1 MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS DEPARTMENT SUITE 209S - LOGAN OFFICE CENTER ONE HARBORSIDE DRIVE EAST BOSTON, MASSACHUSETTS REQUEST FOR QUALIFICATIONS ELECTRICAL SUB-CONTRACTOR SUPPLEMENTAL INFORMATION PACKAGE MPA CONTRACT NO. A359-C1 FAA NEXTGEN ATC TOWER SPACE CONSOLIDATION PROJECT LOGAN INTERNATIONAL AIRPORT EAST BOSTON, MASSACHUSETTS NOVEMBER 15, 2017 Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

2 TABLE OF CONTENTS 1 BACKGROUND 2 SCOPE OF WORK 3 SUBMITTAL PROCESS and SCHEDULE 4 SUBMITTAL REQUIREMENTS APPENDIX A. SENSITIVE SECUIRTY INFORMATION ( SSI ) DOCUMENT PROTECTION REQUIREMENTS B. CONFIDENTIALITY AGREEMENT Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

3 1 BACKGROUND The project includes construction of an addition to 4 th level of Central Garage Building 30 at Boston Logan International Airport, to provide approximately 6,150 SF of office areas, support areas, training room and telecommunication equipment space. Contractors shall provide phased construction services. Phase 1 includes completion for occupancy of an approximately 1,500 SF telecommunication equipment space and Phase 2 includes completion of offices, support areas and training room. This Request for Qualifications (RFQ) is issued pursuant to Massachusetts General Laws, Chapter D½. Firms interested in providing Sub-Contractor service for the construction of the project must submit a Statement of Qualifications in response to this RFQ. The Sub-Contractor selection for this project is a twophase process as set forth in Massachusetts General Laws, Chapter D½. The project delivery method for construction will be under Massachusetts General Laws, Chapter 149 et. seq. Massport is prequalifying firms interested in providing Sub-Contractor service for this project through this RFQ prequalification process. 2 SCOPE OF WORK The Project Full Scope of Work will include but not be limited to: Demolition Structural systems and reinforcement as needed for a building addition and equipment Exterior building skin systems Exterior security systems Interior building finish systems Fire Protection systems Plumbing systems Mechanical systems for office and training areas as well as for data system areas, Electrical systems for offices, training systems and equipment, Electronic security systems and Telecommunication systems. Electrical Sub-Contractor Scope of work will include but not be limited to: Provisions of labor for journeyman electricians including tools, equipment, and incidental materials for installation, inspection and testing of low voltage electrical equipment and wiring (600V nominal or less); and Provisions of labor for telecommunications technician including removal, relocation installing, terminating and testing copper data cables, single and multi-mode fiber optic cable, Sumitomo future flex air blown fiber optic cable and cable supports. Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

4 All electrical and telecommunications work is related to sensitive security information systems including, but not limited to access control, security cameras, and the security network. The project has an unconditional requirement: COMPLETION OF PHASE 1 CONSTRUCTION BY FRIDAY, JUNE 29, The total construction cost is currently estimated by Massport at approximately $5,000,000. The construction duration for the entire project is ten (10) months. The estimated value of work to be performed by electrical contractors is as follows: NINE HUNDRED SEVENTY THOUSAND DOLLARS ($970,000.00). The Sub Contractor shall be DCAMM certified in Electrical Construction and shall provide a Certificate of eligibility and an Update Statement as well as an affidavit that the Statement of Qualifications being submitted in response to the RFQ is signed under the pains and penalties of perjury. The Sub-Contractor shall also provide a letter from a surety company confirming the Sub-Contractor firm s ability to provide performance and payment bonds in the full amount of the construction estimate. Please note that having the document notarized does not fulfill the requirement for signing under the pains and penalties of perjury. 3 SUBMITTAL PROCESS and SCHEDULE In accordance with M.G.L. Chapter 149, Massport is implementing a two-step process beginning with an RFQ which shall be utilized to pre-qualify competent Contractors who are capable of constructing the scope of work described herein. A Pre-Qualification Committee is comprised of four representatives including three Massport representatives and one from the Designer. This Pre-Qualification Committee will be conducting qualifications based evaluation of submittals received from interested Sub-Contractors in order to identify pre-qualified Sub-Contractors who will be subsequently invited to respond to a written Invitation to Bidders. Upon receipt of the Qualification Submittal in response to this RFQ, a copy of each submittal will be delivered to each member of the Pre-Qualification Committee who will be responsible for reviewing the documents independently. Then, the Pre-Qualification Committee will meet to evaluate and review each submittal and will then score them in order to create a list of pre-qualified Sub-Contractors. The decision of the Sub-Contractor Pre-Qualification Committee shall be final and binding and not subject to appeal except on the grounds of fraud or collusion. An individual Sub-Contractor s score shall be made available upon request, but shall not be a public record and shall not be open to public inspection, to the fullest extent possible under the law. In addition, financial information provided from a Sub-Contractor shall remain confidential and shall not become a public record and shall not be open to public inspection, to the fullest extent possible under the law. Only the pre-qualified Sub-Contractors will be eligible to receive an Invitation to Bid to participate in submitting a bid. Massport shall utilize an Invitation to Bid in order to make a final selection of the Sub- Contractor. Pre-qualified Sub-Contractors shall be invited to submit a bid along with a Bid Bond pursuant to an Invitation to Bid that shall include the bid documents for the Project. Massport shall open bids Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

5 publicly. Massport shall award the contract to the lowest responsible and eligible bidder. The Sub- Contractor shall be required to execute a standard Contractor in the form set forth in Division IV of the bid/contract documents, and provide the required insurance, performance and payment bonds, also set forth in Division IV of the bid/contract documents, and in the full amount of the contract. The schedule for creation of the list of pre-qualified Sub-Contractors is as follows. Please note that all times listed are Eastern Daylight Savings Time (EDST) and that Massport will do its best to adhere to the schedule provided below. Milestone Date Supplemental Information Package Released Wednesday, November 15, 2017 Pre-Qualification Briefing Sub-Contractors Deadline for submission of written questions from Sub-Contractor for Pre-qualification Friday, November 17, :00 AM Friday, December 1, 2017 Official answers published by MPA Tuesday, December 5, 2017 RFQ Submission Deadline Wednesday, December 13, 2017 Shortlisted Sub-Contractor Firms Friday, December 15, 2017 Invitation to Bid to GC and Advertise for Sub-contractors Thursday, December 20, 2017 Plans and Drawings Available Thursday, December 28, 2017 Subcontractors questions due Tuesday, January 9, 2018 Subcontractors questions answered Friday, January 12, 2018 Sub-bids opened Wednesday, January 17, 2018 General Contractor questions due Tuesday, January 23, 2018 General Contractor questions answered Friday, January 26, 2018 General Bids Opened Wednesday, January 31, 2018 Execute Contract Tuesday, February 13, 2018 Begin Construction Monday, February 26, 2018 Phase 1 Substantial Completion Friday, June 8, 2018 Phase 1 Completion Friday, June 29, 2018 Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

6 Phase 2 Substantial Completion Friday, August 3, 2018 Phase 2 Completion August 31, 2018 Project Close-out October 30, 2018 Submission Deadline: Sub-Contractors applying shall submit, one (1) original and five (5) bound copies of the Qualification Submittals no later than 12:00 NOON on WEDNESDAY DECEMBER 13, 2017 to: Mr. Houssam H. Sleiman, P.E., C.C.M. Director of Capital Programs and Environmental Affairs Massachusetts Port Authority, Capital Programs Department Logan Office Center One Harborside Drive East Boston, MA Contractors are urged to deliver submittals prior to 11:00 AM to avoid possible delivery delays. Massport recommends hand delivery of the submittals to ensure that they reach Massport by Noon on WEDNESDAY DECEMBER 13, Submittals not received by Massport at the Logan Office Center by the 12:00 Noon deadline on WEDNESDAY DECEMBER 13, 2017 will be rejected. This includes submittals sent by U.S. Mail or overnight delivery that are not delivered to the Capital Programs Department at the Logan Office Center by this deadline. Responses to the RFQ must be on 8 ½ x 11 sheets, double-sided and all pages must be numbered sequentially. Additional details about the format and content are provided in Section 4. Please note that in Section 4, Part B, Item 3 Capacity to Complete Projects, needs to be bound into each copy of the Qualifications Submittal. Questions may be sent via to CPBidQuestions@massport.com subject to the deadline for receipt stated in the timetable above. In the subject lines of your , please reference the MPA Project Name and Number. Questions and their responses will be posted on Capital Bid Opportunities webpage of Massport an attachment to the original Legal Notice and on Comm-BUYS in the listings for this project. Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

