, medical office facilities and clinics, mental institutions, office buildings with tenant improvements, parks, playground and recreational facilities, police stations, public health centers, research facilities, schools (elementary and secondary), stadiums, and welfare buildings. Also, central utilities plants, water supply and distribution plants, sewage treatment and underground systems, electrical sub-stations and primary and secondary distribution systems, roads, bridges and major site improvements when performed as independent projects. When any or all of these types of improvements are incidental to an overall plan of architectural development they will be grouped with the basic architectural service of the overall project unless stated otherwise in the agreement. Group IV: Aquariums, auditoriums, art galleries, college buildings with special facilities, communications buildings, special schools, theaters and similar facilities. Group V: Residences and specialized decorative buildings unless otherwise stated in the agreement. Custom designed furnishings shall be categorized in Group V except when considered incidental to the basic architectural service for a building.

27 SCHEDULE OF BASIC FEE RATES FEE IN PERCENTAGE COST OF THE WORK BUILDING GROUP I II III IV V Up to $100, ,001 to 200, ,001 to 300, ,001 to 400, ,001 to 500, ,001 to 600, ,001 to 700, ,001 to 800, ,001 to 900, ,001 to 1,000, ,000,001 to 1,250, ,250,001 to 1,500, ,500,001 to 1,750, ,750,001 to 2,000, ,000,001 to 2,500, ,500,001 to 3,000, ,000,001 to 3,500, ,500,001 to 4,000, ,000,001 to 5,000,

28 Negotiating the Agreement Basic Services Responsibilities per ABC Form B2-A, Standard Articles Fee Schedule Basic Services Services A Schematic Design (10%) Services B Preliminary Design (15%) Services C Final Design (50%) Services D Bidding and Award of Contract (5%) Services E Construction Administration (20%)

29 Negotiating the Agreement Adjustments to the Basic Fee Increase for major renovation up to 25% of basic fee Does not include reroofing Substantial Duplication Reduction of one-half of Basic Fee for Services A-C for second building (building cost only) No reduction to Services D & E No reduction to Basic Fee for sitework

30 Negotiating the Agreement Additional Services Consulting services such as LEED Certification or geotechnical services or additional services outside of basic scope such as programming or prequalification Extra Services Services required by events beyond the Architect s control (Article 5) Include Schedule of Hourly Rates Reimbursable Expenses Definition of allowable/non-allowable reimbursable expenses (Article 6) Agreements must include Not to Exceed amount and applicable rates

31 Determining A/E Fees Basic Fee (Budget x Fee Percentage) + Additional Services (Consultant s Fee plus markup) + NTE for Reimbursable Expenses = Total Design Fee Adjustments to any of these items requires an amendment to the agreement

32 Payment Schedule for A/E Fees Service A: Schematic (10%) - Due upon approval of Schematic Submittal Services B: Preliminary (15%)- Due upon approval of Preliminary Submittal Services C: Final Design (50%) 90% due upon approval of Final Submittal Services D: Bidding and Award (5%) Remaining 10% of Service C and Service D due upon execution of contract

33 Payment Schedule for A/E Fees Services E: Construction Administration (20%) - % paid to match % on contractor s pay application up to 90%. Final 10% paid when contractor s final pay application is paid. Unawarded Bid Alternates 75% of lowest bid amount of unawarded alternates Reimbursable Expenses Not to exceed State Comptroller s rates (no markup on mileage)

34 Public Works Law

35 OWNER State Agency Building Commission Finance State Fire Marshall Risk Management ARCHITECT Engineers Special Consultants CONTRACTOR Subcontractors Suppliers Fabricators Bonding Company Insurance Company

36 Definition of Public Works Code of Alabama, Title 39, Section (5) PUBLIC WORKS. The construction, repair, renovation, or maintenance of public buildings, structures, sewers, waterworks, roads, bridges, docks, underpasses, and viaducts as well as any other improvement to be constructed, repaired, renovated, or maintained on public property and to be paid, in whole or in part, with public funds or with financing to be retired with public funds in the form of lease payments or otherwise.

37 Public Works Law Requirements Projects over $50K must be publicly advertised (Title 39, Section ) Once a week for three consecutive weeks in newspaper of general circulation in the county If over $500K, once in three (additional) newspapers of statewide circulation Sealed bids taken, opened and read at the place, time and date in advertisement

38 Public Works Law Requirements Exceptions to requirement to publicly advertise Projects under $50K Professional services such as architectural, engineering, project management, etc. (Title 41) Must not engage in performance of any of the work through their own or subcontracted forces Projects declared an emergency affecting health, safety or convenience Homeland Security projects

39 Bidding and Award of Contract Contract Award to Lowest Responsible and Responsive Bidder Definition of Responsible and Responsive per Title (a) A responsible bidder is one who, among other qualities determined necessary for performance, is competent, experienced, and financially able to perform the contract. A responsive bidder is one who submits a bid that complies with the terms and conditions of the invitation for bids.

40 Prequalification Requirements Requirements in Title (b) Advertised in same manner as project Related to the purpose of the contract Related to contract requirements or the quality of product or service Related to the responsibility, including competency, experience and financial ability of bidder Will permit reasonable competition at a level that serves the public interest Recommendations for handling protests

41 Award of Public Works Projects Use of alternates in determining low bidder Used to add or reduce bid to the available funds Funds available announced immediately prior to bid opening Fewest number of alternates taken in order to produce a price within the available funds Determination of lowest bidder

42 Award of Public Works Projects Mistakes in bid No forfeiture of bond if low bidder provides written notice to awarding authority within 3 working days Documentary evidence of calculation or clerical error, inadvertent omission or typographical error Mistake of law, judgment or opinion not valid ground for withdrawal without forfeiture Low bidder prohibited from doing any work on contract in any capacity or bidding if project is rebid

43 Award of Public Works Projects Negotiation of award (AGO ) Actual shortage of funds to award at low bid Awarding authority must disclose shortage of funds and recommend changes Architect must certify no substantial changes, prices reasonable and fair No objection from other contractors Changes are in public interest Redesign/rebid would result in delay, additional cost No collusion, fraud or unjust enrichment Negotiated changes must not exceed 10%

44 Act Prompt Payment Act

45 Prompt Payment Act 2010 revisions to Title 8 Payments under private contracts Time period for processing payment Penalty for late payment Retainage 2011 revisions to Title 39 (Public Works Law) Payments under Public Works projects Time period for processing payments Penalty for late payment Retainage

46 Prompt Payment Act 2014 Revisions Pre-bid meetings must be held at least 7 days prior to bid opening unless the project has been declared an emergency Projects cannot bid unless grant confirmed and matching funds available Contracts must designate person to review progress of completed work and review contractor s documents Designated person must review payments within 10 days after submission

