1 Yukon Mine Site and Reclamation Closure Policy Financial and Technical Guidelines September 2013

2

3 Table of Contents EXPLANATORY NOTES... 1 GUIDELINES SUMMARY... 2 FINANCIAL GUIDELINES... 5 CASH... 6 LETTER OF CREDIT & BANK LETTER OF GUARANTEE... 7 PLEDGE OF ASSETS... 9 SURETY BOND INSURANCE SECURITY HELD PURSUANT TO TRUST INDENTURE LIABILITY ESTIMATE FOR SECURITY DISCOUNT RATE INTEREST & RETURNS EARNED ON SECURITY ADJUSTMENTS & CONVERSIONS OF SECURITY STATEMENT TO MINE OWNERS ON SECURITY NOTICE OF MATERIAL CHANGE RELEASE OF SECURITY ON TRANSFER OF LICENSE TEMPORARY CLOSURE TECHNICAL GUIDELINES WATER RETENTION & SEDIMENT CONTROL STRUCTURES WATERCOURSES WATER QUALITY SITE CONTAMINATION ACID ROCK DRAINAGE POTENTIAL TAILINGS MANAGEMENT UNDERGROUND WORKINGS & OPENINGS TO SURFACE TERRAIN HAZARDS MINE ROCK PILES ROADS & OTHER ACCESS EROSION CONTROL RE-VEGETATION MINE INFRASTRUCTURE HEAP LEACH PADS TEMPORARY CLOSURE SITE CONDITIONS GEOLOGICAL VALUES & HERITAGE APPENDIX A SAMPLE: IRREVOCABLE STANDBY LETTER OF CREDIT SAMPLE: SURETY BOND APPENDIX B WEB REFERENCES... 55

4

5 EXPLANATORY NOTES The financial guidelines provide details on the terms of various forms of security. They also provide greater policy detail regarding discretionary forms of security. They address details on the procedures and timing for calculating, managing, reviewing and adjusting security. The scope of the guidelines applies to security provided in association with a production license issued or transferred under the Quartz Mining Act. The guidelines also apply to security required pursuant to the water license issued under the Waters Act, to the extent reflected in the water license. The financial guidelines include three features: purpose, context and practice. Statements on purpose set out the intended audience and the financial instrument or matter being addressed. Statements about context are normally derived from the Yukon Mine Site Reclamation and Closure Policy and/or legislation, and provide a legal and policy context within which practices can be considered. As to statements on practice, these may include requirements that exist pursuant to legislation or provide greater policy detail. These may also include statements on preferred practices on the part of the Yukon government in relation to the instrument or financial matter at hand. The technical guidelines provide direction on reclamation and closure objectives that mine owners and government administrators must or should consider in developing and implementing a reclamation and closure plan. Key features of the mine and known hazards are addressed with the statement of performance objectives and some details on the practices normally associated with specific aspects of decommissioning. The guidelines are intended to be objective-based and non-prescriptive. This encourages innovation and least-cost options while ensuring that public interest objectives for ensuring public health and safety and environmental protection are met. The guidelines allow mine owners to depart from standard practice at any given time, with adequate rationale provided and risk management strategies in place. The technical guidelines include three elements: purpose, objectives and practice. As with the financial guidelines, statements on purpose set out the intended audience and matter to be addressed. Objectives are non-prescriptive results for environmental quality and conditions following reclamation and closure. The practices outlined include reference to principal legal requirements, policy detail pursuant to the Yukon Mine Site Reclamation and Closure Policy, as well as possible strategies for achieving the desired objectives. The practices also provide recognition of site conditions and circumstances that need to be considered by government and companies in developing plan-specific objectives.

6 GUIDELINES SUMMARY Guideline Topic Cash Letter of credit Pledge of assets Surety bond Insurance Security held pursuant to a trust indenture Liability estimate for security Discount rate Interest and returns earned on security Adjustments and conversions of security Statement to mine owners on security Notice of material change Release of security on transfer of license To inform administrators and mine owners about applicable policy and procedures associated with cash and cash equivalents provided as security under the Quartz Mining Act (QMA) and Waters Act (WA). To inform administrators, mine owners and financial institutions about the provisions of a letter of credit or bank letter of guarantee when they are provided as security under the QMA and WA. To inform administrators and mine owners about the policy and procedures associated with the use of a pledge of assets as security under the QMA and WA. To inform administrators, mine owners, surety issuers and brokers about the policy and procedures associated with the use of surety bonds as security under the QMA and WA. To inform administrators, mine owners, and insurance issuers and brokers about the policy and procedures associated with the use of insurance as a form of security under the QMA and WA. To inform administrators, mine owners and third party trustees about the policy and procedures associated with the terms and investment of security held in trust by a third party to meet requirements of the QMA and WA. To explain the calculation of the liability estimate for reclamation and closure in order to determine the amount of security. To inform administrators and mine owners about the discount rate that will be used for net present value calculations. To inform administrators and mine owners about the policy regarding interest and returns earned on security. To inform administrators and mine owners about the procedures associated with adjustments and conversions of existing security. To inform administrators and mine owners about the policy and procedures associated with annual reporting to the mine owner on security held by the Yukon government. To inform administrators and mine owners about the circumstances for providing the Yukon government with notice of material change when material change has the potential to affect security held by the Yukon government. To inform administrators and mine owners about the policy and procedures associated with the treatment of security in the transfer of a license.

7 Guideline Topic Temporary closure Water retention and sediment control structures Watercourses Water quality Site contamination Acid rock drainage potential Tailings management Underground workings and openings to surface Terrain hazards Mine rock piles Road and other access Erosion control Re-vegetation Mine infrastructure To inform administrators and mine owners about the policy and procedures associated with security in the event of a temporary closure, and to set out the circumstances and procedures by which the Minister may determine whether or not a temporary closure is imminent and additional actions are warranted. To inform administrators and mine owners about closure objectives in decommissioning licensed water retention and sediment control structures used in mine production and associated safety and environmental protection. To inform administrators and mine owners about closure objectives where alternation of water courses has occurred to allow mine development and operation and associated safety and environmental protection. To inform administrators ad mine owners about mine closure objectives on minimum post-closure water quality objectives for waters draining at the mine site. To inform administrators and mine owners about closure objectives for soil, sub-soil and equipment that remains on site, in light of undetected contamination during mine operation and decommissioning. To inform administrators and mine owners about closure objectives and procedures when there is acid rock drainage potential and metal leaching. To inform administrators and mine owners about closure objectives and procedures in decommissioning tailings. To inform administrators and mine owners about objectives for decommissioning underground workings and openings to surface. To inform administrators and mine owners about mine closure objectives and procedures for decommissioning terrain hazards associated with operation and development. To inform administrators and mine owners about closure objectives and procedures in decommissioning rock piles and dumps. To inform administrators and mine owners about closure objectives and procedures in decommissioning roads, trails and other linear infrastructure, where these are to be decommissioned. To inform administrators and mine owners about closure objectives for the landscape of the mine site. To inform administrators and mine owners about closure objectives and procedures where mining activity has resulted in removal of ground cover that, if not reclaimed, would lead to physical instability such as erosion and siltation and/or contribute to a permanent and significant decline in wildlife habitat. To inform administrators and mine owners about closure objectives in decommissioning mine infrastructure.

8 Guideline Topic Heap leach pads Temporary closure site conditions Geological values and heritage To inform administrators and mine owners about closure objectives and procedures in decommissioning heap leach pads. To inform administrators and mine owners about objectives and procedures in the event of a temporary closure and conditions that must continue to be met in order to maintain a site in temporary closure. To inform administrators and mine owners about the policy and procedures for preserving geological values and heritage features while decommissioning a mine site.

9 Financial Guidelines

10 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY CASH Guideline #F-01 Date Issued: January 2, 2008 To inform administrators and mine owners about procedures when cash and cash equivalents are used as security under the Quartz Mining Act and Waters Act. Context Cash equivalents include bank drafts, certified cheques, term deposit certificates, guaranteed investment certificates and bonds. All are forms of acceptable security. Practice Cash provided to the Yukon shall be held in accordance with the Financial Administration Act. Bank drafts and certified cheques from a bank shall be made payable to the Government of Yukon. Postdated cheques are not acceptable unless agreed to by the Yukon as part of an arrangement for periodic instalments. Eligible cash equivalents shall include GICs and term deposits and are to be held to the order of Government of Yukon. Bonds issued by a province of Canada or the Government of Canada and treasury bills must be transferred to the name of the Government of Yukon. Certificates shall be turned over to the Yukon for safekeeping. The interest or yield on investments (e.g. GICs and bonds) will be the interest or yield payable on the investment of the issuing institution. No further interest or yield will be deemed payable by the Yukon government. The mine owner is responsible for all instructions to the issuing institution upon maturity of a security, as well as any fees and taxes associated with the security. Securities such as term deposits, guaranteed investment certificates and bonds that mature with no other instruction provided by the mine owner shall be converted to cash and invested by the Yukon according to the Financial Administration Act. Other cash equivalents such as certain corporate bonds, certificates from other institutions, including those outside of Canada, may be considered as security. Risk as established through credit ratings shall be considered in determining whether or not such cash equivalents will be eligible.

