1 CHAPTER THREE Natural Hazard Mitigation Strategy Chapter 3 Section All Sections Updates to Section Revised Natural Hazards Introduction and all Sections to change Natural Hazards Subcommittee to Committee. Coastal Storms/Hurricanes Revised Coastal Storms/Hurricanes study period from 2010 to 2015 and percentage chance of storm Goal 1 Objective 5 added "Do annual dead-wooding of trees on public property and inspect trees on private property as requested." Coastal Erosion Extreme Heat Mitigation Goal #3 Objective #1 Action Step 2 - Added as recommended by the Department of Health. Floods Goal I Objective #8 reworded to read "Recommend to Glynn County to adopt a flood elevation requirement for new construction of minimum flood elevation plus one foot. The City of Brunswick and Jekyll Island already have this requirement. Enforce the _requirement _for _Flood _Certifications. Hailstorms Severe Winter Storms Tornadoes Wildfires Severe Thunderstorms Earthquakes Tsunamis Environmental Change Added section for Goals and Objectives for Environmental change 153

2 THIS PAGE INTENTIONALLY LEFT BLANK 154

3 CHAPTER THREE Natural Hazard Mitigation Strategy Overall Community Mitigation Strategy As a coastal community, the planning region places an emphasis on damage as a result of coastal storms and flooding. With that in mind, many of the goals and objectives focus on minimizing the area's vulnerabilities through education, prevention, reaction, and planning. The Goals and Objectives in this Chapter are followed by a series of Action Steps. These Steps have been evaluated using the STAPLEE criteria method and local expertise and concerns. Each objective has been given a rating of Priority - High, Medium, or Low priority based on these considerations.' The responsible entity is also identified as has the planning duration. These strategies will also be incorporated into the goals and objectives addressing other important hazards including wildfires and extreme seasonal temperatures. National Mitigation Strategy and Goal FEMA has developed ten fundamental principles for the nation's mitigation strategy:. Risk reduction measures must ensure long-term economic success for the community as a whole, rather than short-term benefits for special interests.. Risk reduction measures for one natural hazard must be compatible with risk reduction measures for other natural hazards.. Risk reduction measures must be evaluated to achieve the best mix for a given location.. Risk reduction measures for natural hazards must be compatible with risk reduction measures for technological hazards and vice versa. All mitigation is local. Emphasizing proactive mitigation before emergency response can reduce disaster costs and the impacts of natural hazards. Both pre-disaster (preventive) and postdisaster (corrective) mitigation is needed. Hazard identification and risk assessment are the cornerstones of mitigation. Building new federal-state-local partnerships and public-private partnerships is the most effective means of implementing measures to reduce the impacts of natural hazards. Those who knowingly choose to assume greater risk must accept responsibility for that choice. Risk reduction measures for natural hazards must be compatible with the protection of natural and cultural resources. FEMA's goal is to - ' STAPLEE is an acronym for evaluation categories entitled: Social, Technical, Administrative, Political, Legal, Economic, and Environmental. The ratings are based on the criteria described in Table 2-1 of FEMA's State and Local Mitigation how-to guide: Development the Mitigation Plan located in Appendix C. 155

4 . Substantially increase public awareness of natural hazard risk so that the public demands safer communities in which to live and work. Significantly reduce the risk of loss of life, injuries, economic costs, and destruction of natural and cultural resources that result from natural hazards 156

5 Coastal Storms, Hurricanes, Floods, Tornadoes, Hailstorms, ThunderstormS 2. Community Mitigation Goals In addressing natural hazards in the planning region, a number of objectives appear applicable to nearly all the hazards mentioned. In sum, the region will develop methods of educating the public on all important hazards, including how to prepare for them and react to them. In addition, both private citizens and commercial business owners are encouraged to adopt mitigation plans specific to their own needs that address hazards inherent to this region. Finally, clear and open lines of communication wherein information can be given to and received from the public is a necessary step in effective hazard mitigation. Identification and Analysis of Range of Mitigation Options Structural and non-structural mitigation - Mitigation actions in this plan will be nonstructural in nature. Any structural or construction actions taken may be the result of interpretations of strategies outlined herein. Existing policies, regulations, ordinances and land use - Local governments involved in this planning process have adopted up to date policies, regulations, ordinances and land uses and therefore it is not at issue in the mitigation actions of this plan. However, the plan does acknowledge the need for the creation of new and/or improved outreach programs. Community values, historic & special considerations - There are no mitigation actions that specifically target community values, historic or special considerations as many of the strategies would apply to these resources. 2 These hazards have been combined as they produce similar destructive forces and produce similar types of damage. 157

6 Mitigation Goal #1 Minimize losses to existing and future structures, especially critical facilities, from coastal storms, hurricanes, floods, tornadoes, and thunderstorms. Objective #1 Action Steps: Enforce regulatory measures that ensure new development will not increase flood threats to existing properties by limiting discharge rates to predevelopment typically associated with localized flooding caused by a thunderstorm but applicable to all storms that produce large amounts of rainfall. Priority - High - Limit post development storm water runoff levels to no more than pre-development storm water runoff levels Responsible Entity - City and County Engineers Priority - High - Determine benefits versus impacts of adopting a more stringent requirement as outlined in the Coastal Stormwater Supplement. Responsible Entity - City and County Engineers Priority - High - Require upgrading of downstream storm water management structures at critical locations as a part of development approval. Responsible Entity - City and County Engineers Priority - High - Continue efforts to refine drainage basin limits by use of LIDAR and field surveys to identify and replace undersized drainage structures and to utilize HAZUS in determining the cost benefit (priority ranking) for the identified facilities. Responsible Entity - City and County Engineers Objective #2 Evaluate current building codes for efficiency in protecting structures from wind damage and adopt new codes as appropriate. This type of damage is typically associated with coastal storms, hurricanes, thunderstorms and tornadoes. 158

7 Action Steps: Objective #3 Action Steps: Objective #4 Action Steps: Priority - Medium- Continue to utilize hurricane resistant construction manual ICC 600 and IBC 2006 or latest adopted code. Responsible Entity - City and County Building Officials Priority - Medium- Update yearly Priority - High wind resistance literature for consumers. Responsible Entity - City and County Building Officials Planning Duration - Yearly Improve traffic circulation during floods and other emergencies. Priority - Medium- Update evacuation route maps with any new road additions. Responsible Entity - EMA and GIS Priority - Medium- Work with state and federal agencies to provide road improvements, and evacuation plan improvements along designated evacuation routes. Responsible Entity - City and County Engineers Priority - Medium Develop a plan to contra flow pattern on major arterials. Responsible Entity - City and County Engineers, EMA and GIS Objective Status- Redirected Ongoing Effort Discourage additional housing (especially Priority - High density and/or special needs) in areas of Priority - High hazard risk. This mitigation effort is directed towards coastal storms, hurricanes and areas prone to flooding. Priority - High - Update zoning to help control development in Priority - High hazard areas. Responsible Entity - City and County Planning Officials Priority - High - Do not recommend rezoning to allow Priority - High density housing in areas of Priority - High risk. Responsible Entity - City and County Planning Officials 159

8 Medium- Identify all existing concentrations of special needs housing and work to receive grant funding to relocate the facilities to areas of lower risk. Responsible Entity - City and County Planning Officials - Grants Obiective Status - Onaoina Effort Objective #5 Action Step: Objective #6 Action Step: Objective #7 Action Step: Identify potentially hazardous trees in public urban areas and plan for their maintenance. Do annual dead-wooding of trees on public property and inspect trees on private property as requested. This mitigation effort is directed towards coastal storms, hurricanes, thunderstorms and tornadoes. Low - Develop an annual inspection and dead wooding program for the urban forest. Responsible Entity - City and County Tree Boards, Georgia Forestry Commission - Develop and distribute educational materials and programs to reach residents and business organizations. This mitigation effort is directed towards coastal storms, hurricanes, thunderstorms, and tornadoes and flooding. Priority - High - Conduct public presentations on preparedness for power outage situations associated with a storm event, and safety and health precautions against flooding and other hazards. Responsible Entity - EMA Objective Status -Ongoing Effort Encourage businesses and private property owners to adopt appropriate mitigation actions. This mitigation effort is directed towards coastal storms, hurricanes and tornadoes. Priority - Medium- Provide literature and information on storm shutters and other protective equipment. Responsible Entity - City and County Building Officials 160

