1 World Bank Safeguards and Program-for-Results (P4R) Financing Summary of Concerns Greater reliance on borrowing country systems: Focus on borrower systems for managing environmental and social (E&S) risks is a welcome objective, provided that such systems adequately and consistently prevent and mitigate potential harm to people and the environment. P4R reliance on borrower systems should provide comparable treatment for comparable risks at the Bank ensuring that risks across each type of lending are addressed in a consistent way. Inconsistent standards: Unlike project-based lending, P4R financing is not subject to the Bank s environmental and social safeguard policies. Rather than creating innovative ways to apply a unified safeguard framework across all Bank lending instruments, P4R created a separate regime for treatment of social and environmental issues, a development that may lead to inconsistent E&S risk management and outcomes. Safeguard flexibility without clear leverage: P4R s vague and somewhat discretionary approach to assessing and using a borrower s E&S systems to address potential operational impacts offers unclear leverage over wider programmatic adoption of higher standards. This approach will expose communities in areas where programs are implemented to higher levels of risk. Transparency: P4R lets the borrower determine what, if any, information related to activities funded through P4R operations is made publicly available or available directly to potentially-affected local communities. Further, there is no clear mechanism for disclosure of information on sub-projects. Independent clearance: The P4R operational policy and procedure (OP/BP 9.00) dilutes the independent clearance role for the Bank s regional safeguard advisors. Sequencing: P4R operations run the risk of perpetuating weak or inadequate mitigation systems. The absence of a requirement to ensure proper sequencing ensuring that capacity gaps are addressed before funding is provided for program activities that depend on adequate capacity constitutes a significant concern. Weak stakeholder consultation: The Bank relies entirely on borrowers to perform project-level consultations, providing no requirements for these activities and no oversight. The lack of consultation standards for P4R supported actions, which may involve considerable environmental and social impacts (Category B level), raises concerns. Key Recommendations: 1. No policy change in OP/BP 9.0 before results of IEG evaluation in FY Open the World Bank Safeguard Review to include all instruments and ensure portfolio wide risk management consistency.

2 1. What is P4R? Program-For-Results Financing (P4R) is a relatively new World Bank lending instrument that aims to support a borrower s programs a flexible term that encompasses a wide-range of potential government-led development initiatives with a national, subnational, multi-sectoral, or sectoral scope. P4R operations can be used to finance investment-lending types of activities that have notable risks, i.e., Category B projects. 1 Current P4R operations include capacity building for multiple local governments, expanded governmental national health service delivery, road rehabilitation and construction, municipal infrastructure, rural water supply and sanitation, and bridge rehabilitation and construction. 2 P4R is a results-based instrument: disbursements are largely tied to achievement of agreed development linked indicators rather than to preparation and expenditures for inputs, as is typically the case with more traditional project lending. Financing is provided to the borrower s overall expenditure program budget rather than linked to individual transactions (such as scheduled purchases of goods and services required for the project). Development linked indicators are identified initially by the borrower, and approved by the Bank. It appears indicators can be changed after the Board approves the P4R operation. 3 P4R lets the borrower determine what, if any, information related to activities funded through P4R operations is made publicly available or available directly to potentially-affected local communities. In other words, the public has assured access to information related only to program level activities not necessarily to activities funded through the program. The Bank considers P4R a third core component of its suite of lending instruments: Development Policy Lending (DPL) to finance government policy reforms and actions, P4R for program-level operations, and Investment Lending (IL) for projects. The Bank argues that P4R will enable it to extend the reach of its advice and financial support to entire national programs despite providing a relatively small share of a program s operating budget. P4R also represents a further fragmentation of the Bank s approach to ensuring that its financing does not contribute to environmental and social harm. Unlike project-based lending, P4R financing is not subject to the Bank s environmental and social safeguard policies. 4 Instead, P4R operations rely on the borrower s systems for avoiding and mitigating potential impacts, with potential capacity strengthening of the systems during the operation. Bank staff are to utilize a set of P4R-specific environmental and social principles to guide an assessment of the adequacy of a borrower s systems, and Bank standards do not apply to activities funded through these systems even when these are the same types of 1 Current two year prohibition on funding of Category A, that will be revisited in 2014 and may be removed. 2 The P4R instrument Operational Policy/Bank Procedure 9.00 Program-For-Results Financing was approved in January See the Bank s P4R website for documents and a list of P4R operations. 3 See OP A "Level One" restructuring involving modification of the original Program objectives, which includes any change to the original DLIs, is submitted for Board approval under absence of objection procedures. 4 World Bank Safeguard Policies (hereafter safeguards ) refer to a set of ten Operational Policies (OPs) and Bank Procedures (BPs) that specify standards and actions to minimize social and environmental impacts that borrowers and Bank staff must meet as a condition of Bank financing. The safeguards apply to Bank projects but not to DPLs and P4R operations. See World Bank Safeguard Policies. 2

3 activities to which Bank safeguards apply when funded through investment lending operations at the Bank. DPLs are also not subject to the Bank s safeguard policies. 5 P4R is currently being rolled out in a limited manner through Bank management agreed to limit total P4R financing to no more than 5% of total IBRD/IDA annual lending for the first two years (or roughly US$ billion per year). Since inception in early 2012, the Bank has approved 10 P4R operations with total Bank financing of US$1.781 billion (as of April 1, 2014), with another 17 projects (totaling over US$1.572 billion) in the pipeline Why should civil society care about P4R? P4R could potentially encompass a sizable portion of the Bank s portfolio. A Bank review found significant demand among country clients for programmatic lending. 7 Bank staff are examining projects in the pipeline to be converted to P4R operations. Many client countries want to transition from reliance on the Bank s safeguard, procurement, transparency, and accountability standards in favor of greater reliance on country systems and practices. If the 5% cap is lifted after the two-year rollout period, P4R lending could expand significantly. 8 The shift toward greater reliance on borrowing country systems for managing environmental and social (E&S) risks is a welcome objective, provided that such systems adequately prevent and mitigate potential harm to people and the environment. These systems should provide comparable treatment for comparable risks at the Bank ensuring that risks across each type of lending are addressed in a consistent way. The Bank argues that by exempting P4R operations from the safeguards, it will be able to provide broader support to and exercise more influence on borrower systems compared to IL projects, which are typically ring fenced from other development activities that would not comply with the Bank s standards. However, it is unclear whether P4R s more leverage 9 approach will be embraced by borrowers. Furthermore, P4R s vague and somewhat discretionary approach to assessing a borrower s E&S systems and addressing potential operational impacts will expose communities in areas where programs are implemented to higher levels of risk. Upon the Bank s review and approval of an acceptable borrower social and environment risk management system, borrowers will assess and address risks associated with activities funded through P4R programs, including those activities that would be characterized as Category B if funded through investment lending operations. 5 For DPLs, Bank staff are to determine whether supported policies are likely to have significant poverty and social consequences or significant effects on the county s environment, forests, and other natural resources. Staff must also assess whether the borrower has systems in place to manage such risks, and DPL operations may include capacity strengthening measures if significant gaps in environmental and social risk management are identified. See World Bank Operational Policy 8.60 Development Policy Lending (2004), paras. 10 and See the Bank s P4R website, the estimate of projects in the pipeline excludes amounts for five projects for which no documentation is yet available. 7 World Bank, Operations Policy and Country Services, A New Instrument to Advance Development Effectiveness: Program-for- Results Financing (December 29, 2011), para. 8. P4R website. 8 For speculative scenarios, see Vince McElhinny, Bank Information Center, P4R Update (February 2012) 9 The Bank claims, In aggregate, the Bank finances between 1-2 percent of the public expenditures of developing countries. Under PforR, the Bank will provide a fraction of the overall funding for a larger program and will be able to apply its technical expertise, capacity building support, fiduciary, environmental and anticorruption oversight and Access to Information Policy to a larger range of government spending. PforR focuses on behavioral and institutional changes required to achieve results and manage associated risks. World Bank Program-for-Results: An Overview. P4R website. 3