7 Companies responding to the RFQ are responsible for the costs associated with the development and submission of a response. 4 SUBMITTAL REQUIREMENTS Submissions in response to the RFQ shall be organized and presented as outlined below. THE QUALIFICATION SUBMITTAL WILL BE REJECTED IF ANY OF THE MANDATARY REQUIREMENTS ARE MISSING. Massport will not reach out to request any missing or incorrect submission requirements. Massport will send back the submittal with a letter explaining of the rejection. Qualification Statements. The RFQ response shall include, at a minimum, the following: (1) a cover letter; (2) an executive summary detailing the response to each evaluation criteria as well the identification of any key factors that may differentiate the firm from other responders; (3) a list of lawsuits and arbitrations to which the firm is a party relative to construction contracts within the last three (3) years, including, if applicable, any convictions or fines for violations of state or federal law including OSHA regulations; as well an explanation of any projects on which the firm was terminated, failed to complete the work, or paid liquidated damages to the owner; (4) an organization chart identifying key project personnel, including subcontractors and their respective roles and responsibilities; (5) a letter from a surety company confirming the Electrical Contractor s ability to provide a bid bond equal to 5% of the full amount of the construction cost estimate, as well as payment and performance bonds each equal to the full amount of the construction cost; (6) information on the Electrical Contractor s safety record, including, if applicable, a workers compensation experience modifier for the prior three (3) years; (7) evidence of the firm s compliance record with minority business enterprise and women business enterprise goals and workforce goals, if applicable; (8) information regarding the firm s experience on similar building projects including references with up to date contact information; (9) information regarding the firm s experience on other SSI projects of similar scope and complexity and its ability to manage SSI including references and up to date contact information; (10) a statement that the firm is able to provide a certificate of eligibility issued by the DCAMM (Division of Capital Asset Management and Maintenance) pursuant to section 44D of chapter 149, showing the proper classification and capacity rating sufficient for the project, and an update statement. Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

8 Prequalification Process. Upon receipt of the Qualification Statements submitted in response to the RFQ, a copy of each submittal shall be delivered to each member of the Prequalification Committee. The Prequalification Committee shall evaluate each submittal independently. There will be a Prequalification Meeting at which time the members of the Prequalification Committee will discuss the requirements of the project and their evaluation of the Qualification Statements. Then, the Prequalification Committee members will identify the firms that he/she believes should be shortlisted. The Committee shall shortlist a minimum of three (3) qualified Electrical Contractors, who will be eligible to move on to Phase 2 of the process and submit bids for the project. If Massport is unable to prequalify three (3) qualified Electrical Contractors, Massport will advertise the prequalification package a second time for additional submittals. If, after two attempts, Massport is unable to prequalify three (3) qualified Electrical Contractors, Massport reserves the rights to prequalify fewer than three from the firms that previously submitted prequalification statements. Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

9 SENSITIVE SECURITY INFORMATION ( SSI ) DOCUMENT PROTECTION REQUIREMENTS The contract documents for this Project, which include any means by which project information is preserved, including, but not limited to, plans, specifications, sketches and drawings, any other documents provided to the contractor, any documents prepared by the contractor, and in any format including paper, film, photograph, or electronic media, may contain Sensitive Security Information, and, therefore, in accordance with 49 CRF part 1520, such documents shall be considered SSI, and are, therefore, privileged and confidential. Drafts, proposed changes, addendums etc. are also defined as contract documents, and also are considered SSI. The contractor, referring to either a shortlisted contractor participating in the bidding phase or the selected contractor participating in the construction phase, shall maintain the confidentiality of the contract documents and shall not use such contract documents for any purpose other than for the performance of services relative to this project. In addition, the contractor shall strictly adhere to the following Document Protection Requirements: 1. Confidentiality Agreement. Each contractor shall be required to execute a Confidentiality Agreement covering the contractor and any parties for whom the contractor is responsible, including subcontractors, before the contractor can receive contract documents for the Project. In summary, the Confidentiality Agreement, a copy of which is attached to these requirements, provides that the contractor recognizes that the contract documents may contain SSI and, therefore, must be maintained in a confidential manner. Furthermore, it requires that the contractor inform all persons to whom the contract documents may be released of the confidential nature of such documents, and to confirm that all necessary steps will be taken to ensure that such persons treat the documents in a confidential manner. 2. Unauthorized Reproduction. Each contractor shall receive five (5) sets of contract documents for its use during the bidding phase. Massport shall appropriately mark each set as SSI and shall number each set, probably with a sequential numbering system, so that the documents can be properly tracked. The contractor shall not be allowed to reproduce the contract documents or any part thereof. Any unauthorized reproduction of the contract documents, or any part thereof, may result in a civil penalty or a criminal penalty or other action by Massport. If the contractor becomes aware of any unauthorized reproduction, he shall notify Massport immediately. 3. Unauthorized Distribution. The contractor shall identify where each set of contract documents will be housed during the bidding phase. The contractor must ensure that only those individuals with a Need to Know will be allowed access to the contract documents. For purposes of this Project, the definition of a Need to Know is limited to an individual who needs the information in order to provide services relative to preparing the contractor s bid. If the contractor has any questions as to whether or not a particular individual can be considered a person with a Need to Know, the contractor should Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

10 request authorization from Massport before providing access to that particular individual. Any unauthorized distribution of the contract documents, or any part thereof, may result in a civil penalty or a criminal penalty or other action by Massport. If the contractor becomes aware of any unauthorized distribution, he shall notify Massport immediately. 4. Unauthorized Disclosure. The contractor must take reasonable steps to safeguard the contract documents from unauthorized disclosure when the contract documents are being used by a person with a Need to Know. However, when the contract documents are not in the physical possession of a person with a Need to Know, such documents shall be stored in a secure container such as a locked desk or file cabinet or a locked room. Under no circumstances should the contract documents be left unattended in a non-secure area. If the contractor loses or misplaces a set of contract documents or any part thereof, the contractor shall notify Massport immediately. Any unauthorized disclosure may result in a civil penalty or a criminal penalty or other action by Massport. If the contractor becomes aware of any unauthorized disclosure, he shall notify Massport immediately. 5. SSI Compliance Officer. The contractor shall identify an SSI Compliance Officer, who shall distribute these SSI Document Protection Requirements to anyone handling the contract documents and shall conduct training sessions, as necessary, to inform team members of their responsibilities with respect to the contract documents. The SSI Compliance Officer shall be the primary contact for Massport with respect to SSI issues. 6. Return of Contract Documents. The contractor shall return all five (5) sets of contract documents to Massport as a condition precedent to Massport accepting the contractor s bid for this Project. 7. Construction Phase. Massport shall provide the selected contractor with a sufficient number of sets of contract documents for use during the construction phase of the Project. Massport shall appropriately mark each set as SSI and shall number each set, probably with a sequential numbering system, so that the documents can be properly tracked. The contractor will be subject to document protection requirements, similar to those discussed above, in order to protect against the unauthorized reproduction, distribution, or disclosure of SSI. During the construction phase of the Project, a person with a Need to Know shall be defined as an individual who needs to have access to the documents in order to perform in accordance with the contract. It should be understood that during the construction phase, locking the documents in a jobsite trailer overnight will not satisfy the Project requirements. Finally, the contractor shall be required to return all sets of construction documents to Massport before the final payment will be issued for the Project. Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