9 Objective #8 Action Step: Objective #9 Recommend to Glynn County to adopt a flood elevation requirement for new construction of minimum flood elevation plus one foot. The City of Brunswick and Jekyll Island already have this requirement. Enforce the requirement for Flood Certifications Priority - High - Provide literature and information on storm shutters and other protective equipment. Responsible Entity - City and County Building Officials To ensure continued compliance with the National Flood Insurance Program, the Community Development Director or his/her designee shall have the responsibility and authority to: (a) Assist the Federal Insurance Administrator ("Administrator"), at his/her request, in the delineation of the limits of the area having special flood, or flood-related erosion hazards. (b) Provide such information as the Administrator may request concerning present uses and occupancy of the floodplain or floodrelated erosion areas. (c) Cooperate with federal, State, and local agencies and private firms which undertake to study, survey, map, and identify floodplain, or flood-related erosion areas, and cooperate with neighboring communities with respect to management of adjourning floodplain and/or flood-related erosion areas in order to prevent aggravation of existing hazards. (d) Submit on the anniversary date of the community's initial eligibility an Annual Report to the Board of Commissioners on the progress made during the past year within the community in the development and implementation of floodplain management measures. (e) Upon occurrence, notify the Board of Commissioners in writing whenever the Flood Hazard Boundary Maps and Flood Insurance Rate Maps have been altered to accurately represent the community's flood boundaries. (f) Maintain for public inspection and to furnish upon request, for the determination of applicable flood insurance risk premium rates within all areas having special flood hazards identified on a Flood Hazard Boundary Map or Flood Insurance Rate Map, any certificates of floodproofing, and information on the elevation (in relation to mean sea level) of the level of the lowest habitable floor (including basement if habitable) of all new or substantially improved structures, and include whether or not structures contain a basement, and if the structure has been floodproofed the elevation (in relation to mean sea level) to which the structure was 161

10 flood proofed. Action Step: Objective #10 Action Step: (g) Take such other actions as may be reasonably necessary for the City to remain in compliance with the National Flood Insurance Program. Priority - High - Provide necessary staff to comply with items a-g above. Responsible Entity - Community Development Department Develop and distribute educational materials and programs to reach residents and builders on the differences in roofing rating regarding hail damage. Evaluate data on annual basis and update materials. This mitigation effort is directed towards hailstorms and thunderstorms. Priority - High - Prepare educational material (printed and electronic) to provide information on different roofing systems and their resistance to damage from hail. Responsible Entity - City and County Building Officials Special Multi-Jurisdictional Strategy And Considerations Goals, Objectives and Action Steps detailed in this plan are applicable to, and will be implemented within, all jurisdictions party to this plan. This Plan and the sections therein do not vary between jurisdictions and apply to the entire planning region. Local Public Information And Awareness Strategy Ongoing public information, involvement, and awareness are addressed by specific mention in above-described Action Steps, as well as within other Sections of this Chapter and the Plan in its entirety. 162

11 Coastal Erosion Community Mitigation Goals In addressing natural hazards in the planning region, a number of objectives appear applicable to nearly all the hazards mentioned. In sum, the region will develop methods of educating the public on all important hazards, including how to prepare for them and react to them. In addition, both private citizens and commercial business owners are encouraged to adopt mitigation plans specific to their own needs that address hazards inherent to this region. Finally, clear and open lines of communication wherein information can be given to and received from the public is a necessary step in effective hazard mitigation. Identification & Analysis Of Range Of Mitigation Options Structural and non-structural mitigation - Mitigation actions in this plan will be nonstructural in nature. Any structural or construction actions taken may be the result of interpretations of strategies outlined herein. Non-structural mitigation actions of this plan are comprised mostly of education materials and outreach programs. Existing policies, regulations, ordinances and land use - Local governments involved in this planning process have adopted up to date policies, regulations, ordinances and land uses and therefore it is not at issue in the mitigation actions of this plan. However, the plan does acknowledge the need for the creation of new and/or improved outreach programs. Community values, historic & special considerations - There are no mitigation actions that specifically target community values, historic or special considerations as many of the strategies would apply to these resources. 163

12 Mitigation Goal #2 Minimize losses to existing and future structures affected by coastal erosion. Objective #1 Action Steps: Identify areas subject to erosion Priority - Medium Utilize LiDAR to identify areas subject to erosion. Responsible Entity - Glynn County GIS Objective Status - New Effort Priority - Medium- Monitor beach erosion along southeastern tip of St. Simons Island with semiannual beach profile survey. Responsible Entity - Glynn County GIS Planning Duration - Annual Objective Status - New Effort Priority - Medium- Notify future residents of erosion potential. Responsible Entity - PlO Objective Status - New Effort 164

13 Objective #2 Action Steps: Use the most effective approaches to protect buildings from coastal erosion. Priority - Medium- Follow existing ICC 600 and FEMA guidelines for site development and building placement along the coast. Responsible Entity - County Building Official Priority - Medium Determine if the County needs to adopt a requirement that all new construction located within the VE Zone need to be constructed on pilings. Responsible Entity - County Building Official Planning Duration - New Effort Objective Status - To be done with new flood regulations and maps Priority - Medium- Maintain and/or improve existing beachfront armoring. Responsible Entity - County Engineer, DNR, USACOE Funding Source - Existing budgets Priority - Medium- Enforce regulatory measures that ensure new development will not increase coastal erosion threats to existing properties. Responsible Entity - County Engineer and Building Official Objective #3 Action Step: Evaluate current building codes for efficiency in protecting structures from coastal erosion. Priority - Low - Review building codes annually. Responsible Entity - County Building Official Obiective Status - Onaoina Effort Special Multi-Jurisdictional Strategy And Considerations Goals, Objectives and Action Steps detailed in this plan are applicable to, and will be implemented within, all jurisdictions party to this plan. This Plan and the sections therein vary between jurisdictions as the City of Brunswick is not subject to coastal erosion. 165

14 Local Public Information And Awareness Strategy Ongoing public information, involvement, and awareness are addressed by specific mention in above-described Action Steps, as well as within other Sections of this Chapter and the Plan in its entirety. 166

15 Extreme Heat Community Mitigation Goals In addressing natural hazards in the planning region, a number of objectives appear applicable to nearly all the hazards mentioned. In sum, the region will develop methods of educating the public on all important hazards, including how to prepare for them and react to them. In addition, both private citizens and commercial business owners are encouraged to adopt mitigation plans specific to their own needs that address hazards inherent to this region. Finally, clear and open lines of communication wherein information can be given to and received from the public is a necessary step in effective hazard mitigation. Identification & Analysis of Range of Mitigation Options Structural and non-structural mitigation - Mitigation actions in this plan will be nonstructural in nature. Any structural or construction actions taken may be the result of interpretations of strategies outlined herein. Non-structural mitigation actions of this plan are comprised mostly of education materials and outreach programs. Existing policies, regulations, ordinances and land use - Local governments involved in this planning process have adopted up to date policies, regulations, ordinances and land uses and therefore it is not at issue in the mitigation actions of this plan. However, the plan does acknowledge the need for the creation of new and/or improved outreach programs. Community values, historic & special considerations - There are no mitigation actions that specifically target community values, historic or special considerations as many of the strategies would apply to these resources. 167

16 Mitigation Goal #3 Minimize the health effects from extreme heat. Objective #1 Action Steps: Develop education programs to reach all citizens concerning proper mitigation strategies. Priority - Medium- Conduct public presentations on preparedness for extreme heat and associated health precautions. Responsible Entity - EMA and Health Department Planning Duration - As required Priority - Medium As recommended by the Department of Health, encourage the use of community buildings as public cooling centers when the heat index exceeds 100 degrees Fahrenheit. Responsible Entity - EMA and Health Department Planning Duration - As required Special Multi-Jurisdictional Strategy And Considerations Goals, Objectives and Action Steps detailed in this plan are applicable to, and will be implemented within, all jurisdictions party to this plan. This Plan and the sections therein do not vary between jurisdictions and apply to the entire planning region. Local Public Information And Awareness Strategy Ongoing public information, involvement, and awareness are addressed by specific mention in above-described Action Steps, as well as within other Sections of this Chapter and the Plan in its entirety. 168