47 Prompt Payment Act 2014 Revisions (cont.) Designated person within 10 days must either forward to owner for payment or return to contractor and disclose error in writing Awarding authority within 10 days must either make payment to contractor or forward to funding agency Payments must be made within 35 days (reduced from 45 days) Interest due on payments made after 35 days except at close of fiscal year or other announced official closures

48 Prompt Payment Act 2014 Revisions (cont.) Interest rates shall be equal to legal amount assessed for late payment of taxes If source of funding is grant or reimbursement which will not be available until contract is executed, this must be disclosed in contract and payment must be made within 10 days of awarding authority s receipt of funds Does not apply to contracts entered into in response to or as result of disaster event

49 Sales and Use Tax Certificates of Exemption for Certain Governmental Entities

50 Provisions of Act Authorizes Alabama Department of Revenue (ADOR) to grant Certificates of Exemption from sales and use taxes to certain governmental entities Enacted May 9, 2013 Applies to any contract awarded on or after January 1, 2014

51 Qualifying Governmental Entities The State of Alabama A county or incorporated municipality of Alabama An Alabama public school An Alabama industrial or economic development board or authority already exempt from sales/use taxes

52 Exemptions from Act Does not apply to the following: Contracts with federal government Contracts for highway, road, bridge construction or repair Any contract entered prior to January 1, 2014, or any change orders or contract extensions to contracts entered into prior to January 1, 2014

53 Bidding of Tax-Exempt Projects Under Act Act , Section 1(g) states the bid form shall provide for an accounting for the tax savings Bid proposal forms for tax-exempt projects must include estimated sales tax savings (refer to ABC Form C-3A) Bid proposal forms that do not include estimated sales tax are non-responsive and must be rejected

54 Applying for Certificates of Exemption The Owner Must submit application for each project Submit Application for Certificate of Exemption (Form ST: EXC-01) to DOR Submit executed construction contract May submit Letter of Intent (coordinate with DOR)

55 Applying for Certificates of Exemption The Contractor Must submit application for each project Submit Application for Certificate of Exemption (Form ST: EXC-01) to DOR Submit executed construction contract May submit Letter of Intent (coordinate with DOR) Submit list of subcontractors (update within 30 days of any change) Submit copy of General Contractor s license Submit copy of State and county business license

56 Applying for Certificates of Exemption The Subcontractor Must submit application for each project Submit Application for Certificate of Exemption (Form ST: EXC-01) to DOR Submit copy of contract with General Contractor Submit copy of General Contractor s license Submit copy of State and county business license

57 Certificates of Exemption for Projects Under $50K Act only allows certificates to be granted to a contractor licensed by the State Licensing Board for General Contractors Contractors working on projects under $50K are not required to have a General Contractor s license Contractor or subcontractor will not be eligible to apply for certificate unless they have a GC s license regardless of the cost of the project or the subcontract

58 Issuance of Certificates of Exemption DOR will issue certificates to the Owner, Contractor and subcontractors Each contractor and subcontractor must have a Consumer Use Tax account Will be assigned by DOR when certificate is issued Contractors and subcontractors must file a monthly consumer use tax return Must report all tax exempt purchases and all taxable purchases Must report online at My Alabama Taxes (

59 Allowable Expenses Sales and Use Tax exemption in Act applies to Purchase of building materials, construction materials and supplies and other tangible personal property that become part of the structure pursuant to a qualifying contract entered into on or after January 1, 2014

60 Non-Allowable Expenses Sales and Use Tax exemption in Act does not apply to Purchase of property that does not become part of the structure (see Rule ) Building materials or supplies not incorporated into the structure

61 Penalties for Misuse of Certificates of Exemption Contractors and subcontractors who intentionally misuse certificates of exemption may be liable for Actual sales or use tax due Civil penalty by DOR of $2000 or two times any state and local sales or use tax due Based on willful misuse may be barred from the use of any Certificate of Exemption on any project for up to two years

62 Timeline and Expiration of Certificates Owner must allow for time to receive certificates in contract performance time Options for proceeding without certificate Owner may continue to appoint the contractor as the Owner s Purchasing Agent using Form ST:PAA1 Requires Owner to be invoiced directly for materials Requires the Owner to pay vendor directly from their funds

63 Expiration of Certificates of Exemption Certificates issued for duration of contract based on completion date on construction contract Must coordinate and request extensions for additional work/time extensions granted by change order Additional time extensions may also be required If contractor does not complete project on time If contractor does not pay for materials until after contract completion date If contract is turned over to bonding company

64 Public School and College Authority (PSCA) Funds

65 PSCA Project Initiation Superintendent sends letter to School Architect outlining scope and funds required School Architect assigns PSCA Number and notifies system and ABC ABC administers project (by law) Funds can be allocated, redirected, etc., only by written communication from local superintendent

66 PSCA Procedures Allocation and approval of PSCA project funds are tied to specific project scope

67 PSCA Procedures PSCA number assigned to funds

68 Allowable Expenses Capitol Improvements Expenditures Professional Services Architect and/or Engineer Surveying Construction Testing Construction Contract Contractor Construction Materials Fixtures, Furnishings and Equipment (FFE) Purchase of property Other miscellaneous expenses

69 Ineligible Expenses Non-capital expenditures Supplies Athletic equipment (uniforms, pads, balls, etc.) Ink cartridges and other dispensable items Personal furnishings such as art, plants, or decorative items Teaching materials (textbooks, software, etc.) Reimbursement of local payments Expenditures not related to the approved project scope

70 Building Commission s Role for PSCA Projects Administers PSCA-funded contracts Reviews plans for compliance with State Building Code Reviews contract documents including Owner- Architect Agreements, construction contracts, change orders, and amendments Reviews and approves PSCA expenditures Inspects projects during construction

71 Current Issues Emergency Contracts Work by Others Current Construction Environment Audit Findings

72 Emergency Contracts Emergency Contracts for Design Services Title (6) Contract let to the extent required to alleviate the emergency Emergency Contracts for Construction Projects Emergency Declaration per the Public Works Law, Title (e) Only allows Owner to proceed without publicly advertising All other requirements still apply

73 Emergency Contracts Emergency Construction Contracts Emergency Declaration Letter by Superintendent Signed Board resolution approving emergency contract Design professional services Not required to be publicly advertised Must have approved plans Must execute contract

74 Work by Others Must comply with Building Commission requirements Full professional design team required Plan review and approval required Architect required to perform inspections Building Commission inspections Definition of Public Works project

75 Current Construction Environment Failure to pay subcontractors Proper termination of contracts Owner s and Bonding Company s Responsibilities

76 OWNER State Agency Building Commission Finance State Fire Marshall Risk Management ARCHITECT Engineers Special Consultants CONTRACTOR Subcontractors Suppliers Fabricators Bonding Company Insurance Company

77 Construction Issues Non-payment of subcontractors or vendors Owner s responsibilities Public Works Law copy of Payment Bond Payment of retainage Pay when paid Instruction to Bidders Para. 13.c. Owner s right to terminate contractor Procedure for termination per General Conditions Notice to Cure Notice of Termination Written Notice to Surety Timeliness of response