11 CONFIDENTIALITY AGREEMENT The Contractor, on behalf of itself and the parties for whom the Contractor is responsible, including, but not limited to, subcontractors, relative to services associated with MPA Project No. A359-C1, FAA NextGen ATC Tower Space Consolidation Project at Logan International Airport, East Boston, MA ( the Project )understands and acknowledges that the Contractor is being provided contract documents which may contain Sensitive Security Information ( SSI ), and that in consideration of the Contractor being granted access to SSI, the Contractor understands and agrees that: (1) the contract documents may contain SSI and, therefore, must be maintained in a confidential manner; and (2) that the Contractor is required to inform all persons to whom the contract documents may be released of the confidential nature of such documents, and to confirm that all necessary steps will be taken to ensure that such persons treat the documents in a confidential manner. 1. Sensitive Security Information (SSI). SSI includes, but is not limited to, (a) any and all Massport business information being made available to the Contractor in connection with the project, and (b) the contract documents and other technical information, security studies, threat correspondence, research and development activities, operating procedures, emergency services plans, studies, reports, and other information, that is provided to, or developed, learned, or generated by the Contractor, by or on behalf of the Massport relative to the Project. The contract documents for the Project, which include any means by which project information is preserved, including, but not limited to, plans, specifications, sketches and drawings, any other documents provided to the Contractor, any documents prepared by the Contractor, and in any format including paper, film, photograph, or electronic media, may contain SSI, and, therefore, in accordance with 49 CRF part 1520, such documents shall be considered SSI and are, therefore, privileged and confidential. Drafts, proposed changes, addendums, etc., are also defined as contract documents and are also considered SSI. 2. Nondisclosure of SSI. Maintaining the confidentiality of SSI is vital to the protection of critical transportation infrastructure and public safety. Accordingly, it is not for public dissemination or disclosure to any unauthorized individual. Such information shall only be used by the Contractor solely in the performance of preparing a proposal for the Project, and the Contractor shall not make use of the SSI for any other purpose, or in any other manner. The Contractor agrees that, from the date of receipt of the contract documents until such time as the information may no longer be considered SSI, the Contractor shall hold and treat the SSI in the strictest confidence in order to prevent the unauthorized reproduction, distribution, or disclosure of the SSI, and to prevent any compromise to the security of civil aviation, as provided in 49 CFR Part 1520 et seq. Any unauthorized reproduction, distribution, or disclosure of the contract documents, or any part thereof, may result in a civil penalty or a criminal penalty or other action by Massport. If the Contractor becomes aware of any unauthorized reproduction, distribution, or disclosure, he shall notify Massport immediately. Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

12 The Contractor also agrees that, except as required by law, he shall not, either directly or indirectly distribute or disclose, or permit anyone else to distribute or disclose, any SSI to any persons other than those persons who have a Need to Know in connection with the performance of services for the project. For purposes of the Project, a Need to Know is defined as an individual who needs the information in order to provide the necessary services to the Project. Furthermore, any authorized distribution or disclosure shall only be made to the extent that the information is required for use in connection with the services provided for the Project, and the contract documents, or any part thereof, shall not be reproduced by the Contractor or any party for whom the Contractor is responsible, including, but not limited to, subcontractors. 3. Protection of SSI. If the Contractor is served with a subpoena or a discovery request of any kind in a judicial or administrative proceeding, or receives a Freedom of Information Act request, or is otherwise required by law to respond to a request for, or to disclose, any SSI, the Contractor shall immediately notify Massport in order to permit Massport to seek a protective order, or take such other action as it may deem appropriate. The Contractor also shall cooperate in any effort by Massport to obtain a protective order or other assurance that confidential treatment will be afforded the SSI. If a protective order is not sought or is sought but not granted, the Contractor will: (a) disclose only such portion of the SSI as is responsive to the request and is necessary to fully respond; (b) disclose it only to the person compelling disclosure, in which case, prior to such disclosure, the Contractor will advise and consult with Massport and its counsel as to such disclosure and the nature and wording of the such disclosure; and (c) use its best efforts to obtain the confidential treatment thereof by others. 4. Return of Information. Upon the earlier of Massport s written request or the completion of the Contractor s need for such information, any and all sets of contract documents obtained by the Contractor shall be returned to Massport. The selected contractor may retain copies of such information after completion of its services only if its written agreement with Massport authorizes such retention, or if such selected contractor obtains express written permission to retain from Massport. Any final payments due the Contractor will not be processed until all sets of contract documents are returned by the Contractor to Massport in a manner that is acceptable to Massport. 5. Term. The Contractor s obligations with regard to the terms of this Agreement shall be perpetual or until such time that the information may no longer be considered SSI. 6. Severability. Each provision of this Agreement is severable. If a court of competent jurisdiction should find any provision of this Agreement to be unenforceable, all other provisions hereof shall remain in full force and effect. Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

13 7. Acknowledgements. The Contractor acknowledges receipt of Massport s SSI Document Protection Requirements and agrees to strictly adhere to such requirements. The Contractor acknowledges that the unauthorized reproduction, distribution, or disclosure of SSI could cause substantial damage, could expose Massport and its customers and facilities to significant dangers, and could result in civil or criminal fines and penalties and/or other actions by Massport. The Contractor also acknowledges that the obligations of confidentiality required hereunder are vital to the safety, security, and well-being of Massport, its customers, its facilities and operations, and the general public. The Contractor further acknowledges that damages at law may be an inadequate remedy for any breach or threatened breach of the terms of this Agreement, and that Massport may, in addition to all other rights or remedies, seek an injunction in order to restrain any breach or threatened breach, without being required either to show actual damage or to post an undertaking or other security. By signing this Confidentiality Agreement, the Contractor, on behalf of itself and all parties for whom the Contractor is responsible, agrees to be strictly bound to the provisions of this Agreement, and that the person signing below on behalf of the Contractor has the authority and power to execute this Agreement and to bind the Contractor to the obligations contained herein. Contractor s Authorized Representative Date Capital Programs and Environmental Affairs Department Rev. 6/08/ P age

MASSACHUSETTS PORT AUTHORITY TERMINAL C ENHANCEMENT PROJECTS LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS

MASSACHUSETTS PORT AUTHORITY TERMINAL C ENHANCEMENT PROJECTS LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS MASSACHUSETTS PORT AUTHORITY MPA PROJECT NO. L1429-C1 TERMINAL C ENHANCEMENT PROJECTS LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS Supplemental Information Package For Trade Contractor Pre-Qualification

More information

Madera Unified School District

Madera Unified School District Madera Unified School District Contractor Prequalification Procedures Prequalification Application PREQUALIFICATION PROCEDURES tice is hereby given by Madera Unified School District ( District ) that general

More information

PREQUALIFICATION PACKAGE FOR

PREQUALIFICATION PACKAGE FOR PREQUALIFICATION PACKAGE FOR THERMAL ENERGY STORAGE TANK REHABILITATION (REVISED) PROJECT 17-59 Due Date and Location for Submittal: 2:00 pm on Monday, December 18, 2017 City Clerk City of Beverly Hills

More information

Request for Qualifications

Request for Qualifications Request for Qualifications Issued: December 2, 2016 City Auditorium Bathroom Remodel Project Design-Build Project STATEMENTS OF QUALIFICATIONS ARE DUE BY 3:00 P.M. TUESDAY, JANUARY 10, 2017 1.0 REQUEST

More information

2018 GENERAL CONTRACTOR PREQUALIFICATION APPLICATION FOR NON STATE FUNDED PROJECTS > $1 MILLION. December 12, 2017

2018 GENERAL CONTRACTOR PREQUALIFICATION APPLICATION FOR NON STATE FUNDED PROJECTS > $1 MILLION. December 12, 2017 2018 GENERAL CONTRACTOR PREQUALIFICATION APPLICATION FOR NON STATE FUNDED PROJECTS > $1 MILLION PART A 2018 Instructions; Appeals Process PART B 2018 Questionnaire PART C 2018 Questionnaire Scoring PART

More information

PREQUALIFICATION QUESTIONAIRE

PREQUALIFICATION QUESTIONAIRE CITY HALL FIRST FLOOR COMMUNITY DEVELOPMENT REMODEL PREQUALIFICATION QUESTIONAIRE PROJECT DESCRIPTION Beverly Hills Community Development Facility was last remodeled in 2007, and contains approximately

More information

INVITATION FOR BID ATTENTION: This is not an order. Read all instructions, terms and conditions carefully.