17 Severe Winter Storms Community Mitigation Goals In addressing natural hazards in the planning region, a number of objectives appear applicable to nearly all the hazards mentioned. In sum, the region will develop methods of educating the public on all important hazards, including how to prepare for them and react to them. In addition, both private citizens and commercial business owners are encouraged to adopt mitigation plans specific to their own needs that address hazards inherent to this region. Finally, clear and open lines of communication wherein information can be given to and received from the public is a necessary step in effective hazard mitigation. Identification & Analysis Of Range Of Mitigation Options Structural and non-structural mitigation - Mitigation actions in this plan will be nonstructural in nature. Any structural or construction actions taken may be the result of interpretations of strategies outlined herein. Non-structural mitigation actions of this plan are comprised mostly of education materials and outreach programs. Existing policies, regulations, ordinances and land use - Local governments involved in this planning process have adopted up to date policies, regulations, ordinances and land uses and therefore it is not at issue in the mitigation actions of this plan. However, the plan does acknowledge the need for the creation of new and/or improved outreach programs. Community values, historic & special considerations - There are no mitigation actions that specifically target community values, historic or special considerations as many of the strategies would apply to these resources. 169

18 Mitigation Goal #4 Minimize the health effects from extreme cold; and property loss as a result of winter related fires. Objective #1 Action Steps: Develop education programs to reach all citizens concerning proper mitigation strategies Priority - Medium- Conduct public presentations on preparedness for extreme cold and associated health precautions. Responsible Entity - Fire Departments, EMA and Parks Departments Planning Duration - Annual Priority - Medium- Encourage the use of community buildings as public heating centers when the wind chill factor falls 0 degrees Fahrenheit or below. Responsible Entity - Fire Departments, EMA and Parks Departments Planning Duration - As required Special Multi-Jurisdictional Strategy And Considerations Goals, Objectives and Action Steps detailed in this plan are applicable to, and will be implemented within, all jurisdictions party to this plan. This Plan and the sections therein do not vary between jurisdictions and apply to the entire planning region. Local Public Information And Awareness Strategy Ongoing public information, involvement, and awareness are addressed by specific mention in above-described Action Steps, as well as within other Sections of this Chapter and the Plan in its entirety. 170

19 Wildfires Community Mitigation Goals In addressing natural hazards in the planning region, a number of objectives appear applicable to nearly all the hazards mentioned. In sum, the region will develop methods of educating the public on all important hazards, including how to prepare for them and react to them. In addition, both private citizens and commercial business owners are encouraged to adopt mitigation plans specific to their own needs that address hazards inherent to this region. Finally, clear and open lines of communication wherein information can be given to and received from the public is a necessary step in effective hazard mitigation. Identification & Analysis Of Range Of Mitigation Options Structural and non-structural mitigation - Mitigation actions in this plan will be nonstructural in nature. Any structural or construction actions taken may be the result of interpretations of strategies outlined herein. Non-structural mitigation actions of this plan are comprised mostly of education materials and outreach programs. Existing policies, regulations, ordinances and land use - Local governments involved in this planning process have adopted up to date policies, regulations, ordinances and land uses and therefore it is not at issue in the mitigation actions of this plan. However, the plan does acknowledge the need for the creation of new and/or improved outreach programs. Community values, historic & special considerations - There are no mitigation actions that specifically target community values, historic or special considerations as many of the strategies would apply to these resources. 171

20 Mitigation Goal #5 Provide for the conservation and protection of natural resources through the prevention of wildfires. Objective #1 Action Steps: Objective #2 Action Steps: Schedule more frequent prescribed burnings of underbrush in forest tracts through the Georgia Forestry Commission Priority - High - Stricter enforcement of existing open burning laws by local authorities with appropriate jurisdiction. Responsible Entity - Glynn County Fire Department and GA Forestry Commission Planning Duration - As required Priority - High - Encourage private landowners to construct and maintain appropriate fire breaks in coordination with the Georgia Forestry Commission. Responsible Entity - Glynn County Fire Department and GA Forestry Commission Planning Duration - As required Develop educational programs for urban interface neighborhoods and rural areas, and conduct education and outreach activities with specific emphasis on those more vulnerable to specific hazards and those located within Priority - High hazard areas. Priority - Medium- Neighborhood meetings conducted by the local fire departments and the Georgia Forestry Commission to distribute informational materials. Responsible Entity - Glynn County Fire Department and GA Forestry Commission Planning Duration- Annual Priority - Medium- Local fire departments and Georgia Forestry Commission will conduct presentations to local civic organizations and neighborhood associations concerning the dangers of wildfires and steps that can be taken to help prevent them. Responsible Entity - Glynn County Fire Department and GA Forestry Commission Planning Duration - Annual 172

21 Priority - Medium- Local fire departments will incorporate wildfire prevention training with the established fire safety training programs for local youths. Responsible Entity - Glynn County Fire Department and GA Forestry Commission Planning Duration - Annual Priority - Medium- Continue to require fire department notification of new business applications to ensure that appropriate fire plans have been developed. Responsible Entity - Glynn County Fire Department and GA Forestry Commission Objective #3 Action Steps: Protect structures in the Urban Woodland Interface. Priority - High - Local fire departments will provide information for local property owners to encourage clear zones around vulnerable structures within forested areas. Responsible Entity - Glynn County Fire Department and GA Forestry Commission Planning Duration - As required Objective Status - Ongoing Priority - Medium- Local building officials will encourage the use of fire-resistant materials in new construction, renovations, and remodeling projects. Responsible Entity - Glynn County Fire Department, Glynn County Building Official Planning Duration - As required Objective Status - Ongoing Priority - Medium- Local fire departments will encourage the installation of drafting hydrants in ponds and lakes in forested areas not served by pressurized water systems. Responsible Entity - Glynn County Fire Department, and GA Forestry Commission Planning Duration - As required 173

22 Objective #4 Action Steps Objective #5 Action Steps: Develop evacuation procedures to enable residents near the forest to evacuate safely Priority - High - Coordinate with E-911 and the Emergency Management Agency to notify affected residents of the need for evacuation using existing communication methods. Responsible Entity - Glynn County Fire Department, and EMA Planning Duration - As required Priority - High - Coordinate with E-911 and the Emergency Management Agency to acquire and utilize an automated telephonic emergency notification system. Responsible Entity - Glynn County Fire Department, and EMA Planning Duration - As required Priority - Medium- Glynn County to complete paving of all existing county unpaved roads to facilitate rapid evacuation and rapid access for firefighting equipment. Responsible Entity - Glynn County Fire Department, and EMA Planning Duration - As required Encourage local zoning and planning entities to work closely with landowners and/or developers who choose to build in woodland/urban interface wildfire hazards. Priority - Medium- Local building officials will encourage the use of fire-resistant materials in new construction, renovations, and remodeling projects. Responsible Entity - Glynn County Building Official Planning Duration - As required Priority - Medium Glynn County Fire Department will require the installation of drafting hydrants in ponds and lakes in subdivisions located in forested areas not served by pressurized water systems. Responsible Entity - Glynn County Fire Department and Planning and Zoning Planning Duration - As required Priority - Medium- Encourage private landowners to construct and maintain appropriate fire breaks in coordination with the Georgia Forestry Commission. Responsible Entity - Glynn County Fire Department and GA Forestry Commission Planning Duration - As required VVI

23 I Special Multi-Jurisdictional Strategy And Considerations Goals, Objectives and Action Steps detailed in this plan are applicable to, and will be implemented within, all jurisdictions party to this plan. This Plan and the sections therein vary between jurisdictions as the City of Brunswick is not subject to wildfires. Local Public Information And Awareness Strategy Ongoing public information, involvement, and awareness are addressed by specific mention in above-described Action Steps, as well as within other Sections of this Chapter and the Plan in its entirety. 175