11 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY LETTER OF CREDIT & BANK LETTER OF GUARANTEE Guideline #F-02 Date Issued: January 2, 2008 To inform administrators, mine owners and financial institutions about the provisions of a letter of credit or bank letter of guarantee when they are provided as security under the Quartz Mining Act and Waters Act. Context Both an irrevocable letter of credit and bank letter of guarantee are acceptable forms of security when issued by a bank or financial institution organized or authorized to transact business in Canada under the Bank Act (Canada). Practice A letter of credit issued by a foreign institution may be considered if it is backstopped by a bank or financial institution authorized to transact business in Canada under the Bank Act. A standby letter of credit or letter of guarantee must be irrevocable. Unlimited, partial drawings should be permitted. The sole beneficiary named in a letter of credit or letter of guarantee must be the Government of Yukon, or the Minister (as indicated), Government of Yukon. A letter of credit or letter of guarantee must identify the mine for which the security is furnished and the applicable quartz production and/or water license. The letter of credit or letter of guarantee must enable a designated officer of the Minister to, upon written request, obtain the required funds pursuant to the letter without any requirement for proof of jurisdiction or claim by the Yukon. The letter of credit or letter of guarantee should provide for automatic renewal. The terms established in the letter of credit or letter of guarantee must satisfy Yukon government requirements respecting notification in the event of changes, manner and circumstances for payment and pertinent material changes in financial status. Any changes in terms must be approved by all parties involved, including the Yukon government, in order for the security to remain acceptable. Amendments to a letter of credit or letter of guarantee may be made to: adjust for increases or decreases in the amount of security required to cover the total outstanding liability which may change from time to time, including as a result of progressive reclamation; and reflect changes to the name of the mine owner.

12 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY While requiring the consent of all parties, such amendments may be requested by the Yukon government from time to time. All fees and charges associated with a letter of credit or letter of guarantee are the responsibility of the mine owner. A letter of credit sample is included in Appendix A.

13 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY PLEDGE OF ASSETS Guideline #F-03 Date Issued: January 2, 2008 To inform administrators and mine owners about the policy and procedures associated with the use of a pledge of assets as security under the Quartz Mining Act and Waters Act. Context Consideration may be given to alternate (non-cash) forms of security for lower risk components of a project, provided these forms meet certain criteria that protect the Yukon government s interests and objectives. Practice A pledge of assets will be considered for financial security pursuant to the Yukon Mine Site Closure and Reclamation Policy, subject to the following provisions: Subject to confirmation by the Yukon government that there are no other liens which would rank in priority to the Yukon s charge on the asset and thereby diminish the Yukon s ability to realize on the asset; Subject to limited exceptions, the assets must be located in the Yukon; A pledge of assets will only be taken over those assets for which a security interest can be perfected under the Personal Property Security Act, or comparable legislation when assets are located elsewhere in Canada; The company may not allow further charges on the asset that would have the effect of diminishing the Yukon s charge; The condition, location and value of assets are subject to verification by the Minister at any time; Where the assets involve equipment used for mining, milling, processing and transportation: o the equipment should not be unacceptably contaminated for its intended use; o must remain in good working order; and o is used for its intended purpose. The assets are not required for environmental or public health and safety maintenance in the event of a closure; The Yukon government is satisfied the arrangements meet Yukon objectives and interests, including but not limited to: o Risk management;

14 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY o Satisfactory progress by the mine owner in progressive reclamation; o The applicant/licensee s past corporate performance; and o Matters pertaining to the company s solvency as reported to the pertinent Securities Commission. Assets are assessed for their market value within the 12 months prior to their being taken as security by the Yukon government; The value of assets for the purposes of security will be established net of the costs of retrieval and transportation to a viable market, including remediation of any contamination of equipment to allow its transportation to a viable market; The assets must be appraised by an independent 3 rd party, operating at arm s length from the Yukon government and the mine owner, and that is acceptable to the Yukon. The appraiser s report should: o identify asset type, size, capacity, serial number, condition, expected life, residual value and estimated costs for retrieval and transportation to a viable market; and o address further matters as required by the Minister. A revised appraisal may be required any time that overall financial security arrangements are being considered by the Yukon; The mine owner pays the costs of 3 rd party valuation and perfecting under the Personal Property Security Act or other legislation; The mine owner should provide the Yukon government with timely notice of: o Registration of additional charges or changes in existing charges, or: o Addition of a new perfection or changes to existing perfections; o Taking possession of pledged assets by another secured party. Adjustments to security may be required to account for changes in value or status, under the Personal Property Security Act (Yukon) or other legislation, of the pledged assets. Any costs associated with such adjustments remain the responsibility of the mine owner. A pledge of assets is not acceptable security for higher risk reclamation and closure components, as determined by the Minister, nor for post-closure monitoring and maintenance.

15 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY SURETY BOND Guideline #F-04 Date Issued: September 25, 2013 To inform administrators, mine owners, surety issuers and brokers about the policy and procedures associated with the use of surety bonds as security under the Quartz Mining Act and Waters Act. Context A surety bond where the terms are acceptable to the Minister is acceptable security. A surety bond involves three parties or more - the insurance provider, the principal (mine owner) and the obligee (Yukon government). Practice The surety bond must be issued by a company licensed under the Insurance Act (Yukon) and Insurance Companies Act (Canada) to issue surety bonds in Canada. The surety bond must be issued for at least one year with an automatic renewal clause. The mine owner is responsible for any fees, charges, premiums or other amounts associated with the surety bond. A change or rider endorsement may be made to a surety bond where: Adjustments are required to increase or decrease the amount of security based on changes in liability or to account for progressive reclamation; or Where there is a change in the name of the mine owner. Where there is any intent to limit the application of a surety bond to certain aspects (e.g. cost overruns and contingencies) of an approved reclamation and closure plan, this should be stated in the surety provisions. Any disputes should be subject to recovery by the surety without preventing the work from proceeding. An example of a surety bond is included in Appendix A.

16 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY INSURANCE Guideline #F-05 Date Issued: January 2, 2008 To inform administrators, mine operators, and insurance issuers and brokers about the policy and procedures associated with the use of insurance as a form of security under the Quartz Mining Act and Waters Act. Context Consideration may be given to alternate (non-cash) forms of financial assurance for lower risk components of a project, provided these forms meet certain criteria that protect the Yukon government s interests and objectives. In these situations, insurance may be an acceptable form of financial security, in whole or in part, and is usually suited to cost uncertainties associated with reclamation and closure, such as failures, cost overruns and contingencies. Insurance may be available on the market in helping a mine owner cap liability, securing post-remediation liabilities, securing creditors, or for directly securing uncertain liabilities when a mine owner wants to free up operating capital or credit. Practice The insurance company must be licensed to issue insurance pursuant to the Insurance Act (Yukon) and the Insurance Companies Act (Canada). The purpose and form of the insurance should be such that the enforceable pledges of funding are used to guarantee coverage should specified reclamation and closure liabilities arise, including in the event of default by the insured. The insurance policy should make reference to the mine site, the production and/or water licenses issued, and the approved reclamation and closure plan and should specify the liabilities being addressed by the insurance. The policy must include the Yukon government as an additional named insured. Limits to liability in the policy must not prevent continuous coverage for the term of the policy as well as any periods required for monitoring, reporting and verification periods associated with the plan or until such time as a Certificate of Completion has been issued under Section 134 of the Quartz Mining Act and/or cancellation of a water license under the Waters Act. The policy should allow that limits to liability associated with concealment and fraud may be set aside in the event the Yukon government notifies the insurer of pertinent facts and circumstances respecting contamination and site conditions. Provisions respecting limits to liability of the policy in the event of intentional non-compliance on the part of the insured shall be limited to situations where the non-compliance constitutes an offence under the laws of the Yukon.

17 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY The policy continues in effect in the event of directions and actions of inspectors pursuant to Sections 146 and 147 of the Quartz Mining Act and/or actions pursuant to Sections 35 and 37 of the Waters Act. The policy should be irrevocable without written consent of the Yukon government, and establish that amending, revoking or terminating the policy requires the written consent of the Yukon government. The policy should further establish that release of monies requires written notification of the Minister. Provisions for assignment should require the written authorization of the Yukon government. Provision must be made that in the event of disputes, work shall proceed and be paid for through the policy as required according to the timetable set out in the approved reclamation and closure plan. Any disputes should be subject to recovery by the insurer and/or insured without preventing the work from proceeding. Any arbitration involving the Yukon government should be conducted within the Yukon. The policy must remain satisfactory at all times to the Yukon. The policy should reserve right of action against the insurer to the Yukon government, which action should be specified to take place in the Yukon pursuant to the applicable laws of the Yukon. In the event of default or non-performance of the reclamation and closure measures required by the approved reclamation and closure plan and secured by the insurance, the insurer may seek agreement with the Yukon government, to perform the work in lieu of payment of any portion or all of the insured value. In the event the Minister no longer finds the policy a satisfactory form of security, the mine owner shall be provided written notice of the need for alternate security. The mine owner should provide alternate forms of security within 90 days.