INVITATION FOR BID ATTENTION: This is not an order. Read all instructions, terms and conditions carefully. A n E q u a l O p p o r t u n i t y U n i v e r s i t y INVITATION FOR BID ATTENTION: This is not an order. Read all instructions, terms and conditions carefully. INVITATION NO.: UK-1912-19 Issue Date:

More information

Maintenance and Repair Services Contract Template

Maintenance and Repair Services Contract Template Maintenance and Repair Services Contract Template USER GUIDE Regional Capital Assistance Team Revised 12/31/18 Table of Contents INTRODUCTION... 2 APPLICABLE PROCUREMENT LAW... 2 GETTING STARTED... 2 STANDARD

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2019 PRE-QUALIFICATION QUESTIONNAIRE

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2019 PRE-QUALIFICATION QUESTIONNAIRE PART B. 2019 QUESTIONNAIRE PREQUALIFICATION FOR GENERAL CONTRACTORS AND MECHANICAL, ELECTRICAL AND PLUMBING SUBCONTRACTORS CONTACT INFORMATION Firm Name: Check One: (As it appears on license) Corporation

More information

APPLICATION FOR PRE-QUALIFICATION OF GENERAL CONTRACTORS FOR NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT

APPLICATION FOR PRE-QUALIFICATION OF GENERAL CONTRACTORS FOR NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT APPLICATION FOR PRE-QUALIFICATION OF GENERAL CONTRACTORS FOR NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT NORTH ORANGE COUNTY COMMUNICTION COLLEGE DISTRICT PURCHASING DEPARTMENT 1830 WEST ROMNEYA DR.

More information

GUADALUPE RIVER PARK AND GARDENS IDENTIFICATION, INTERPRETIVE AND WAY FINDING SYSTEMS SINGAGE PROJECT CITY OF SAN JOSE REDEVELOPMENT AGENCY

GUADALUPE RIVER PARK AND GARDENS IDENTIFICATION, INTERPRETIVE AND WAY FINDING SYSTEMS SINGAGE PROJECT CITY OF SAN JOSE REDEVELOPMENT AGENCY CITY OF SAN JOSE REDEVELOPMENT AGENCY REQUEST FOR PRE-QUALIFICATION OF EXTERIOR SIGN FABRICATION BIDDERS GUADALUPE RIVER PARK AND GARDENS IDENTIFICATION, INTERPRETIVE AND WAY FINDING SYSTEMS SINGAGE PROJECT

More information

PRE-QUALIFICATION SUBMITTAL PACKAGE FOR GENERAL CONTRACTOR PRE-QUALIFICATION FOR THE VETERANS SPORTS PARK AT TUSTIN LEGACY, CIP NO.

PRE-QUALIFICATION SUBMITTAL PACKAGE FOR GENERAL CONTRACTOR PRE-QUALIFICATION FOR THE VETERANS SPORTS PARK AT TUSTIN LEGACY, CIP NO. PRE-QUALIFICATION SUBMITTAL PACKAGE FOR GENERAL CONTRACTOR PRE-QUALIFICATION FOR THE VETERANS SPORTS PARK AT TUSTIN LEGACY, CIP NO. 20043 IN THE CITY OF TUSTIN 300 CENTENNIAL WAY TUSTIN, CALIFORNIA 92780

More information

OFFEROR S STATEMENT OF QUALIFICATIONS

OFFEROR S STATEMENT OF QUALIFICATIONS RBHA.ORG 804-819-4000 107 SOUTH FIFTH STREET, RICHMOND, VA 23219 OFFEROR S STATEMENT OF QUALIFICATIONS CAMPUS PHASE II CONSTRUCTION MANAGEMENT AT RISK 2016-AD-0004 TO BE COMPLETED BY OFFERORS IN RESPONSE

More information

BUSINESS ASSOCIATE AGREEMENT (for use when there is no written agreement with the business associate)

BUSINESS ASSOCIATE AGREEMENT (for use when there is no written agreement with the business associate) BUSINESS ASSOCIATE AGREEMENT (for use when there is no written agreement with the business associate) This HIPAA Business Associate Agreement ( Agreement ) is entered into this day of, 20, by and between

More information

ARTICLE 8: BASIC SERVICES

ARTICLE 8: BASIC SERVICES THE SCOPE OF SERVICES ADDED BY THIS AMENDMENT IS FOR A CM AT RISK PROJECT ONLY. THE SCOPE OF SERVICES SPECIFIED BELOW INCLUDES ARTICLES 8.1, 8.3, 8.4, 8.5, 8.6, 8.7 AND 8.8. THE SERVICES SPECIFIED IN ARTICLE

More information

H 7789 S T A T E O F R H O D E I S L A N D

H 7789 S T A T E O F R H O D E I S L A N D ======== LC001 ======== 01 -- H S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO INSURANCE - INSURANCE DATA SECURITY ACT Introduced By: Representatives

More information

Public Review Draft PORT OF HOOD RIVER RULE PUBLIC PRIVATE PARTNERSHIPS FOR BRIDGE PROJECTS AND BRIDGE PROJECT ACTIVITIES

Public Review Draft PORT OF HOOD RIVER RULE PUBLIC PRIVATE PARTNERSHIPS FOR BRIDGE PROJECTS AND BRIDGE PROJECT ACTIVITIES PORT OF HOOD RIVER RULE PUBLIC PRIVATE PARTNERSHIPS FOR BRIDGE PROJECTS AND BRIDGE PROJECT ACTIVITIES. PURPOSE AND INTENT OF RULE () The primary purpose of this Rule is to describe the process for developing

More information

Any questions regarding this RFP should be ed to John Peters

Any questions regarding this RFP should be  ed to John Peters NORTH COUNTRY SUPERVISORY UNION REQUEST FOR PROPOSALS Installation of Fiber Optic Backbone Cable Proposals must be received no later than 3:00pm June 17, 2015 North Country Supervisory Union Attn: John

More information

REQUEST FOR PROPOSALS to Design, Build and Finance the Highway 401 Expansion Project Credit River to Regional Road 25 RFP No (RFP Version 1.

REQUEST FOR PROPOSALS to Design, Build and Finance the Highway 401 Expansion Project Credit River to Regional Road 25 RFP No (RFP Version 1. REQUEST FOR PROPOSALS to Design, Build and Finance the Highway 401 Expansion Project Credit River to Regional Road 25 RFP No. 17-178 (RFP Version 1.0) TABLE OF CONTENTS SECTION 1 INTRODUCTION...1 1.1 General...1

More information

UNIVERSITY OF WEST FLORIDA BOARD OF TRUSTEES NOTICE TO PROFESSIONAL CONSULTANTS 13PQS-10JJ Greek Village Design Services

UNIVERSITY OF WEST FLORIDA BOARD OF TRUSTEES NOTICE TO PROFESSIONAL CONSULTANTS 13PQS-10JJ Greek Village Design Services UNIVERSITY OF WEST FLORIDA BOARD OF TRUSTEES NOTICE TO PROFESSIONAL CONSULTANTS 13PQS-10JJ Greek Village Design Services The University of West Florida and its Board of Trustees announce that professional

More information

ATTACHMENT 6 PREQUALIFICATION QUESTIONNAIRE. Firm Name: Check One: Corporation (as it appears on license) Sole Prop.

ATTACHMENT 6 PREQUALIFICATION QUESTIONNAIRE. Firm Name: Check One: Corporation (as it appears on license) Sole Prop. ATTACHMENT 6 PREQUALIFICATION QUESTIONNAIRE CONTACT INFORMATION Firm Name: Check One: Corporation (as it appears on license) Partnership Sole Prop. Contact Person: Address: Phone: Fax: If Firm is a sole

More information

INFORMATION FOR BID. Tee Shirts (School Nutrition)

INFORMATION FOR BID. Tee Shirts (School Nutrition) BIBB COUNTY SCHOOL DISTRICT Procurement Services 4580 CAVALIER DRIVE Macon Georgia 31211 INFORMATION FOR BID For Tee Shirts (School Nutrition) April 14, 2016 IFB Number: 16-34 Due Date: 04/20/2016 Time

More information

EXHIBIT A: SECTION INSTRUCTIONS TO BIDDERS

EXHIBIT A: SECTION INSTRUCTIONS TO BIDDERS EXHIBIT A: SECTION 000200 INSTRUCTIONS TO BIDDERS 1.01 INVITATION TO BID A. The City of will be accepting bids for the Revised City Wayfinding Signage Project. This project is generally described as: fabrication

More information

IFB: MDI-SAB-14-B-0003 NOTICE TO GENERAL CONTRACTORS PROJECT VALUED BY THE STATE ARMORY BOARD, OVER $150,000

IFB: MDI-SAB-14-B-0003 NOTICE TO GENERAL CONTRACTORS PROJECT VALUED BY THE STATE ARMORY BOARD, OVER $150,000 NOTICE TO GENERAL CONTRACTORS IFB: MDI-SAB-14-B-0003 PROJECT VALUED BY THE STATE ARMORY BOARD, OVER $150,000 Notice is hereby given that sealed bids for the CONSTRUCTION OF Building 7 Renovations, 2002

More information

ARCHIVED - MAY 20, 2014

ARCHIVED - MAY 20, 2014 TEXAS POLICY In Texas, organizations contracting directly with the Texas Department of Agriculture (TDA) to operate nutrition programs federally funded through the United States Department of Agriculture

More information

CONTRACTORS AND SUBCONTRACTORS PRE-QUALIFICATION APPLICATION for MEASURE M BOND PROJECTS

CONTRACTORS AND SUBCONTRACTORS PRE-QUALIFICATION APPLICATION for MEASURE M BOND PROJECTS CONTRACTORS AND SUBCONTRACTORS PRE-QUALIFICATION APPLICATION for MEASURE M BOND PROJECTS Hollister School District will be soliciting bids for reconstruction and new construction on Measure M Bond Projects.