24 THIS PAGE INTE

25 Earthquakes and Tsunamis Community Mitigation Goals In addressing natural hazards in the planning region, a number of objectives appear applicable to nearly all the hazards mentioned. In sum, the region will develop methods of educating the public on all important hazards, including how to prepare for them and react to them. In addition, both private citizens and commercial business owners are encouraged to adopt mitigation plans specific to their own needs that address hazards inherent to this region. Finally, clear and open lines of communication wherein information can be given to and received from the public is a necessary step in effective hazard mitigation. Identification & Analysis Of Range Of Mitigation Options Structural and non-structural mitigation - Mitigation actions in this plan will be nonstructural in nature. Any structural or construction actions taken may be the result of interpretations of strategies outlined herein. Existing policies, regulations, ordinances and land use - Local governments involved in this planning process have adopted up to date policies, regulations, ordinances and land uses that will need to be evaluated. Community values, historic & special considerations - There are no mitigation actions that specifically target community values, historic or special considerations as many of the strategies would apply to these resources. 177

26 I Mitigation Goal #6 Minimize losses to existing and future structures affected by earthquakes or tsunamis. Objective #1 Use the most effective approaches to protect buildings from earthquakes or tsunamis recognizing the low probability but potential devastating effects. Action Step: Priority - Medium- Follow existing IBC requirements or latest adopted codes for construction in this region. Responsible Entity - City and County Building Officials Objective Status - New Effort Objective #2 Action Step: Evaluate current building codes for any required changes to improve efficiency in protecting structures from earthquakes or tsunamis. Priority - Low - Review building codes annually. Responsible Entity - City and County Building Officials Planning Duration - Annual Obiective Status - New Effort Objective #3 Action Step: Make available basic information to the public on the possibility of an earthquake or tsunami. Priority - Low - Develop internet website with appropriate information and links. Responsible Entity - EMA, GIS and PlO Objective Status - New Effort Special Multi-Jurisdictional Strategy And Considerations Goals, Objectives and Action Steps detailed in this plan are applicable to, and will be implemented within, all jurisdictions party to this plan. This Plan and the sections therein vary between jurisdictions with the barrier islands being more susceptible to tsunamis. Local Public Information And Awareness Strategy Ongoing public information, involvement, and awareness are addressed by specific mention in above-described Action Steps, as well as within other Sections of this Chapter and the Plan in its entirety. 178

27 Environmental Change Community Mitigation Goals In addressing natural hazards in the planning region, a number of objectives appear applicable to nearly all the hazards mentioned. In sum, the region will develop methods of educating the public on all important hazards, including how to prepare for them and react to them. In addition, both private citizens and commercial business owners are encouraged to adopt mitigation plans specific to their own needs that address hazards inherent to this region. Finally, clear and open lines of communication wherein information can be given to and received from the public is a necessary step in effective hazard mitigation. Identification & Analysis Of Range Of Mitigation Options Structural and non-structural mitigation - Mitigation actions in this plan will be nonstructural in nature. Any structural or construction actions taken may be the result of interpretations of strategies outlined herein. Existing policies, regulations, ordinances and land use - Local governments involved in this planning process have adopted up to date policies, regulations, ordinances and land uses that will need to be evaluated. Community values, historic & special considerations - There are no mitigation actions that specifically target community values, historic or special considerations as many of the strategies would apply to these resources. 179

28 Mitigation Goal #7 Minimize losses to existing and future structures affected by environmental change and sea level rise. Objective #1 Action Step: Objective #2 Action Step: Objective #3 Action Step: Use the most effective approaches to protect buildings from climate change and sea level rise recognizing the low probability but potential devastating effects. Priority - Low - Review building codes annually. Responsible Entity - City and County Building Officials Planning Duration - Annual Objective Status - New Effort Evaluate current building codes for any required changes to improve building efficiency in addressing climate change. Priority - Low - Review building codes annually. Responsible Entity - City and County Building Officials Planning Duration - Annual Objective Status - New Effort Make available basic information to the public on the possibility of sea level rise. Priority - Low - Develop internet website with appropriate information and links. Responsible Entity - EMA, GIS and PlO Obiective Status - New Effort Special Multi-Jurisdictional Strategy And Considerations Goals, Objectives and Action Steps detailed in this plan are applicable to, and will be implemented within, all jurisdictions party to this plan. This Plan and the sections therein vary between jurisdictions with the barrier islands being more susceptible to tsunamis. Local Public Information And Awareness Strategy Ongoing public information, involvement, and awareness are addressed by specific mention in above-described Action Steps, as well as within other Sections of this Chapter and the Plan in its entirety.

29 CHAPTER FOUR Plan Integration and Maintenance Chapter 4 Section Authority, Responsibility and Implementation Reporting Multi-Jurisdictional Strategy And Considerations Plan Update And Maintenance Evaluation Methods and Timeframe Prioritization Conclusion Updates and Evaluations to Section Changed Glynn County seal Added major partners and their seals Prior system did not work due to a lack of commitment and manpower Identified change in EMA status as an independent entity The participating entities work well together but have not had a major event to test the resiliency to recover With the independent status of the EMA and general improved staffing levels this plan has an improved likelihood of being implemented. The method used to update the plan utilizing the active participants of the 2010 plan update worked well. All entities committed staff that had good attendance at the meetings. The committee recognized that there was a noticeable gap between activity of the prior report and the current update and committed to have quarterly meetings at the LEPC to discuss issues. The proposed evaluation method will work if implemented. It was concluded that there was no implementation push by the entities but that administrative changes in the EMA structure should enable this to be improved. Added this section 181

30 THIS PAGE INTEN

Hazard Mitigation Planning

Hazard Mitigation Planning Hazard Mitigation Planning Mitigation In order to develop an effective mitigation plan for your facility, residents and staff, one must understand several factors. The first factor is geography. Is your

More information

Dade County Natural Hazard Mitigation Plan

Dade County Natural Hazard Mitigation Plan Introduction to Mitigation Definition of Mitigation Mitigation is defined by FEMA as "...sustained action that reduces or eliminates longterm risk to people and property from natural hazards and their

More information

Section 2. Introduction and Purpose of the LMS

Section 2. Introduction and Purpose of the LMS Section 2. Introduction and Purpose of the LMS 2.1 Introduction The Disaster Mitigation Act of 2000 (DMA 2000), signed into law by the President of the United States on October 30, 2000 (P.L. 106-390),

More information

SOUTH CENTRAL REGION MULTI-JURISDICTION HAZARD MITIGATION PLAN. Advisory Committee Meeting September 12, 2012

SOUTH CENTRAL REGION MULTI-JURISDICTION HAZARD MITIGATION PLAN. Advisory Committee Meeting September 12, 2012 SOUTH CENTRAL REGION MULTI-JURISDICTION HAZARD MITIGATION PLAN Advisory Committee Meeting September 12, 2012 AGENDA FOR TODAY Purpose of Meeting Engage All Advisory Committee Members Distribute Project

More information

T-318. Hazard Mitigation Section TDEM Recovery, Mitigation, and Standards

T-318. Hazard Mitigation Section TDEM Recovery, Mitigation, and Standards T-318 Local Hazard Mitigation Plan Requirements Hazard Mitigation Section TDEM Recovery, Mitigation, and Standards Raymond Mejia, Lead Hazard Mitigation Planner Samantha Aburto, Hazard Mitigation Planner

More information

ANNEX B: TOWN OF BLUE RIVER

ANNEX B: TOWN OF BLUE RIVER ANNEX B: TOWN OF BLUE RIVER B.1 Community Profile Figure B.1 shows a map of the Town of Blue River and its location within Summit County. Figure B.1. Map of Blue River Summit County (Blue River) Annex