78 Owner s Responsibilities Termination for Cause Contracts Under $50K ABC Form C-8, Article 27, A.(2) Notice to Cure Notice of Termination Upon effective date of termination, Owner may take possession of site Finish the work by whatever reasonable method Final resolution if amount required to complete the project exceeds the contract balance

79 Owner s Responsibilities Termination for Cause Contracts Over $50K ABC Form C-8, Article 27, A.(3) Notice to Cure typically issued by the Architect Notice of Termination must be issued by the Owner Demand on the Performance Bond must be issued by the Owner Surety Claims Takeover Agreements

80 Audit Findings Change Orders over 10% Change orders must be within 10% and within scope If over 10% must be due to extraordinary circumstances such as unforeseen circumstances or differing project conditions Allowances Allowance amounts included in contract for work that is over $50K and that will not be bid Is the work over $50K? Can the work be performed as a separate contract? Will the work be performed by the general contractor? Is there intent to exceed the 10% or avoid bidding? Examples: Landscaping, Audio/Visual, FFE

81 Collection of User Fees Effective October 1, 2014, Building Commission will collect a fee for services Plan Review Fee Contract Administration Fee (State Agency or PSCA funded) Permit (Inspection) Fee Required for final plans received after October 1, 2014 and projects bid after October 1, 2014 Payment by check or electronic payment

82 Questions? Alabama Building Commission s website is Contact us at (334) or Alabama Building Commission PO Box Montgomery, AL

TAB 3 - CONTRACTS - CONSULTANTS.DOC

TAB 3 - CONTRACTS - CONSULTANTS.DOC Consultants Procedures Manual TAB 3 Contracts Owner and Designer with Prolog Owner & Designer Abbreviated Form Amendment to Agreement Types of Specialty Agreements Contractor Contract & Sales Tax Agreement

More information

CHARLOTTE PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSALS ("RFP")

CHARLOTTE PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSALS (RFP) CHARLOTTE PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSALS ("RFP") May 12, 2017 CHARLOTTE PUBLIC SCHOOLS A. Instructions REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES PART

More information

University of Maine System Supplementary Requirements to AIA Document B Standard Form of Agreement Between Owner and Architect

University of Maine System Supplementary Requirements to AIA Document B Standard Form of Agreement Between Owner and Architect APPENDIX A University of Maine System Supplementary Requirements to AIA Document B102 2007 Standard Form of Agreement Between Owner and Architect NOTE: B102 2007 AS MODIFIED WITH UNIVERSITY OF MAINE SYSTEM

More information

Document A133 TM. AGREEMENT made as of the day of in the year 20 (In words, indicate day, month and year.)

Document A133 TM. AGREEMENT made as of the day of in the year 20 (In words, indicate day, month and year.) Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AGREEMENT

More information

Design Services & Expectations for Performance

Design Services & Expectations for Performance Standard Terms & Conditions of Agreement between Owner & Designer Design Services & Expectations for Performance ARTICLE 1. Basic Services The Designer agrees to perform, for the referenced Work, the basic

More information

POLICY TITLE: Purchasing District Purchasing POLICY NO: 850 PAGE 1 of 11 PURCHASING POLICY 1 - DISTRICT PURCHASING

POLICY TITLE: Purchasing District Purchasing POLICY NO: 850 PAGE 1 of 11 PURCHASING POLICY 1 - DISTRICT PURCHASING POLICY TITLE: Purchasing District Purchasing POLICY NO: 850 PAGE 1 of 11 PURCHASING POLICY 1 - DISTRICT PURCHASING It is the policy of the Mountain Home School District to make purchases of goods, services,

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS ARCHITECTURAL/ENGINEERING SERVICES Proposals Due by: Tuesday, April 5, 2016 at 10:00 AM Secaucus Housing Authority 700 County Avenue Secaucus, New Jersey 07094 201 867-2957 www.secaucusha.org

More information

CAR 7-1 PURCHASING REGULATION CAR 7-1 OPR: Finance 4/90 (Revised 2/10)

CAR 7-1 PURCHASING REGULATION CAR 7-1 OPR: Finance 4/90 (Revised 2/10) CAR 7-1 PURCHASING REGULATION CAR 7-1 OPR: Finance 4/90 (Revised 2/10) Purpose Section I Scope II Definitions III Responsibility IV Using Department IV A Purchasing Function IV B Property Disposal V I.

More information

SAN DIEGO CONVENTION CENTER CORPORATION

SAN DIEGO CONVENTION CENTER CORPORATION SAN DIEGO CONVENTION CENTER CORPORATION REQUEST FOR PROPOSALS FOR CONSTRUCTION PROJECT MANAGEMENT RFP # 19-1159 Issue Date: Friday, October 5, 2018 Pre-Bid Conference: Pre-Bid Question Deadline: Bid Deadline:

More information

MARCH 3, Referred to Committee on Government Affairs. SUMMARY Revises provisions governing public works. (BDR )

MARCH 3, Referred to Committee on Government Affairs. SUMMARY Revises provisions governing public works. (BDR ) A.B. ASSEMBLY BILL NO. COMMITTEE ON GOVERNMENT AFFAIRS MARCH, 0 Referred to Committee on Government Affairs SUMMARY Revises provisions governing public works. (BDR -0) FISCAL NOTE: Effect on Local Government:

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

OWNER/PROFESSIONAL SERVICES CONSULTANT AGREEMENT PROJECT TITLE UNIVERSITY OF ILLINOIS

OWNER/PROFESSIONAL SERVICES CONSULTANT AGREEMENT PROJECT TITLE UNIVERSITY OF ILLINOIS PROJECT TITLE UNIVERSITY OF ILLINOIS THIS AGREEMENT, made and entered into in the City of, State of Illinois, as of the date of the last signature of the parties hereto by and between THE BOARD OF TRUSTEES

More information

Request for Fee Proposals (RFFP) Progressive Design-Build Services. New High School

Request for Fee Proposals (RFFP) Progressive Design-Build Services. New High School Request for Fee Proposals (RFFP) Progressive Design-Build Services New High School Issaquah School District February 12, 2018 TABLE OF CONTENTS 1. INTRODUCTION 2. PROJECT OVERVIEW 3. APPLICATION OF FEE

More information

OKEECHOBEE COUNTY PROCUREMENT POLICY

OKEECHOBEE COUNTY PROCUREMENT POLICY OKEECHOBEE COUNTY PROCUREMENT POLICY I. SCOPE Purchasing authority is vested in the Office of the County Administrator, subject to limitations prescribed herein. This policy applies to expenditure(s) of

More information

Request For Proposal. For Construction Management Services. For The. Benton County Jail and Sheriff s Office