More information

COWLEY COUNTY, KANSAS REQUEST FOR PROPOSAL. SALARY STUDY SUBMITTAL DEADLINE June 1, 2012 RFP NUMBER

COWLEY COUNTY, KANSAS REQUEST FOR PROPOSAL. SALARY STUDY SUBMITTAL DEADLINE June 1, 2012 RFP NUMBER REQUEST FOR PROPOSAL SALARY STUDY SUBMITTAL DEADLINE June 1, 2012 RFP NUMBER 12-001 1. BACKGROUND INFORMATION: COWLEY COUNTY, KANSAS SCOPE OF SERVICES Cowley County, a municipal corporation existing under

More information

Request for Bids. SUPPLY AND DELIVERY OF LIQUID SODIUM HYDROXIDE Wastewater Division. Town of North Attleborough, Massachusetts BOARD OF PUBLIC WORKS

Request for Bids. SUPPLY AND DELIVERY OF LIQUID SODIUM HYDROXIDE Wastewater Division. Town of North Attleborough, Massachusetts BOARD OF PUBLIC WORKS Request for Bids SUPPLY AND DELIVERY OF LIQUID SODIUM HYDROXIDE Wastewater Division Town of North Attleborough, Massachusetts BOARD OF PUBLIC WORKS DONALD CERRONE, CHAIRMAN JOHN M WALSH, VICE-CHAIRMAN

More information

EL RANCHO UNIFIED DISTRICT PREQUALIFICATION QUESTIONNAIRE PACKET

EL RANCHO UNIFIED DISTRICT PREQUALIFICATION QUESTIONNAIRE PACKET EL RANCHO UNIFIED DISTRICT PREQUALIFICATION QUESTIONNAIRE PACKET In accordance with California Public Contract Code section 20111.6, all prime or general contractors and mechanical, electrical and plumbing

More information

The City of Moore Moore, Oklahoma

The City of Moore Moore, Oklahoma The City of Moore Moore, Oklahoma BID #1516-007 Construction Services Asbestos Removal for Royal Park Development Tract City of Moore Office of City Clerk, Purchasing Division 301 N. Broadway Avenue, Suite

More information

PRIME CONTRACTOR PREQUALIFICATION APPLICATION

PRIME CONTRACTOR PREQUALIFICATION APPLICATION PRIME CONTRACTOR PREQUALIFICATION APPLICATION Director of Purchasing Services 3401 Walnut Street Suite 421 A Philadelphia, Pennsylvania 19104-6228 Issue Date 01/01/99 Revision 7 01/07/05 INSTRUCTIONS ON

More information

Request for Proposal Records Management and Storage September 1, 2017

Request for Proposal Records Management and Storage September 1, 2017 Request for Proposal Records Management and Storage September 1, 2017-1- Table of Contents Page I. DESCRIPTION OF SERVICES... 1 II. SITE VISIT... 1 III. RULES AND INSTRUCTIONS... 1 IV. INSURANCE REQUIREMENTS...

More information

HIPAA BUSINESS ASSOCIATE AGREEMENT

HIPAA BUSINESS ASSOCIATE AGREEMENT HIPAA BUSINESS ASSOCIATE AGREEMENT This Business Associate Agreement ( Agreement ), is between Birch Family Services, Inc., a New York not-for-profit corporation ( Covered Entity ) and ( Business Associate

More information

PUBLIC WORKS DEPARTMENT ROOF REPLACEMENT AND CONSTRUCTION PROGRAM CITY OF STOCKTON CORPORATION YARD PROJECT NO. PW1320

PUBLIC WORKS DEPARTMENT ROOF REPLACEMENT AND CONSTRUCTION PROGRAM CITY OF STOCKTON CORPORATION YARD PROJECT NO. PW1320 PUBLIC WORKS DEPARTMENT BID FORMS FOR ROOF REPLACEMENT AND CONSTRUCTION PROGRAM CITY OF STOCKTON CORPORATION YARD PROJECT NO. PW1320 DO NOT DETACH ANY OF THIS MATERIAL THIS CONSTITUTES YOUR BID PROPOSAL

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK SERVICES ("RFQ") January 20, 2018

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK SERVICES (RFQ) January 20, 2018 1. INTRODUCTION REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK SERVICES ("RFQ") January 20, 2018 The Board of Education of the Dublin City School District ("Owner"), in accordance with Ohio

More information

PREQUALIFICATION QUESTIONNAIRE

PREQUALIFICATION QUESTIONNAIRE PREQUALIFICATION QUESTIONNAIRE FOR THE LANDSCAPE MAINTENANCE OF VARIOUS CITY PARKS, MEDIANS, COMMUNITY FACILITIES DISTRICTS, A WATERWAYS ASSESSMENT DISTRICT LANDSCAPE MAINTENANCE DISTRICTS AND OTHER CITY

More information

INVITATION TO BID. Pre-Bid Showing: Enter Date and Time Here. Please call by Enter Date and Time Here to reserve a bid packet and confirm attendance.

INVITATION TO BID. Pre-Bid Showing: Enter Date and Time Here. Please call by Enter Date and Time Here to reserve a bid packet and confirm attendance. INVITATION TO BID Notice to Bidders: Bids will be received by the Port of Shelton, 21 W Sanderson Way, Shelton, WA 98584 for the following work order: Work Order: Enter # and Name Here Pre-Bid Showing:

More information

CITY OF MORRISTOWN, TENNESSEE INVITATION TO BID DEMOLITION OF PROPERTY INVITATION TO BID

CITY OF MORRISTOWN, TENNESSEE INVITATION TO BID DEMOLITION OF PROPERTY INVITATION TO BID INVITATION TO BID Office of Finance 100 West First North Street Morristown, TN 37814 INTRODUCTION The City of Morristown is accepting sealed bids for demolition of properties with specifications stated

More information

ADDENDUM NO. 1. Date: March 7, Accessible Ramp at Saddleback College. Bid No South Orange County Community College District

ADDENDUM NO. 1. Date: March 7, Accessible Ramp at Saddleback College. Bid No South Orange County Community College District ADDENDUM NO. 1 Date: March 7, 2018 Accessible Ramp at Saddleback College Bid. 2071 South Orange County Community College District General-All project documents including contract documents, drawings, and

More information

BOROUGH OF HAWTHORNE Office of the Borough Administrator 445 Lafayette Avenue, Hawthorne, New Jersey (TEL) (FAX)

BOROUGH OF HAWTHORNE Office of the Borough Administrator 445 Lafayette Avenue, Hawthorne, New Jersey (TEL) (FAX) BOROUGH OF HAWTHORNE Office of the Borough Administrator 445 Lafayette Avenue, Hawthorne, New Jersey 07506-2551 (TEL) 973-427-1168 (FAX) 973-427-2320 REQUEST FOR PROPOSALS Arborist/Certified Tree Expert

More information

DOCUMENT MOUNTAIN VIEW-WHISMAN SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS. December 1, 2018

DOCUMENT MOUNTAIN VIEW-WHISMAN SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS. December 1, 2018 DOCUMENT 00 45 13 FOR PROSPECTIVE BIDDERS December 1, 2018 The Mountain View-Whisman School District ( District ) has determined that contractors ( Contractor(s) or Firm(s) ) on projects during the calendar

More information

Request for Qualifications #9709RFQ. Architectural Services for Dawson County Fire Station #9

Request for Qualifications #9709RFQ. Architectural Services for Dawson County Fire Station #9 Dawson County Board of Commissioners Dawson County, GA Request for Qualifications #9709RFQ Architectural Services for Dawson County Fire Station #9 Schedule of Events This Request for Qualifications will

