MARINE WARRANTY A Surveyors View Of Today s Challenges And The Way Forward. Alex Harrison (Director LOC Australia)

Size: px
Start display at page:

Download "MARINE WARRANTY A Surveyors View Of Today s Challenges And The Way Forward. Alex Harrison (Director LOC Australia)"

Transcription

1 MARINE WARRANTY A Surveyors View Of Today s Challenges And The Way Forward Alex Harrison (Director LOC Australia)

2 Presentation Content LOC Company Profile Up-date Project Risk Drivers In The Current Market Resulting Issues Faced By The MWS Actions Being Taken By LOC Recommendations For Further Actions By All Key Messages. Q & A.

3 LOC COMPANY PROFILE UP-DATE

4 LOC Company Profile Over 30 years experience in Marine Warranty Surveying. Provided warranty services to all of the major offshore operators and contractors, in all parts of the world. Appointed as Marine Warranty surveyor on 800+ major marine projects worldwide, some 220+ of which have been performed in the Asia Pacific region. Have performed Marine Warranty on projects insured by all the main Underwriters. Member of the Marine Warranty Advisory Panel to the JRC (Joint Rig Committee) in London. Co authors of the JRC code of practice and generic scopes for Warranty Surveyors.

5 LOC Company Profile LOC s first office was established in London in Since then 19 other offices have been opened to service the worlds shipping and resources centres including in the Asia Pacific region LOC Singapore (1987), LOC Australia, in Perth (1988), and most recently LOC Hong Kong(2010) along with 4 other offices across Thailand and China Aberdeen Stavanger Halifax LONDON San Francisco Tampico Houston Florida Abu Dhabi Dubai Qatar Tianjin Qingdao Shanghai Hong Kong Lagos Singapore Laem Chabang Rio de Janeiro Perth

6 LOC Company Profile LOC currently has circa 220 full-time staff and some 60 contract staff worldwide from the following disciplines:- Master Mariners Marine and Offshore Engineers Subsea and Pipelines Engineers Structural Engineers Civil Engineers Naval Architects Engineering Marine Expertise

7 MAJOR PROJECT RISK DRIVERS IN THE CURRENT MARKET

8 Major Project Risk Drivers In The Current Market The marine environment will always be the largest risk factor with any operation at sea. Over time most of the traditional risk factors associated with this environment for more standard marine operations have become well understood and quantified through experience. However, in the current Market there are some new key risk drivers that have evolved and lead to some less quantifiable but equally serious risks. These include; Shortage of Marine Qualified Personnel on Projects Increasingly Shorter Project Schedules Increasingly Tighter Project Budgets Shortage of Vessels and Equipment Local Content Requirements Materials and Equipment Quality and Traceability

9 Major Project Risk Drivers In The Current Market 1) Shortage of Marine Qualified Personnel on Projects: This is a problem that has increased significantly over the last 5 years. The causes are as follows:- Ignorance of management of the benefits of inclusion of marine expertise within project teams ( Why do we need this, our installation contractor will have this expertise won t they? ). Ignorance of the range of different marine disciplines and the benefits that each can or can t offer. Scarceness of resource Or perception there of Diminishing numbers of personnel from the more traditional sources and a reluctance to train and use less familiar sources The ex-pat mentality Insufficient training opportunities for the generation of new resource.

10 Major Project Risk Drivers In The Current Market Shortage of Marine Qualified Personnel on Projects (continued) This resource shortage has the impacts, all of which have significant potential risk implications; Assured and their contractors are under resourced in respect to marine expertise and thus are unable to adequately review and assess marine associated risks. Cornerstone project philosophy decisions (Particularly at early stages in the project) thus being made without suitable marine technical input leading to higher risk projects. Critical design and procedure writing, and similarly physical site works, being performed or supervised by insufficiently experienced, or in some cases unsuitably qualified, personnel. Overworking of those who are suitably qualified or experienced. Over reliance on external 3 rd parties such as MWS, Class and IVB s to provide technical review assurance.

11 Major Project Risk Drivers In The Current Market 2) Increasingly Shorter Project Schedules: Project schedules are becoming tighter all the time. On many projects this has led to engineering phases (Pre-FEED, FEED and detailed design) which should be performed in series now being performed in parallel or even removed completely. This in turn leads to a lack of the proper level of engineering and procedural checking in the design phase, thus reducing reliability of design and in turn increasing risk. Additionally we have seen a constant pressure to reduce site operational schedules which invariably causes a pushing of the boundaries of safe environmental limits for design of the operations

12 Major Project Risk Drivers In The Current Market 3) Increasingly Tighter Project Budgets: There has over the years been a gradual shift of emphasis in the make up of Operator and Contractor project teams with a trend towards more commercial and planning weighted teams and away from a marine and engineering bias. In parallel there has continued to be a significant shift in what is considered as a successful project strategy. A reduction of costs at all cost is often seen as a major project objective particularly on smaller under financed projects. This want to constantly reduce cost is a key driver in the incorrect selection of contractors, equipment and operation methodologies with the cheapest cost option often chosen irrespective of technical review and advice. The cheapest option is never the best technical alternative and as such will nearly always increase the risk of incident on a project and often the overall cost of completion.

13 Major Project Risk Drivers In The Current Market Increasingly Tighter Project Budgets (Continued): Other impacts that aggressive project budgets are having include:- Constant push to minimise project team numbers with non commercial contractual disciplines the first to go. Cutting back of 3 rd party involvement in technical verification and assurance roles including MWS. Insufficient or no funding for non-safety related industry training and mentoring of personnel within the project budgets.

14 Major Project Risk Drivers In The Current Market 4) Shortage of Vessels and Equipment: Despite a large amount of new building over recent years demand has outstripped availability and has led to a Make do and mend mentality in the industry. Key impacts have included; Contracting of equipment of vessels of marginal or insufficient capability. Retrofitting of non standard equipment on vessels to fulfil project requirements. Insufficient maintenance of equipment or vessels due to lack of time between projects often driven by LD s. Last minute vessel substitutions due to delays on previous projects Increase in use of new or untried vessels due to un-availability of existing fleet

15 Major Project Risk Drivers In The Current Market 5) Local Content Requirements: Increasingly the various Nation states, government departments or unions within the countries in which the predominance of project developments are occurring are insisting on elevated levels of Local Content within the project, including the use of local personnel, local contractors, locally hired equipment or Unionised personnel.. These Policies invariably lead to increased levels of inexperienced personnel being appointed on the projects by way of local quota systems. They also often lead to equipment that has predominantly been used in local markets, and which may not be maintained or managed to recognised International offshore standards, being proposed for the works. Particularly in new parochial markets we commonly see the We have always done it like this round here attitude which may not be in alignment with global Industry expectations.