4 A number of issues associated with P4R are a cause of concern for achieving sustainable development goals. These include: Inconsistent standards: Rather than creating innovative ways to apply a unified safeguard framework across all Bank lending instruments, P4R created a separate regime for treatment of social and environmental issues, a development that may lead to inconsistent E&S risk management and outcomes. For example, environmental assessments for IL projects must examine risks and impacts in a project s area of influence (which includes all ancillary aspects, including power transmission corridors, pipelines, access roads, etc., as well as unplanned, induced impacts of a project). It is not clear how the Bank will apply this requirement consistently to P4R programs, even when specific project activities are defined. More discretion, more E&S risk?: P4R operations consciously rely on far greater discretion and judgment of Bank task teams in assessing E&S risks than is the case for investment projects (see below). With greater discretion comes the potential that environmental and social risks and impacts may not be adequately identified and addressed. The Uruguay P4R provides a case in point no project-level impact assessments are being required for a relatively extensive road rehabilitation program that will, admittedly involve resettlement and has underestimated the impacts of the likely expansion of logistics corridors. The Bank has noted elsewhere, that impact assessments are required for similar road rehabilitation activities funded through direct investment lending operations. Evaluations of Bank operations have indicated significant under-estimation of the degree of E&S risk (i.e., in one-third of high risk projects), even for more prescriptive, compliance-oriented investment projects. 10 As the Bank s Independent Evaluation Group has found, framework lending, such as P4R, deals less robustly with risk than other lending approaches. Supervision results performance in terms of mitigation are both lower for Bank projects that rely on policy frameworks, whose environmental and social impacts cannot be assessed at appraisal. 11 Reduced role of E&S experts: For investment projects, regional safeguard advisors (RSA) have mandatory review and clearance functions of a project s environmental and social aspects. 12 The P4R operational policy and procedure (OP/BP 9.00) eliminates formal RSA clearance authority. Rather, all Bank actions are to be undertaken by the task team. While the task team takes the lead in carrying out the ESSA and have played an active role in some of the early P4R operations, Bank safeguard specialists may serve solely as advisors for P4R operations as the number increases. Will capacity building occur?: The Bank states that a priority area for both preparation and implementation support will be to strengthen the capacity of institutions to implement the program. 13 But will P4R deliver on this objective? National, subnational, or sector-wide capacity strengthening is an 10 For example, the Bank s evaluation department found that project E&S risk determination was not always based on objective criteria. Almost a third of projects with high-risk levels were incorrectly classified as category B, while one sixth of category-a projects had much lower risks. World Bank Independent Evaluation Group, Safeguards and Sustainability Policies in a Changing World An Independent Evaluation of World Bank Group Experience, 2010, p Ibid, p At the Project Decision stage, the RESU [Regional environment sector unit] provides formal clearance of the environmental aspects of the project, including their treatment in the draft legal documents prepared by LEG [legal department]. World Bank, Bank Procedures 4.01 Environmental Assessment, para World Bank OPCS, A New Instrument, para

5 expensive, complex and often long-term proposition. Will borrowers be willing to devote more internal resources for capacity building or even incur more debt for additional technical assistance loans? 14 P4R operations run the risk of perpetuating weak or inadequate mitigation systems. The absence of a requirement to ensure proper sequencing ensuring that capacity gaps are addressed before funding is provided for program activities that depend on adequate capacity constitutes a significant concern. These sequencing issues should be addressed as a condition of effectiveness at the start of the program. 15 Stakeholder consultation: P4R operations take a different approach to stakeholder consultations than is the case with IL. The Bank s safeguards require borrowers to consult affected groups and local NGOs early on about a project s environmental aspects and to take their views into account. Category A investment projects require both early and follow-on consultations. 16 In P4R operations, the Bank conducts program-level assessments and consults stakeholders on the findings (separating borrowers from this responsibility). The Bank s assessment is to include a review of a borrower s arrangements for stakeholder consultations, but no standards are contained in the P4R operational documents. 17 The Bank relies entirely on borrowers to perform project-level consultations, providing no requirements for these activities and no oversight. The lack of consultation standards for P4R supported actions that encompass mechanisms for the feedback of affected populations, which may involve considerable environmental and social impacts (Category B level), raises concerns. Transparency: P4R operations, by design, are sector and/or system-level interventions. P4R documentation primarily addresses actions that governments will undertake to address institutional capacity and implementation issues. However, a transparency gap exists at the level of program subprojects, where localized impacts are a primary concern for nearby stakeholders (see below). In addition, serious concerns regarding transparency of procurement processes within P4R operations have been raised How does P4R address social and environmental issues? How does this compare with safeguards for investment lending and other programs? P4R operations include three primary assessments as part of the Bank s appraisal of the borrower s program. The technical assessment describes the government program, its rationale and objectives, technical soundness, expenditure levels, and institutional capacity. The fiduciary systems assessment examines the program s financial management systems, internal controls, procurement system, 14 [I]n many cases, the bank will actively support capacity building through dedicated technical assistance activities, either integrated into the P4R operation or as a separate stand-alone IL. World Bank OPCS, A New Instrument, para The Extractive Industries Review indicated the importance of such sequencing for addressing risks in the context of extractive industries projects. See Striking a Better Balance: The World Bank Group and Extractive Industries: The Final Report of the EIR. World Bank Group Management Response (Sep. 17, 2004). 16 For Category A projects, borrowers must consult groups at least twice: after screening and before terms of reference for the EA are finalized, and once a draft EA is prepared. OP 4.01, para See BP 9.00, paras. 29(b), 30. Regarding indigenous peoples, the P4R procedure does include the Bank s free prior informed consultation standard. See BP 9.00, para. 29(j). 18 For example, see Transparency International s Input to the WB Consultation Process on the Draft P4R Operational Policy, Bank Procedures and Anticorruption Guidelines. 5