More information

REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR

REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR SANTA BARBARA UNIFIED SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS/ PROPOSALS LEASE-LEASEBACK CONTRACTOR FOR Multi-Purpose Building Renovation Projects at Harding University Partnership School and Roosevelt

More information

COUNTY OF WISE, VIRGINIA REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL CONSULTING SERVICES BROWNFIELDS GRANT. Date of Issue: September 25, 2017

COUNTY OF WISE, VIRGINIA REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL CONSULTING SERVICES BROWNFIELDS GRANT. Date of Issue: September 25, 2017 COUNTY OF WISE, VIRGINIA REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL CONSULTING SERVICES BROWNFIELDS GRANT Date of Issue: September 25, 2017 Due Date for Proposal: October 6, 2017 COUNTY OF WISE, VA REQUEST

More information

Proposal No:

Proposal No: City of Spartanburg Procurement and Property Division Post Office Drawer 1749, SC 29304-1749 P (864)-596-2049 F (864) 596-2365 Legal Notice Request Proposal Demolition Asbestos /Abatement of Two (2) Structures

More information

COUNTY OF COLE JEFFERSON CITY, MISSOURI

COUNTY OF COLE JEFFERSON CITY, MISSOURI COUNTY OF COLE JEFFERSON CITY, MISSOURI REQUEST FOR BID 2018-33: PROPANE PROVISION & SERVICES SUBMISSIONS SHALL BE ACCEPTED UNTIL THURSDAY, AUGUST 23 at 3:30 p.m. Central AND RECEIVED AT: COLE COUNTY COMMISSION

More information

City of Coolidge 130 W. Central Avenue Coolidge, Arizona (520) TDD: (520) / Fax: (520)

City of Coolidge 130 W. Central Avenue Coolidge, Arizona (520) TDD: (520) / Fax: (520) REQUEST FOR PROPOSALS Energy Performance Contracting Services INTRODUCTION The City of Coolidge will accept competitive sealed proposals for energy performance contracting services at the address or physical

More information

SUBMISSION REQUIREMENTS

SUBMISSION REQUIREMENTS GREATER ORLANDO AVIATION AUTHORITY NOTICE OF PROFESSIONAL SERVICES W-376, SELECTION OF DESIGN CONSULTANT SERVICES FOR RUNWAY 18L-36R REHABILITATION AND RELATED WORK ORLANDO INTERNATIONAL AIRPORT SUBMISSION

More information

C740 (13002F) REQUEST FOR PRE-QUALIFICATION BIDDERS

C740 (13002F) REQUEST FOR PRE-QUALIFICATION BIDDERS SILICON VALLEY BERRYESSA EXTENSION PROJECT C740 (13002F) REQUEST FOR PRE-QUALIFICATION OF BIDDERS Milpitas Station Surface Parking and Roadway Issued September 25, 2014 REQUEST FOR PRE-QUALIFICATION OF

More information

WHERE: 250 North Water Street, Killian Room, Mobile, Ala 36602

WHERE: 250 North Water Street, Killian Room, Mobile, Ala 36602 http://www.asdd.com/ WHERE: 250 North Water Street, Killian Room, Mobile, Ala 36602 WHEN: 10:00 A.M., CDT, March 16, 2016 INSPECTION: REQUIREMENTS: By appointment between the hours of 9:00 A.M. and 3:00

More information

Request for Qualifications. Change Management Lead. Texas FAIR Plan Association

Request for Qualifications. Change Management Lead. Texas FAIR Plan Association Request for Qualifications Change Management Lead Texas FAIR Plan Association 3 Table of Contents Table of Contents... 1 Important Dates and Events... 2 Section 1 Introduction... 3 Purpose of the RFQ...

More information

OFFICIAL BID SHEET. DATE: May 3, 2018

OFFICIAL BID SHEET. DATE: May 3, 2018 DATE: May 3, 2018 OFFICIAL BID SHEET BID NUMBER: 18-17 FIRM CONTRACT INVITATION Bids must be signed in Ink. Unsigned bids will not be considered. Bids are invited for the renovation of two rooms in the

More information

NOTICE TO GENERAL CONTRACTORS PROJECT VALUED BY THE STATE ARMORY BOARD, OVER $150,000

NOTICE TO GENERAL CONTRACTORS PROJECT VALUED BY THE STATE ARMORY BOARD, OVER $150,000 NOTICE TO GENERAL CONTRACTORS IFB: MDI-SAB-16-B-0004 PROJECT VALUED BY THE STATE ARMORY BOARD, OVER $150,000 Notice is hereby given that sealed bids for the Building 18 Site Repairs and Interior Renovation,

More information

PUBLIC WORKS DEPARTMENT FIRE STATION NO. 2 KITCHEN IMPROVEMENTS PROJECT NO. PW1618

PUBLIC WORKS DEPARTMENT FIRE STATION NO. 2 KITCHEN IMPROVEMENTS PROJECT NO. PW1618 PUBLIC WORKS DEPARTMENT BID FORMS FOR FIRE STATION NO. 2 KITCHEN IMPROVEMENTS PROJECT NO. PW1618 DO NOT DETACH ANY OF THIS MATERIAL THIS CONSTITUTES YOUR BID PROPOSAL SUBMIT ONE ORIGINAL OF THIS BID PROPOSAL

More information

SNOW PLOW BLADES, GRADER BLADES AND LOADER CUTTING EDGES

SNOW PLOW BLADES, GRADER BLADES AND LOADER CUTTING EDGES INVITATION FOR BID (IFB) SNOW PLOW BLADES, GRADER BLADES AND LOADER CUTTING EDGES TOWN OF LONGMEADOW MASSACHUSETTS May 16, 2012 1 INVITATION FOR BID (IFB): SNOW PLOW BLADES, GRADER BLADES AND LOADER CUTTING

More information

LEGAL SERVICES RFP # AUGUST 13, 2018

LEGAL SERVICES RFP # AUGUST 13, 2018 LEGAL SERVICES RFP #2018-27 AUGUST 13, 2018 Electronic Submittals are due by 4:30 PM on September 5, 2018 The EVERETT HOUSING AUTHORITY is soliciting proposals for Licensed Professional Legal Services.

More information

WHEREAS, the District desires to adopt the Prequalification Process, including the Questionnaire, Rating System, and Appeal Process.

WHEREAS, the District desires to adopt the Prequalification Process, including the Questionnaire, Rating System, and Appeal Process. RESOLUTION NO. 18-009 OF THE BERKELEY UNIFIED SCHOOL DISTRICT ADOPTING PREQUALIFICATION PROCESS FOR PRIME CONTRACTORS PURSUANT TO PUBLIC CONTRACT CODE SECTION 20111.6 WHEREAS, the Berkeley Unified School

More information

REQUEST FOR PROPOSAL (RFP) ENERGY SAVINGS PERFORMANCE CONTRACTING PROJECT INSTRUCTIONS TO BIDDERS

REQUEST FOR PROPOSAL (RFP) ENERGY SAVINGS PERFORMANCE CONTRACTING PROJECT INSTRUCTIONS TO BIDDERS REQUEST FOR PROPOSAL (RFP) ENERGY SAVINGS PERFORMANCE CONTRACTING PROJECT INSTRUCTIONS TO BIDDERS 1. INTRODUCTION Van Dyke Public Schools is requesting proposals from Energy Services Companies (ESCOs)

More information

HIPAA PRIVACY AND SECURITY AWARENESS

HIPAA PRIVACY AND SECURITY AWARENESS HIPAA PRIVACY AND SECURITY AWARENESS Introduction The Health Insurance Portability and Accountability Act (known as HIPAA) was enacted by Congress in 1996. HIPAA serves three main purposes: To protect

More information

Oppenheimer Upper Equestrian Pavilion -- MAJ 16-MJ0067 California Polytechnic State University San Luis Obispo, CA 93407

Oppenheimer Upper Equestrian Pavilion -- MAJ 16-MJ0067 California Polytechnic State University San Luis Obispo, CA 93407 TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY FEE PROPOSAL FORM Oppenheimer Upper Equestrian Pavilion -- MAJ 16-MJ0067 California Polytechnic State University San Luis Obispo, CA 93407 To the Trustees of