16 Major Project Risk Drivers In The Current Market 6) Materials and Equipment Traceability: Increased project activity has led to unprecedented demand for the materials and equipment required for marine based project work. The projects are demanding delivery of these at low cost and on short schedules. The sourcing of these materials has thus been spread thin and diversified to less traditional routes. The level of quality and quality control of the supporting documentation for these materials and equipment has in turn been seen to diminish rapidly. Often equipment is being presented without suitable traceability or documentation and a trend of failures is being reported, often when utilised well below their reported capacities.

17 RESULTING ISSUES FACED BY THE MWS

18 Resulting Issues Faced By The MWS The following are some of the areas of difficulty that we increasingly face on Marine Warranty Projects and which are linked to the previously identified increased project risk areas; Late engagement of the MWS. Lack of MWS interface experience on the projects. Lack of Marine expertise on project teams. Late receipt and poor quality of project documentation Late vessel changes Insufficient notice of attendance requirement Budgets incompatible with expected MWS Scope

19 Resulting Issues Faced by LOC as MWS 1) Late Engagement of MWS Oh Hello!, Yes I wonder whether you can help? We need to organise a Marine Warranty Surveyor for an offshore Project our first operation is this coming Monday do you have anyone available to attend? Causes Lack of MWS interface experience on the projects. Late placing of Insurance or definition of scope Accelerated Project schedule A want to minimise MWS involvement /Impact Lack of understanding of MWS requirements Effects Rushed contracting process (badly prepared MWS contracts) Main equipment and contractor contracts already placed vessels already on charter. Design criteria and specifications already set between Insured and contractors Limited time for in-depth review & audits

20 Resulting Issues Faced by LOC as MWS 2) Lack of MWS Interface Experience on projects Traditionally the MWS would be used to dealing with senior client technical managers or assurance managers for the administration of their contracts. Increasingly this is changing to parties with less experience of MWS. Causes Lack of personnel in the industry Decrease in project team sizes More commercial project team bias. Local content requirements on projects Undervaluing of MWS role on project Effects Badly prepared MWS contracts Misinterpretation by project of MWS roles or scopes Poor interface management for supply of deliverables to MWS Poor notifications of up-coming attendances

21 Resulting Issues Faced by LOC as MWS 3) Lack of Marine Expertise on Project Teams. Operator and Contractor Project teams are becoming smaller all the time, with more focus on contractual and commercial planning and less marine and engineering bias. Causes Ignorance as to benefit of Marine Qualified personnel on the project Decrease in project team sizes More commercial project team bias. Local content requirements on projects undervaluing of need for Marine Input Effects Need for increased management of marine Issues by MWS Badly engineered procedures from marine perspective Insured over reliance on contractor advice which may be commercially bias Site teams not experienced in operation to be performed Lack of Understanding of MWS marine related recommendations

22 Resulting Issues Faced by LOC as MWS 4) Late Receipt and Poor Quality of Project Documentation The trend over recent years has been for a decreasing quality and increasingly later submission of project documentation to the MWS for Review Causes Lack of MWS interface experience Project schedules too short Decrease in project team sizes insufficient resources to perform the work Lack of required expertise Deliberate delay by contractors to minimise client & MWS review and document revision cycle Effects Increased reliance on MWS for detailed engineering review. Need for more revisions of documentation Delays in operations commencement Burden on MWS to work for extended hours under pressure not to delay operations Poor engineering details potentially missed by all parties

23 Resulting Issues Faced by LOC as MWS 5) Late Vessel Changes Causes Previous project overrun Vessel breakdowns due to lack of maintenance Poor planning with respect to charter and on-hire dates Cargo fabrication Delays Effects Additional vessel surveys required at short notice Replacement vessel often not to same specification as original vessel Approved procedures not in line with new replacement vessel

24 Resulting Issues Faced by LOC as MWS 6) Insufficient Notice of Attendance Oh! we forgot to tell you, but the plan has changed, can you get a man to Timbuktu this afternoon please? Causes Lack of MWS interface experience on the projects. Constant schedules compression Past response performance MWS notification considered as low priority Efforts to remove MWS attendance Effects Can lead to poorly briefed surveyors. Pressure to perform pre-operation checks too quickly on arrival to avoid delays. Potential operations delay waiting for MWS approval site conflicts Makes manpower management difficult.

25 Resulting Issues Faced by LOC as MWS 7) Budgets Incompatible with Expected MWS Scope Topsides Weight : 4,000t Value: $200m+ MWS Scope: Loadout, Sailaway, offshore installation lift Manifold Weight : 100t Value: $10m MWS Scope: Loadout, Sailaway, offshore installation lift

26 Resulting Issues Faced by LOC as MWS Activity Topsides Manifold Review of Loadout procedures & Engineering Review of Transportation procedures and engineering Review of installation procedures and engineering Survey Transportation Barge Survey Tow Vessel Survey Installation Vessel Attend and approve Loadout Attend and approve seafastening and sailaway Attend and approve Installation lift offshore

27 Resulting Issues Faced by LOC as MWS Budgets Incompatible with Expected MWS Scope It is thus important to recognize the following when Considering MWS Budgets:- The number of activities to be performed by the MWS for small value projects may be similar to that for large value projects particularly if the number of permanent materials to be installed is similar. Therefore the activity cost may be similar for both types of project and may not be proportional to the value of the permanent materials in question. Indeed in cases where the smaller value project involves more weather sensitive or novel installation methodologies that require greater review or are more susceptible to delays due to weather etc.. the smaller value project can in fact attract a higher MWS cost.

28 Resulting Issues Faced by LOC as MWS Effects of Restrictive MWS Budgets Leads to restrictive hours budget for the performance of documentation review. Limits the amount of marine expertise support that the MWS can provide the project in parallel with the MWS duties. Leads to a tendency for assureds to limit MWS attendance scope where possible to reduce costs. Causes difficulty with variations when project schedules overrun or there are major scope changes. In turn Leads to MWS having to attend operations to complete a scope and to protect Insurers interests despite large outstanding invoices and without guarantee of payment. Creates downward pressure on MWS rates which are already low (Typically 25-30% lower than equivalent Class Society or engineering contractor rates requiring a similar level of expertise).