18 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY SECURITY HELD PURSUANT TO TRUST INDENTURE Guideline #F-06 Date Issued: January 2, 2008 To inform administrators, mine operators, and third party trustees about the policy and procedures associated with the terms and investment of security under the Quartz Mining Act and Waters Act and held pursuant to a trust indenture. Context Security may be held in a trust pursuant to a trust indenture where the Yukon government is named as beneficiary of the trust. Practice To be eligible to hold security on behalf of a mine owner, a third party must be a trust company licensed under the Trust and Loans Companies Act (Canada). The beneficial use of the trust must be to meet security requirements associated with licenses issued under the Quartz Mining Act and Waters Act. The Yukon government should be named as beneficiary of the trust. The mine owner (settler) may be named as a beneficiary. The trust must establish that payments to the settler shall be made only with the prior written consent of the Yukon government. Prior to providing consent, the Yukon government may assess whether or not any further verification of effectiveness of the reclamation or closure strategy is required. Prior to providing consent, the Yukon government will evaluate what security should be maintained. The terms of the trust should establish that security will be released by the trustee once the Yukon government has indicated that the security is no longer required. The trust agreement must be irrevocable without written consent of the Yukon government, and shall establish that amending, revoking or terminating the trust agreement require written consent on the part of the Yukon government. A trust agreement must be in place between the mine owner (settler) and the party holding the trust (trustee). This agreement shall limit investment to permitted investments as defined in the Pension Benefits Standards Regulation, Pension Benefits Standards Act, 1985 (Canada), subject to maximum weightings in the following asset classes: 100% fixed income; 20% real return assets (real estate and inflation-linked bonds); and

19 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY 70% equities. The portfolio of investments shall be structured to provide sufficient liquidity to meet the timetable for planned reclamation and closure expenditures. The mine owner is responsible for all fees, charges and taxes associated with the trust. The trust funds amount shall take into consideration investment policy, rates of return, as well as anticipated taxes and fees. The terms of the trust agreement shall establish that an audited financial statement on the trust will be provided annually to the Yukon government.

20 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY LIABILITY ESTIMATE FOR SECURITY Guideline #F-07 Date Issued: January 2, 2008 To explain the calculation of the liability estimate for reclamation and closure in order to determine the amount of security. Context The Quartz Mining Act and Waters Act specify the circumstances under which the Yukon government can draw on security furnished by a licensee. For instance, costs incurred by the Yukon government where an inspector has issued direction to the operator to prevent unnecessary danger to persons, property or the environment, can be recovered from security. The actions taken and costs incurred may not necessarily pertain to reclamation and closure or be addressed in an approved reclamation and closure plan. As well, the Waters Act provides that security may be drawn upon to compensate an entitled person adversely affected by the issuance of a water license. The Quartz Mining Act and Waters Act should be consulted for a complete understanding of the Yukon government s authority to draw on security. Practice As a matter about the policy, the security held will remain commensurate with the outstanding reclamation and closure liability. This liability is the cost to reclaim and close the mine were it to close at any time. The liability estimate for security will be based on the cost to implement the approved reclamation and closure plan. Considerations taken into account will include: The cost for a third party to complete the work; When there is a need, based on risk, for the costs of mitigative contingencies; The net present value for reclamation and closure costs that will be incurred at the time of decommissioning, where operations are reasonably expected to continue for more than two years; Retained earnings; and Progressive reclamation completed and verified. The liability estimate may be prepared by an independent third party as agreed to in advance by the mine owner and the Yukon government. Alternatively, the mine owner may submit an estimate for review by the Yukon government. Estimates for engineered structures and designs must be sealed by a professional engineer licensed to practice in the Yukon. Where appropriate other professional estimates may be required where specialized work is necessary (e.g. biological studies). Security shall be reviewed at least every 24 months. Adjustments to security may be made to account for progressive reclamation or failure to meet reclamation objectives; changes in liabilities, knowledge, technology and risk; to account for costs associated with a temporary closure; to account for changes to the

21 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY net present value of security; or a material change reported by the mine owner, deemed by the Minister to significantly increase or decrease liability during the period covered by an approved reclamation and closure plan.

22 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY DISCOUNT RATE Guideline #F-08 Date Issued: January 2, 2008 To inform administrators and mine operators about the policy and procedures associated with the discount rate to be used in calculating net present value. Context At any point in time, outstanding liability shall include the net present value (NPV) of security for postclosure reclamation, monitoring, and maintenance programs to support the reclamation and closure work done up to that point in time, plus reasonable contingencies. Security held for reclamation and closure work scheduled within two years will not be subject to discounting. Practice The discount rate that will be used in NPV calculations shall be the most recent Government of Canada benchmark bond yields as published by the Bank of Canada. The bond term chosen shall be the longest term published that does not exceed the expected duration of the post-closure reclamation, monitoring and maintenance programs. In updating net present value, calculations shall be based on the market value of the security being held two years (to the closest month s end) from the effective date of the establishment of the security, and on two year intervals thereafter.

23 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY INTEREST & RETURNS EARNED ON SECURITY Guideline #F-09 Date Issued: January 2, 2008 To inform administrators and mine operators about the policy and procedures associated with the treatment of interest and returns earned on security. Context The Yukon government will ensure that security held will be commensurate with the outstanding mine reclamation and closure costs. Practice When earnings are to be retained as part of the security, the Yukon government will consider the interest and returns projected to be earned on security. The earnings shall be the amount of interest payable by the investment, where this is known. In the event security is held in the form of equities an indicative S&P/TSX index may be used to project earnings. Adjustments shall be made based on actual earnings at the time security is reviewed by the Yukon government. Retained earnings should accrue to the total security held, except where these earnings increase the amount held beyond the security required by the Yukon government. The mine owner is responsible for any fees, commissions and taxes payable on interest and returns earned on security. When cash security has been provided to the Yukon government, the interest and returns shall be paid annually to the mine owner.

24 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY ADJUSTMENTS & CONVERSIONS OF SECURITY Guideline #F-10 Date Issued: January 2, 2008 To inform administrators and mine owners about the procedures associated with adjustments and conversions of security. Context Unless specified otherwise, every 24 months the mine owners will submit to government a revised estimate of outstanding liability. Progressive reclamation may reduce the amount of financial security required. If outstanding liability increases, mine owners will provide additional financial security. The Yukon government may enter into an administrative agreement with the mine owner to adjust security. This administrative agreement may include the development of a security schedule that will be adjusted as reclamation work is implemented. Practice A mine owner may request to change either the amount or form of security. The Minister shall consider whether the proposed changes are acceptable and provide the mine owner notification of the requirements for conversion, refund or additional security to be provided, based on outstanding liability. In converting forms of security, existing security will only be released once the Yukon government is assured acceptable alternative security is assured.

25 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY STATEMENT TO MINE OWNERS ON SECURITY Guideline #F-11 Date Issued: January 2, 2008 Context To inform administrators and mine operators about the policy and procedures associated with annual reporting to the mine owner on security held by the Yukon government. Guideline Providing direction to administrators and mine owners on annual statements from the Yukon government to mine owners. Requirements The Yukon government shall provide mine owners with an annual statement confirming the amount and forms of security held by the Yukon, including any changes in investments, policy or legislation affecting security held by the Yukon, and interest earned or fees charged by an institution in relation to the management of that security. In circumstances where the Yukon has been provided cash, it will also issue any applicable tax forms. Statements will be prepared on a calendar year basis, and shall be provided to mine owners no later than April 30 th of the year following the reporting calendar year.

26 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY NOTICE OF MATERIAL CHANGE Guideline #F-12 Date Issued: January 2, 2008 To inform administrators and mine owners about when notice of material change should be provided to the Yukon government and about the procedures that follow when notice has been provided. Context The Yukon government will ensure that security is maintained at all times to provide for the outstanding mine reclamation and closure liability and to prevent lapses in the ability of government to access this security if and when it may be required. Practice If there has been a material change with respect to the affairs of the mine owner that a reasonable person would consider likely to adversely affect security being held by the Yukon government, the mine owner should provide written notice of material change as soon as possible to the concerned Minister(s). Material change that might reasonably be expected to adversely affect security held by the Yukon government includes the following: a change or decision to change made by the board of directors or senior management that would reasonably be expected to have a significant effect on the value of assets held as security by the Yukon government; an offer for sale or transfer of the assets associated with the mine on the part of the mine owner if the assets are related to security; in the event a corporate financial test 1 has affected the ranking of the risk of significant adverse environmental effects of production and development, any change to the credit rating considered in the risk assessment of the project; and a change which is likely to have bearing on the form of security required by the Yukon government because the mine owner s investment and/or management risk has significantly changed (as expressed, for example, in the corporation s objectives and/or investment activities). Government will consider a significant change in financial risk associated with security, when provided with notice of material change or as a result of information publicly available to it that indicates a significant change in financial risk. 1 Corporate financial test includes the self-bonding capability of a company that may be used to offset risk, or use of a credit rating from an independent agency such as Standard & Poors Inc; Moody s Investor s Services Inc; Dominion Bond Rating Service, Ltd. that is used to reduce financial risk.

27 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY RELEASE OF SECURITY ON TRANSFER OF LICENSE Guideline #F-13 Date Issued: January 2, 2008 To inform administrators and mine operators about the policy and procedures associated with the treatment of security in the transfer of a license. Context In accordance with the Quartz Mining Act, in the event of a sale or other transfer of the mine property, the Yukon government shall only authorize the assignment of a license if the prospective assignee furnishes any security required, undertakes in writing to comply with the license and the Yukon government is satisfied that the assignment will not be likely to result in a contravention of any condition of license. Assignment of an associated water license shall be undertaken where the requirements under the Waters Act and Waters Regulation are met. Practice Prior to the release of security to the former mine owner, the new mine owner must furnish replacement security satisfactory to the Yukon. In the event security is part of the transfer or is subject to conversion, the Yukon government must be satisfied that transfer/conversion/replacement of existing security is assured and adequately addresses outstanding liability.