6 financial reporting and auditing to ascertain whether the arrangements provide reasonable assurance on appropriate use of funds and safeguarding of assets. Instead of relying on and adapting its existing E&S safeguard policies to assist in addressing risks related to activities funded through P4R operations, the Bank developed a separate approach to dealing with potential social and environmental impacts in P4R operations. Environmental and social systems are assessed using a third assessment the environmental and social systems assessment (ESSA). This assessment considers the degree to which the program s systems reflect a set of P4R-specific E&S principles (see Box 1). However, the principles do not reflect most Bank safeguards, nor do they contain minimum standards, policy triggers, and procedural requirements that make the safeguards risk management tools. As an example, Bank safeguard policies constitute about fifty pages of detailed policy, procedure and practices, the Use of Country Systems guidelines condense policy requirements to about five pages, while the P4R principles reduce this content further to some six sentences. This seems to be a case of over-simplification leading not to appropriate flexibility, but excessive discretion. BOX 1: Environmental and social principles for assessing P4R operations The E&S systems assessment considers, as may be applicable or relevant in a particular country, sector, or Program circumstances, the degree to which [the program s systems: [emphasis added] (a) promote environmental and social sustainability in the Program design; avoid, minimize, or mitigate adverse impacts, and promote informed decision-making relating to the Program s environmental and social impacts; (b) avoid, minimize, or mitigate adverse impacts on natural habitats and physical cultural resources resulting from the Program; (c) protect public and worker safety against the potential risks associated with: (i) construction and/or operations of facilities or other operational practices under the Program; (ii) exposure to toxic chemicals, hazardous wastes, and other dangerous materials under the Program; and (iii) reconstruction or rehabilitation of infrastructure located in areas prone to natural hazards; (d) manage land acquisition and loss of access to natural resources in a way that avoids or minimizes displacement, and assist the affected people in improving, or at the minimum restoring, their livelihoods and living standards; (e) give due consideration to the cultural appropriateness of, and equitable access to, Program benefits, giving special attention to the rights and interests of the Indigenous Peoples and to the needs or concerns of vulnerable groups; and (f) avoid exacerbating social conflict, especially in fragile states, post-conflict areas, or areas subject to territorial disputes. (OP 9.00, para. 8) The E&S systems assessment is to consider whether the Program institutions have the capacity to carry out adequate planning, decision making, execution, reporting, monitoring, and evaluation, auditing, and information disclosure under the Program [emphasis added] World Bank BP 9.00, para

7 Unlike application of safeguards to projects, P4R s E&S systems assessment is not aimed at ensuring compliance with minimum social and environmental standards before the operation commences. If significant gaps are identified in how the program s systems address the P4R E&S principles, Bank staff may (if deemed applicable or relevant ) 20 identify areas requiring institutional strengthening. These areas in turn may be included in the Program Action Plan, which selects, from each assessment, a limited set of key priority actions. 21 The assessment provides a reference for monitoring E&S performance. 22 P4R s approach also stands in sharp contrast to the Bank s pilot program on the use of country systems for environmental and social safeguards (OP 4.00). Under the country systems approach, the Bank undertakes rigorous, two-stage diagnostics (conducted by safeguard experts) to determine whether a borrower s systems meet Bank minimum safeguard standards and whether the borrower has the capacity and implementation track record. 23 Such extensive diagnostics have been sidelined under P4R, relying instead on more context-specific reviews and judgments of Bank task teams. Because the country systems approach and P4R overlap significantly in the types of activities funded through country system frameworks they both fund primarily activities that would be categorized as B or C if funded through direct investment lending, P4R appears to be replacing the more robust country systems approach. 24 The Bank implicitly acknowledges that P4R s more discretionary, judgment-based approach 25 to environmental and social risks is not appropriate for activities that may pose significant, irreversible impacts. Highest risk activities, such as large infrastructure, commercial logging, industrial processing facilities, etc., currently are excluded from P4R financing. 26 In addition, the Bank notes that even this exclusion cannot ensure that all potentially significant adverse impacts will be identified. 27 Given the lack of specific assessment standards for P4R operations, it also cannot be assured that all impacts in a subproject s area of influence (or the cumulative impact of multiple subprojects) will be addressed. The Bank therefore recommends (but does not require) task teams to conduct a supplementary E&S risk screening exercise in addition to a mandatory screening to exclude highest risk activities. 28 however, these and other inherent challenges to managing risks through program-level due diligence frameworks, 20 The assessment considers the degree to which the program systems address the P4R principles as may be applicable or relevant in a particular country, sector, or Program circumstances. OP 9.00, para The time boundedness of sequenced actions or relationship with DLI disbursements is not clarified. See World Bank, Operations Policy and Country Services, Program-For-Results Financing: Interim Guidance Notes to Staff on Assessments, Draft June 18, 2012, para. 9. See P4R website. 22 World Bank BP 9.00, para See the Bank s website on its Use of Country Systems. 24 In the 17 operations funded through country systems pilot, two were categorized as high risk A projects. 25 The ESSA uses a risk management approach, in which judgment is applied in assessing both management capacity and the significance of potential environmental and social effects. There are few empirical and reliable indicators by which to assess management capacity; application of judgment by the Bank is especially necessary in assessing their commitment of potential borrowers to implement new programs effectively, or to strengthen or broaden effectiveness of existing programs during the course of program implementation. Interim Guidelines, pp Activities that are judged to be likely to have significant adverse impacts that are sensitive, diverse, or unprecedented on the environment and/or affected people, and activities are not eligible for [P4R] financing and are excluded from the Program. OP 9.00, para. 9. Also, high-value procurement contracts are also excluded. 27 P4R Interim Guidelines, p P4R Interim Guidelines, pp