29 ACTIONS BEING TAKEN BY LOC

30 Actions Being Taken By LOC Continued increase in personnel over last year despite recessionary pressures. Increasing global coverage of offices to improve experienced local representation and minimise mobilisation costs to projects. (3 further offices opened in last 12 months). Instigating Graduate Training programmes to improve long term experienced resource supply. Opening a greater level of dialog with brokers and underwriters where allowed under contract. Engaging in education presentations to clients and contractors as to MWS role and requirements and the benefits of our involvement at project front end and during the project. Undertaking regular group MWS forums to share lessons learned, discuss major technical issues and industry trends and to ensure consistency worldwide. Continuing to Not approve operations where minimum MWS requirements are not met (despite commercial impact!) or insufficient time has been given.

31 RECOMMENDATIONS FOR FURTHER ACTIONS FOR ALL

32 Recommendations For Further Actions For All Underwriters to consider whether they require evidence of intended minimum project manning levels and disciplines (Particularly Marine expertise) as part of policy requirements and whether more detailed interrogation of project schedules would be beneficial. Investigate implementation of an educational program for Insureds as to the roles, responsibilities and benefits of the MWS Perhaps a presentation by an MWS to the key project parties during the Insurance placement process. The need for early engagement of MWS is to be further emphasised to Insured during policy negotiation so MWS is appointed prior to selection and contracting of essential equipment or vessels and can comment on project marine philosophies and expected design criteria. If this can not be done and the policy is being placed after project commencement, then it is recommended that Underwriters engage an independent party to perform a technical risk review on the project philosophy and selected contractors and equipment prior to placement.

33 Recommendations For Further Actions For All It needs to be further emphasised to Insured as to need for procedures to be provided for review in timely fashion and for MWS to be given adequate notice of operations requiring attendance. Consideration of breach if failure to do so. More feedback required from Underwriters to MWS such as:- supply of data on claims profiles so MWS is aware of what types of operations are proving to be higher risk and can thus focus accordingly In the event of an incident that MWS is advised of cause and nature of damages - (Important for Lessons Learned). Consider a program for Brokers/ Underwriters to spend some time in-house with warranty surveying companies in order to obtain a better appreciation of the issues they face on a day to day basis and the lengths they go to protect their interests.

34 Recommendations For Further Actions For All Scope of work to be well defined, agreed with Underwriters and MWS has been provided with a copy. (MWS is asked to comment on adequacy of the scope). Requirement should be made for a meeting to take place with the assured, the MWS, lead underwriter & brokers prior to commencement of project to agree;- a) Final MWS Scope, b) Clear reporting and communication lines, c) Mechanism is in place for monitoring MWS costs against budget and for approving variations in scope and cost promptly.

35 KEY MESSAGES

36 Key Messages MWS s do make a difference. Indeed having an independent, technically qualified party involved in a project is more important than ever for the protection of Insurance Interests particularly in the current market where; Both Client and Contractor project teams are constantly getting smaller thus have reduced capacity for review and management of contractor & their procedures. Both Client and Contractor project teams are becoming more commercially Bias and do not have the same level of Marine or engineering expertise. There is currently a large cost cutting mentality in the industry. There is constant schedule acceleration being imposed. Underwriters should strongly consider paying specific scrutiny on achievability of project schedule and the assureds proposed project team Make-up to ensure that sufficient technical and marine expertise is included to be able to effectively manage and co-ordinate the project in question.

37 Key Messages MWS s, always want to prevent all incidents if possible. However, it must be recognised that a Warranty Surveyor can only reduce not eliminate risk!. This is sometimes forgotten. The projects themselves need to take more responsibility in identifying and mitigating marine risks. The amount by which the MWS can effect risk reduction is directly related to the level of support given to them by the assured. This is in turn directly affected by having suitably experienced or briefed MWS interface points within the project team and a project team that understands the role and the benefits of an MWS. One of the main times that this support can be given is at the start-up of the project through; Early Appointment of the MWS Clear scope definitions agreed formally by all parties Contracts that allow open communication with Underwriters MWS budgets that are consummate with the expected level of approvals

38 Key Messages Thereafter during the projects the following are key to effective MWS Services being provided; Continued open communication between all parties particularly in respect of changes in scope. Early delivery of project documentation for review. Early notification of attendance requirements. A program of educational placements and presentations would be beneficial for all parties including Assured, Underwriters, Broker, Contractor & MWS in order to expand knowledge and understanding of the roles and responsibilities of the other parties. This should be performed in the preliminary stages of new projects. Feedback to all parties is essential. For the MWS one of the main sources of feedback needs to be in respect to claims that have occurred on theirs, as well as all other, projects in order that the lessons learned can be implemented into future projects.

39 ANY QUESTIONS?

Construction Risks. US Construction Practice

Construction Risks. US Construction Practice US Construction Practice Willis' US Construction Practice provides innovative products and delivers risk management services through its specialist building services teams, addressing the unique needs

More information

The basics of verification. Richard Nott Lloyd s Register EMEA

The basics of verification. Richard Nott Lloyd s Register EMEA The basics of verification Richard Nott Lloyd s Register EMEA Introductions Richard Nott Manager, Compliance and Engineering Services Lloyd s Register EMEA Agenda The Offshore Installation (Safety Case)

More information

MARINE SALVAGE: REINFORCING POLLUTION DEFENCE IN EU WATERS

MARINE SALVAGE: REINFORCING POLLUTION DEFENCE IN EU WATERS MARINE SALVAGE: REINFORCING POLLUTION DEFENCE IN EU WATERS INTRODUCTION 1. This paper has been prepared by the International Salvage Union (ISU), an association of companies engaged in marine salvage.

More information

PREQIN INVESTOR OUTLOOK: REAL ESTATE H1 2017

PREQIN INVESTOR OUTLOOK: REAL ESTATE H1 2017 PREQIN INVESTOR OUTLOOK: REAL ESTATE H1 2017 alternative assets. intelligent data. INVESTOR APPETITE REMAINS STRONG Institutional investors have continued to see strong returns from their real estate portfolios,

More information

WHY CHOOSE HFW? GENEVA

WHY CHOOSE HFW? GENEVA WHY CHOOSE HFW? GENEVA HFW IS COMMITTED TO SUPPORTING THE SHIPPING, TRADING, CORPORATE, COMMERCIAL, BANKING AND FINANCE SECTORS IN SWITZERLAND AND INTERNATIONALLY HFW is unique as a sector focused international

More information

RISK MANAGEMENT RISK MANAGEMENT. Our risk monitoring structure

RISK MANAGEMENT RISK MANAGEMENT. Our risk monitoring structure RISK MANAGEMENT Willow Point discharging logs in Shanghai The purpose of risk management is to ensure that management understands the risks the Group is exposed to and acts to mitigate these risks where

More information

Insurance Act Shaking up a century of insurance law. Extract from Clyde & Co s in depth report on the Insurance Act