Request For Proposal. For Construction Management Services. For The. Benton County Jail and Sheriff s Office For For The Issue Date: June 1, 2018 Due Date: June 25, 2018 by 10:00 a.m. Central Time Submit RFP to: Benton County Commission c/o Michelle McLerran Kreisler P.O. Box 1238 316 Van Buren Warsaw, Missouri

More information

DATE ISSUED: 10/20/ of 13 UPDATE 103 CV(LEGAL)-P

DATE ISSUED: 10/20/ of 13 UPDATE 103 CV(LEGAL)-P Note: For information on procuring goods and services under Education Code Chapter 44, see CH. Board Authority Delegation of Authority Contracts Valued at or Above $50,000 A district may adopt rules as

More information

SECTION II: PURCHASING POLICY & CONTRACTS

SECTION II: PURCHASING POLICY & CONTRACTS SECTION II: PURCHASING POLICY & CONTRACTS 1. POLICY OBJECTIVES. The underlying purpose of this policy is the balancing of the following objectives. It is understood that some of the objectives may be in

More information

WEXFORD COUNTY REQUEST FOR PROPOSALS

WEXFORD COUNTY REQUEST FOR PROPOSALS WEXFORD COUNTY REQUEST FOR PROPOSALS Central Dispatch 911 Center Architectural Services ISSUED BY: WEXFORD COUNTY BOARD OF COMMISSIONERS Date: September 28, 2018 Project Representative: Elaine Richardson

More information

Proposal Response Date: March 18, 2019, at 1:00p.m.

Proposal Response Date: March 18, 2019, at 1:00p.m. CONSULTANT SERVICES Architectural & Engineering Design Services Tracey Elementary & West Rocks Middle School Cafeteria and Kitchen Improvements Norwalk Public Schools REQUEST FOR PROPOSAL Proposal Response

More information

REQUEST FOR PROPOSAL Asbestos Inspection, Project Design and Monitoring

REQUEST FOR PROPOSAL Asbestos Inspection, Project Design and Monitoring City of Montrose Purchasing Division 433 South First Street PO Box 790 Montrose, CO 81402 REQUEST FOR PROPOSAL Asbestos Inspection, Project Design and Monitoring Issue Date: Monday September 15, 2014 Bid

More information

construction plans must be approved for construction by the City PBZ department.

construction plans must be approved for construction by the City PBZ department. City of Forest Park Request for Proposals Architectural Services for the Forest Park Public Works Department Mandatory Pre-Proposal Conference April 13, 2016 at 10:00 am Bid Deadline May 20, 2016 at 2:00

More information

RFP March 8, 2018 by 3:00 p.m. March 1, 2:00 p.m. in New Residence Halls Classroom (115C)

RFP March 8, 2018 by 3:00 p.m. March 1, 2:00 p.m. in New Residence Halls Classroom (115C) Request for Proposals t o provide Janitorial Services Residence Halls RFP-18111 Due Date Proposal Submissions March 8, 2018 by 3:00 p.m. MANDATORY Pre-Proposal Meeting March 1, 2018 @ 2:00 p.m. in New

More information

BIDS AND CONTRACTS. Limits Bids or quotations shall be secured as may be necessary to obtain the lowest possible prices as follows:

BIDS AND CONTRACTS. Limits Bids or quotations shall be secured as may be necessary to obtain the lowest possible prices as follows: AP 6340 BIDS AND CONTRACTS Adopted: January 27, 2009 Last Revised: January 26, 2017 References: Education Code Sections 81641-81656 Government Code Section 53060; Public Contract Code Sections 20103.7,

More information

FAYETTE COUNTY SCHOOL DISTRICT REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT AT RISK SERVICES

FAYETTE COUNTY SCHOOL DISTRICT REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT AT RISK SERVICES FAYETTE COUNTY SCHOOL DISTRICT REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT AT RISK SERVICES The Fayette County School District (FCSD) desires to retain the services of a professional Construction

More information

LOCAL GOVERNMENTS CAPITAL IMPROVEMENTS REVOLVING LOAN PROGRAM (CAP LOAN)

LOCAL GOVERNMENTS CAPITAL IMPROVEMENTS REVOLVING LOAN PROGRAM (CAP LOAN) LOCAL GOVERNMENTS CAPITAL IMPROVEMENTS REVOLVING LOAN PROGRAM (CAP LOAN) GUIDELINES LOCAL GOVERNMENTS CAPITAL IMPROVEMENTS REVOLVING LOAN PROGRAM (CAP) The Local Governments Capital Improvements Revolving

More information

Mentor Public Schools Board of Education 8.18 Policy Manual page 1 Chapter VIII Fiscal Management PROCUREMENT WITH FEDERAL GRANTS/FUNDS

Mentor Public Schools Board of Education 8.18 Policy Manual page 1 Chapter VIII Fiscal Management PROCUREMENT WITH FEDERAL GRANTS/FUNDS Policy Manual page 1 PROCUREMENT WITH FEDERAL GRANTS/FUNDS Procurement of all supplies, materials, equipment, and services paid for with federal funds or District matching funds shall be made in accordance

More information

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PRE-CONSTRUCTION AND CONSTRUCTION SERVICES AGREEMENT made by and between, hereinafter called the Owner, and SITESCOMMERCIAL, LLC 185 WIND CHIME COURT, SUITE

More information

PROFESSIONAL SERVICES CONSULTANT TYPE OF RETAINER AGREEMENT UNIVERSITY OF ILLINOIS

PROFESSIONAL SERVICES CONSULTANT TYPE OF RETAINER AGREEMENT UNIVERSITY OF ILLINOIS PROFESSIONAL SERVICES CONSULTANT TYPE OF RETAINER AGREEMENT UNIVERSITY OF ILLINOIS THIS AGREEMENT, made and entered into in the City of, State of Illinois, as of the date of the last signature of the parties

More information

OREGON STATE UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor)

OREGON STATE UNIVERSITY CM/GC CONTRACT. (Construction Manager/General Contractor) OREGON STATE UNIVERSITY CM/GC CONTRACT (Construction Manager/General Contractor) THE CONTRACT IS BETWEEN: OWNER: Oregon State University And CONSTRUCTION MANAGER/ GENERAL CONTRACTOR (referred to as Contractor

More information

FEDERAL GRANT ADMINISTRATION PROCUREMENT PROCEDURES Regulation Code: 8305

FEDERAL GRANT ADMINISTRATION PROCUREMENT PROCEDURES Regulation Code: 8305 Submitted to the Board for Information June 7, 2018 FEDERAL GRANT ADMINISTRATION PROCUREMENT PROCEDURES Regulation Code: 8305 This regulation applies to contracts for purchases of goods (apparatus, supplies,

More information

4.11 Procurement Procedures with Federal Funds

4.11 Procurement Procedures with Federal Funds 4.11 Procurement Procedures with Federal Funds I. Purpose The purpose of this policy is to establish guidelines that meet or exceed the procurement requirements for the purchase of goods (apparatus, supplies,