More information

G318 Local Mitigation Planning Workshop. Module 2: Risk Assessment. Visual 2.0

G318 Local Mitigation Planning Workshop. Module 2: Risk Assessment. Visual 2.0 G318 Local Mitigation Planning Workshop Module 2: Risk Assessment Visual 2.0 Unit 1 Risk Assessment Visual 2.1 Risk Assessment Process that collects information and assigns values to risks to: Identify

More information

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary 1. Introduction Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary Kankakee County is subject to natural hazards that threaten life, safety, health, and welfare and cause extensive

More information

in coordination with Peoria County, Planning and Zoning Department

in coordination with Peoria County, Planning and Zoning Department Prepared by Amec Foster Wheeler Environment & Infrastructure Hazard Mitigation and Emergency Management Program in coordination with Peoria County, Planning and Zoning Department The purpose of hazard

More information

44 CFR PARTS 59 & 60 MINIMUM REQUIREMENTS

44 CFR PARTS 59 & 60 MINIMUM REQUIREMENTS 44 CFR PARTS 59 & 60 MINIMUM REQUIREMENTS IMPACT ON LOCAL GOVERNMENT FLOODPLAIN ADMINISTRATORS ALAN M. ARMSTRONG, CFM, FPA HOW DID WE GET HERE? SOMETIMES PROACTIVE BUT GENERALLY REACTIVE PROACTIVE: DUE

More information

APPENDIX D PLANNING PROCESS DOCUMENTATION

APPENDIX D PLANNING PROCESS DOCUMENTATION APPENDIX D PLANNING PROCESS DOCUMENTATION This appendix includes the following: 1. Meeting Agendas 2. Meeting Minutes 3. Meeting Sign-In Sheets 4. Public Survey Summary Results 1) Introductions AGENDA

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT northcatasauquaema@yahoo.com scheirerg@gmail.com MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) Identify source

More information

FEMA Leverages Building Codes and Standards to Advance Resiliency

FEMA Leverages Building Codes and Standards to Advance Resiliency FEMA Leverages Building Codes and Standards to Advance Resiliency The goal of emergency management policy should be not just to respond but also to change the outcomes of natural hazards, and to do that,

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT louise@windgap-pa.gov jeffreyyob@gmail.com MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) Identify source

More information

Natural Hazards Mitigation Plan. Executive Summary

Natural Hazards Mitigation Plan. Executive Summary Natural Hazards Mitigation Plan Executive Summary 1. Introduction Kane County Illinois, is subject to natural hazards that threaten life and health and have caused extensive property damage. Floods struck

More information

FLOODPLAIN MANAGEMENT PLAN 2015 ANNUAL PROGRESS REPORT

FLOODPLAIN MANAGEMENT PLAN 2015 ANNUAL PROGRESS REPORT FLOODPLAIN MANAGEMENT PLAN 2015 ANNUAL PROGRESS REPORT Hinds County (Unincorporated) NFIP Community Number 280070 The 2015 Floodplain Management Plan Annual Progress Report on the progress made in implementing

More information

9.35 VILLAGE OF TULLY

9.35 VILLAGE OF TULLY 9.35 VILLAGE OF TULLY This section presents the jurisdictional annex for the Village of Tully. A.) HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Elizabeth L. Greenwood, Mayor 5833 Meetinghouse

More information

Stevens County, Washington Request for Proposal For A Countywide Multi-Jurisdictional All Hazard Mitigation Plan (Update)

Stevens County, Washington Request for Proposal For A Countywide Multi-Jurisdictional All Hazard Mitigation Plan (Update) Stevens County, Washington Request for Proposal For A Countywide Multi-Jurisdictional All Hazard Mitigation Plan (Update) Project background A Multi-Jurisdictional All Hazard Mitigation Plan is a representation

More information

Simsbury. Challenges Capitol Region Natural Hazards Mitigation Plan Update - Page 356

Simsbury. Challenges Capitol Region Natural Hazards Mitigation Plan Update - Page 356 Simsbury Simsbury is a suburban community of about 23,600 located in the western portion of the Capitol Region. Its land area encompasses 33.9 square miles. Elevation in town generally ranges from about

More information

Osceola County Hazard Mitigation Plan. Part 3 - Mitigation Strategy

Osceola County Hazard Mitigation Plan. Part 3 - Mitigation Strategy Osceola County Hazard Mitigation Plan Part 3 - Mitigation Strategy Osceola County Hazard Mitigation Plan - Part 3 Mitigation Strategy 3-1 Contents Tables and Figures... 3 Overview... 4 Strategy... 4 Goals...

More information

Natural Hazards Risks in Kentucky. KAMM Regional Training

Natural Hazards Risks in Kentucky. KAMM Regional Training Natural Hazards Risks in Kentucky KAMM Regional Training Floodplain 101 Kentucky has approximately 92,000 linear miles of streams and rivers Approximately 31,000 linear miles have mapped flood hazards

More information

PUBLIC SURVEY FOR HAZARD MITIGATION PLANNING

PUBLIC SURVEY FOR HAZARD MITIGATION PLANNING PUBLIC SURVEY FOR HAZARD MITIGATION PLANNING We need your help! The Counties of Cherokee, Graham, Haywood, Jackson, Swain, and the Eastern Band of Cherokee Indians are currently engaged in a planning process

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT hankvb@entermail.net khorvath@kceinc.com MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) Topic 1. Staff Resources

More information

Priority Ranking. Timeframe. Faribault County Blue Earth, Bricelyn, Delavan, Easton, Elmore, Frost, Kiester, Minnesota Lake, Walters, Wells, Winnebago

Priority Ranking. Timeframe. Faribault County Blue Earth, Bricelyn, Delavan, Easton, Elmore, Frost, Kiester, Minnesota Lake, Walters, Wells, Winnebago Multi-Hazard Plan, 2017 Table G - 1. Actions Identified by the () (From Master Action Chart) Action 1 All-Hazards 6 All-Hazards Education & Awareness Programs / Preparedness and Response Support Work to

More information

Northern Kentucky University 2018 Hazard Mitigation Plan. Public Kick-Off Meeting March 20, 2018

Northern Kentucky University 2018 Hazard Mitigation Plan. Public Kick-Off Meeting March 20, 2018 Northern Kentucky University 2018 Hazard Mitigation Plan Public Kick-Off Meeting March 20, 2018 Agenda Welcome Hazard Mitigation Planning 101 Hazard Identification Exercises Next Steps Jeff Baker, NKU

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT nazareth50em1@gmail.com jessicagteel@gmail.com MUNICIPAL PROFILE MUNICIPAL PARTICIPATION 3. Describe how the public will be engaged in the current planning process

More information

Pre-Development Floodplain Application

Pre-Development Floodplain Application Pre-Development Floodplain Application The Department of Planning, at the recommendation of FEMA, is now requiring completion of a Pre- Development Floodplain Application for all properties in the regulated

More information

Public Meeting 28 November Presented by: Deepa Srinivasan, Vision Planning and Consulting, LLC Dr. Michael Scott, ESRGC, Salisbury University

Public Meeting 28 November Presented by: Deepa Srinivasan, Vision Planning and Consulting, LLC Dr. Michael Scott, ESRGC, Salisbury University Public Meeting 28 November 2016 Presented by: Deepa Srinivasan, Vision Planning and Consulting, LLC Dr. Michael Scott, ESRGC, Salisbury University To update the all-hazards mitigation plan and flood mitigation

More information

Section 19: Basin-Wide Mitigation Action Plans

Section 19: Basin-Wide Mitigation Action Plans Section 19: Basin-Wide Mitigation Action Plans Contents Introduction...19-1 Texas Colorado River Floodplain Coalition Mitigation Actions...19-2 Mitigation Actions...19-9 Introduction This Mitigation Plan,

More information

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan.

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan. Section 3 Capability Identification Requirements Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan. Documentation of the Planning

More information

Volusia County Floodplain Management Plan 2012

Volusia County Floodplain Management Plan 2012 Volusia County Floodplain Management Plan 2012 Introduction The National Flood Insurance Program (NFIP) provides federally supported flood insurance in communities that regulate development in floodplains.