Insurance Act Shaking up a century of insurance law. Extract from Clyde & Co s in depth report on the Insurance Act Insurance Act 2015 Shaking up a century of insurance law Extract from Clyde & Co s in depth report on the Insurance Act We are a matter of weeks away from the UK's Insurance Act 2015 finally coming into

More information

Basel II Briefing: Pillar 2 Preparations. Considerations on Pillar 2 for Subsidiary Banks

Basel II Briefing: Pillar 2 Preparations. Considerations on Pillar 2 for Subsidiary Banks Basel II Briefing: Pillar 2 Preparations Considerations on Pillar 2 for Subsidiary Banks November 2006 Preamble Those studying this document should be aware that because of the nature of the technical

More information

CHANAKA KUMARASINGHE PARTNER, HFW. Offshore Contract Performance and Termination

CHANAKA KUMARASINGHE PARTNER, HFW. Offshore Contract Performance and Termination CHANAKA KUMARASINGHE PARTNER, HFW Offshore Contract Performance and Termination Asian Offshore Support Journal Conference 8 9 September 2015 Singapore Contract Performance Continuing with the Contract

More information

1Q2012 Results Briefing Analyst & Investor Update 22 February 2012

1Q2012 Results Briefing Analyst & Investor Update 22 February 2012 1Q2012 Results Briefing Analyst & Investor Update 22 February 2012 Disclaimer This Investor Presentation has been prepared by Mermaid Maritime Plc for investors, solely for information purposes. The views

More information

Classification Based on Performance Criteria Determined from Risk Assessment Methodology

Classification Based on Performance Criteria Determined from Risk Assessment Methodology OFFSHORE SERVICE SPECIFICATION DNV-OSS-121 Classification Based on Performance Criteria Determined from Risk Assessment Methodology OCTOBER 2008 This document has been amended since the main revision (October

More information

Principal risks and uncertainties

Principal risks and uncertainties Principal risks and uncertainties Strategic report Principal risks are a risk or a combination of risks that, given the Group s current position, could seriously affect the performance, future prospects

More information

Work and Pensions Select Committee Inquiry into governance and best practice in workplace pension provision

Work and Pensions Select Committee Inquiry into governance and best practice in workplace pension provision Work and Pensions Select Committee Inquiry into governance and best practice in workplace pension provision Introduction 1. With the advent of automatic enrolment, questions of governance and best practice

More information

Contract Management in Offshore & Marine, EPCIC and Shipyard

Contract Management in Offshore & Marine, EPCIC and Shipyard An Intensive 5 Day Training Course Contract Management in Offshore & Marine, EPCIC and Shipyard 18-22 Nov 2018, Dubai 28 Apr - 02 May 2019, Dubai 17-21 Nov 2019, Dubai 18-JUL-18 This course is Designed,

More information

Somewhere in Time - Securing and Protecting your Contractual Rights

Somewhere in Time - Securing and Protecting your Contractual Rights Howard KLEIN, United Kingdom Keywords: Ascertaining Delays, Delay Costs, Notice, Provisions, Extension of Time, Records, Construction Economics. SUMMARY Time is money and this is no less the case on construction

More information

AIA Acorns of Asia Fund

AIA Acorns of Asia Fund AIA Acorns of Asia Fund (the ILP Sub-Fund ) Fund Summary (IFPS) Prepared on March 2018 AIA ACORNS OF ASIA FUND (the ILP Sub-Fund ) FUND FACTS Manager of ILP Sub-Fund AIA Investment Management Private Limited

More information

Mr. Hans Hoogervorst Chairman International Accounting Standards Board 30 Cannon Street London EC4M 6XH United Kingdom.

Mr. Hans Hoogervorst Chairman International Accounting Standards Board 30 Cannon Street London EC4M 6XH United Kingdom. Mr. Hans Hoogervorst Chairman International Accounting Standards Board 30 Cannon Street London EC4M 6XH United Kingdom 19 September 2013 Lease Exposure Draft ED/2013/6 Comments on the Exposure Draft Dear

More information

Brookfield Asset Management Inc.

Brookfield Asset Management Inc. Brookfield Asset Management Inc. A GLOBAL ALTERNATIVE ASSET MANAGEMENT COMPANY Focused on Real Estate, Infrastructure, Power and Private Equity BROOKFIELD TIMBERLANDS TIMBER INVEST EUROPE 2012 MANAGER

More information

AIA Regional Equity Fund (the ILP Sub-Fund )

AIA Regional Equity Fund (the ILP Sub-Fund ) AIA Regional Equity Fund (the ILP Sub-Fund ) Fund Summary (IFPS) Prepared on March 2018 FUND FACTS Manager of ILP Sub-Fund FIL Investment Management (Singapore) Limited Underlying Fund Fidelity Funds -

More information

Financial Interest Cover

Financial Interest Cover Financial Interest Cover This document aims to provide interested readers with an overview of key considerations regarding the provision of financial interest cover. 1 Table of Contents 1. Background...

More information

Independent auditors report to the members of Savills plc

Independent auditors report to the members of Savills plc to the members of Savills plc Report on the financial statements Our opinion In our opinion: Savills plc s Group financial statements and Company financial statements (the financial statements ) give a

More information

CASUALTY INSURANCE ACE OFFSHORE INSURANCE FOR CONTRACTORS AND SUPPLIERS TO THE OFFSHORE OIL & GAS INDUSTRY

CASUALTY INSURANCE ACE OFFSHORE INSURANCE FOR CONTRACTORS AND SUPPLIERS TO THE OFFSHORE OIL & GAS INDUSTRY CASUALTY INSURANCE ACE OFFSHORE INSURANCE FOR CONTRACTORS AND SUPPLIERS TO THE OFFSHORE OIL & GAS INDUSTRY The offshore oil and gas industry might be mature but it remains dynamic, offering fresh opportunities

More information

Welcome to the TT Club

Welcome to the TT Club Welcome to the TT Club Welcome to the TT Club We d like to thank you for insuring your business with us. We are confident we can provide the service and expertise you require. This pack has been developed

More information

INSURANCE: Bermuda Issues Guidance Notes

INSURANCE: Bermuda Issues Guidance Notes INSURANCE: Bermuda Issues Guidance Notes David J. Doyle, Partner, July 2005 In 2003 the International Monetary Fund ("IMF") performed an in-depth on-site review of Bermuda's financial services legislation

More information

China A-shares and Global Indices. Adapting the Benchmark for International Market Participants

China A-shares and Global Indices. Adapting the Benchmark for International Market Participants China A-shares and Global Indices Adapting the Benchmark for International Market Participants Page 1 Overview China equities represent an important part of the global equity investment landscape Based