More information

REQUEST FOR PROPOSAL TO PROVIDE UNCLAIMED PROPERTY SECURITIES CUSTODY SERVICES TO THE STATE OF NEW HAMPSHIRE

REQUEST FOR PROPOSAL TO PROVIDE UNCLAIMED PROPERTY SECURITIES CUSTODY SERVICES TO THE STATE OF NEW HAMPSHIRE Catherine A. Provencher STATE TREASURER THE STATE OF NEW HAMPSHIRE STATE TREASURY 25 CAPITOL STREET, ROOM 121 CONCORD, NH 03301 (603) 271-2621 FAX (603) 271-3922 EMAIL: cprovencher@treasury.state.nh.us

More information

REQUEST FOR PROPOSALS TO PROVIDE CONSTRUCTION COST ANALYSIS SERVICES

REQUEST FOR PROPOSALS TO PROVIDE CONSTRUCTION COST ANALYSIS SERVICES REQUEST FOR PROPOSALS TO PROVIDE CONSTRUCTION COST ANALYSIS SERVICES Missouri Housing Development Commission RESPONSE DEADLINE: One original copy and one electronic copy on a CD-ROM or Flash Drive to MHDC

More information

POLICY AND PROCEDURES GOVERNING BIDDING FOR FACILITY PROJECTS # P

POLICY AND PROCEDURES GOVERNING BIDDING FOR FACILITY PROJECTS # P POLICY AND PROCEDURES GOVERNING BIDDING FOR FACILITY PROJECTS # P-2016.11.03 1. PURPOSE 1.1 The purpose of this policy is to clarify the public contracting processes for Facility Projects (as defined in

More information

Attachment A Application for Prequalification of Hazardous Material and Building Removal Contractors

Attachment A Application for Prequalification of Hazardous Material and Building Removal Contractors Attachment A Application for Prequalification of Hazardous Material and Building Removal Contractors S201-RFQ3 Request for Qualifications Page 1 of 23 APPLICATION FOR PRE-QUALIFICATION OF HAZARDOUS MATERIAL

More information

Business Associate Agreement

Business Associate Agreement This Business Associate Agreement Is Related To and a Part of the Following Underlying Agreement: Effective Date of Underlying Agreement: Vendor: Business Associate Agreement This Business Associate Agreement

More information

2017 HUD Sidewalk and ADA Ramp Project, Phase II start construction 09/2017 and be completed by 12/2017.

2017 HUD Sidewalk and ADA Ramp Project, Phase II start construction 09/2017 and be completed by 12/2017. Request for Proposals RFP2M17-9 Labor Compliance Services for the 2017 HUD Sidewalk and ADA Ramp Project, Phase II and 2017 HUD Street Improvement Project GENERAL INFORMATION Award of contract by the City

More information

Philadelphia County, Pennsylvania

Philadelphia County, Pennsylvania 34BRequest for Proposal for a 35BDesign Build Contractor Project No. 18-059.1 RFP for Design Build of SouthPort Vehicle Processing Facility Philadelphia County, Pennsylvania 2018 May 23, 2018 NOTICE TO

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER-AT-RISK, TWO-STEP PROCESS

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER-AT-RISK, TWO-STEP PROCESS REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER-AT-RISK, TWO-STEP PROCESS GUADALUPE COUNTY EXISTING ROAD & BRIDGE SHOP RENOVATION 2605 N. Guadalupe St., Seguin, TX 78155 COUNTY WORK PROJECT RFQ NO. 2017-5302

More information

Greenville-Spartanburg Airport District 2000 GSP Drive, Suite 1 Greer, SC CONTRACTOR PREQUALIFICATION APPLICATION

Greenville-Spartanburg Airport District 2000 GSP Drive, Suite 1 Greer, SC CONTRACTOR PREQUALIFICATION APPLICATION Greenville-Spartanburg Airport District 2000 GSP Drive, Suite 1 Greer, SC 29651 CONTRACTOR PREQUALIFICATION APPLICATION Terminal Drop-off Improvements August 15, 2018 REQUEST FOR QUALIFICATIONS FOR LANDSCAPE

More information

ADDENDUM NO. 3 to the PREQUALIFICATION DOCUMENTS AUGUST 26, 2011

ADDENDUM NO. 3 to the PREQUALIFICATION DOCUMENTS AUGUST 26, 2011 ADDENDUM NO. 3 to the PREQUALIFICATION DOCUMENTS AUGUST 26, 2011 HOUSING 4: THE SUMMITS PROJECT NO. 906270 CAMPUS, MERCED CALIFORNIA A. BID SUBMISSION DEADLINE: [The deadline for submitting prequalification

More information

January 18, Request for Proposals. for

January 18, Request for Proposals. for January 18, 2017 Request for Proposals for Preparation of Tulare County Transit Authority (TCTA) Fiscal Audits for Years 2016/17, 2017/18 and 2018/19 from the Tulare County Association of Governments (TCAG)

More information

MIDDLETOWN TOWNSHIP PUBLIC SCHOOLS REQUEST FOR QUALIFICATIONS. School District Board, Labor and Negotiations Legal Services SPECIFICATIONS

MIDDLETOWN TOWNSHIP PUBLIC SCHOOLS REQUEST FOR QUALIFICATIONS. School District Board, Labor and Negotiations Legal Services SPECIFICATIONS MIDDLETOWN TOWNSHIP PUBLIC SCHOOLS REQUEST FOR QUALIFICATIONS School District Board, Labor and Negotiations Legal Services SPECIFICATIONS PROPOSALS DUE: June 10, 2016 3:00 p.m.. MIDDLETOWN TOWNSHIP PUBLIC

More information

March 1. HIPAA Privacy Policy

March 1. HIPAA Privacy Policy March 1 HIPAA Privacy Policy 2016 1 PRIVACY POLICY STATEMENT Purpose: The following privacy policy is adopted by the Florida College System Risk Management Consortium (FCSRMC) Health Program and its member

More information

DATA PROCESSING ADENDUM

DATA PROCESSING ADENDUM W www.exponea.com C +421 948 127 332 sales@exponea.com A Exponea, Twin City B, Mlynské Nivy 12 821 09 Bratislava, SK DATA PROCESSING ADENDUM Exponea s.r.o. registered in the Commercial Register maintained

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS All University of Alabama Solicitations are made upon and subject to the following conditions, if applicable, unless otherwise noted in the Solicitation: 1.0 Definitions 1.1 The

More information

PROCUREMENT POLICY Originally Adopted April 1983 Revised: February 26, 2014

PROCUREMENT POLICY Originally Adopted April 1983 Revised: February 26, 2014 PROCUREMENT POLICY Originally Adopted April 1983 Revised: February 26, 2014 Table of Contents PREFACE... 3 I. INTRODUCTION... 4 II. GENERAL... 4 A. Purpose... 4 B. Applicability... 5 C. Delegation of Authority...

More information

MIDDLESEX COUNTY UTILITIES AUTHORITY

MIDDLESEX COUNTY UTILITIES AUTHORITY MIDDLESEX COUNTY UTILITIES AUTHORITY REQUEST FOR QUALIFICATIONS FOR FINANCIAL INVESTMENT AND ADVISORY SERVICES FOR THE AUTHORITY S SOLID WASTE AND WASTEWATER DIVISIONS DEADLINE: 12:00 NOON ON FRIDAY, FEBRUARY

More information

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104 Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104 REQUEST FOR PROPOSAL (RFP) 2018-02 LEGAL REPRESENTATION IN ACTIONS FOR UNLAWFUL DETAINER DATE ISSUED: Thursday, January

More information

SUBMISSION REQUIREMENTS

SUBMISSION REQUIREMENTS GREATER ORLANDO AVIATION AUTHORITY NOTICE OF PROFESSIONAL SERVICES W-00380 SELECTION OF CONTINUING CIVIL ENGINEERING SERVICES CONSULTANT ORLANDO INTERNATIONAL AIRPORT, ORLANDO EXECUTIVE AIRPORT, AND OTHER

More information

EL PASO COUNTY COMMUNITY COLLEGE DISTRICT POST OFFICE BOX EL PASO, TEXAS GENERAL CONDITIONS OF CONTRACT

EL PASO COUNTY COMMUNITY COLLEGE DISTRICT POST OFFICE BOX EL PASO, TEXAS GENERAL CONDITIONS OF CONTRACT EL PASO COUNTY COMMUNITY COLLEGE DISTRICT POST OFFICE BOX 20500 EL PASO, TEXAS 79998-0500 GENERAL CONDITIONS OF CONTRACT All Offerors must agree to the conditions as stated without alterations. Proposed