More information

Tangipahoa Parish Hazard Mitigation Plan Update Mitigation Steering Committee Kick-off Meeting. September 9, 2014 Hammond, LA

Tangipahoa Parish Hazard Mitigation Plan Update Mitigation Steering Committee Kick-off Meeting. September 9, 2014 Hammond, LA Tangipahoa Parish Hazard Mitigation Plan Update Mitigation Steering Committee Kick-off Meeting September 9, 2014 Hammond, LA Introductions Officials Mitigation Steering Committee members SDMI team members

More information

SECTION 6 - RANGE OF ALTERNATIVE MITIGATION ACTIONS CONSIDERED

SECTION 6 - RANGE OF ALTERNATIVE MITIGATION ACTIONS CONSIDERED SECTION 6 - RANGE OF ALTERNATIVE MITIGATION ACTIONS CONSIDERED For this hazard mitigation plan to be approved by FEMA, each participating jurisdiction was required to identify and analyze a comprehensive

More information

Village of Blue Mounds Annex

Village of Blue Mounds Annex Village of Blue Mounds Annex Community Profile The Village of Blue Mounds is located in the southwest quadrant of the County, north of the town of Perry, west of the town of Springdale, and south of the

More information

PHASE 2 HAZARD IDENTIFICATION AND RISK ASSESSMENT

PHASE 2 HAZARD IDENTIFICATION AND RISK ASSESSMENT Prioritize Hazards PHASE 2 HAZARD IDENTIFICATION AND After you have developed a full list of potential hazards affecting your campus, prioritize them based on their likelihood of occurrence. This step

More information

Potential Climate Compatible Tourism Adaptation Strategies for Belize

Potential Climate Compatible Tourism Adaptation Strategies for Belize Potential Climate Compatible Tourism Adaptation Strategies for Belize What is Climate Adaptation? Adaptation:.. an adjustment in natural or human systems in response to actual or expected climatic stimuli

More information

Priority Ranking. Timeframe. Faribault County Blue Earth, Bricelyn, Delavan, Easton, Elmore, Frost, Kiester, Minnesota Lake, Walters, Wells, Winnebago

Priority Ranking. Timeframe. Faribault County Blue Earth, Bricelyn, Delavan, Easton, Elmore, Frost, Kiester, Minnesota Lake, Walters, Wells, Winnebago Multi-Hazard Plan, 2017 Table G - 11. Actions Identified for by the () (From Master Action Chart) Action /City Comments on 1 All-Hazards Education & Awareness Programs Work to ensure that all residents

More information

VULNERABILITY ASSESSMENT

VULNERABILITY ASSESSMENT SOUTHSIDE HAMPTON ROADS HAZARD MITIGATION PLAN VULNERABILITY ASSESSMENT INTRODUCTION The Vulnerability Assessment section builds upon the information provided in the Hazard Identification and Analysis

More information

LOCAL HAZARD MITIGATION PLAN REVIEW WORKSHEET FEMA REGION 2 Jurisdiction: Jurisdiction: Title of Plan: Date of Plan: Address:

LOCAL HAZARD MITIGATION PLAN REVIEW WORKSHEET FEMA REGION 2 Jurisdiction: Jurisdiction: Title of Plan: Date of Plan: Address: REVIEW AD APPROVAL TATU Title of Plan: Date of Plan: Local Plan submitted by: Address: Title: Agency: Phone umber: E-Mail: tate Reviewer: Title: Date: FEMA Reviewer: Title: Date: FEMA QA/QC: Title: Date:

More information

SECTION V THE LOCAL MITIGATION STRATEGY BLUEPRINT

SECTION V THE LOCAL MITIGATION STRATEGY BLUEPRINT SECTION V THE LOCAL MITIGATION STRATEGY BLUEPRINT A. GUIDING MITIGATION PRINCIPLES The Local Mitigation Strategy (LMS) is Hillsborough County s program developed to reduce or eliminate all forms of losses

More information

Sussex County All Hazard Mitigation Plan. Plan Executive Summary

Sussex County All Hazard Mitigation Plan. Plan Executive Summary Sussex County All Hazard Mitigation Plan Plan Executive Summary March 2010 SUSSEX COUNTY ALL HAZARD MITIGATION PLAN SUMMARY March 2010 For questions and to make comments on this document, contact: Joseph

More information

Flood Risk Outreach Tools for Georgia Communities. GAFM 10 th Annual Conference Presented By: Jarrett Mattli

Flood Risk Outreach Tools for Georgia Communities. GAFM 10 th Annual Conference Presented By: Jarrett Mattli Flood Risk Outreach Tools for Georgia Communities GAFM 10 th Annual Conference Presented By: Jarrett Mattli April 13, 2016 Presentation Overview Guidebooks Toolkits Templates Educational Videos Resource

More information

HAZARD MITIGATION PLAN POINT OF CONTACT. MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT. MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT alacko@walnutportpa.org MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) Topic 1. Staff Resources Is the Community

More information

ITEM 9 STAFF REPORT. TO: Mayor and City Council. FROM: Tom Welch, Interim Fire Chief. SUBJECT: City ofmill Valley All-Hazard Mitigation Plan

ITEM 9 STAFF REPORT. TO: Mayor and City Council. FROM: Tom Welch, Interim Fire Chief. SUBJECT: City ofmill Valley All-Hazard Mitigation Plan STAFF REPORT TO: Mayor and City Council FROM: Tom Welch, Interim Fire Chief SUBJECT: City ofmill Valley DATE: March 2,2015 Approved for Forwarding: ~c.~~_ a es C. McCann, City Manager 1 Issue: Consideration

More information

Appendix F: Ozark special Road District Addendum

Appendix F: Ozark special Road District Addendum Appendix F: Ozark special Road District Addendum F-1: Introduction and Planning Process F-1.1 Purpose The Christian County 2016 Multi-Jurisdictional Natural Hazards Mitigation Plan is an updated version

More information

HAZARD MITIGATION PLAN POINT OF CONTACT. MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT.  MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT troseberry@easton-pa.gov cmanges@easton-pa.gov MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) Identify source

More information

DeSoto Parish Hazard Mitigation Plan Update Kick-off Meeting. February 16, 2016 Grand Cane, LA

DeSoto Parish Hazard Mitigation Plan Update Kick-off Meeting. February 16, 2016 Grand Cane, LA DeSoto Parish Hazard Mitigation Plan Update Kick-off Meeting February 16, 2016 Grand Cane, LA Introductions Officials Mitigation Steering Committee members SDMI team members GOHSEP hazard mitigation team

More information

Truckloads (at 25 tons/truck) of building debris 90

Truckloads (at 25 tons/truck) of building debris 90 Marlborough Marlborough is a rural community in Hartford County covering a land area of 23.3 square miles and with an estimated population of 6,410. Elevation ranges from about 160 to 800 feet. The Town

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT lee.laubach@allentownpa.gov james.wehr@allentownpa.gov MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) 1. Staff

More information

Southwest Florida Healthcare Coalition

Southwest Florida Healthcare Coalition Southwest Florida Healthcare Coalition Hazards Vulnerability Assessment 2018 1 Table of Contents Summary 3 EmPower Maps and Data 5 Social Vulnerability Index Maps 19 Suncoast Disaster Healthcare Coalition

More information

Wildfire and Flood Hazards, Using GIS Tools to Assess Risk

Wildfire and Flood Hazards, Using GIS Tools to Assess Risk Wildfire and Flood Hazards, Using GIS Tools to Assess Risk Floodplain Management Association Conference, Rancho Mirage, CA September 2015 Thoughts To Keep In Mind What advantages are there in looking at

More information

Facts & Info regarding the NFIP in Mathews County VA And the Mathews County Floodplain Management Ordinance

Facts & Info regarding the NFIP in Mathews County VA And the Mathews County Floodplain Management Ordinance Facts & Info regarding the NFIP in Mathews County VA And the Mathews County Floodplain Management Ordinance As of 05-31-2014: Current NFIP policies in Mathews County = 1687 NFIP Claims= 1127, for a total

More information

a) Ensure public safety through reducing the threats to life and personal injury.