More information

GUIDELINE ON OUTSOURCING

GUIDELINE ON OUTSOURCING GL14 GUIDELINE ON OUTSOURCING Insurance Authority Contents Page 1. Introduction..... 1 2. Application of this Guideline........ 1 3. Interpretation... 2 4. Legal and Regulatory Obligations.. 3 5. Essential

More information

The Maritime and Coastguard Agency s response to growth in the UK merchant fleet

The Maritime and Coastguard Agency s response to growth in the UK merchant fleet The Maritime and Coastguard Agency s response to growth in the UK merchant fleet LONDON: The Stationery Office 14.35 Ordered by the House of Commons to be printed on 9 February 2009 REPORT BY THE COMPTROLLER

More information

New Standard Offshore P&I rules

New Standard Offshore P&I rules New Standard Offshore P&I rules BARBARA JENNINGS DIRECTOR, OFFSHORE +44 20 7522 7429 barbara.jennings@ctcplc.com At renewal this year we introduced modernised and simplified P&I and defence rules; these

More information

Just a few good reasons why

Just a few good reasons why Admiralty Solicitors Group LONDON ARBITRATION Just a few good reasons why 1. Familiarity within the international maritime community 2. Certainty and commerciality 3. Confidentiality 4. Enforcement of

More information

Submission on the Exposure Draft Tax Laws Amendment (2013 Measures No. 2) Bill 2013: Investment Manager Regime ( IMR 3 )

Submission on the Exposure Draft Tax Laws Amendment (2013 Measures No. 2) Bill 2013: Investment Manager Regime ( IMR 3 ) Manager International Tax Base Unit Corporate and International Tax Division The Treasury Langton Crescent Parkes ACT 2600 AUSTRALIA By email to: investmentmanager@treasury.gov.au Dear Sirs, 26 April 2013

More information

Lessons learned on business in Brazil

Lessons learned on business in Brazil UK ENERGY IN BRAZIL - Mission Briefing March 2013 Lessons learned on business in Brazil Ian Wilkinson Petrolink Serviços Ltda Ian Wilkinson - Profile 28 years in the oil and gas industry 15 of them in

More information

The Standard Club An introduction to P&I. Anna Doumeni Senior Claims Executive

The Standard Club An introduction to P&I. Anna Doumeni Senior Claims Executive The Standard Club An introduction to P&I Anna Doumeni Senior Claims Executive Agenda 01 Introduction to the Standard Club 02 What is P&I 03 Claims Statistics 04 Loss Prevention 05 P&I Claims handling 06

More information

GLOBAL ENTERPRISE SURVEY REPORT 2009 PROVIDING A UNIQUE PICTURE OF THE OPPORTUNITIES AND CHALLENGES FACING BUSINESSES ACROSS THE GLOBE

GLOBAL ENTERPRISE SURVEY REPORT 2009 PROVIDING A UNIQUE PICTURE OF THE OPPORTUNITIES AND CHALLENGES FACING BUSINESSES ACROSS THE GLOBE GLOBAL ENTERPRISE SURVEY REPORT 2009 PROVIDING A UNIQUE PICTURE OF THE OPPORTUNITIES AND CHALLENGES FACING BUSINESSES ACROSS THE GLOBE WELCOME TO THE 2009 GLOBAL ENTERPRISE SURVEY REPORT The ICAEW annual

More information

FAIRSTAR HEAVY TRANSPORT NV BOARD OF DIRECTORS REPORT FIRST HALF YEAR OF 2010

FAIRSTAR HEAVY TRANSPORT NV BOARD OF DIRECTORS REPORT FIRST HALF YEAR OF 2010 FAIRSTAR HEAVY TRANSPORT NV BOARD OF DIRECTORS REPORT FIRST HALF YEAR OF 2010 FAIRSTAR AWARDED USD 90M TRANSPORTATION CONTRACT FOR GORGON LNG PROJECT FAIRSTAR INITIATES FLEET EXPANSION STRATEGY WITH SUCCESSFUL

More information

Invitation to eahsn.org. Eastern Academic Health Science Network Finance Function Date of issue: 4 September 2017

Invitation to eahsn.org. Eastern Academic Health Science Network Finance Function Date of issue: 4 September 2017 Invitation to Tender Eastern Academic Health Science Network Finance Function Date of issue: 4 September 2017 eahsn.org @TheEAHSN About the Eastern Academic Health Science Network Galvanising people to

More information

BEGINNERS GUIDE TO YOUR GUIDE TO CREDIT INSURANCE

BEGINNERS GUIDE TO YOUR GUIDE TO CREDIT INSURANCE BEGINNERS GUIDE TO YOUR GUIDE TO CREDIT INSURANCE CONTENTS Chapter 1 The Basics 2 What is Credit Insurance? Why is Credit Insurance so Important? Who is Credit Insurance Suitable For? Chapter 2 Benefits

More information

Finance Committee. Inquiry into methods of funding capital investment projects. Submission from PPP Forum

Finance Committee. Inquiry into methods of funding capital investment projects. Submission from PPP Forum About Finance Committee Inquiry into methods of funding capital investment projects Submission from Established in 2001, the is an industry body representing over 110 private sector companies involved

More information

The Renminbi: Why + How = Now

The Renminbi: Why + How = Now Excerpt from Insights 2013 The Renminbi: Why + How = Now Sridhar Kanthadai, Regional Head of Transaction Banking, North Asia Michael Vrontamitis, Regional Head of Product Management, Transaction Banking,

More information

MEASURING PERFORMANCE. Member and Broker Survey 2013 UKDC IS MANAGED BY THOMAS MILLER

MEASURING PERFORMANCE. Member and Broker Survey 2013 UKDC IS MANAGED BY THOMAS MILLER MEASURING PERFORMANCE Member and Broker Survey 2013 UKDC IS MANAGED BY THOMAS MILLER CONTENTS Background 1 Overall satisfaction 2 How is UKDC perceived 4 Likes and dislikes and comparison with other clubs

More information

WHY CHOOSE HFW? GENEVA

WHY CHOOSE HFW? GENEVA WHY CHOOSE HFW? GENEVA HFW IS COMMITTED TO SUPPORTING THE SHIPPING, TRADING, CORPORATE, COMMERCIAL, BANKING AND FINANCE SECTORS IN SWITZERLAND AND INTERNATIONALLY HFW is a sector focused international

More information

Helping Asset Management Firms in Hong Kong Face Regulatory and Operational Challenges