28 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY TEMPORARY CLOSURE Guideline #F-14 Date Issued: January 2, 2008 To inform administrators and mine owners about the policy and procedures associated with security in the event of a temporary closure. To establish the circumstances by which the Minister may determine whether or not a temporary closure is imminent, and set out actions that may be taken by the Yukon government in such circumstances. To enhance environmental protection, manage public risk and minimize the costs associated with reclamation, and planned and unplanned closure, by encouraging mine owners to voluntarily discover, promptly disclose and expeditiously address changes in liability associated with a temporary closure. Context The Yukon government will ensure that security is maintained at all times to provide for the outstanding mine reclamation and closure liability and to prevent lapses in the ability of government to access this security if and when it may be required. If the outstanding reclamation and closure liability increases, government may approve short term measures to address immediate site mitigation that offsets the increased liability rather than requiring additional financial security being posted by the mine owner. The mine owner will maintain financial security acceptable to the Yukon government during any temporary closure. In determining the amount of security, the Minister must consider the costs associated with maintaining any works, installations or structures required for development of production for a period of temporary closure of up to five calendar years. Practice A temporary closure is a closure that exceeds six months and is not expected to last longer than five years. A mine owner shall provide notice to the Minister(s) of potential temporary closure as soon as possible. Despite the absence of notification by the mine owner, the Minister of Energy, Mines and Resources may conclude that a temporary closure is imminent. Such a determination will be based on information available to the Minister at the time, and may include a notice of material change (see Guideline #F-12) on the part of the mine owner, public knowledge available through a securities commission combined with current knowledge of metals market conditions. These factors will be considered in the context of the particular conditions of the operation. The mine owner shall be provided a reasonable opportunity to review and respond to the Minister on all information considered before the Minister concludes whether or not a temporary closure is in fact imminent. The Minister shall consider the mine owner s views before making a determination.

29 FINANCIAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY Upon notice or determination of a temporary closure, the Yukon government will determine whether or not a review of the approved reclamation and closure plan, outstanding liability and adequacy of security shall be completed. The mine owner shall conduct planning and assessments in discussion with relevant Yukon government agencies to prepare for the temporary closure. Where a mine owner provides the Yukon government timely notice of an anticipated early closure, including a reasonable assessment of changes to liability and plans, the Yukon government may approve short term measures that offset liability rather than requiring additional financial security for temporary closure measures. The Yukon government may consider a mine owner s effort to anticipate and address temporary closures and associated liabilities. Upon re-opening of a mine that has been subject to a temporary closure, security to cover incremental liabilities shall be promptly released by the Yukon government, except where a current risk assessment demonstrates an ongoing and significant risk of another temporary closure prior to the projected end-ofmine life.

30

31 Technical Guidelines

32 TECHNICAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY WATER RETENTION & SEDIMENT CONTROL STRUCTURES Guideline #T-01 Date Issued: January 2, 2008 To inform administrators and mine owners about mine closure objectives for licensed water retention and sediment control structures where these have been developed and used in mine production and associated safety and environmental protection. Objectives The objective is to ensure decommissioning of water retention and sediment control structures, and their appurtenances, in such a way that drainage at, and adjacent to the site, is stable in the long term. Practice Typically this objective means dismantling and disposing of operational structures so that natural drainage is not impeded. The planning goal should be minimal maintenance requirements for areas reclaimed of surface water management structures. For example, operational sediment traps, basins, silt fencing, spillways and dikes should be dismantled and materials disposed of in an approved non-hazardous solid waste dump or be removed from the site. Collection and diversion systems for passive treatment that are put into place or remaining at closure in order to recover contaminated percolation waters or runoff shall require minimal maintenance. Those structures that are defined as dams are to meet the provisions of the Canadian Dam Safety Guidelines. Any additional stability criteria will be commensurate with the level of risk associated with failure of the collection systems. All engineered impoundment structures shall be certified by a qualified professional engineer with respect to their long-term physical and chemical stability. Unless an alternate use is identified in an approved reclamation and closure plan, mine dewatering ponds should be decommissioned, with sediments stabilized, pond dikes levelled and the surface contoured and re-vegetation underway. Fines, sludge and sediment meeting the definition of tailings must be removed to an approved tailings facility or be otherwise decommissioned in accordance with the approved reclamation and closure plan. Water course diversions shall be dismantled and materials disposed of in an approved non-hazardous solid waste dump according to the Solid Waste Regulations in the Environment Act, or removed from the site.

33 TECHNICAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY WATERCOURSES Guideline #T-02 Date Issued: January 2, 2008 To inform administrators and mine owners about closure objectives where alteration of watercourses has occurred during mine development and operation. Objectives Restore watercourses to meet current water management objectives. Practice Restore watercourses in accordance with the approved reclamation and closure plan. The plan shall take into account the intended future land use, as well as water management objectives that have been established under legislation.

34 TECHNICAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY WATER QUALITY Guideline #T-03 Date Issued: January 2, 2008 To inform administrators and mine owners about mine closure objectives on minimum post-closure water quality objectives for waters draining at the mine site. Objectives The objective is to prevent contamination of receiving environments. Practice Following decommissioning, water quality must consistently meet the requirements of applicable territorial and federal legislation. For example, it must meet the requirements of the Waters Act respecting the deposit of waste into water or into other places where the waste may enter water such as groundwater that may reach surface water. Produced water must also meet the Fisheries Act (Canada) requirements with respect to the deposit of deleterious substances, including, if applicable, discharge standards set out in the Metal Mine Effluent Regulations of the Fisheries Act (Canada). Where the site is a contaminated site, as defined by the Environment Act, the site must be restored and maintained as required by the Environment Act and regulations made under it. Recognition will be given to background levels of substances naturally occurring as identified in prior to start-up of production.

35 TECHNICAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY SITE CONTAMINATION Guideline #T-04 Date Issued: January 2, 2008 To inform administrators and mine owners about closure objectives for soil, subsoil, and equipment that remains on site, in light of possible contamination. Objectives The objective of addressing contamination is to prevent exposure to and mobilization of substances that pose a risk to human health and the environment through physical and chemical stability. Practice Leading up to closure, a site contamination assessment plan must be prepared which Locates through a site investigation program any and all contaminated material on the mine site arising from any operation, transportation, storage, handling or processing; Characterizes the type, level and horizontal and vertical extent of the contamination; and Proposes methods for dealing with the contamination. Whether through neutralizing, treating or disposing, soils, sub-soils and materials on the site must meet the appropriate level of decontamination, commensurate with the proposed future land use objective set out in the approved reclamation and closure plan. Where the site is a contaminated site under the Environment Act, the requirements for a site contamination assessment plan, investigation, reports and plans for restoration will be required according to the Contaminated Sites Regulation of the Environment Act. A final report must be submitted to the Yukon government on the implementation of the approved Plan of Restoration under the Contaminated Sites Regulation of the Environment Act. The requirements of the Occupational Health and Safety Regulations set out by the Occupational Health and Safety Act, for controlled substances under the Hazardous Products Act (Canada) must be met. So too are the requirements of the Special Waste Regulation of the Environment Act.

36 TECHNICAL GUIDELINES MINE SITE RECLAMATION AND CLOSURE POLICY ACID ROCK DRAINAGE POTENTIAL Guideline #T-05 Date Issued: January 2, 2008 To inform administrators and mine owners about closure objectives and procedures when there is acid rock drainage potential and metal leaching. Objectives The closure objective for acid rock drainage and metal leaching is a walk-away solution. Reliance on longterm active treatment is not considered acceptable for reclamation and closure planning. Practice Rock piles, dumps, tailings and underground workings must be decommissioned such that in the event of acid rock drainage and metal leaching ground and surface water quality objectives continue to be met. Following decommissioning, drainage from the site or from passive treatment must consistently meet the requirements of applicable territorial and federal legislation. For example, it must meet the requirements of the Waters Act respecting the deposit of waste into water or into other places where the waste may enter water such as groundwater that may reach surface water. Produced water must also meet the Fisheries Act (Canada) requirements with respect to the deposit of deleterious substances, including, if applicable, discharge standards set out in the Metal Mine Effluent Regulations of the Fisheries Act (Canada). Where the site is a contaminated site, as defined by the Environment Act, the site must be restored and maintained as required by the Environment Act and regulations made under it. Walk-away solutions for spillways, together with natural passive management of discharges not requiring active intervention are preferred. A near-neutral ph water discharge from the site is the optimum goal.

Policy and Process Review for Mine Reclamation Security

Policy and Process Review for Mine Reclamation Security Policy and Process Review for Mine Reclamation Security Prepared for: Guy Gensey, Ph.D., Director Corporate Policy and External Relations Ministry of Natural Gas Development and Ministry of Energy and

More information

Approach to Mine Risk Assessment and Risk Management under the Environmental Management Act

Approach to Mine Risk Assessment and Risk Management under the Environmental Management Act Approach to Mine Risk Assessment and Risk Management under the Environmental Management Act John E.H. Ward, B.C. Ministry of Environment NOAMI Risk Assessment Workshop Richmond, B.C. November 13, 2008

More information

Indian and Northern Affairs Canada. Affaires indiennes et du Nord Canada MINE SITE RECLAMATION POLICY FOR NUNAVUT

Indian and Northern Affairs Canada. Affaires indiennes et du Nord Canada MINE SITE RECLAMATION POLICY FOR NUNAVUT Indian and Northern Affairs Canada Affaires indiennes et du Nord Canada MINE SITE RECLAMATION POLICY FOR NUNAVUT Published under the authority of the Minister of Indian Affairs and Northern Development

More information

REGULATORY DOCUMENTS. The main classes of regulatory documents developed by the CNSC are:

REGULATORY DOCUMENTS. The main classes of regulatory documents developed by the CNSC are: Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire REGULATORY GUIDE G-206 FINANCIAL GUARANTEES FOR THE DECOMMISSIONING OF LICENSED ACTIVITIES Published by the Canadian Nuclear