More information

DIVISION 2. - PURCHASES [11]

DIVISION 2. - PURCHASES [11] DIVISION 2. - PURCHASES [11] Sec. 2-261. - Definitions. Sec. 2-262. - Penalty. Sec. 2-263. - Purpose. Sec. 2-264. - Establishment of purchasing division. Sec. 2-265. - Appointment and functions of purchasing

More information

Request for Proposal for Construction Manager-at Risk Responses Due: 3:00 p.m. Thursday, September 10, 2015

Request for Proposal for Construction Manager-at Risk Responses Due: 3:00 p.m. Thursday, September 10, 2015 Request for Proposal for Construction Manager-at Risk Responses Due: 3:00 p.m. Thursday, September 10, 2015 The Housing Authority of the Town of Glastonbury (the GHA ) is seeking a qualified firm to serve

More information

Chapter 3.24 PURCHASING PROCEDURES

Chapter 3.24 PURCHASING PROCEDURES Page 1/8 Chapter 3.24 PURCHASING PROCEDURES Sections: 3.24.003 Definitions. 3.24.005 Types of contracts. 3.24.010 Service contracts. 3.24.020 Guidelines for service contracts. 3.24.030 Repealed. 3.24.040

More information

PROPOSALS DUE NO LATER THAN 11:00 A.M., SEPTEMBER 23, 2015 (6 COPIES) TO THE ATTENTION OF KRAIG BOYNTON, PURCHASING AGENT.

PROPOSALS DUE NO LATER THAN 11:00 A.M., SEPTEMBER 23, 2015 (6 COPIES) TO THE ATTENTION OF KRAIG BOYNTON, PURCHASING AGENT. REQUEST FOR PROPOSAL (RFP) FOR ARCHITECTURAL/ENGINEERING SERVICES FOR BUILDING ANALYSIS OF THE CITY- OWNED BUILDING LOCATED AT 149 NORTH BROAD STREET (FORMER ILLINOIS NATIONAL GUARD ARMORY) Kraig Boynton,

More information

ARLINGTON COUNTY PURCHASING RESOLUTION

ARLINGTON COUNTY PURCHASING RESOLUTION ARLINGTON COUNTY PURCHASING RESOLUTION ADOPTED: DECEMBER 1982 AMENDED: JUNE 1983 AMENDED: OCTOBER 1984 AMENDED: JUNE 1985 AMENDED: JULY 1986 AMENDED: JUNE 1987 AMENDED: JANUARY 1990 AMENDED: JULY 1991

More information

From the current CLPCCD Policy 3310 titled Purchasing and Contracting

From the current CLPCCD Policy 3310 titled Purchasing and Contracting Proposed Chabot-Las Positas Community College District Board Policy BP 6340 Business and Fiscal Affairs DRAFT as of 3/22/13 BP 6340 CONTRACTS References: Education Code Sections 81641 et seq.; Public Contract

More information

City of Hood River REQUEST FOR STATEMENTS OF INTEREST AND QUALIFICATIONS For City Engineering Services

City of Hood River REQUEST FOR STATEMENTS OF INTEREST AND QUALIFICATIONS For City Engineering Services SAMPLE DOCUMENT ONLY City of Hood River REQUEST FOR STATEMENTS OF INTEREST AND QUALIFICATIONS For City Engineering Services The City of Hood River is requesting Statement of Qualifications (RFQ) from qualified

More information

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER-AT-RISK

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER-AT-RISK AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER-AT-RISK MD ANDERSON AGREEMENT No. This Agreement is made as of, 2015 (the Effective Date ), by and between The Owner: The University of Texas M. D. Anderson

More information

School Business Consulting, Inc. W.H. Byrd, Inc. Thank you to our Sponsors!

School Business Consulting, Inc. W.H. Byrd, Inc. Thank you to our Sponsors! School Business Consulting, Inc. W.H. Byrd, Inc. Thank you to our Sponsors! How to Successfully Hard-Bid a Project Jeff Becker, Director of Facilities & Operations Maiya Yang, General Counsel Competitive

More information

Our mission is to procure supplies and services for our customers at the best value utilizing innovative supply-chain practices and technology.

Our mission is to procure supplies and services for our customers at the best value utilizing innovative supply-chain practices and technology. Supplier Guide Purpose Mission Statement How to Reach Us Sales Visits Office Hours Location Supplier Registration How the Procurement Process Works Purchasing Methods Quotations Bids Request for Proposals

More information

a. Proposals shall be submitted in a sealed envelope and addressed as follows:

a. Proposals shall be submitted in a sealed envelope and addressed as follows: City of North Mankato 1 CITY OF NORTH MANKATO REQUEST FOR QUALIFICATIONS & PROPOSAL PLUMBING SERVICES JULY 1, 2015 THROUGH JUNE 30, 2016 DUE: APRIL 15, 2015 by 5:00 p.m. The City of North Mankato (City)

More information

CITY UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR PROCUREMENT CONTRACTS (as amended through June 23, 2016)

CITY UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR PROCUREMENT CONTRACTS (as amended through June 23, 2016) CITY UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR PROCUREMENT CONTRACTS (as amended through June 23, 2016) Section A. Introduction These Guidelines set forth the operative policy and instructions of the

More information

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF PROGRAM MANAGER 1. BASIC SERVICES A-1 2. GENERAL PROGRAM SERVICES A-6

EXHIBIT A RESPONSIBILITIES AND SERVICES OF PROGRAM MANAGER 1. BASIC SERVICES A-1 2. GENERAL PROGRAM SERVICES A-6 EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF PROGRAM MANAGER 1. BASIC SERVICES A-1 2. GENERAL PROGRAM SERVICES A-6 3. PLANNING AND ADMINISTRATION A-6 OF THE PROJECT 4. PRECONSTRUCTION PHASE A-7 5. PRE-BIDDING

More information

COWLEY COUNTY, KANSAS REQUEST FOR PROPOSAL. SALARY STUDY SUBMITTAL DEADLINE June 1, 2012 RFP NUMBER

COWLEY COUNTY, KANSAS REQUEST FOR PROPOSAL. SALARY STUDY SUBMITTAL DEADLINE June 1, 2012 RFP NUMBER REQUEST FOR PROPOSAL SALARY STUDY SUBMITTAL DEADLINE June 1, 2012 RFP NUMBER 12-001 1. BACKGROUND INFORMATION: COWLEY COUNTY, KANSAS SCOPE OF SERVICES Cowley County, a municipal corporation existing under

More information

Request for Qualifications (RFQ) from Architectural/Engineering Firms

Request for Qualifications (RFQ) from Architectural/Engineering Firms Town of Windham, CT Issue Date: April 18, 2018 Bid Number: WHS 482018 To: Re: ALL PROSPECTIVE RESPONDENTS Request for Qualifications (RFQ) from Architectural/Engineering Firms The Town of Windham, CT (hereafter