Helping Asset Management Firms in Hong Kong Face Regulatory and Operational Challenges www.pwchk.com Helping Asset Management Firms in Hong Kong Face Regulatory and Operational Challenges Regulatory Advisory Services February 2012 Introduction While the economy has shown signs of improvement,

More information

Your claims. advocate

Your claims. advocate Your claims advocate Why is a strong claims team important? An insurance broker should not only be measured on their ability to secure a competitive premium and the right level of cover, but their capacity

More information

INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS

INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS Guidance Paper No. 2.2.x INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS GUIDANCE PAPER ON ENTERPRISE RISK MANAGEMENT FOR CAPITAL ADEQUACY AND SOLVENCY PURPOSES DRAFT, MARCH 2008 This document was prepared

More information

Agenda. CGGVeritas - Overview. Sercel & Services Detail. H Update. Outlook and Perspectives

Agenda. CGGVeritas - Overview. Sercel & Services Detail. H Update. Outlook and Perspectives Agenda CGGVeritas - Overview Sercel & Services Detail H1 2009 Update Outlook and Perspectives 2 CGGVeritas: A Full Range of Activities H1 2009 Sales: $1.6bn; EBITDAs: $0.5bn Equipment Services Sercel Marine

More information

INTERNATIONAL MARINE CLAIMS CONFERENCE 2017

INTERNATIONAL MARINE CLAIMS CONFERENCE 2017 SHIPPING INTERNATIONAL MARINE CLAIMS CONFERENCE 2017 WORKSHOP 3: SAME WORDS, DIFFERENT GEOGRAPHY 29 SEPTEMBER 2017 AGENDA 1. Introduction 2. Background of three regimes 3. Introducing the scenario A. Pre-contractual

More information

Issuer: ASL Marine Holdings Ltd. Security: ASL Marine Holdings Ltd.

Issuer: ASL Marine Holdings Ltd. Security: ASL Marine Holdings Ltd. Issuer: ASL Marine Holdings Ltd. Security: ASL Marine Holdings Ltd. Meeting details: Date: 31 October 2018 Time: 2.00 p.m. Venue: 19 Pandan Road, Singapore 609271 Company Description ASL Marine Holdings

More information

GUIDANCE NOTE ASSET MANAGEMENT BY AUTHORIZED INSURERS

GUIDANCE NOTE ASSET MANAGEMENT BY AUTHORIZED INSURERS GN13 GUIDANCE NOTE ON ASSET MANAGEMENT BY AUTHORIZED INSURERS Office of the Commissioner of Insurance June 2004 GN13 Guidance Note on Asset Management By Authorized Insurers Table of Contents Page Preamble...

More information

Delay in Start Up Insurance Understanding & Controlling Risk

Delay in Start Up Insurance Understanding & Controlling Risk Delay in Start Up Insurance Understanding & Controlling Risk Marine & Energy Insurance Conference Houston Monday September 17, 2018 Main Principles of DSU DSU is purchased by the Project Owner not the

More information

A focus on innovation

A focus on innovation Introduction Bibby Line Group started out as a family-run shipping business. It was founded in 1807 and since that time the company has grown to become a global business. It has also diversified into new

More information

TECHNICAL GUIDE A GUIDE TO FINANCING ENERGY MANAGEMENT

TECHNICAL GUIDE A GUIDE TO FINANCING ENERGY MANAGEMENT TECHNICAL GUIDE A GUIDE TO FINANCING ENERGY MANAGEMENT Table of Contents 1. Introduction 1 2. What is Energy Management Financing? 2 3. Barriers to Investing in Energy Management 3 1. Initial Costs 3 2.

More information

2017 EXECUTIVE SUMMARY

2017 EXECUTIVE SUMMARY EXECUTIVE SUMMARY 2 www.macdonaldandcompany.com/salary-surveys Introduction The tenth edition of the annual Macdonald & Company Middle East Rewards and Attitudes Survey is the most comprehensive survey

More information

General Standards. Introduction. Independence

General Standards. Introduction. Independence Chapter3 Introduction 3.01 This chapter establishes general standards and provides guidance for performing financial audits, attestation engagements, and performance audits under generally accepted government

More information

THE ADOPTION OF ACCRUAL ACCOUNTING AND BUDGETING BY GOVERNMENTS (CENTRAL, FEDERAL, REGIONAL AND LOCAL)

THE ADOPTION OF ACCRUAL ACCOUNTING AND BUDGETING BY GOVERNMENTS (CENTRAL, FEDERAL, REGIONAL AND LOCAL) THE ADOPTION OF ACCRUAL ACCOUNTING AND BUDGETING BY GOVERNMENTS (CENTRAL, FEDERAL, REGIONAL AND LOCAL) Fédération des Experts Comptables Européens July 2003 1. Introduction 1.1. There is an increasing

More information

The Navigators Group, Inc.

The Navigators Group, Inc. The Navigators Group, Inc. Willis 2012 Latin American Energy Conference The Underwriting of Construction Project Risks in the Latin American Energy/Power Generation Sector Stephen Coward President Navigators

More information

WILLIS AUSTRALIA LIMITED FINANCIAL SERVICES GUIDE

WILLIS AUSTRALIA LIMITED FINANCIAL SERVICES GUIDE www.willis.com.au WILLIS AUSTRALIA LIMITED FINANCIAL SERVICES GUIDE (Incorporating the Willis Client Engagement Guide) Willis Australia Limited - ABN 90 000 321 237 AFS Licence No - 240600 Date of issue

More information

The Scope and Nature of Occupational Health and Safety

The Scope and Nature of Occupational Health and Safety Element 1: Foundations in Health and Safety The Scope and Nature of Occupational Health and Safety The study of health and safety involves the study of many different subjects including the sciences (chemistry,

More information

NATIONAL INSURANCE BROKERS ASSOCIATION OF AUSTRALIA (NIBA) SUBMISSION TO THE AUSTRALIAN GOVERNMENT

NATIONAL INSURANCE BROKERS ASSOCIATION OF AUSTRALIA (NIBA) SUBMISSION TO THE AUSTRALIAN GOVERNMENT NATIONAL INSURANCE BROKERS ASSOCIATION OF AUSTRALIA (NIBA) SUBMISSION TO THE AUSTRALIAN GOVERNMENT TREASURY CONSULTATION PAPER ON PARLIAMENTARY JOINT COMMITTEE ON CORPORATIONS AND FINANCIAL SERVICES INQUIRY

More information

Motor Vehicle Claim Form

Motor Vehicle Claim Form MOTOR VEHICLE Allianz Australia Insurance Limited CLAIM FORM McKenna Hampton Pty Ltd "Kandahar House" Level 1, 41-43 Ord Street West Perth WA 6005 Motor Vehicle Claim Form PO Box 204, West Perth WA 6872