More information

Spinifex Ridge Molybdenum Project

Spinifex Ridge Molybdenum Project Spinifex Ridge Molybdenum Project MOLY MINES LIMITED Annual Environmental Report Ministerial Statement 772 (5 th August 2008) Ministerial Statement 948 (2 nd September 2013) June 2017 Document history

More information

CHAPTER House Bill No. 1123

CHAPTER House Bill No. 1123 CHAPTER 2003-173 House Bill No. 1123 An act relating to site rehabilitation of contaminated sites; creating s. 376.30701, F.S.; extending application of risk-based corrective action principles to all contaminated

More information

4. MINE CLOSURE - AN INTERNATIONAL OVERVIEW

4. MINE CLOSURE - AN INTERNATIONAL OVERVIEW 4. MINE CLOSURE - AN INTERNATIONAL OVERVIEW 4.1 Legal Provisions for Mine Closure Mine closure presents a mixture of issues like: environmental, economic, social and development. Governments in various

More information

Ch. 264a OWNERS AND OPERATORS 25. CHAPTER 264a. OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE AND DISPOSAL FACILITIES

Ch. 264a OWNERS AND OPERATORS 25. CHAPTER 264a. OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE AND DISPOSAL FACILITIES Ch. 264a OWNERS AND OPERATORS 25 CHAPTER 264a. OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE AND DISPOSAL FACILITIES Subchap. A. GENERAL... 264a.1 B. GENERAL FACILITY STANDARDS... 264a.11

More information

Security for Contaminated Sites. Prepared pursuant to Section 64 of the Environmental Management Act

Security for Contaminated Sites. Prepared pursuant to Section 64 of the Environmental Management Act PROTOCOL 8 FOR CONTAMINATED SITES Security for Contaminated Sites Prepared pursuant to Section 64 of the Environmental Management Act Approved: J. E. Hofweber November 19, 2007 Director of Waste Management

More information

ENVIRONMENTAL ASSESSMENT CERTIFICATE TEMPLATE

ENVIRONMENTAL ASSESSMENT CERTIFICATE TEMPLATE ENVIRONMENTAL ASSESSMENT OFFICE ENVIRONMENTAL ASSESSMENT CERTIFICATE TEMPLATE Version # Date (yyyy-mm-dd) Modifications 1 2016-12-01 N/A 2 2017-01-18 IEM condition and plan development conditions In the

More information

Research Branch BILL C-6: AN ACT TO AMEND THE YUKON QUARTZ MINING ACT AND THE YUKON PLACER MINING ACT. David Johansen. Law and Government Division

Research Branch BILL C-6: AN ACT TO AMEND THE YUKON QUARTZ MINING ACT AND THE YUKON PLACER MINING ACT. David Johansen. Law and Government Division Legislative Summary LS-228E BILL C-6: AN ACT TO AMEND THE YUKON QUARTZ MINING ACT AND THE YUKON PLACER MINING ACT David Johansen Law and Government Division 18 March 1996 Library of Parliament Bibliotheque

More information

SCHEDULE B. TABLE OF CONDITIONS FOR A SECTION 10(1)(B) EXEMPTION ORDER Progress Energy Lily Dam

SCHEDULE B. TABLE OF CONDITIONS FOR A SECTION 10(1)(B) EXEMPTION ORDER Progress Energy Lily Dam SCHEDULE B TABLE OF CONDITIONS FOR A SECTION 10(1)(B) EXEMPTION ORDER Progress Energy Lily Dam DEFINITIONS Aboriginal Groups Construction of Upgrades Consequence classification Dam Emergency Plan Decommissioning

More information

ENVIRONMENTAL ASSESSMENT CERTIFICATE AMENDMENT TEMPLATE

ENVIRONMENTAL ASSESSMENT CERTIFICATE AMENDMENT TEMPLATE ENVIRONMENTAL ASSESSMENT OFFICE ENVIRONMENTAL ASSESSMENT CERTIFICATE AMENDMENT TEMPLATE Version # Date (yyyy-mm-dd) Modifications 1 2016-12-01 N/A 2 2017-01-18 IEM condition and plan development conditions

More information

S. ll. To promote remediation of orphan hardrock mines, and for other purposes. IN THE SENATE OF THE UNITED STATES A BILL

S. ll. To promote remediation of orphan hardrock mines, and for other purposes. IN THE SENATE OF THE UNITED STATES A BILL MAZ [DISCUSSION DRAFT] S.L.C. TH CONGRESS D SESSION S. ll To promote remediation of orphan hardrock mines, and for other purposes. IN THE SENATE OF THE UNITED STATES llllllllll Mr. GARDNER introduced the

More information

Ch. 265a INTERIM STATUS STANDARDS a.1

Ch. 265a INTERIM STATUS STANDARDS a.1 Ch. 265a INTERIM STATUS STANDARDS 25 265a.1 CHAPTER 265a. INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE AND DISPOSAL FACILITIES Subchap. Sec. A. GENERAL... 265a.1

More information

SECTION PS 3260 liability for contaminated sites

SECTION PS 3260 liability for contaminated sites SECTION PS 3260 liability for contaminated sites TABLE OF CONTENTS Paragraph Purpose and scope.01-.07 Recognition.08-.39 Environmental standard.09-.13 Contamination.14-.17 Direct responsibility.18-.22

More information

6.0 MONITORING AND CONTINGENCY PLANS

6.0 MONITORING AND CONTINGENCY PLANS 6.0 MONITORING AND CONTINGENCY PLANS 6.1 MONITORING The primary objective of compliance and effects monitoring is to confirm whether mitigation and protective measures are effectively implemented and to

More information

Assessing and Dealing with Environmental Liabilities of Local Governments. LGANT 2014 Dennis Kefalas, P. Eng. SAO City of Yellowknife

Assessing and Dealing with Environmental Liabilities of Local Governments. LGANT 2014 Dennis Kefalas, P. Eng. SAO City of Yellowknife Assessing and Dealing with Environmental Liabilities of Local Governments LGANT 2014 Dennis Kefalas, P. Eng. SAO City of Yellowknife Overview Obligations Environmental Liabilities Landfill Closure and

More information

Policy framework in Canada for mine closure and management of long term liabilities

Policy framework in Canada for mine closure and management of long term liabilities Policy framework in Canada for mine closure and management of long term liabilities Gilles A. Tremblay and Charlene M. Hogan Natural Resources Canada, Canada W.R. Cowan Cowan Minerals Ltd., Canada ABSTRACT

More information

Annual Consolidated Financial Statements

Annual Consolidated Financial Statements Annual Consolidated Financial Statements For the years ended and 2013 (Expressed in thousands of Canadian dollars, unless otherwise stated) INDEPENDENT AUDITORS REPORT OF REGISTERED PUBLIC ACCOUNTING FIRM

More information

State Conservation Commission

State Conservation Commission Agency 11 State Conservation Commission Articles 11-1. WATER RESOURCES COST-SHARE PROGRAM. 11-2. HIGH PRIORITY COST-SHARE PROGRAM. 11-3. WATERSHED DAM CONSTRUCTION PROGRAM. 11-4. MULTIPURPOSE SMALL LAKES

More information

Canadian Zinc Corporation

Canadian Zinc Corporation Canadian Zinc Corporation Condensed Interim Financial Statements For the three month period ended (Unaudited, expressed in thousands of Canadian dollars, unless otherwise stated) Condensed Interim Statement

More information

Appendix C Council Resource Consents and CLCLR Information

Appendix C Council Resource Consents and CLCLR Information Appendix C Council Resource Consents and CLCLR Information Appendix C1 Resource Consents Appendix C2 Feedback from the CLCLR Team This page has been intentionally left blank. Appendix C1 Resource Consents

More information

PART 2.4 DEPARTMENT OF ENVIRONMENT AND CONSERVATION CONTAMINATED SITES

PART 2.4 DEPARTMENT OF ENVIRONMENT AND CONSERVATION CONTAMINATED SITES PART 2.4 DEPARTMENT OF ENVIRONMENT AND CONSERVATION CONTAMINATED SITES Executive Summary A contaminated site is defined by the Canadian Council of Ministers of the Environment (CCME) as a location at which

More information

Session of SENATE BILL No By Committee on Utilities 2-15

Session of SENATE BILL No By Committee on Utilities 2-15 Session of 0 SENATE BILL No. By Committee on Utilities - 0 0 0 AN ACT concerning electric utilities; relating to the state corporation commission; authorizing the approval and issuance of K-EBRA bonds;

More information

Ministry of Government Relations. PS 3260 Liability for Contaminated Sites

Ministry of Government Relations. PS 3260 Liability for Contaminated Sites Ministry of Government Relations PS 3260 Liability for Contaminated Sites October 2015 Table of Contents Introduction... 2 Effective date of PS 3260. 2 Contamination defined..2 Recognition... 4 Environmental

More information

CORPORATION OF THE MUNICIPALITY OF TRENT LAKES CONSOLIDATED FINANCIAL STATEMENTS DECEMBER 31, 2015

CORPORATION OF THE MUNICIPALITY OF TRENT LAKES CONSOLIDATED FINANCIAL STATEMENTS DECEMBER 31, 2015 CORPORATION OF THE MUNICIPALITY OF TRENT LAKES CONSOLIDATED FINANCIAL STATEMENTS DECEMBER 31, 2015 CORPORATION OF THE MUNICIPALITY OF TRENT LAKES CONSOLIDATED FINANCIAL STATEMENTS DECEMBER 31, 2015 TABLE

More information

Security Policy Guidance for Contaminated Sites Decision Matrix Ministry of Water, Land and Air Protection 28 May 2003