8 are not associated with more prescriptive mitigation requirements, despite the Bank s uneven track record in overseeing framework and system approaches. P4R operations involve a somewhat novel shift of responsibilities from borrower to the Bank. For investment projects, it is the borrower s responsibility to conduct assessments of environmental and social impacts, following Bank minimum requirements. For P4R operations, Bank task teams undertake the assessment of a borrower s environmental and social systems but leave borrowers responsible for assessing impacts associated with activities funded through these operations without following Bank minimum requirements. 29 In addition, the Bank assumes direct responsibility for consulting with stakeholders on its draft assessment (but not on the specific program activities per se). The Bank adopts a context-specific approach to consultations (no uniform protocol), following general guidelines. 30 In addition, the Bank is responsible for disclosing the draft and final E&S systems assessment, but allows the borrower to determine if the activity-level assessments will be disclosed. The program sub-project level disclosure mechanism is not clearly defined. 31 The assessment is also to include a review of grievance redress processes for Program activities. Grievance redress, as well as borrower disclosure and consultation processes, should be appropriate to the activities to be supported under the program. 32 The Bank argues that P4R operations will significantly enlarge its transparency footprint because disclosed program documentation will cover the entire government program, not just the Banksupported portion. 33 The P4R results framework, overall expenditures, and indicators will be disclosed. The Bank will also disclose the draft and final program-level ESSA in addition to a number of other regularly disclosed Bank documents: a Program Information Document, the Project Appraisal Document, Implementation Status and Results Reports, annual audit reports, and Implementation Completion Reports. However, a significant transparency gap concerns the issue of subprojects to be financed by the P4R program. The impacts on-the-ground are of primary concern to local program stakeholders. However, given the nature of such programmatic interventions, program documentation focuses on the system level, providing only general information on targeted geographic areas and types of activities to be supported in the future. Only one of the approved P4R operations to date specified site-specific interventions, albeit partially (see Box 2). While some P4R operations may have only broad, sector-wide effects (such as support for nation-wide health delivery system improvements), others will have site-specific impacts of which local stakeholders should be fully informed. These include operations supporting infrastructure development. Other potential subproject risks involve the distribution of benefits, avoidance of corruption and fair 29 The task team carries out the fiduciary and the environmental and social assessments in accordance with paragraphs 7 and 8 of OP BP 9.00, para P4R Interim Guidelines, Attachment BIC requests for subproject disclosure on Vietnam Water and Sanitation P4R through the Bank's Access to Information mechanisms typically referred back to the PAD. 32 World Bank BP 9.00, para World Bank, OPCS, A New Instrument, para

9 treatment of program beneficiaries. These risks related to ensuring achievement of positive program benefits require robust local disclosure of implementation plans, progress updates and results. Box 2: Approved Program-For-Results Operations (as of April ) US$m Subprojects identified? Morocco Uruguay Vietnam Ethiopia Uganda Nepal Tanzania Brazil National Human Development Initiative 300 Road Rehabilitation and Maintenance Program 66 Results-Based Rural Water Supply and Sanitation Under the National Target Program 200 Health MDG Support Operation 100 Support to Municipal Infrastructure Development Program 150 Bridges Improvement and Maintenance Program 60 Urban Local Government Strengthening Program 255 Child development and Water quality 350 Ceará State areas targeted (but not listed), sub-projects not specified in PAD or ESSA subprojects not listed in PAD or ESSA subprojects not listed in PAD and ESSA subprojects not listed in PAD and ESSA targeted municipalities identified, but not specific subprojects some (not all) bridges identified in PAD and ESSA targeted urban area identified, not specific subprojects Kenya National Safety Net 250 National Cash Transfer Program Punjab Governance Reforms Pakistan for Service Delivery 50 Punjab Province wide Strengthening borrower transparency and stakeholder engagement, an explicit P4R rationale, will depend on the degree to which the Bank fully assesses existing disclosure, consultation, and stakeholder participation rules and practices, and, if found deficient, insists on inclusion of institutional strengthening measures in the action plan. Sequencing of addressing potential gaps is critical: improvements should be a condition of effectiveness at the start of the program, otherwise stakeholders may continue to be excluded or be ill-informed regarding subprojects that directly affect their interests. 9

10 4. Will P4R be included in the WB Safeguard Policy Review? The Bank s safeguard policy review has to date excluded consideration of the P4R instrument despite the review s objective of developing a new integrated framework that will articulate how all Bank instruments can achieve better development outcomes. 34 The Bank s Approach Paper for the safeguards review does not explain its rationale for limiting the review only to application of safeguard policies for investment lending. The Bank should adopt the principle that comparable risks will be addressed with comparable levels of protection and due diligence, no matter the specific lending vehicle. The Bank will miss a critical opportunity to develop a fully integrated, comprehensive safeguards and sustainability framework if it does not consider, and solicit feedback on, how all core Bank lending instruments fit together. 5. Why P4R should be incorporated into the Bank s safeguard policy framework Bank Management s paper on the new instrument presents P4R as one of three core Bank lending vehicles. After the rollout phase, P4R operations are likely to expand significantly. P4R operations may include a wide range of activities that may have significant environmental and social impacts (such as road and bridge maintenance, local municipal infrastructure construction, water supply and sanitation infrastructure). Without consistent treatment of E&S risks across Bank lending instruments, several risks may arise. Borrowers and Bank staff are likely to forum shop for the least stringent standards, with one instrument undercutting the standards of another. In addition, different Bank instruments are likely to lead to divergent E&S outcomes, weakening the Bank s sustainability objectives. The Bank s evaluation department has argued for greater consistency across Bank instruments: it is vital to seek consistency among the approaches followed in these growing segments [DPLs, financial intermediaries, programmatic lending, and the new P4R instrument] of the portfolio to ensure coherence in environmental and social outcomes. 35 For reasons of effectiveness, efficiency, comprehensiveness, the Bank should open the safeguards review to include a discussion on how the new integrated framework will address all Bank lending instruments. The exclusion or postponement of consideration key Bank instruments significantly undermines the integrity of the review process. 6. Is it feasible to incorporate P4R in the Bank s future safeguard framework? Application of a revised Bank-wide safeguards framework to P4R operations does not present fundamental challenges. The Bank has a history of applying safeguards to program-level operations, including current application to Sector-Wide Approaches (SWaps), Community-Driven Development programs (CDD), Adaptable Program Loans (APLs) and other types of programmatic lending operations. Such operations typically employ safeguard frameworks (such as Environmental and Social Management Frameworks, ESMF) that specify the standards and procedures to be followed as subsequent program activities are defined and implemented. Bank lending through frameworks or borrower systems share 34 World Bank s Safeguard Policies Review Approach Paper, October 10, 2012, para Anis Dani, Ade Freeman, and Vinod Thomas, Evaluative Directions for the World Bank Group s Safeguards and Sustainability Policies, IEG Evaluation Brief 15, World Bank, 2011, p