More information

I. PROJECT DESCRIPTION

I. PROJECT DESCRIPTION REQUEST FOR QUALIFICATIONS The Board of Education of the Mariemont City School District (the Owner ) is seeking sealed, signed, written qualification statements from qualified Construction Management firms

More information

NC General Statutes - Chapter 143 Article 8 1

NC General Statutes - Chapter 143 Article 8 1 Article 8. Public Contracts. 143-128. Requirements for certain building contracts. (a) Preparation of specifications. Every officer, board, department, commission or commissions charged with responsibility

More information

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND J.T. VAUGHN CONSTRUCTION, LLC DESIGN-BUILD CONTRACTOR

AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND J.T. VAUGHN CONSTRUCTION, LLC DESIGN-BUILD CONTRACTOR DB-BIM Contract No. 5928 04/16 Project No. 01-3228 AGREEMENT BETWEEN THE BOARD OF REGENTS OF THE TEXAS A&M UNIVERSITY SYSTEM AND J.T. VAUGHN CONSTRUCTION, LLC DESIGN-BUILD CONTRACTOR 1 DB-BIM Contract

More information

City of Ballwin RFP #18-01 Ries Road Bridge Replacement BRM-4939(606)

City of Ballwin RFP #18-01 Ries Road Bridge Replacement BRM-4939(606) NOTICE TO CONTRACTORS Sealed bids, addressed to Ballwin Public Works, 14811 Manchester Road, Ballwin, Missouri 63011 for the proposed work will be received by the City of Ballwin until 10:00 AM (prevailing

More information

SECTION NOTICE TO BIDDERS

SECTION NOTICE TO BIDDERS SECTION 00 0030 NOTICE TO BIDDERS MAQUOKETA COMMUNITY SCHOOL AG LEARNING CENTER MAQUOKETA, IA NOTICE IS HEREBY GIVEN: Sealed bids for a Lump Sum Bid under a Single Construction Contract for the Maquoketa

More information

COUNSEL S CORNER. Iowa Code Chapter 26 Iowa Construction Bidding Procedures Act. By Danielle Jess Haindfield Ahlers & Cooney, P.C.

COUNSEL S CORNER. Iowa Code Chapter 26 Iowa Construction Bidding Procedures Act. By Danielle Jess Haindfield Ahlers & Cooney, P.C. COUNSEL S CORNER Iowa Code Chapter 26 Iowa Construction Bidding Procedures Act By Danielle Jess Haindfield Ahlers & Cooney, P.C. New Competitive Bidding Law passed by the Iowa legislature in 2006. Law

More information

The City of Moore Moore, Oklahoma

The City of Moore Moore, Oklahoma The City of Moore Moore, Oklahoma BID #1516-007 Construction Services Asbestos Removal for Royal Park Development Tract City of Moore Office of City Clerk, Purchasing Division 301 N. Broadway Avenue, Suite

More information

IC Chapter Guaranteed Savings Contracts; Energy Efficiency Programs Used by School Corporations

IC Chapter Guaranteed Savings Contracts; Energy Efficiency Programs Used by School Corporations IC 36-1-12.5 Chapter 12.5. Guaranteed Savings Contracts; Energy Efficiency Programs Used by School Corporations IC 36-1-12.5-0.5 "Actual savings" defined Sec. 0.5. As used in this chapter, "actual savings"

More information

Document C132 TM. Standard Form of Agreement Between Owner and Construction Manager as Adviser

Document C132 TM. Standard Form of Agreement Between Owner and Construction Manager as Adviser Document C132 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Adviser AGREEMENT made as of the 14th day of July in the year 2014 (In words, indicate day, month and year.) BETWEEN

More information

FACILITIES CONSTRUCTION (LEGAL)

FACILITIES CONSTRUCTION (LEGAL) Note: For information on procuring goods and services under Education Code Chapter 44, see CH. For additional legal requirements applicable to purchases with federal funds, see CBB. Board Authority Delegation

More information

ATTACHMENT A AIA DOCUMENT B EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT

ATTACHMENT A AIA DOCUMENT B EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT ATTACHMENT A AIA DOCUMENT B141 1987 EDITION STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT Winston-Salem/Forsyth County Board of Education June 15-2015 Revised Edition for Project: Architect: Amendments,

More information

5/16/2016. Procurement 101 OIG Findings TDEM Conference Texas Department of Public Safety. Procurement 101

5/16/2016. Procurement 101 OIG Findings TDEM Conference Texas Department of Public Safety. Procurement 101 Procurement 101 OIG Findings TDEM Conference - 2016 Procurement 101 Topics for Discussion Governing Regulations Methods of Procurement Procurement Requirements Contracts (Types) Required Written Procedures

More information

Sec Responsibility for the procurement of goods and services.

Sec Responsibility for the procurement of goods and services. Sec. 2-700. Duty of city manager. In accordance with and to the extent provided by I.C. 372.8 or successor provision, the city manager has charge of the procurement of goods and/or services for use in

More information

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services

AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER. Pre-Construction and Construction Phase Services AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER Pre-Construction and Construction Phase Services FP&M Project No, CP00Error! Bookmark not defined. AGREEMENT made by and between the Board of Regents, State

More information

RENOVATIONS TO TRENHOLM STATE TECHNICAL COLLEGE BUILDING H - WELDING MONTGOMERY, ALABAMA

RENOVATIONS TO TRENHOLM STATE TECHNICAL COLLEGE BUILDING H - WELDING MONTGOMERY, ALABAMA PROJECT MANUAL for RENOVATIONS TO TRENHOLM STATE TECHNICAL COLLEGE BUILDING H - WELDING MONTGOMERY, ALABAMA August 2, 2013 PSCA Project No. 710C ABC Project No. 2013 (PSCA and Local Funds) Prepared By

More information

!!" #$!%&#!" ' (& ')*+!"

!! #$!%&#! ' (& ')*+! !!" #$!%&#!" ' (& ')*+!" '&$,$- 1 OVERVIEW Documents organized in accordance with Construction Specification Institute Table of Contents Relationship between Division 0 and Division 1 ODOT and City Supplement

More information

Total Cost per Unit and Wall Mount including Installation Total Cost per Unit and Wall Mount not including Installation

Total Cost per Unit and Wall Mount including Installation Total Cost per Unit and Wall Mount not including Installation *** Invitation to Submit a Bid Proposal for Taylorsville Elementary School s LED Full HD Interactive Multi-Touch Flat Panel Display for 55 (Fifty-five) Units*** The Spencer County Board of Education is

More information

PROCUREMENT POLICY Originally Adopted April 1983 Revised: February 26, 2014

PROCUREMENT POLICY Originally Adopted April 1983 Revised: February 26, 2014 PROCUREMENT POLICY Originally Adopted April 1983 Revised: February 26, 2014 Table of Contents PREFACE... 3 I. INTRODUCTION... 4 II. GENERAL... 4 A. Purpose... 4 B. Applicability... 5 C. Delegation of Authority...