Security Policy Guidance for Contaminated Sites Decision Matrix Ministry of Water, Land and Air Protection 28 May 2003 28 May 2003 Table of Contents DEFINITIONS 2 PURPOSE 3 DECISION MATRIX 5 HOW TO CALCULATE FINANCIAL SECURITY 7 FORMS OF SECURITY 10 5-YEAR REVIEW 10 PERIODIC REVIEWS 11 BUSINESS REVIEW (SELF-FUNDING ALTERNATIVE)

More information

Implementation of Financial Guarantees for Licensees

Implementation of Financial Guarantees for Licensees Implementation of Financial Guarantees for Licensees Discussion Paper DIS-11-01 Implementation of Financial Guarantees for Licensees Discussion Paper DIS-11-01 Minister of Public Works and Government Services

More information

Payday Loans Act. BE IT ENACTED by the Lieutenant Governor and the Legislative Assembly of the Province of Prince Edward Island as follows:

Payday Loans Act. BE IT ENACTED by the Lieutenant Governor and the Legislative Assembly of the Province of Prince Edward Island as follows: Consultation Draft Payday Loans Act September 30, 2008 Payday Loans Act BE IT ENACTED by the Lieutenant Governor and the Legislative Assembly of the Province of Prince Edward Island as follows: PART I

More information

Commercial Lender Policy

Commercial Lender Policy Commercial Lender Policy Commercial Lender Policy Stewart Title Limited s Commercial Lender Policy will insure you subject to the terms and conditions of the Policy against your actual loss resulting from

More information

YEAR ENDED DECEMBER 31, 2017 AUDITED FINANCIAL STATEMENTS

YEAR ENDED DECEMBER 31, 2017 AUDITED FINANCIAL STATEMENTS YEAR ENDED DECEMBER 31, 2017 AUDITED FINANCIAL STATEMENTS Table of Contents Page Management s Responsibility for Financial Reporting Report 2 Independent Auditor s Report 3 Statements of Financial Position

More information

Investing in the Mining sector in Tanzania. 1. Relevant Authorities and Legislation Laws Regulating Mining Sector In Tanzania

Investing in the Mining sector in Tanzania. 1. Relevant Authorities and Legislation Laws Regulating Mining Sector In Tanzania Investing in the Mining sector in Tanzania 1. Relevant Authorities and Legislation 1.1. Laws Regulating Mining Sector In Tanzania The principal legislation regulating mining is the Mining Act, No. 15 of

More information

c t PAYDAY LOANS ACT

c t PAYDAY LOANS ACT c t PAYDAY LOANS ACT PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this Act, current to December 2, 2015. It is intended for information and reference

More information

Independent Auditors Report

Independent Auditors Report Independent Auditors Report To the Reeve and Members of Council of Rocky View County: We have audited the accompanying financial statements of Rocky View County, which comprise the statement of financial

More information

Title 36: TAXATION. Chapter 371: MINING EXCISE TAX. Table of Contents Part 4. BUSINESS TAXES...

Title 36: TAXATION. Chapter 371: MINING EXCISE TAX. Table of Contents Part 4. BUSINESS TAXES... Title 36: TAXATION Chapter 371: MINING EXCISE TAX Table of Contents Part 4. BUSINESS TAXES... Section 2851. PREAMBLE... 3 Section 2852. FINDINGS... 3 Section 2853. PURPOSE... 4 Section 2854. EXCISE TAX

More information

Draft Pipeline Financial Requirements Guidelines FOR DISCUSSION PURPOSES ONLY

Draft Pipeline Financial Requirements Guidelines FOR DISCUSSION PURPOSES ONLY Draft Pipeline Financial Requirements Guidelines FOR DISCUSSION PURPOSES ONLY Contents 1. Introduction... 3 1.1 Background... 4 1.2 Purpose of the Pipeline Financial Requirements Guidelines... 5 2. Financial

More information

Financial Assurances for Compensatory Mitigation

Financial Assurances for Compensatory Mitigation Financial Assurances for Compensatory Mitigation Steven Martin, PWS Environmental Planner Institute for Water Resources US Army Corps of Engineers What are Financial Assurances? Mechanism to ensure that:

More information

As Introduced. 132nd General Assembly Regular Session H. B. No

As Introduced. 132nd General Assembly Regular Session H. B. No 132nd General Assembly Regular Session H. B. No. 15 2017-2018 Representative Cera Cosponsors: Representatives Rogers, O'Brien, Antonio, Fedor, Sheehy A B I L L To amend sections 1513.37, 1561.24, and 5727.81

More information

Petroleum and Geothermal Energy Resources (Environment) Regulations 2012

Petroleum and Geothermal Energy Resources (Environment) Regulations 2012 Western Australia Petroleum and Geothermal Energy Resources Act 1967 Petroleum and Geothermal Energy Resources (Environment) Regulations As at 29 Aug Version 00-a0-01 Western Australia Petroleum and Geothermal

More information

CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST

CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST CODE OF PRACTICE FOR WORKS AFFECTING THE CANAL & RIVER TRUST PART 3 FORMS April 2018 Third Party Works Code of Practice: Part 3: Forms April 2018 1 CONTENTS FORM 1:NOTIFICATION FORM FORM 2: COST UNDERTAKING

More information

A Practical Approach to Section PS 3260

A Practical Approach to Section PS 3260 WWW.BDO.CA ASSURANCE AND ACCOUNTING CONTAMINATED SITES A Practical Approach to Section PS 3260 Section PS 3260, Liability for Contaminated Sites, was issued by the Public Sector Accounting Standards Board

More information

EXPLORATION REGULATION

EXPLORATION REGULATION Province of Alberta FORESTS ACT MINES AND MINERALS ACT PUBLIC HIGHWAYS DEVELOPMENT ACT PUBLIC LANDS ACT EXPLORATION REGULATION Alberta Regulation 284/2006 With amendments up to and including Alberta Regulation

More information

Interim Consolidated Financial Statements

Interim Consolidated Financial Statements Interim Consolidated Financial Statements For the three and six month periods ended (Unaudited, expressed in thousands of Canadian dollars, unless otherwise stated) (The Company s auditors have not reviewed

More information

Dalhousie University Staff Pension Plan. Statement of Investment Policies and Guidelines of the Dalhousie Pension Trust Fund

Dalhousie University Staff Pension Plan. Statement of Investment Policies and Guidelines of the Dalhousie Pension Trust Fund Dalhousie University Staff Pension Plan Statement of Investment Policies and Guidelines of the Dalhousie Pension Trust Fund Dalhousie Pension Trust Fund Statement of Investment Policy and Guidelines March

More information

NICOLA MINING INC. Condensed Consolidated Interim Financial Statements. For the three and nine months ended September 30, 2018 and 2017

NICOLA MINING INC. Condensed Consolidated Interim Financial Statements. For the three and nine months ended September 30, 2018 and 2017 Condensed Consolidated Interim Financial Statements For the three and nine months ended September 30, 2018 and 2017 MANAGEMENT S RESPONSIBILITY FOR FINANCIAL REPORTING CONDENSED CONSOLIDATED INTERIM FINANCIAL

More information

AVIDIAN GOLD INC. CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED JUNE 30, 2016 AND (Expressed in US Dollars)

AVIDIAN GOLD INC. CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED JUNE 30, 2016 AND (Expressed in US Dollars) CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED JUNE 30, 2016 AND 2015 (Expressed in US Dollars) To the Shareholders of Avidian Gold Inc.: INDEPENDENT AUDITOR S REPORT We have audited the accompanying

More information

MUNICIPALITY OF MIDDLESEX CENTRE FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2016

MUNICIPALITY OF MIDDLESEX CENTRE FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2016 FINANCIAL STATEMENTS FINANCIAL STATEMENTS -1- Independent Auditor's Report -2- Statement of Financial Position -3- Statement of Operations and Accumulated Surplus -4- Statement of Cash Flows -5- Statement

More information

AGRICULTURAL INSURANCE ACT LIVESTOCK INSURANCE REGULATIONS

AGRICULTURAL INSURANCE ACT LIVESTOCK INSURANCE REGULATIONS c t AGRICULTURAL INSURANCE ACT LIVESTOCK INSURANCE REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to March 18,

More information

Standard Mortgage Terms

Standard Mortgage Terms These mortgage terms shall be deemed to be included and form part of every mortgage. The terms of this set of standard mortgage terms may be modified by additions, amendments or deletions in the schedule

More information

TITAN MINING CORPORATION CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED DECEMBER 31, 2017 and 2016

TITAN MINING CORPORATION CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED DECEMBER 31, 2017 and 2016 CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED DECEMBER 31, 2017 and 2016 MANAGEMENT S RESPONSIBILITY FOR FINANCIAL REPORTING The accompanying consolidated financial statements of Titan Mining Corporation

More information

Retail Collateral Mortgage

Retail Collateral Mortgage Image Only Image Only Image Only Page 1 Retail Collateral Mortgage THE REAL PROPERTY ACT STANDARD CHARGE MORTGAGE TERMS Filed by: THE BANK OF NOVA SCOTIA Filing Date: 2015/02/09 Filing Name: The Bank of

More information

MANAGEMENT S DISCUSSION AND ANALYSIS

MANAGEMENT S DISCUSSION AND ANALYSIS www.canickel.com MANAGEMENT S DISCUSSION AND ANALYSIS For the three months ended March 31, 2017 CaNickel Mining Limited MANAGEMENT S DISCUSSION AND ANALYSIS of financial condition and results of operations