11 many common parameters and provide a platform for including both under the safeguard policy review. In addition, the Bank s Forest Carbon Partnership Facility applies Bank safeguards to sector-wide forestry and institutional reform programs among partner countries (utilizing the Bank s Strategic Environmental and Social Assessment tool and ESMFs). The revised integrated safeguards policy should articulate clearly how such frameworks will apply consistently across all non-project lending instruments. It should be noted that other international financial institutions apply integrated safeguard frameworks. The Asian Development Bank applies its integrated Safeguard Policy Statement to all operations, including policy support and results-based reform programs. 36 The European Bank for Reconstruction and Development applies its Environmental and Social Policy (based largely on the IFC s 2006 Performance Standards) to all its financed operations. 37 There is no conceptual reason why P4R operations could not be integrated into a comprehensive safeguards framework. Waiting until after the Framework is designed would make this task much more difficult. 7. How should the Bank s treatment of P4R change? P4R operations are still in a rollout phase through calendar year The implementation track record for P4R operations is thin. In 2014 Bank management will conduct a review of the instrument and in 2015 the Bank s Independent Evaluation Group will evaluate P4R performance, both potentially yielding important insights on implementation, and in particular on management of E&S risks. This P4R review should explicitly consider how the new instrument's approach to safeguards relates to the safeguard review. The Bank should outline in detail how the results of the P4R and safeguard reviews will be coordinated to provide opportunities to discuss and consider how safeguards under P4R will be consistent with safeguards under other forms of Bank lending. As indicated in the BIC ESAM model policy proposal, 38 any decision to use of borrower systems by the Bank (whether though P4R or other instruments), should be guided by the principle that all similar risks should receive similar treatment. More objective and tangible screening requirements are needed for determining borrower eligibility to use P4R (and similar instruments). Such screening tools should consider both higher level governance criteria as well as more detailed and standardized analysis of the quality of the E/S management system. E/S risk management system capacity should be more precisely defined and explained prior to approval and during implementation, so as to better define baselines and benchmark progress. Category A activity exclusion should be maintained. ESSA should include predictable, transparent participatory consultation requirements, including mechanisms for sub-project disclosure. P4R PADs should provide a better explanation of how these analyses determine a single risk categorization that is consistent with IL. The overly discretionary nature of the Bank s risk assessment of P4R programs should be addressed through updated policy tools to inform professional judgment regarding the level of risk and the 36 This safeguard policy statement applies to all ADB-financed and/or ADB-administered sovereign and non-sovereign projects, and their components regardless of the source of financing, including investment projects funded by a loan; and/or grant; and/or other means, such as equity and/or guarantees (hereafter broadly referred to as projects). Asian Development Bank Safeguard Policy Statement, June 2009, p European Bank for Reconstruction and Development, Environmental and Social Policy (May 2008), para See BIC Safeguards page, ESAM model policy, Section IV d. 11

12 appropriate mitigation options. The Bank should apply more objective criteria 39 in assessing the governance and capacity dimensions of borrowers systems. Strategic Environmental and Social Assessments (SESAs) of programmatic interventions are already employed in Bank operations and should become a common feature of P4R operations along with better quality criteria for their effective use. P4R operations should be guided by appropriate environmental and social management systems or frameworks to guide borrower subproject selection and risk management approaches. Stakeholders must be appropriately informed and consulted regarding development and implementation of P4R subprojects. The Bank should ensure that assessments of subprojects are disclosed to affected stakeholders in a timely manner, in an accessible form and language. The Bank should also ensure that minimum consultation standards for subprojects are followed through random audits. 8. What needs to happen now? 1. No policy change in OP/BP 9.0 before results of IEG evaluation in FY As instruments that defer strict compliance with safeguard requirements to the implementation stage of the project cycle, the risks and opportunities implied by P4R are not yet known well. It is also crucial for the Bank to ensure that the review of the P4R rollout phase is inclusive and comprehensive. Bank management is to issue a report on implementation by late The Bank s IEG is to conduct an early review of the instrument by Bank management as well as the IEG should release draft terms of reference (TORs) and timetables for the separate reviews and solicit feedback from stakeholders before the reviews are final. The results of both reviews should be fully consulted in public before any decisions on revising OP 9.0 are taken. 2. Open the Safeguard Review to include all instruments and ensure portfolio wide risk management consistency. The noted risks for P4R are evident for a number of similar Bank instruments, such as programmatic framework lending, emergency lending and financial intermediary lending. The Bank lacks a single set of criteria for assessing the capacity of borrower frameworks, systems or related ways to delegate risk management responsibility, or to properly size, sequence and condition gap filling actions. Before embarking on piecemeal changes that introduce safeguard flexibility to different instruments through parallel processes, the Bank should open a discussion on P4R as part of the ongoing safeguards update process (slated to continue through 2015) to focus on the definition of these eligibility and capacity strengthening procedures for all higher risks safeguard instruments. Discussions with civil society stakeholders in countries with ongoing P4R operations could yield important insights. In addition, experts from other international financial institutions should be consulted on their experiences in applying an integrated safeguards framework to programmatic lending operations. 39 The Bank already develops a range of relevant indicators that could be utilized here, such as the Worldwide Governance Indicators and criteria from the Bank s Country Policy and Institutional Assessment (CPIA). 12

13 For More Information: For additional background information on the Program for Results, see For more information on the World Bank safeguard review process see To contact BIC staff about the P4R and safeguards, please write Vince McElhinny at or Josh Lichtenstein at 13

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region

Safeguard Policies: A Quick View Tbilisi. The World Bank Europe & Central Asia Region Safeguard Policies: A Quick View Tbilisi April 1-3, 1 2008 The World Bank Europe & Central Asia Region 1 Why do we have the World Bank Safeguard Policies? Do no harm: protect people and environment from

More information

World Bank Environmental. and Social Policy for Investment Project Financing

World Bank Environmental. and Social Policy for Investment Project Financing World Bank Environmental and Social Policy for Investment Project Financing Purpose 1. This Environmental and Social Policy for Investment Project Financing 1 sets out the mandatory requirements of the

More information

The World Bank and Road Infrastructure Investment. October 8, Chanin Manopiniwes World Bank

The World Bank and Road Infrastructure Investment. October 8, Chanin Manopiniwes World Bank The World Bank and Road Infrastructure Investment October 8, 2013 Chanin Manopiniwes World Bank Outline 1. The Project Cycle 2. Roles of the World Bank in Road Infrastructure 3. Program for Result (P4R)

More information

World Bank Safeguard Policies: An Overview

World Bank Safeguard Policies: An Overview Forest Carbon Partnership Facility World Bank Safeguard Policies: An Overview Victor Mosoti, Legal Department, World Bank Pan Africa Indigenous Peoples Dialogue Arusha, Tanzania April 19-24, 2012 Overview