More information

REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR

REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR SANTA BARBARA UNIFIED SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR Multi-Purpose Building Renovation Projects at Harding University Partnership School and Roosevelt

More information

Miller Act. Nabil dmaidi 1

Miller Act. Nabil dmaidi 1 Miller Act Enacted in 1935 Federal Contracts over $25,000 Contractor shall provide Bonds Performance Bonds in the amount to protect the U.S. List of Surety Companies acceptable in Federal Register Bid

More information

HUNTERSVILLE GATEWAY APPROX 327 HUNTERSVILLE GATEWAY DR HUNTERSVILLE, NC ABC STORE # 22

HUNTERSVILLE GATEWAY APPROX 327 HUNTERSVILLE GATEWAY DR HUNTERSVILLE, NC ABC STORE # 22 REQUEST FOR QUALIFICATIONS (RFQ) For ARCHITECTURAL/ENGINEERING SERVICES FOR THE MECKLENBURG COUNTY ALCOHOLIC BEVERAGE CONTROL BOARD HUNTERSVILLE GATEWAY APPROX 327 HUNTERSVILLE GATEWAY DR HUNTERSVILLE,

More information

SENATE, No STATE OF NEW JERSEY. 209th LEGISLATURE INTRODUCED MAY 14, 2001

SENATE, No STATE OF NEW JERSEY. 209th LEGISLATURE INTRODUCED MAY 14, 2001 SENATE, No. 0 STATE OF NEW JERSEY 0th LEGISLATURE INTRODUCED MAY, 00 Sponsored by: Senator JOSEPH A. PALAIA District (Monmouth) SYNOPSIS Raises threshold for public advertisement of contracts under "County

More information

Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project

Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project Document B108 2009 Standard Form of Agreement Between Owner and Architect for a Federally Funded or Federally Insured Project AGREEMENT made as of the in the year (In words, indicate day, month and year.)

More information

The Capital Outlay Process in Virginia

The Capital Outlay Process in Virginia Department of General Services Division of Engineering & Buildings The Capital Outlay Process in Virginia January 24, 2008 Commonwealth of Virginia s agencies and institutions design and construct facilities

More information

As added by P.L , SEC.69.

As added by P.L , SEC.69. IC 5-1-16.5 Chapter 16.5. Indiana Health and Educational Facilities Financing Authority; Additional Provisions; Financing Projects for Private Colleges and Universities; Participation in Risk Retention

More information

AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER

AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER Project Name: Continuing Services Architect/Engineer: July 2012 Edition AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER This Agreement ( Agreement ) is made

More information

Washington University in St. Louis

Washington University in St. Louis Washington University in St. Louis Construction Terms and Conditions A. AGREEMENT. The Purchase Order, these Terms and Conditions, any special conditions, Owner s Policies, Design Standards and Insurance

More information

Request for Bid/Proposal

Request for Bid/Proposal Request for Bid/Proposal Hall of Science Lab Renovations Bids/Proposals Due: April 24, 2018 Mark Mehler Director of Procurement Services Drew University 36 Madison Ave, Madison, NJ 07940 973-408-3309 mmehler@drew.edu

More information

Document B109 TM. Standard Form of Agreement Between Owner and Architect for a Multi-Family Residential or Mixed Use Residential Project

Document B109 TM. Standard Form of Agreement Between Owner and Architect for a Multi-Family Residential or Mixed Use Residential Project Document B109 TM 2010 Standard Form of Agreement Between Owner and Architect for a Multi-Family Residential or Mixed Use Residential Project AGREEMENT made as of the day of in the year 2014 (In words,

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS Jefferson County School District No. R-1, State of Colorado, hereinafter called the "Owner", has advertised for bids to be submitted for the construction work specified in the advertisement.

More information

ONONDAGA COUNTY WATER AUTHORITY PURCHASING POLICY

ONONDAGA COUNTY WATER AUTHORITY PURCHASING POLICY ONONDAGA COUNTY WATER AUTHORITY PURCHASING POLICY I. INTRODUCTION The Onondaga County Water Authority ( OCWA ) was created as a public benefit corporation, pursuant to Public Authorities Law Article 5,

More information

CHAPTER Committee Substitute for Senate Bill No. 124

CHAPTER Committee Substitute for Senate Bill No. 124 CHAPTER 2016-153 Committee Substitute for Senate Bill No. 124 An act relating to public-private partnerships; transferring, renumbering, and amending s. 287.05712, F.S.; revising definitions; deleting

More information

Norway Vulcan Area Schools Bylaws & Policies

Norway Vulcan Area Schools Bylaws & Policies Norway Vulcan Area Schools Bylaws & Policies 6320 PURCHASING Procurement of all supplies, materials, equipment, and services paid for from District funds shall be made in accordance with all applicable

More information

PROCUREMENT PROCEDURES

PROCUREMENT PROCEDURES PROCUREMENT PROCEDURES BIDS Board 5-27-08 BP 3311 The District shall purchase equipment, supplies and services using competitive bidding when required by law and in accordance with statutory requirements

More information

Administrative Policy for Procurement, Bidding, Bid Specifications, Consulting, Request For Qualifications (RFQ), and Evaluation Criteria

Administrative Policy for Procurement, Bidding, Bid Specifications, Consulting, Request For Qualifications (RFQ), and Evaluation Criteria CITY OF LARAMIE Policy Title: Administrative Policy for Procurement, Bidding, Bid Specifications, Consulting, Request For Qualifications (RFQ), and Evaluation Criteria Policy Number: 2014-01 Page 1 of

More information

Request For Qualifications Construction Management at Risk

Request For Qualifications Construction Management at Risk Request For Qualifications Construction Management at Risk DAVIE COUNTY HIGH SCHOOL REPURPOSING PROJECT SOLICITATION: REC-2018-020 Representative for RFQ: Brad Blackwelder bblackwelder@daviecountync.gov

More information

3043 Design-Build Contracts

3043 Design-Build Contracts 3043 Design-Build Contracts This policy is adopted pursuant to the Political Subdivisions Construction Alternatives Act (NEB. REV. STAT. 13-2901 through 13-2914). The board shall adopt a resolution by

More information

Purchasing Manual. Resolution Exhibit A. AWWD Purchasing Manual Date: Last Revised 6/29/10

Purchasing Manual. Resolution Exhibit A. AWWD Purchasing Manual Date: Last Revised 6/29/10 Purchasing Manual Resolution 2527-2009 Exhibit A Date: Last Revised 6/29/10 Date: Last Revised 6/29/10 Table of Contents Purchasing Decision Trees Item to Be Purchased Cross Reference Guide Section 1.