More information

PROJECT AGREEMENT FOR THE QUEBEC LITHIUM SPODUMENE MINE IN QUEBEC

PROJECT AGREEMENT FOR THE QUEBEC LITHIUM SPODUMENE MINE IN QUEBEC PROJECT AGREEMENT FOR THE QUEBEC LITHIUM SPODUMENE MINE IN QUEBEC PREAMBLE WHEREAS the Government of Canada is committed to improving the efficiency of the federal environmental assessment (EA) and regulatory

More information

ABACUS MINING & EXPLORATION CORPORATION (An exploration stage company) Management s discussion & analysis. For the period ended March 31, 2012

ABACUS MINING & EXPLORATION CORPORATION (An exploration stage company) Management s discussion & analysis. For the period ended March 31, 2012 ABACUS MINING & EXPLORATION CORPORATION (An exploration stage company) Management s discussion & analysis For the period ended March 31, 2012 May 29, 2012 The following management s discussion and analysis

More information

ALEXIS MINERALS CORPORATION (A Development Stage Company)

ALEXIS MINERALS CORPORATION (A Development Stage Company) CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED DECEMBER 31, 2007 AUDITED AUDITORS' REPORT To the Shareholders of Alexis Minerals Corporation We have audited the consolidated balance sheets of Alexis

More information

Management s Responsibility for Financial Reporting

Management s Responsibility for Financial Reporting Management s Responsibility for Financial Reporting The accompanying consolidated financial statements and all information in the annual report are the responsibility of management. These consolidated

More information

MOUNTAIN PROVINCE DIAMONDS INC. As at December 31, 2015 and 2014 And for the years ended December 31, 2015, 2014 and 2013

MOUNTAIN PROVINCE DIAMONDS INC. As at December 31, 2015 and 2014 And for the years ended December 31, 2015, 2014 and 2013 Consolidated Financial Statements (Expressed in Canadian Dollars) MOUNTAIN PROVINCE DIAMONDS INC. As at December 31, 2015 and 2014 And for the years ended December 31, 2015, 2014 and 2013 CONTENTS Page

More information

Contaminated Sites. Municipal Officers Forum June 17, 2015

Contaminated Sites. Municipal Officers Forum June 17, 2015 Contaminated Sites Municipal Officers Forum June 17, 2015 Contaminated Sites -Applying the Standard -Definitions -Liability Recognition -Recognition Criteria -Liability Measurement -Liability Disclosure

More information

BURNCO AGGREGATE PROJECT SCHEDULE B TABLE OF CONDITIONS FOR AN ENVIRONMENTAL ASSESSMENT CERTIFICATE

BURNCO AGGREGATE PROJECT SCHEDULE B TABLE OF CONDITIONS FOR AN ENVIRONMENTAL ASSESSMENT CERTIFICATE BURNCO AGGREGATE PROJECT SCHEDULE B TABLE OF CONDITIONS FOR AN ENVIRONMENTAL ASSESSMENT CERTIFICATE DEFINITIONS Aboriginal Groups Application Care and Maintenance Certificate Closure Construction Holder

More information

THE PETROLEUM EXPLORATION AND PRODUCTION ACT, 2001 ARRANGEMENT OF SECTIONS. Part II ESTABLISHMENT OF PETROLEUM RESOURCES UNIT

THE PETROLEUM EXPLORATION AND PRODUCTION ACT, 2001 ARRANGEMENT OF SECTIONS. Part II ESTABLISHMENT OF PETROLEUM RESOURCES UNIT Part I Preliminary. 1. Interpretation. THE PETROLEUM EXPLORATION AND PRODUCTION ACT, 2001 ARRANGEMENT OF SECTIONS Part II ESTABLISHMENT OF PETROLEUM RESOURCES UNIT 2. Establishment of Petroleum Resources

More information

PEMBINA PIPELINE CORPORATION. Premium Dividend and Dividend Reinvestment Plan

PEMBINA PIPELINE CORPORATION. Premium Dividend and Dividend Reinvestment Plan PEMBINA PIPELINE CORPORATION Premium Dividend and Dividend Reinvestment Plan Certain capitalized terms in this Premium Dividend and Dividend Reinvestment Plan have the meaning assigned to them under "Definitions"

More information

The Crown Mineral Royalty Regulations

The Crown Mineral Royalty Regulations CROWN MINERAL ROYALTY C-50.2 REG 29 1 The Crown Mineral Royalty Regulations being Chapter C-50.2 Reg 29 (effective January 1, 2013) as amended by an Errata Notice published in Part II of the Gazette on

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Policy Office

DEPARTMENT OF ENVIRONMENTAL PROTECTION Policy Office DEPARTMENT OF ENVIRONMENTAL PROTECTION Policy Office DOCUMENT NUMBER: 012-4180-001 TITLE: Policy for the Consideration of Community Environmental Projects in Conjunction with Assessment of Civil Penalty

More information

Financial assurance for mine closure in Chile Alfonso Olivari. National Geological and Mining Survey, Chile

Financial assurance for mine closure in Chile Alfonso Olivari. National Geological and Mining Survey, Chile Financial assurance for mine closure in Chile Alfonso Olivari National Geological and Mining Survey, Chile General aspects of the law 20.551 Objective To avoid and mitigate environmental liabilities once

More information

PLEASE NOTE Legislative Counsel Office not Table of Public Acts

PLEASE NOTE Legislative Counsel Office not Table of Public Acts c t ARCHAEOLOGY ACT PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this Act, current to December 2, 2015. It is intended for information and reference

More information

Summary Klamath Hydroelectric Settlement Agreement

Summary Klamath Hydroelectric Settlement Agreement Summary Klamath Hydroelectric Settlement Agreement Summary and Status January 7, 2010 PacifiCorp and over 30 federal, state, tribal, county, irrigation, conservation, and fishing organizations have developed

More information

Annual Consolidated Financial Statements

Annual Consolidated Financial Statements Annual Consolidated Financial Statements For the years ended December 31, 2016, 2015 and 2014 (Expressed in thousands of Canadian dollars, unless otherwise stated) KPMG LLP Chartered Professional Accountants

More information

South Star Mining Corp. (formerly STEM 7 Capital Inc.)

South Star Mining Corp. (formerly STEM 7 Capital Inc.) South Star Mining Corp. (formerly STEM 7 Capital Inc.) (the Company ) FORM 51-102F1 MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE YEARS ENDED DECEMBER 31, 2017 AND 2016 Introduction This Management s Discussion

More information

Province of New Brunswick

Province of New Brunswick Province of New Brunswick Department of Local Government- Implementation of PSAB Summary Document for Accruals February, 2011 Contents Page Introduction 1 Accruals Project Plan 1 Determination of Accruals

More information

Implementing Financial Assurance for Mitigation Project Success. June 2011

Implementing Financial Assurance for Mitigation Project Success. June 2011 Implementing Financial Assurance for Mitigation Project Success June 2011 Implementing financial assurances for mitigation project success can be challenging and place demands on regulators outside their

More information

BARD VENTURES LTD. CONSOLIDATED FINANCIAL STATEMENTS (Expressed in Canadian Dollars) FOR THE FISCAL YEAR ENDED SEPTEMBER 30, 2015 AND 2014

BARD VENTURES LTD. CONSOLIDATED FINANCIAL STATEMENTS (Expressed in Canadian Dollars) FOR THE FISCAL YEAR ENDED SEPTEMBER 30, 2015 AND 2014 CONSOLIDATED FINANCIAL STATEMENTS FOR THE FISCAL YEAR ENDED SEPTEMBER 30, 2015 AND 2014 1 UNIT 114B (2 nd floor) 8988 FRASERTON COURT BURNABY, BC, V5J 5H8 T: 604.318.5465 F: 604.239.0866 Adam Kim ADAM

More information

Government Decree. on mining activities (391/2012) Issued in Helsinki 28 June 2012

Government Decree. on mining activities (391/2012) Issued in Helsinki 28 June 2012 NB: Unofficial translation, legally binding only in Finnish and Swedish Ministry of Employment and the Economy, Finland Government Decree on mining activities (391/2012) Issued in Helsinki 28 June 2012

More information

Canadian Nuclear Safety Commission. Commission canadienne de sûreté nucléaire

Canadian Nuclear Safety Commission. Commission canadienne de sûreté nucléaire Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire REGULATORY GUIDE Developing and Using Action Levels G-228 March 2001 REGULATORY DOCUMENTS The Canadian Nuclear Safety Commission

More information

disclosure of liabilities for asset retirement obligations and the associated

disclosure of liabilities for asset retirement obligations and the associated Knotia - CICA Stadards & Guidance Collection Page 1 of 26 :;:; Accounting Handbook :;:; Accounting Recommendations :;:; Specific items (Sections 3000-3870) :;:; 3110 - Asset Retirement Obligations SPECIFIC

More information

Consolidated Financial Statements. City of Camrose. December 31, 2016

Consolidated Financial Statements. City of Camrose. December 31, 2016 Consolidated Financial Statements City of Camrose December 31, 2016 December 31, 2016 Contents Consolidated Financial Statements Management's Responsibility for Financial Reporting 1 Independent Auditors'

More information

Interim Consolidated Financial Statements

Interim Consolidated Financial Statements Interim Consolidated Financial Statements For the three and nine month periods ended (Unaudited, expressed in thousands of Canadian dollars, unless otherwise stated) (The Company s auditors have not reviewed

More information

To: All Oil and Gas Pipeline Companies under the National Energy Board (Board) All Interested Parties.