More information

Program-for-Results Financing 1

Program-for-Results Financing 1 Operational Manual BP 9.00 - Program-for-Results Financing These procedures were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. BP 9.00 February, 2012

More information

DRAFT FOR CONSULTATION OCTOBER 7, 2014

DRAFT FOR CONSULTATION OCTOBER 7, 2014 DRAFT FOR CONSULTATION OCTOBER 7, 2014 Information Note 1: Environmental and Social Risk Classification The Board has requested the release of this document for consultation purposes to seek feedback on

More information

The World Bank Group s safeguards and sustainability policies were

The World Bank Group s safeguards and sustainability policies were Executive Summary The World Bank Group s safeguards and sustainability policies were put in place to prevent or mitigate adverse impacts of its projects on people and the environment. These goals remain

More information

Environmental and Social Directive for Investment Project Financing. Bank Access to Information Policy Designation Public

Environmental and Social Directive for Investment Project Financing. Bank Access to Information Policy Designation Public Bank Directive Environmental and Social Directive for Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-DIR.111 Issued October 3, 2018 Effective

More information

NGO Concerns on the Use of National Safeguard Systems in World Bank Projects

NGO Concerns on the Use of National Safeguard Systems in World Bank Projects NGO Concerns on the Use of National Safeguard Systems in World Bank Projects A Critique of the World Bank Paper, Issues in Using Country Systems in Bank Operations, August 23, 2004 By Peter Bosshard, Policy

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/06/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Earth is our Business

Earth is our Business Earth is our Business changing the rules of the game POLLY HIGGINS SHEPHEARD-WALWYN (PUBLISHERS) LTD 2012 Polly Higgins Some rights reserved. [license_3.0] This work is licensed under a Creative Commons

More information

A. Scenarios for P4R in World Bank Lending:

A. Scenarios for P4R in World Bank Lending: P4R Update: World Bank Approves Program for Results Policy 5% Cap over Two Year Pilot Period, but Questions Remain about how P4R Expansion will be Conditional upon Results of Management and IEG Evaluations

More information

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project Environmental Safeguard Monitoring Report Semi Annual Report July 2016 ADB Project Number: 48141-001 ADB Loan Number: 3210 FIJ: Transport Infrastructure Investment Sector Project Prepared by Fiji Roads

More information

Piloting Results-Based Lending for Programs. Asian Development Bank 2014

Piloting Results-Based Lending for Programs. Asian Development Bank 2014 Piloting Results-Based Lending for Programs Asian Development Bank 2014 Outline 1. Why RBL 2. Defining RBL 3. Defining and Assessing Programs 4. Questions 2 Supporting Development Effectiveness Measurable

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.110 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.110 Issued September 30, 2018 Effective October 1, 2018 Content Operational policy

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.109 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.109 Issued November 10, 2017 Effective November 10, 2017 Content Operational policy

More information

Environmental Assessment

Environmental Assessment OP 4.01 January 1999 These policies were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. Environmental Assessment (Archived August 2004) Note: OP and BP

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/15/2010 1. Basic Project Data Original

More information

OP Investment Project Financing. Bank Access to Information Policy Designation Public

OP Investment Project Financing. Bank Access to Information Policy Designation Public Bank Policy - Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPSVP5.03-POL.103 Issued Effective July 1, 2014 Last Revised On July 1, 2016 Retired July

More information

several other framework opt out provisions common approach jointly financed projects financial intermediaries

several other framework opt out provisions common approach jointly financed projects financial intermediaries Talking Points: Proposed World Bank Environmental and Social Policy (ESP) and Assessment and Management of Environmental and Social Risks and Impacts - ESS1 Bank Information Center (November 2014) Vince

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 02-Sep-2014

More information

Third Monitoring Report of IFC s Response to: CAO Audit of a Sample of IFC Investments in Third-Party Financial Intermediaries

Third Monitoring Report of IFC s Response to: CAO Audit of a Sample of IFC Investments in Third-Party Financial Intermediaries MONITORING REPORT CAO Audit of IFC CAO Compliance March 6, 2017 Third Monitoring Report of IFC s Response to: CAO Audit of a Sample of IFC Investments in Third-Party Financial Intermediaries Office of

More information

SECOND DRAFT FOR CONSULTATION JULY WORLD BANK. Environmental and Social Framework

SECOND DRAFT FOR CONSULTATION JULY WORLD BANK. Environmental and Social Framework WORLD BANK Environmental and Social Framework Setting Environmental and Social Standards for Investment Project Financing SECOND DRAFT FOR CONSULTATION THE CONTENT OF THE DRAFT IS FOR CONSULTATION PURPOSES

More information

Stephanie Fried March 2015 Adapted from article forthcoming in BankWatch, NGO Forum on ADB

Stephanie Fried March 2015 Adapted from article forthcoming in BankWatch, NGO Forum on ADB Lessons Learned? The Implications of the ADB s Review of Safeguard Policy Implementation for the World Bank and the Asian Infrastructure Investment Bank Stephanie Fried March 2015 Adapted from article

More information

Status: Lending Sector: Banking (100%) Theme: State enterprise/bank restructuring and privatization (P)

Status: Lending Sector: Banking (100%) Theme: State enterprise/bank restructuring and privatization (P) Section I - Basic Information Date ISDS Updated: 12/19/2003 A. Basic Project Data (from PDS) I.A.1. Project Statistics Country: NEPAL Integrated Safeguards Data Sheet (Negotiation Stage) Project ID: P084219

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 14-Jul-2014

More information

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108

Bank Policy. Investment Project Financing. Bank Access to Information Policy Designation Public. Catalogue Number OPS5.03-POL.108 Bank Policy Investment Project Financing Bank Access to Information Policy Designation Public Catalogue Number OPS5.03-POL.108 Issued August 18, 2017 Effective August 18, 2017 Retired November 9, 2017

More information

Table 1 the Road Network of Mozambique (in kilometers)

Table 1 the Road Network of Mozambique (in kilometers) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2867 Roads

More information

Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Case Studies in Indonesia

Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Case Studies in Indonesia Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Case Studies in Indonesia Phase 3 Consultation in Indonesia January 26-28, 2016 Objective Illustrate

More information

UPDATE. Financial Intermediary Lending and Environmental Assessment. Environmental Assessment

UPDATE. Financial Intermediary Lending and Environmental Assessment. Environmental Assessment Environmental Assessment S o u r c e b o o k UPDATE Environment Department June 2002 The World Bank Number 27 Financial Intermediary Lending and Environmental Assessment The World Bank supports economic

More information

FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS)

FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) OPERATIONS POLICY AND COUNTRY SERVICES APRIL 2, 2002 FIDUCIARY ARRANGEMENTS FOR SECTORWIDE APPROACHES (SWAPS) CONTENTS Page I. Introduction..1 II.