a) Ensure public safety through reducing the threats to life and personal injury. SECTION VII: FLOODPLAIN DISTRICT 7-1 Statement Of Purpose The purposes of the Floodplain District are to: a) Ensure public safety through reducing the threats to life and personal injury. b) Eliminate

More information

Integrating Hazard Mitigation into Local Planning to Support Community Resilience on the Mississippi Gulf Coast

Integrating Hazard Mitigation into Local Planning to Support Community Resilience on the Mississippi Gulf Coast Integrating Hazard Mitigation into Local Planning to Support Community Resilience on the Mississippi Gulf Coast MASGP-13-020 This publication was supported by the U.S. Department of Commerce s National

More information

APPENDIX H TOWN OF FARMVILLE. Hazard Rankings. Status of Mitigation Actions. Building Permit Data. Future Land Use Map. Critical Facilities Map

APPENDIX H TOWN OF FARMVILLE. Hazard Rankings. Status of Mitigation Actions. Building Permit Data. Future Land Use Map. Critical Facilities Map APPENDIX H TOWN OF FARMVILLE Hazard Rankings Status of Mitigation Actions Building Permit Data Future Land Use Map Critical Facilities Map Zone Maps Hazard Rankings (From Qualitative Assessment and Local

More information

Priority Ranking. Timeframe. Faribault County Blue Earth, Bricelyn, Delavan, Easton, Elmore, Frost, Kiester, Minnesota Lake, Walters, Wells, Winnebago

Priority Ranking. Timeframe. Faribault County Blue Earth, Bricelyn, Delavan, Easton, Elmore, Frost, Kiester, Minnesota Lake, Walters, Wells, Winnebago Table G - 8. Actions Identified for by the () (From Master Action Chart) Action 1 All-Hazards 6 All-Hazards Education & Awareness Programs & Regulations / Preparedness and Response Work to ensure that

More information

CAPABILITY ASSESSMENT

CAPABILITY ASSESSMENT SECTION 7 CAPABILITY ASSESSMENT This section of the Plan discusses the capability of the communities in the Smoky Mountain Region to implement hazard mitigation activities. It consists of the following

More information

COMMUNITY SUMMARY LINN COUNTY MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN CITY OF LISBON

COMMUNITY SUMMARY LINN COUNTY MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN CITY OF LISBON COMMUNITY SUMMARY LINN COUNTY MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN CITY OF LISBON This document provides a summary of the hazard mitigation planning information for the City of Lisbon that will

More information

9.46 NAZARETH BOROUGH

9.46 NAZARETH BOROUGH 9.46 NAZARETH BOROUGH This section presents the jurisdictional annex for Nazareth Borough. A. HAZARD MITIGATION PLAN POINT OF CONTACT Name Title/ Department Address Telephone Fax Email Primary Point of

More information

Non Regulatory Risk MAP Products Flood Depth and Probability Grids

Non Regulatory Risk MAP Products Flood Depth and Probability Grids Non Regulatory Risk MAP Products Flood Depth and Probability Grids Virginia Floodplain Management Association 2015 Floodplain Management Workshop October 29th, 2015 Nabil Ghalayini, P.E., PMP, D.WRE, CFM

More information

Mitigation Action Plan Alamance County

Mitigation Action Plan Alamance County Mitigation Action Plan Alamance County The Mitigation Action Plan for Alamance County is divided into two subsections: 7.1 Status of Previously Adopted Mitigation Actions 7.2 New 2015 Mitigation Actions

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT glendonboro@rcn.com glendonboro@rcn.com MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Identify source of information, if different Topic from the one listed 1. Staff

More information

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan.

Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan. Section 3 Capability Identification Requirements Planning Process---Requirement 201.6(b): An open public involvement process is essential to the development of an effective plan. Documentation of the Planning

More information

9.36 TOWN OF VAN BUREN

9.36 TOWN OF VAN BUREN 9.36 TOWN OF VAN BUREN This section presents the jurisdictional annex for the Town of Van Buren. A.) HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact David J. Pringle, Code Enforcement

More information

FEMA FLOOD MAPS Public Works Department Stormwater Management Division March 6, 2018

FEMA FLOOD MAPS Public Works Department Stormwater Management Division March 6, 2018 FEMA FLOOD MAPS Public Works Department Stormwater Management Division March 6, 2018 Presentation Overview FEMA National Flood Insurance Program (NFIP) FEMA Community Rating System (CRS) Flood Insurance

More information

COMMUNITY SUMMARY LINN COUNTY MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN CITY OF CENTRAL CITY

COMMUNITY SUMMARY LINN COUNTY MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN CITY OF CENTRAL CITY COMMUNITY SUMMARY LINN COUNTY MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN CITY OF CENTRAL CITY This document provides a summary of the hazard mitigation planning information for the City of Central City

More information

Article 23-6 FLOODPLAIN DISTRICT

Article 23-6 FLOODPLAIN DISTRICT AMENDING THE CODE OF THE CITY OF PITTSFIELD CHAPTER 23, ZONING ORDINANCE SECTION I That the Code of the City of Pittsfield, Chapter 23, Article 23-6 Floodplain District, shall be replaced with the following:

More information

PART 3 LOCAL MITIGATION PLANS

PART 3 LOCAL MITIGATION PLANS PART 3 LOCAL MITIGATION PLANS Local Mitigation Plan requirements in 44 CFR, Part 201.6 of the Interim Final Rule (the Rule) apply to both local jurisdictions and Tribal governments that elect to participate

More information

Floodplain Development Permit Application

Floodplain Development Permit Application Floodplain Development Permit Application City of Jonesboro, AR This is an application packet for a Floodplain Development Permit. Certain sections are to be completed by the Applicant, and certain sections

More information

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial

More information

Delaware River Basin Commission s Role in Flood Loss Reduction Efforts

Delaware River Basin Commission s Role in Flood Loss Reduction Efforts Delaware River Basin Commission s Role in Flood Loss Reduction Efforts There is a strong need to reduce flood vulnerability and damages in the Delaware River Basin. This paper presents the ongoing role

More information

9.10 HEIDELBERG TOWNSHIP

9.10 HEIDELBERG TOWNSHIP 9.10 HEIDELBERG TOWNSHIP This section presents the jurisdictional annex for Heidelberg Township. A. HAZARD MITIGATION PLAN POINT OF CONTACT Name Title/ Department Address Telephone Fax Email Primary Point

More information

HAZARD MITIGATION PLANNING

HAZARD MITIGATION PLANNING HAZARD MITIGATION PLANNING Oswego County HMP Update Working Group Kickoff Meeting September 27, 2017 Agenda Welcoming Remarks Oswego County Emergency Management DHSES FEMA Introduce Executive Committee

More information

Use of FEMA Non regulatory Flood Risk Products in Planning

Use of FEMA Non regulatory Flood Risk Products in Planning Use of FEMA Non regulatory Flood Risk Products in Planning Georgia Association of Floodplain Managers Annual Conference March 24, 2016 What are the Non regulatory Flood Risk products? Go beyond the basic

More information

Floodplain Management Annual Conference Atlanta, Georgia April 2017

Floodplain Management Annual Conference Atlanta, Georgia April 2017 Floodplain Management 2017 Annual Conference Atlanta, Georgia April 2017 Floodplain Mapping and Flood Zones Zone Deisgnations: Zone A: No base flood elevations have been determined it is an approximated

More information

Mitigation Success Publications

Mitigation Success Publications The following publications are a sample of the many and varied documents that have been produced by States, associations and communities. MULTI-HAZARDS FEMA 294 Report on Costs and Benefits of Natural

More information

Chapter 7 Appendix B: National Flood Insurance Program Summary for Kaua'i County, 2015 Update

Chapter 7 Appendix B: National Flood Insurance Program Summary for Kaua'i County, 2015 Update Chapter 7 Appendix B: National Flood Insurance Program Summary for Kaua'i County, 2015 Update Topic Considerations Description INSURANCE SUMMARY STAFF RESOURCES How many NFIP policies are in Kaua i County?