To: All Oil and Gas Pipeline Companies under the National Energy Board (Board) All Interested Parties. File: AD-GA-ActsLeg-Fed-NEBA-01 01 1 August 2012 To: All Oil and Gas Pipeline Companies under the National Energy Board (Board) All Interested Parties. Section 58 Streamlining Order The Board has revoked

More information

AGRICULTURAL INSURANCE ACT REGULATIONS

AGRICULTURAL INSURANCE ACT REGULATIONS c t AGRICULTURAL INSURANCE ACT REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to March 18, 2017. It is intended

More information

CONDENSED INTERIM FINANCIAL STATEMENTS

CONDENSED INTERIM FINANCIAL STATEMENTS www.canickel.com CONDENSED INTERIM FINANCIAL STATEMENTS March 31, 2016 (Unaudited) CANICKEL MINING LIMITED NOTES TO READER These unaudited condensed interim financial statements of CaNickel Mining Limited

More information

U.S. Army Corps of Engineers (USACE) Fort Worth District

U.S. Army Corps of Engineers (USACE) Fort Worth District U.S. Army Corps of Engineers (USACE) Fort Worth District Financial Assurances Guidance Document This document discusses the requirements for financial assurances within the USACE Regulatory Program as

More information

AVIDIAN GOLD INC. CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED JUNE 30, 2015 AND (Expressed in US Dollars)

AVIDIAN GOLD INC. CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED JUNE 30, 2015 AND (Expressed in US Dollars) CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED JUNE 30, 2015 AND 2014 (Expressed in US Dollars) To the Shareholders of Avidian Gold Inc.: INDEPENDENT AUDITOR S REPORT We have audited the accompanying

More information

South Star Mining Corp. (formerly STEM 7 Capital Inc.)

South Star Mining Corp. (formerly STEM 7 Capital Inc.) South Star Mining Corp. (formerly STEM 7 Capital Inc.) (the Company ) FORM 51-102F1 MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MARCH 31, 2018 Introduction This Management s Discussion

More information

GOWEST GOLD LTD. Unaudited. Financial Statements. Three Months Ended January 31, 2019 and Expressed in Canadian Dollars

GOWEST GOLD LTD. Unaudited. Financial Statements. Three Months Ended January 31, 2019 and Expressed in Canadian Dollars Financial Statements Three Months Ended January 31, 2019 and 2018 Expressed in Canadian Dollars - 1 - MANAGEMENT'S RESPONSIBILITY FOR FINANCIAL REPORTING The accompanying unaudited condensed interim consolidated

More information

No.13 International Insurance (Amendment and Consolidation) 1998 SAINT VINCENT AND THE GRENADINES ACT NO. 13 OF ASSENT

No.13 International Insurance (Amendment and Consolidation) 1998 SAINT VINCENT AND THE GRENADINES ACT NO. 13 OF ASSENT SAINT VINCENT AND THE GRENADINES ACT NO. 13 OF 1998 1 ASSENT [L.S.] CHARLES J. ANTROBUS Governor-General 15 th December, 1998 AN ACT to amend and restate the International Insurance Act, 1996. [By Proclamation]

More information

Liability for Contaminated

Liability for Contaminated november 2011 www.bdo.ca Assurance and accounting Liability for Contaminated Sites The new Section PS3260, Liability for Contaminated Sites, in the Public Sector Accounting Handbook establishes standards

More information

Group Independent Auditors Report to the Members of Croda International Plc

Group Independent Auditors Report to the Members of Croda International Plc Group Independent Auditors Report to the Members of Report on the Group financial statements Our opinion In our opinion, s Group financial statements (the financial statements ): give a true and fair view

More information

SCOZINC MINING LTD. CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED JUNE 30, 2017 AND 2016

SCOZINC MINING LTD. CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED JUNE 30, 2017 AND 2016 SCOZINC MINING LTD. CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE AND SIX MONTHS ENDED JUNE 30, 2017 AND 2016 NOTICE TO READER Under National Instrument 51-102, Part 4, subsection 4.3(3)(a),

More information

April 2018 ULSTER BANK IRELAND DAC AS SELLER AND SERVICER ARDMORE SECURITIES NO. 1 DESIGNATED ACTIVITY COMPANY AS ISSUER AND

April 2018 ULSTER BANK IRELAND DAC AS SELLER AND SERVICER ARDMORE SECURITIES NO. 1 DESIGNATED ACTIVITY COMPANY AS ISSUER AND CLIFFORD CHANCE LLP EXECUTION VERSION April 2018 ULSTER BANK IRELAND DAC AS SELLER AND SERVICER ARDMORE SECURITIES NO. 1 DESIGNATED ACTIVITY COMPANY AS ISSUER AND BNY MELLON CORPORATE TRUSTEE SERVICES

More information

DEED OF TRUST NOTICE: THIS LOAN IS NOT ASSUMABLE WITHOUT THE APPROVAL OF THE DEPARTMENT OF VETERANS AFFAIRS OR ITS AUTHORIZED AGENT.

DEED OF TRUST NOTICE: THIS LOAN IS NOT ASSUMABLE WITHOUT THE APPROVAL OF THE DEPARTMENT OF VETERANS AFFAIRS OR ITS AUTHORIZED AGENT. WHEN RECORDED MAIL TO: SPACE ABOVE THIS LINE FOR RECORDER'S USE DEED OF TRUST NOTICE: THIS LOAN IS NOT ASSUMABLE WITHOUT THE APPROVAL OF THE DEPARTMENT OF VETERANS AFFAIRS OR ITS AUTHORIZED AGENT. The

More information

Yukon Oil and Gas Act Yukon Oil and Gas Disposition Regulations CALL FOR WORK BIDS FALL 2007 Exploration Basin: Peel Plateau-Plain The Minister of Energy, Mines and Resources of Yukon invites the submission

More information

Labor Management Trust Fiduciary Liability Policy

Labor Management Trust Fiduciary Liability Policy Labor Management Trust Fiduciary Liability Policy In consideration of the payment of the premium and subject to the Declarations, limitations, conditions, provisions and other terms of this policy, the

More information

Consolidated Financial Statements. Dalradian Resources Inc. (Expressed in Canadian Dollars)

Consolidated Financial Statements. Dalradian Resources Inc. (Expressed in Canadian Dollars) Consolidated Financial Statements (Expressed in Canadian Dollars) For the years ended December 31, 2016 And December 31, 2015 March 23, 2017 1 Management s Responsibility for Consolidated Financial Statements

More information

ARGONAUT GOLD INC. (Formerly Argonaut Gold Ltd.) MANAGEMENT S DISCUSSION & ANALYSIS FOR THE QUARTER ENDED SEPTEMBER 30, 2010

ARGONAUT GOLD INC. (Formerly Argonaut Gold Ltd.) MANAGEMENT S DISCUSSION & ANALYSIS FOR THE QUARTER ENDED SEPTEMBER 30, 2010 ARGONAUT GOLD INC. (Formerly Argonaut Gold Ltd.) MANAGEMENT S DISCUSSION & ANALYSIS FOR THE QUARTER ENDED SEPTEMBER 30, 2010 The following Management s Discussion and Analysis ( MD&A ) of Argonaut Gold

More information

CANADIAN NATIONAL RAILWAY COMPANY CONSOLIDATED STATEMENT OF INCOME (U.S. GAAP)

CANADIAN NATIONAL RAILWAY COMPANY CONSOLIDATED STATEMENT OF INCOME (U.S. GAAP) CONSOLIDATED STATEMENT OF INCOME (U.S. GAAP) (In millions, except per share data) Three months ended March 31 2008 2007 (Unaudited) Revenues 1,927 1,906 Operating expenses Labor and fringe benefits 461

More information

PERSONAL INFORMATION FILE

PERSONAL INFORMATION FILE PERSONAL INFORMATION FILE To serve you with maximum efficiency, please refer to the details of the checklist and requirements guide below for opening an account. CHECKLIST: Regular Customer: Verification

More information

EVERGREEN CREDIT CARD TRUST RECEIVABLES PURCHASE AGREEMENT. between THE TORONTO-DOMINION BANK. and EVERGREEN FUNDING LIMITED PARTNERSHIP

EVERGREEN CREDIT CARD TRUST RECEIVABLES PURCHASE AGREEMENT. between THE TORONTO-DOMINION BANK. and EVERGREEN FUNDING LIMITED PARTNERSHIP EVERGREEN CREDIT CARD TRUST RECEIVABLES PURCHASE AGREEMENT between THE TORONTO-DOMINION BANK and EVERGREEN FUNDING LIMITED PARTNERSHIP Dated as of May 9, 2016 TABLE OF CONTENTS ARTICLE 1 - DEFINITIONS...2

More information

BOREAL METALS CORP. (formerly European Ferro Metals Ltd.) FORM F1 MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2016

BOREAL METALS CORP. (formerly European Ferro Metals Ltd.) FORM F1 MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2016 BOREAL METALS CORP. (formerly European Ferro Metals Ltd.) FORM 51-102F1 MANAGEMENT S DISCUSSION AND ANALYSIS FOR THE YEAR ENDED DECEMBER 31, 2016 The following management s discussion and analysis ( MD&A

More information

June 2017 BIDDING PROCEDURES No. 90

June 2017 BIDDING PROCEDURES No. 90 June 2017 BIDDING PROCEDURES No. 90 TABLE OF CONTENTS SECTION 1 DEFINITIONS AND INTERPRETATION Page 90. 1.1 Definitions... 3 90. 1.2 Interpretation... 3 SECTION 2 GENERAL TENDER INFORMATION 90. 2.1 Examination

More information

ecobalt Solutions Inc.

ecobalt Solutions Inc. Condensed Interim Consolidated Financial Statements For the Six Months Ended June 30, 2018 (Stated in Canadian dollars) Suite 1810 999 West Hastings Street Vancouver, BC, Canada V6C 2W2 June 30, 2018 Table

More information