More information

Terre View Research Facility Relocation Washington State University Pullman, WA Project Manual

Terre View Research Facility Relocation Washington State University Pullman, WA Project Manual Terre View Research Facility Relocation Washington State University Pullman, WA Project Manual Project No. 9574-2018 Issued 7/19/2017 Washington State University Facility Services, Capital Terre View Research

More information

The Minnesota Workers Compensation Assigned Risk Plan (MWCARP) Servicing Carrier REQUEST FOR PROPOSAL ( RFP ) ISSUED.

The Minnesota Workers Compensation Assigned Risk Plan (MWCARP) Servicing Carrier REQUEST FOR PROPOSAL ( RFP ) ISSUED. The Minnesota Workers Compensation Assigned Risk Plan (MWCARP) Servicing Carrier REQUEST FOR PROPOSAL ( RFP ) ISSUED July 31, 2014 Issued by Affinity Insurance Services, Inc. Plan Administrator Minnesota

More information

Randolph County Schools. Renovations to Third Ward Elementary School

Randolph County Schools. Renovations to Third Ward Elementary School Randolph County Schools Pre-Bid Meeting Notes August 8, 2011; 11:00 a.m. Third Ward Elementary School, 111 Nathan St., Elkins, WV, 26241 This meeting was mandatory for General Contractors, optional for

More information

REQUEST FOR QUALIFICATIONS DEADLINE: OCTOBER 19, :00 PM PT

REQUEST FOR QUALIFICATIONS DEADLINE: OCTOBER 19, :00 PM PT Roseburg Public Schools Purchasing Department 1419 NW Valley View Drive Roseburg OR 97471 1798 Phone 541 440 4020 Fax 541 440 4000 REQUEST FOR QUALIFICATIONS RFQ Number and Name: 17 653 PROJECT MANAGEMENT

More information

Lessons Learned: Construction Bidding & Procurement Item D.1

Lessons Learned: Construction Bidding & Procurement Item D.1 Lessons Learned: Construction Bidding & Procurement Item D.1 Facilities Subcommittee Meeting February 28, 2017 Bid Limits The District must competitively bid any contract involving an expenditure of: Bid

More information

City of Winston-Salem. Purchasing Policy and Procedures Manual

City of Winston-Salem. Purchasing Policy and Procedures Manual Purchasing Policy and Procedures Manual TABLE OF CONTENTS City of Winston-Salem SECTION 1 GENERAL INFORMATION.. 4 1.1 FORWARD....4 1.2 OVERVIEW......4 1.2.1 Centralized Purchasing...4 1.2.2 Program Administration....5

More information

THREE RIVERS AREA YOUTH SPORTS COMPLEX. Request for PROPOSALS. 333 West Michigan Ave. Three Rivers, Michigan,

THREE RIVERS AREA YOUTH SPORTS COMPLEX. Request for PROPOSALS. 333 West Michigan Ave. Three Rivers, Michigan, City of Three Rivers THREE RIVERS AREA YOUTH SPORTS COMPLEX Request for PROPOSALS 333 West Michigan Ave. Three Rivers, Michigan, 49093 269 273 1075 www.threeriversmi.org Engineering Services for the Youth

More information

Questions regarding this RFP should be directed to Stephen M. Pelz, Executive Director, at (661) , ext or

Questions regarding this RFP should be directed to Stephen M. Pelz, Executive Director, at (661) , ext or ISSUE DATE: June 25, 2018 REQUEST FOR PROPOSALS Terrace Cottages The Housing Authority of the County of Kern (Authority) is seeking the Professional Services of an Architectural firm, for the purpose of

More information

HSU Reddie Grill Renovation OFFICIAL BID SHEET

HSU Reddie Grill Renovation OFFICIAL BID SHEET OFFICIAL BID SHEET BID NUMBER: 18-24 FIRM CONTRACT DATE: June 26, 2018 INVITATION Bids must be signed in Ink. Unsigned bids will not be considered. Bids are invited for the Renovation of the HSU Reddie

More information

The Liberia Annual Conference Monrovia, Liberia. REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT and GENERAL CONTRACTOR SERVICES FOR

The Liberia Annual Conference Monrovia, Liberia. REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT and GENERAL CONTRACTOR SERVICES FOR The Liberia Annual Conference Monrovia, Liberia REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT and GENERAL CONTRACTOR SERVICES FOR NEW RESIDENTIAL TWO-STORY CLASSROOM BUILDING AND VOCATIONAL SCHOOL

More information

REQUEST FOR PROPOSALS PROFESSIONAL CONSULTING SERVICES RFP

REQUEST FOR PROPOSALS PROFESSIONAL CONSULTING SERVICES RFP REQUEST FOR PROPOSALS FOR PROFESSIONAL CONSULTING SERVICES RFP 252018 Town of Scarborough P.O. Box 360 259 U.S. Route One Scarborough, Maine 04070-0360 Released on April 12, 2018 Proposals Due on May 7,

More information

Document A133 TM. AGREEMENT made as of the day of in the year Two Thousand and Sixteen. BETWEEN the Owner:

Document A133 TM. AGREEMENT made as of the day of in the year Two Thousand and Sixteen. BETWEEN the Owner: Document A133 TM 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AGREEMENT

More information

BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER

BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER BUILDING CONSTRUCTION AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PROJECT NAME AND LOCATION: Project Name Campus Name Campus Address CONSTRUCTION MANAGER: Contractor Name Address ARCHITECT-ENGINEER:

More information

RETAINER CONTRACT SUPPLEMENT OSU RETAINERCONTRACT FOR PROFESSIONAL CONSULTANTS SUPPLEMENT NO.: OSU-xxx-P-15-xx CAMPUS ROOF REPLACEMENT DESIGN 2016

RETAINER CONTRACT SUPPLEMENT OSU RETAINERCONTRACT FOR PROFESSIONAL CONSULTANTS SUPPLEMENT NO.: OSU-xxx-P-15-xx CAMPUS ROOF REPLACEMENT DESIGN 2016 RETAINER CONTRACT SUPPLEMENT OSU RETAINERCONTRACT FOR PROFESSIONAL CONSULTANTS SUPPLEMENT NO.: OSU-xxx-P-15-xx CAMPUS ROOF REPLACEMENT DESIGN 2016 This Retainer Contract Supplement dated (the Supplement

More information

Purchasing and Contracting

Purchasing and Contracting 19 Purchasing and Contracting The most significant legislative change in the purchasing and contracting field this session will allow local school units to make purchases using locally administered procedures

More information

REQUEST FOR PROPOSAL SUPPLY OF

REQUEST FOR PROPOSAL SUPPLY OF TOWN OF SANDOWN, NH REQUEST FOR PROPOSAL SUPPLY OF #2 HEATING OIL, PROPANE GASOLINE AND DIESEL BID DUE DATE: September 6, 2018 Page 1 of 10 I. General Conditions 1. General Information: The Selectmen s

More information