More information

Program-for-Results Financing

Program-for-Results Financing Program-for-Results Financing D E C E M B E R 2 0 1 1 the world bank What is Program-for-Results? In today s world, development is about results. Everyone government officials, parliamentarians, civil

More information

4. Forest Revenues. GFI Guidance Manual 182

4. Forest Revenues. GFI Guidance Manual 182 4. Forest Revenues This thematic area covers the entire spectrum of revenue management in the forest sector. Forests provide a major source of income in many countries. The forest revenue indicators are

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 24-Feb-2015

More information

International Finance Corporation s Policy on Social & Environmental Sustainability

International Finance Corporation s Policy on Social & Environmental Sustainability International Finance Corporation s Policy on Social & Environmental Sustainability Section 1: Purpose of this Policy 1. International Finance Corporation (IFC) strives for positive development outcomes

More information

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER

TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TURKEY ISTANBUL MUNICIPAL INFRASTRUCTURE PROJECT (RESTRUCTURING) PROJECT PAPER Responsible

More information

Analysis of the Second Draft of the Proposed World Bank Environmental and Social Framework. Briefing Paper THE NETHERLANDS

Analysis of the Second Draft of the Proposed World Bank Environmental and Social Framework. Briefing Paper THE NETHERLANDS Analysis of the Second Draft of the Proposed World Bank Environmental and Social Framework Briefing Paper THE NETHERLANDS 21 September 2015 Advisory Report by the Dutch Sustainability Unit Subject: Analysis

More information

The World Bank s Safeguard Policies Under Pressure

The World Bank s Safeguard Policies Under Pressure The World Bank s Safeguard Policies Under Pressure A Critique of the World Bank s New Middle Income Country Strategy Peter Bosshard, Policy Director, International Rivers Network May 17, 2004 Introduction

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/26/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 11/15/2005 INTEGRATED SAFEGUARDS DATASHEET

More information

SAFEGUARD AND SUSTAINABILITY POLICIES IN A CHANGING WORLD: AN INDEPENDENT EVALUATION OF WORLD BANK GROUP EXPERIENCE

SAFEGUARD AND SUSTAINABILITY POLICIES IN A CHANGING WORLD: AN INDEPENDENT EVALUATION OF WORLD BANK GROUP EXPERIENCE SAFEGUARD AND SUSTAINABILITY POLICIES IN A CHANGING WORLD: AN INDEPENDENT EVALUATION OF WORLD BANK GROUP EXPERIENCE WBG-CSO Forum October 7, 2010 1. Objective and Methodology First comprehensive evaluation

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name. Wenchuan Earthquake Recovery Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4291 Project Name Wenchuan

More information

ESS1. Assessment and Management of Environmental and Social Risks and Impacts

ESS1. Assessment and Management of Environmental and Social Risks and Impacts ESS1. Assessment and Management of Environmental and Social Risks and Impacts DRAFT FOR CONSULTATION OCTOBER 7, 2014 The Board has authorized the release of this document for consultation purposes to seek

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 16-Mar-2012

More information

Dear Motoko, Stephen, Charles, Colin and members of the World Bank Safeguard Review Team

Dear Motoko, Stephen, Charles, Colin and members of the World Bank Safeguard Review Team 30 April 2013 Dear Motoko, Stephen, Charles, Colin and members of the World Bank Safeguard Review Team The Bank Information Center is pleased to submit our proposal for a policy on environment and social

More information

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS1 Assessment and Management of Environmental and Social Risks and Impacts

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS1 Assessment and Management of Environmental and Social Risks and Impacts The Guidance Notes provide guidance for the Borrower on the application of the Environmental and Social Standards (ESSs), which form part of the World Bank s 2016 Environmental and Social Framework. The

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/10/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

Interpretation Note on Environmental and Social Categorization

Interpretation Note on Environmental and Social Categorization Introduction IN1. This Interpretation Note (IN) explains IFC s approach to environmental and social (E&S) categorization of proposed investments, and becomes effective on. IN1 This IN also contrasts the

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section F1/BP Page 1 of 3 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ENVIRONMENTAL

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2649. Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2649. Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 06/26/2009 I. BASIC INFORMATION A. Basic Project Data Country:

More information

Procurement. OP January 2011 Page 1 of 10. Revised July 1, 2014

Procurement. OP January 2011 Page 1 of 10. Revised July 1, 2014 Page 1 of 10 "OP/BP11:00 "Procurement, were revised on July 2014 to take into account the recommendations in " World Bank Group A New Approach to Country Engagement" (R2014-0089), which were approved by

More information

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS)

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project

More information

6 Report No.: JSDSC1361 1

6 Report No.: JSDSC1361 1 Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE 6 Report No.: JSDSC1361 1,2 Date ISDS Prepared/Updated: 05-Nov-2015 Date ISDS Approved/Disclosed: 06-Nov-2015 Public Disclosure

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING

More information

MEMO Independent Assessment of IDB s Background Information for the FCPF Common Approach to Environmental and Social Safeguards

MEMO Independent Assessment of IDB s Background Information for the FCPF Common Approach to Environmental and Social Safeguards MEMO Independent Assessment of IDB s Background Information for the FCPF Common Approach to Environmental and Social Safeguards To: FCPF Task Force (TF) on a Common Approach to Environmental and Social

More information

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 13-Jan-2014 INTEGRATED SAFEGUARDS DATA SHEET ADDITIONAL FINANCING

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/15/2005 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE te: This ISDS will be considered effective only upon approval of the project restructuring Date ISDS Prepared/Updated:

More information

b) if the sub-project is in the Annex B list of this Operational Manual;

b) if the sub-project is in the Annex B list of this Operational Manual; Environmental Review Procedures 1. Background The Environmental Category of the project is FI, since Ziraat Bank (as an FI) will on-lend the World Bank funds to private commercial banks and leasing companies

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

IBRD: ($m.) support the development of municipal infrastructure to provide quality local services.