More information

Solving for Fixed Income

Solving for Fixed Income MARKET INSIGHTS Solving for Fixed Income Using Market Insights to achieve better outcomes Q4 2016 SINCE 2004, J.P. MORGAN HAS PRODUCED MARKET INSIGHTS TO HELP INDIVIDUAL INVESTORS UNDERSTAND AND MAKE THEIR

More information

NEW ZEALAND SOCIETY OF ACTUARIES PROFESSIONAL STANDARD NO. 31 NON-LIFE INSURERS - FINANCIAL CONDITION REPORT MANDATORY STATUS

NEW ZEALAND SOCIETY OF ACTUARIES PROFESSIONAL STANDARD NO. 31 NON-LIFE INSURERS - FINANCIAL CONDITION REPORT MANDATORY STATUS NEW ZEALAND SOCIETY OF ACTUARIES PROFESSIONAL STANDARD NO. 31 NON-LIFE INSURERS - FINANCIAL CONDITION REPORT MANDATORY STATUS EFFECTIVE DATE: 1 JANUARY 2013 INDEX 1 INTRODUCTION 2 1.1 Application 2 1.2

More information

ACQUIRING A UK PUBLIC COMPANY

ACQUIRING A UK PUBLIC COMPANY ACQUIRING A UK PUBLIC COMPANY Introduction With few governmental restrictions on foreign ownership, takeovers of UK listed companies by international bidders are comparatively common. Indeed, the regulatory

More information

MSM IS AN ADVOCATE FOR PROJECT OWNERS AND FINANCIERS IN THE EVENT OF A CRISIS CAUSING DELAY AND INCREASED COSTS

MSM IS AN ADVOCATE FOR PROJECT OWNERS AND FINANCIERS IN THE EVENT OF A CRISIS CAUSING DELAY AND INCREASED COSTS AUSTRALIA AND ASIA PACIFIC S PREFERRED PROVIDER OF PRE LOSS, CLAIM PREPARATION AND LITIGATION AND DISPUTE SUPPORT SERVICES TO MAJOR PROJECTS AND THE CONSTRUCTION INDUSTRY MSM loss management MSM loss management

More information

Implementing the Construction Supply Chain Payment Charter. January Guidance Note

Implementing the Construction Supply Chain Payment Charter. January Guidance Note Implementing the Construction Supply Chain Payment Charter January 2017 Guidance Note Contents Introduction 3 Implementing the Payment Charter 3 Commitments 3 1. We will make correct full payment as and

More information

Loss Prevention through Risk Management

Loss Prevention through Risk Management Loss Prevention through Risk Management Tang Sau Weng 8 Sept 2011 Agenda > Introductions > Present market conditions > Loss Prevention > Damages survey > Conclusions CSL - Global Services RISK CONTROL

More information

Establishing a Private Investment Fund Management Platform in Hong Kong

Establishing a Private Investment Fund Management Platform in Hong Kong SYNOPSIS SERIES Establishing a Private Investment Management Platform in Hong Kong Hong Kong is widely recognised as a leading fund center in Asia. Hong Kong offers the fund industry a developed and stable

More information

QBE Asia P&I. Providing Fixed Premium P&I for the Region

QBE Asia P&I. Providing Fixed Premium P&I for the Region QBE Asia P&I Providing Fixed Premium P&I for the Region Introducing QBE Asia P&I QBE Asia P&I is a collaboration between QBE Asia and British Marine, providing P&I insurance to small and medium sized commercially

More information

Continuous Disclosure

Continuous Disclosure ASX 200 Roundtable Summary Paper 2012 Continuous Disclosure ASX 200 Supporting Partner The Australian Institute of Company Directors hosted a series of roundtable events in November 2012 supported by the

More information

Risk Management User Guide. Prepared By: Neville Turbit Version Feb /01/2009 Risk Management User Guide Page 1 of 36

Risk Management User Guide. Prepared By: Neville Turbit Version Feb /01/2009 Risk Management User Guide Page 1 of 36 Risk Management User Guide Prepared By: Neville Turbit Version 1.0 1 Feb 09 22/01/2009 Risk Management User Guide Page 1 of 36 Table of Contents Document Origin...2 Change History...2 Risk Guidelines...

More information

MACQUARIE UNIT TRUST SERIES REPORTS AND FINANCIAL STATEMENTS FOR THE YEAR ENDED 30 JUNE 2014

MACQUARIE UNIT TRUST SERIES REPORTS AND FINANCIAL STATEMENTS FOR THE YEAR ENDED 30 JUNE 2014 REPORTS AND FINANCIAL STATEMENTS FOR THE YEAR ENDED 30 JUNE 2014 Investments in the Macquarie Unit Trust Series are not deposits with or liabilities of Macquarie Bank Limited ABN 46 008 583 542 ( Macquarie

More information

Structure of Mining, Petroleum and Major Hazard Facilities Safety Legislation

Structure of Mining, Petroleum and Major Hazard Facilities Safety Legislation CONSULTATION PAPER NOVEMBER 2014 Structure of Mining, Petroleum and Major Hazard Facilities Safety Legislation Consultation Regulation Impact Statement prepared for the TABLE OF CONTENTS Page Summary...

More information

IROHS010. Submission to the. Independent Review of Occupational Health and Safety Compliance and Enforcement in Victoria

IROHS010. Submission to the. Independent Review of Occupational Health and Safety Compliance and Enforcement in Victoria IROHS010 Submission to the Independent Review of Occupational Health and Safety Compliance and Enforcement in Victoria 1 August 2016 ABOUT THE HOUSING INDUSTRY ASSOCIATION...3 1. INTRODUCTION...4 2. RESPONSE

More information

FINANCING THE FUTURE

FINANCING THE FUTURE FINANCING THE FUTURE A report on student awareness of the impact of poor money management while at university Introduction Managing money can be one of the biggest challenges students face at university.