More information

INVITATION TO BID (ITB)

INVITATION TO BID (ITB) INVITATION TO BID (ITB) Annual Contract for Letterhead, Envelopes and Business Cards BIDDER INSTRUCTIONS Montrose County is seeking sealed bids from qualified vendors to supply and print letterhead, envelopes,

More information

EXHIBIT 1. PROPOSALS ARE REQUESTED FROM QUALIFIED, LICENSED GENERAL CONTRACTORS or LICENSED PAINTING CONTRACTORS BY THE

EXHIBIT 1. PROPOSALS ARE REQUESTED FROM QUALIFIED, LICENSED GENERAL CONTRACTORS or LICENSED PAINTING CONTRACTORS BY THE EXHIBIT 1 Solicitation Date: PROPOSALS ARE REQUESTED FROM QUALIFIED, LICENSED GENERAL CONTRACTORS or LICENSED PAINTING CONTRACTORS BY THE State of Florida, Department of Military Affairs HEREINAFTER REFERRED

More information

City of Columbus, Ohio

City of Columbus, Ohio City of Columbus, Ohio THIS IS NOT AN ORDER Solicitation - 90 2014 SA005634 Respond before: Bid Contact : 11/13/2014 1:00 pm Steve Lewie Dept of Finance\Construction Management 90 W.Broad St. Columbus

More information

The Engineer s opinion of probable construction cost for the Work is $760,000 to $840,000.

The Engineer s opinion of probable construction cost for the Work is $760,000 to $840,000. NOTICE TO BIDDERS FOR PAVE AIRPORT SERVICE ROAD TERMINAL APRON TO SOUTH CARGO APRON AT DES MOINES INTERNATIONAL AIRPORT Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each

More information

CAMERON INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS ENERGY SAVING PERFORMANCE CONTRACT TOTAL CAMPUS ENERGY OPTIMIZATION SERVICES

CAMERON INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS ENERGY SAVING PERFORMANCE CONTRACT TOTAL CAMPUS ENERGY OPTIMIZATION SERVICES CAMERON INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS ENERGY SAVING PERFORMANCE CONTRACT TOTAL CAMPUS ENERGY OPTIMIZATION SERVICES The intent of this Request for Qualifications (RFQ) is to solicit

More information

Request for Qualifications (RFQ) for Legal Services to Mustang Special Utility District Issued April 30, 2015

Request for Qualifications (RFQ) for Legal Services to Mustang Special Utility District Issued April 30, 2015 Request for Qualifications (RFQ) for Legal Services to Mustang Special Utility District Issued April 30, 2015 Submission Due by 12:00 Noon, CDT on Tuesday, June 2, 2015 Mr. Chris Boyd, General Manager

More information

Suite 300 Tenant Improvement

Suite 300 Tenant Improvement BID FORM FOR: Suite 300 Tenant Improvement UNIVERSITY OF CALIFORNIA Office of the President Sacramento, CA 95814 February 19, 2014 BID TO: Pamela Madison, Space Planning Manager University of California,

More information

GEORGIA LOTTERY CORPORATION

GEORGIA LOTTERY CORPORATION GEORGIA LOTTERY CORPORATION REQUEST FOR PROPOSAL FOR EVENING/NIGHT LOTTERY DRAW AUDIT SERVICES (SUNDAY - SATURDAY) We propose to furnish and deliver any and all of the deliverables and services named in

More information

Request for Proposals

Request for Proposals Request for Proposals Measure & List of New Construction for Forsyth County Proposals Will Be Received Until 12:00 Noon, Friday April 6, 2018 By The City of W-S/Forsyth Co. Purchasing Department In Room

More information

REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR QUALIFICATIONS (RFQ) Wayne Metropolitan Community Action Agency WRAP Water Conservation Plumbing Repair Services REQUEST FOR QUALIFICATIONS (RFQ) Issued: Tuesday, December 11, 2018 Posted at: waynemetro.org/request-for-proposal/

More information

REQUEST FOR PROPOSAL (RFP) OWNER S REPRESENTATION/PROJECT MANAGER. New Combined Court Facility In Montezuma County

REQUEST FOR PROPOSAL (RFP) OWNER S REPRESENTATION/PROJECT MANAGER. New Combined Court Facility In Montezuma County REQUEST FOR PROPOSAL (RFP) OWNER S REPRESENTATION/PROJECT MANAGER New Combined Court Facility In Montezuma County 12/11/2015 Prepared by: Montezuma County 109 W. Main, Room 302 Cortez, CO 81321 Melissa

More information

NASDAQ Futures, Inc. Off-Exchange Reporting Broker Agreement

NASDAQ Futures, Inc. Off-Exchange Reporting Broker Agreement 2. Access to the Services. a. The Exchange may issue to the Authorized Customer s security contact person, or persons (each such person is referred to herein as an Authorized Security Administrator ),

More information

SUBMISSION REQUIREMENTS

SUBMISSION REQUIREMENTS GREATER ORLANDO AVIATION AUTHORITY NOTICE OF DESIGN/BUILD SERVICES DESIRED FOR BP-00483 INTRUSION DETECTION SYSTEM & POND SECURITY FENCING (D/B) ORLANDO INTERNATIONAL AIRPORT SUBMISSION REQUIREMENTS For

More information

Posti Group - Purchasing Terms and Conditions

Posti Group - Purchasing Terms and Conditions 1 (18) Posti Group - Purchasing Terms and 2 (18) Table of Contents 1 SUPPLIER... 4 1.1 Customer instructions... 4 1.2 Exclusive rights... 4 1.3 Act on Contractor Obligations... 4 1.4 Recruitment restrictions...

More information

A competitive bidding process shall be utilized to the greatest extent possible for all construction contracts.

A competitive bidding process shall be utilized to the greatest extent possible for all construction contracts. BOARD POLICY NO. 024 PROCUREMENT AND CONTRACTING CONSTRUCTION Purpose To establish a method for administering SANDAG construction contracts. Background Public Utilities Code section 132352.4 states that

More information

Bid No. B17-13 Bldg 1300 HVAC

Bid No. B17-13 Bldg 1300 HVAC Bid No. B17-13 Bldg 1300 HVAC INFORMAL BID ***PREQUALIFIED CONTRACTORS ONLY*** BID DUE DATE: WEDNESDAY, April 19, 2017, 2:00P.M. CABRILLO COMMUNITY COLLEGE DISTRICT PURCHASING, CONTRACTS & RISK MANAGEMENT

More information

HOUSING QUALITY STANDARDS (HQS) & UNIFORM PHYSICAL CONDITIONS STANDARDS (UPCS) INSPECTION SERVICES

HOUSING QUALITY STANDARDS (HQS) & UNIFORM PHYSICAL CONDITIONS STANDARDS (UPCS) INSPECTION SERVICES REQUEST FOR PROPOSAL HOUSING QUALITY STANDARDS (HQS) & UNIFORM PHYSICAL CONDITIONS STANDARDS (UPCS) INSPECTION SERVICES August 2013 Tacoma Community Redevelopment Authority City of Tacoma Community and

More information

Table of Contents. SUMMARY OF KEY TERMS AGREEMENT TERMS Costs Overdraft Protection Payments

Table of Contents. SUMMARY OF KEY TERMS AGREEMENT TERMS Costs Overdraft Protection Payments P-1786 Rev. 9/17 CREDIT CARD ACCOUNT AGREEMENT Table of Contents SUMMARY OF KEY TERMS AGREEMENT TERMS Costs Overdraft Protection Payments Card Account Agreement (CA) SUMMARY OF KEY TERMS SunTrust Cash

More information

For. 621 Grant. Yakima, WA until: preparation. Kim Hixson Director

For. 621 Grant. Yakima, WA until: preparation. Kim Hixson Director Yakima Valley Libraries 102 North Third Street Yakima, WA 98901 Request for Statement of Qualifications (SOQ) For Remodel of Sunnyside Community Library 621 Grant Sunnyside, WA 98944 Notice is hereby given

More information

STATEMENT OF BIDDER'S QUALIFICATIONS

STATEMENT OF BIDDER'S QUALIFICATIONS STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate

More information