IBRD: ($m.) support the development of municipal infrastructure to provide quality local services. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I Basic Information Date ISDS Prepared/Updated:

More information

Actual Project Name : Mn - Sustainable Livelihoods Country: Mongolia US$M): Project Costs (US$M

Actual Project Name : Mn - Sustainable Livelihoods Country: Mongolia US$M): Project Costs (US$M IEG ICR Review Independent Evaluation Group 1. Project Data: Date Posted : 10/29/2008 Report Number : ICRR12989 PROJ ID : P067770 Appraisal Actual Project Name : Mn - Sustainable Project Costs (US$M US$M):

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. Energy and Extractive Industries Transparency and Accountability

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. Energy and Extractive Industries Transparency and Accountability INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: March 12, 2015 I. BASIC INFORMATION A. Basic Project Data Country: Project Name: Task Team Leader: Estimated Date of Approval:

More information

I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1

I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1 Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE 36184 Report No.: AB219 I Proiect Name I TRANSPORT SECTOR SUPPORT PROJECT 1 Public Disclosure Authorized Public Disclosure

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic

More information

The Effectiveness of World Bank Support for Community-Based and -Driven Development

The Effectiveness of World Bank Support for Community-Based and -Driven Development The Effectiveness of World Bank Support for Community-Based and -Driven Development Background Paper Safeguard Policy Review Peter Whitford Kavita Mathur Director-General, Independent Evaluation: Vinod

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2486. Date ISDS Prepared/Updated: 09/18/2006 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2486. Date ISDS Prepared/Updated: 09/18/2006 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 09/18/2006 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247. Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 11/28/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3247 Country: Madagascar Project ID: P104049 Project Name:

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 22-Apr-2015 Report No.: ISDSC8904 Date ISDS Approved/Disclosed: 27-Apr-2015 Public Disclosure Authorized

More information

1. Key development issues and rationale for Bank involvement

1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DRAFT PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5278 Project Name

More information

IFC Response to Third Monitoring Report of IFC s Response to: CAO Audit of a Sample of IFC Investments in Third-Party Financial Intermediaries

IFC Response to Third Monitoring Report of IFC s Response to: CAO Audit of a Sample of IFC Investments in Third-Party Financial Intermediaries March 9, 2017 IFC Response to Third Monitoring Report of IFC s Response to: CAO Audit of a Sample of IFC Investments in Third-Party Financial Intermediaries IFC would like to thank CAO for the monitoring

More information

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Date: February 16 and 17, 2016 Location (City, Country): Dar es Salaam, Tanzania Audience: Government

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 09-Dec-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

FEDERAL REPUBLIC OF NIGERIA STATES FISCAL TRANSPARENCY, ACCOUNTABILITY AND SUSTAINABILITY (SFTAS) PROGRAM-FOR-RESULTS (PforR) P162009

FEDERAL REPUBLIC OF NIGERIA STATES FISCAL TRANSPARENCY, ACCOUNTABILITY AND SUSTAINABILITY (SFTAS) PROGRAM-FOR-RESULTS (PforR) P162009 Public Disclosure Authorized FEDERAL REPUBLIC OF NIGERIA Public Disclosure Authorized STATES FISCAL TRANSPARENCY, ACCOUNTABILITY AND SUSTAINABILITY (SFTAS) PROGRAM-FOR-RESULTS (PforR) P162009 Public Disclosure

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social Welfare and Development Reform Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4283 PH-Social

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

Report No.: ISDSA13781

Report No.: ISDSA13781 Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 03-Aug-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Date ISDS Approved/Disclosed: 06-Aug-2015 Report No.: ISDSA13781 Public Disclosure

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

2015 Development Policy Financing Retrospective: Preliminary Findings

2015 Development Policy Financing Retrospective: Preliminary Findings 2015 Development Policy Financing Retrospective: Preliminary Findings Purpose of this Consultation Meeting on the DPF Retrospective The 2015 Retrospective will focus on the Bank s experience with Development

More information

Tanzania Health Sector Development APL II Region

Tanzania Health Sector Development APL II Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5049 Project Name Tanzania Health Sector Development APL II Region Africa Sector Health (80%), Non-compulsory health finance (10%), Central

More information

IIC Environmental and Social Guidance Document

IIC Environmental and Social Guidance Document IIC Environmental and Social Guidance Document Acronyms and Abbreviations DFI DIAS E & S EIA ESDD ESIA ESAP ESMP ESMS FI IIC IDB IFC ILO ISO PS SME TA XASR Development Finance Institution Development

More information

Initial Modalities for the Operation of the Fund s Mitigation and Adaptation Windows and its Private Sector Facility

Initial Modalities for the Operation of the Fund s Mitigation and Adaptation Windows and its Private Sector Facility Initial Modalities for the Operation of the Fund s Mitigation and Adaptation Windows and its Private Sector Facility GCF/B.07/08 12 May 2014 Meeting of the Board 18-21 May 2014 Songdo, Republic of Korea

More information

Proposed Tanzania Second Local Government Support Project (LGSP 2) Terms of Reference

Proposed Tanzania Second Local Government Support Project (LGSP 2) Terms of Reference Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Proposed Tanzania Second Local Government Support Project (LGSP 2) Terms of Reference

More information

Environmental and Social Management System Arrangement. Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project

Environmental and Social Management System Arrangement. Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project Environmental and Social Management System Arrangement February 2017 Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project Prepared by Sampath Bank PLC for the Asian Development Bank. The

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 18-Sep-2013

More information

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY

Project Name KIAT GURU: KINERJA DAN AKUNTABILITAS GURU - IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC56822

More information

NIIFL E&S Management Policy. NIIF Group. Strategic Fund

NIIFL E&S Management Policy. NIIF Group. Strategic Fund NIIFL E&S Management Policy National Investment and Infrastructure Fund Limited ( NIIFL ), an institution anchored by the Government of India, will act as the investment manager to alternative funds set

More information

Programmatic approach to funding proposals

Programmatic approach to funding proposals Meeting of the Board 28 30 June 2016 Songdo, Incheon, Republic of Korea Provisional agenda Item 12(g) GCF/B.13/18 20 June 2016 Programmatic approach to funding proposals Summary This document builds on

More information

Report No.: ISDSA13978

Report No.: ISDSA13978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o Date ISDS Prepared/Updated: 29-Jul-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 26-Jun-2014

More information

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS)

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Concept Stage Date ISDS Prepared/Updated:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated: 02-Jun-2016 Report : PIDISDSC17616 Public Disclosure Authorized Public Disclosure Authorized

More information

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection Technical Assistance Report Project Number: 47042-001 Policy and Advisory Technical Assistance (PATA) October 2013 People s Republic of China: Promotion of a Legal Framework for Financial Consumer Protection

More information

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) 1. Sector Performance, Problems, and Opportunities National Disaster Risk Management Fund (RRP PAK 50316) SECTOR ASSESSMENT (SUMMARY): FINANCE (DISASTER RISK MANAGEMENT) A. Sector Road Map 1. Sector Performance, Problems, and Opportunities a. Performance

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Jan-2013