More information

Hillsborough County Local Mitigation Strategy and the Community Rating System

Hillsborough County Local Mitigation Strategy and the Community Rating System Hillsborough County Local Mitigation Strategy and the Community Rating System Presented By Hillsborough County s Hazard Mitigation Section Eugene Henry, Manager Hazard Mitigation Contributing Team Members:

More information

9.12 VILLAGE OF FABIUS

9.12 VILLAGE OF FABIUS 9.12 VILLAGE OF FABIUS This section presents the jurisdictional annex for the Village of Fabius. A.) HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Melanie Vilardi, Town Supervisor P.O.

More information

Aquidneck Island Resilience Strategy Issue Paper 4. Issue: RESIDENTIAL FLOODING

Aquidneck Island Resilience Strategy Issue Paper 4. Issue: RESIDENTIAL FLOODING Aquidneck Island Resilience Strategy Issue Paper 4 Issue: RESIDENTIAL FLOODING Description of Concern: While much of Aquidneck Island s geography lies outside the reach of coastal flooding, some of the

More information

Upper Joachim Creek Public Survey on Potential Flood Risk Reduction

Upper Joachim Creek Public Survey on Potential Flood Risk Reduction Upper Joachim Creek Public Survey on Potential Flood Risk Reduction This survey is intended to help the interagency planning committee to receive public feedback on specific flood risk reduction techniques,

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT tatamy1@rcn.com dwerkheiser@tatamypa.com MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Topic Identify source of information, if different from the one listed Additional

More information

ADVISORY BASE FLOOD ELEVATIONS (ABFEs)

ADVISORY BASE FLOOD ELEVATIONS (ABFEs) The Department of Homeland Security s Federal Emergency Management Agency is committed to helping communities that were impacted by Hurricanes Katrina and Rita rebuild safer and stronger. Following catastrophic

More information

REPUBLIC OF BULGARIA

REPUBLIC OF BULGARIA REPUBLIC OF BULGARIA DISASTER RISK REDUCTION STRATEGY INTRUDUCTION Republic of Bulgaria often has been affected by natural or man-made disasters, whose social and economic consequences cause significant

More information

SECTION 1 INTRODUCTION

SECTION 1 INTRODUCTION SECTION 1 INTRODUCTION This section provides a general introduction to the Mississippi Emergency Management Agency (MEMA) District 9 Regional Hazard Mitigation Plan. It consists of the following five subsections:

More information

C APABILITY A SSESSMENT

C APABILITY A SSESSMENT PURPOSE The Rappahannock Rapidan region's capability assessment was conducted to determine the ability of participating localities to develop and implement a comprehensive hazard mitigation strategy and

More information

Location: Tampa, Florida March 6, 2013

Location: Tampa, Florida March 6, 2013 Discovery Meeting: West Florida Coastal Study Location: Tampa, Florida March 6, 2013 Agenda Introductions Why we are here Outline Risk MAP products and datasets Discovery Overview: Project scoping and

More information

Implementing risk-based asset management strategies

Implementing risk-based asset management strategies Implementing risk-based asset management strategies 2018. 04. 17 Disaster Resilience by Design The challenge for local governments The Challenge for Local Governments Landslides Debris Flows Wildfire Wind

More information

APPENDIX 1 FEMA MITIGATION GRANT PROGRAMS

APPENDIX 1 FEMA MITIGATION GRANT PROGRAMS APPENDIX 1 FEMA MITIGATION GRANT PROGRAMS 2016 FEMA FUNDING POSSIBILITIES FOR SCHOOL DISTRICTS IN WASHINGTON Overview For public entities in Washington, including school districts, FEMA mitigation funding

More information

Best Practices. for Incorporating Building Science Guidance into Community Risk MAP Implementation November 2012

Best Practices. for Incorporating Building Science Guidance into Community Risk MAP Implementation November 2012 Best Practices for Incorporating Building Science Guidance into Community Risk MAP Implementation November 2012 Federal Emergency Management Agency Department of Homeland Security 500 C Street, SW Washington,

More information

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE

HAZARD MITIGATION PLAN POINT OF CONTACT MUNICIPAL PROFILE HAZARD MITIGATION PLAN POINT OF CONTACT stockpolice@rcn.com stockworks@rcn.com MUNICIPAL PROFILE MUNICIPAL PARTICIPATION Compliance with the National Flood Insurance Program (NFIP) Identify source of information,

More information

A.) HAZARD MITIGATION PLAN POINT OF CONTACT

A.) HAZARD MITIGATION PLAN POINT OF CONTACT 9.6 TOWN OF CLAY This section presents the jurisdictional annex for the Town of Clay. A.) HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Mark Territo, Commissioner of Planning & Development

More information

CHAPTER CAPITAL FACILITIES, FEES, AND INCENTIVES RELATED TO FEES

CHAPTER CAPITAL FACILITIES, FEES, AND INCENTIVES RELATED TO FEES CHAPTER 1300. CAPITAL FACILITIES, FEES, AND INCENTIVES RELATED TO FEES SECTION 1302. IMPACT FEES 1302.7. Hurricane Preparedness Mitigation Fees A. Intent, Purpose, and Study 1. The purpose of this section

More information

Floodplain Management 101. Mississippi Emergency Management Agency Floodplain Management Bureau

Floodplain Management 101. Mississippi Emergency Management Agency Floodplain Management Bureau Floodplain Management 101 Mississippi Emergency Management Agency Floodplain Management Bureau Stafford Act The Stafford Disaster Relief and Emergency Assistance Act (Stafford Act) (Public Law 100-707)

More information

2015 Mobile County, Alabama Multi-Hazard Mitigation Plan Appendices

2015 Mobile County, Alabama Multi-Hazard Mitigation Plan Appendices 2015 Mobile County, Alabama Multi-Hazard Mitigation Plan A - Federal Requirements for local Mitigation Plans B - Community Mitigation Capabilities C - 2009 Plan Implementation Status D - Hazard Ratings

More information

Guideline For Compliance With The Standards and Criteria of the National Flood Insurance Program

Guideline For Compliance With The Standards and Criteria of the National Flood Insurance Program Guideline For Compliance With The Standards and Criteria of the National Flood Insurance Program 160-5-4-.16 (a) 1 Educational Facility Site, Construction, and Reimbursement Facilities Services Unit Effective

More information

A Flood Mitigation Plan for the Non-Tidal N.J. Section of the Delaware River Basin. Warren County Planning Workshop (2 nd Meeting) March 7, 2007

A Flood Mitigation Plan for the Non-Tidal N.J. Section of the Delaware River Basin. Warren County Planning Workshop (2 nd Meeting) March 7, 2007 A Flood Mitigation Plan for the Non-Tidal N.J. Section of the Delaware River Basin Warren County Planning Workshop (2 nd Meeting) March 7, 2007 Study Area Participation: Hunterdon: 16 Eligible Municipalities

More information

California Building Code and the NFIP. John Ingargiola, Senior Engineer FEMA Building Science Branch

California Building Code and the NFIP. John Ingargiola, Senior Engineer FEMA Building Science Branch California Building Code and the NFIP John Ingargiola, Senior Engineer FEMA Building Science Branch CA Major Disaster Declarations and Federal Assistance $21 $21 $76 $78 7 declarations, 2004-2016, total

More information

Role of Disaster Insurance in Improving Resilience: An Expert Meeting The Resilient America Roundtable

Role of Disaster Insurance in Improving Resilience: An Expert Meeting The Resilient America Roundtable Role of Disaster Insurance in Improving Resilience: An Expert Meeting The Resilient America Roundtable National Academy of Science Washington, DC July 9, 2015 Roseville Demographics Primary population

More information

APPENDIX B EVALUATION OF EXISTING PROGRAMS AND POLICIES. Hillsborough County Local Mitigation Strategy Appendix B-1

APPENDIX B EVALUATION OF EXISTING PROGRAMS AND POLICIES. Hillsborough County Local Mitigation Strategy Appendix B-1 APPENDIX B EVALUATION OF EXISTING PROGRAMS AND POLICIES Appendix B-1 Note: Hillsborough County is currently in the process of updating both the Land Development Code as well as preparing for the adoption