More information

INVESTING IN HUMAN PROGRESS 10 OVER 10 DIVIDEND. INVESTMENT STRATEGY by Dr. Ian Mortimer and Matthew Page, CFA Fund Co-managers

INVESTING IN HUMAN PROGRESS 10 OVER 10 DIVIDEND. INVESTMENT STRATEGY by Dr. Ian Mortimer and Matthew Page, CFA Fund Co-managers INVESTING IN HUMAN PROGRESS 10 OVER 10 DIVIDEND TM INVESTMENT STRATEGY by Dr. Ian Mortimer and Matthew Page, CFA Fund Co-managers TM I N V E S T M E N T R E S E A R C H S E R I E S 1. I N T R O D U C T

More information

THIRD PARTY ADMINISTRATION (TPA) EXPERTISE MARITIME CLAIMS SERVICES OVERVIEW CONSTRUCTION CLAIMS GENERAL LIABILITY

THIRD PARTY ADMINISTRATION (TPA) EXPERTISE MARITIME CLAIMS SERVICES OVERVIEW CONSTRUCTION CLAIMS GENERAL LIABILITY THIRD PARTY ADMINISTRATION (TPA) EXPERTISE MARITIME CLAIMS CONSTRUCTION CLAIMS GENERAL LIABILITY SERVICES OVERVIEW WELCOME TO CONDON CLAIMS MANAGEMENT We believe that the success of your insurance program

More information

INTERNATIONAL GROUP GUIDELINES FOR INSERTION OF SALVOR CONTRACTS IN US VRPS (NOT WRECK REMOVAL)

INTERNATIONAL GROUP GUIDELINES FOR INSERTION OF SALVOR CONTRACTS IN US VRPS (NOT WRECK REMOVAL) Annex 1 INTERNATIONAL GROUP GUIDELINES FOR INSERTION OF SALVOR CONTRACTS IN US VRPS (NOT WRECK REMOVAL) 1. Owner s Representative The Owner shall have a right to appoint a representative to attend the

More information

ACCREDITATION OF BEE VERIFICATION AGENCIES

ACCREDITATION OF BEE VERIFICATION AGENCIES ACCREDITATION OF BEE VERIFICATION AGENCIES Approved By: Chief Executive Officer: Ron Josias Senior Manager: Christinah Leballo Date of Approval: 2013-02-28 Date of Implementation: 2013-02-28 SANAS Page

More information

S P E C I A L I S T A D M I N I S T R A T I O N L O N G - T E R M C O M M I T M E N T. I n f r a s t r u c t u r e F u n d S e r v i c e s

S P E C I A L I S T A D M I N I S T R A T I O N L O N G - T E R M C O M M I T M E N T. I n f r a s t r u c t u r e F u n d S e r v i c e s S P E C I A L I S T A D M I N I S T R A T I O N L O N G - T E R M C O M M I T M E N T I n f r a s t r u c t u r e F u n d S e r v i c e s C O M P R E H E N S I V E A N D C U S T O M I S E D Overseeing

More information

AIA REGIONAL FIXED INCOME FUND. (the ILP Sub-Fund ) Low to Medium Risk Narrowly Focused Country Singapore 1

AIA REGIONAL FIXED INCOME FUND. (the ILP Sub-Fund ) Low to Medium Risk Narrowly Focused Country Singapore 1 AIA Regional Fixed Income Fund (the ILP Sub-Fund ) Fund Summary (IFPS) Prepared on March 2018 AIA REGIONAL FIXED INCOME FUND (the ILP Sub-Fund ) FUND FACTS Manager of ILP Sub-Fund AIA Investment Management

More information

Proposal Form Professional Indemnity Insurance (Architect & Engineers)

Proposal Form Professional Indemnity Insurance (Architect & Engineers) AXA INSURANCE PTE LTD 8 Shenton Way, #24-01 AXA Tower Singapore 068811 Customer Service Centre #B1-01 (65)6338 7288 (65) 6338 2522 www.axa.com.sg Co. Reg No. 199903512M Proposal Form Professional Indemnity

More information

What Happens After the Deal Closes? Representations and Warranties Insurance Global Claims Study ASIA-PACIFIC EDITION

What Happens After the Deal Closes? Representations and Warranties Insurance Global Claims Study ASIA-PACIFIC EDITION What Happens After the Deal Closes? Representations and Warranties Insurance Global Claims Study ASIA-PACIFIC EDITION Foreword The development of Warranty and Indemnity insurance ( W&I, also known as Representations

More information

COLUMBIA VARIABLE PORTFOLIO EMERGING MARKETS FUND

COLUMBIA VARIABLE PORTFOLIO EMERGING MARKETS FUND PROSPECTUS May 1, 2018 COLUMBIA VARIABLE PORTFOLIO EMERGING MARKETS FUND The Fund may offer Class 1, Class 2 and Class 3 shares to separate accounts funding variable annuity contracts and variable life

More information

A New Frontier Amendments to the Listing Rules, Prospectus Rules and Disclosure and Transparency Rules

A New Frontier Amendments to the Listing Rules, Prospectus Rules and Disclosure and Transparency Rules A New Frontier Amendments to the Listing Rules, Prospectus Rules and Disclosure and Transparency Rules Feedback on FSA Consultation Paper 12/2 as set out in FSA Consultation Paper 12/25 October 2012 1

More information

Employers pension consultation obligations

Employers pension consultation obligations Financial institutions Energy Infrastructure, mining and commodities Transport Technology and innovation Life sciences and healthcare Employers pension consultation obligations Briefing December 2017 Introduction

More information

Actuarial Transformation The Future Actuary

Actuarial Transformation The Future Actuary Actuarial Transformation The Future Actuary Prepared by: Rick Shaw Kaise Stephan Presented to the Actuaries Institute General Insurance Seminar Sydney This paper has been prepared for the Actuaries Institute

More information

Report on cooperation challenges faced by the Court with respect to financial investigations. Workshop October 2015, The Hague, Netherlands

Report on cooperation challenges faced by the Court with respect to financial investigations. Workshop October 2015, The Hague, Netherlands Report on cooperation challenges faced by the Court with respect to financial investigations Workshop 26-27 October 2015, The Hague, Netherlands Forward-looking conclusions Strengthening financial investigations

More information

Templeton Emerging Markets Smaller Companies Fund

Templeton Emerging Markets Smaller Companies Fund Franklin Templeton Investment Funds Templeton Emerging Markets Smaller Companies Fund Core Value Fund Profile Fund Details Inception Date 18 October 2007 Investment Style Benchmark(s) Core Value MSCI Emerging

More information

Regulatory Capital. Allen & Overy Briefing Paper No. 8 The Trading Book. CS indd 3 8/5/09 10:57:02

Regulatory Capital. Allen & Overy Briefing Paper No. 8 The Trading Book. CS indd 3 8/5/09 10:57:02 Regulatory Capital Allen & Overy Briefing Paper No. 8 The Trading Book CS807185.indd 3 8/5/09 10:57:02 Untitled-2 1 12/3/09 14:23:14 THE TRADING BOOK This briefing paper is part of a series of briefings

More information

The Institute of Chartered Shipbrokers Column Our word our bond : Professionalism and ethics in shipping. (How to avoid losing your pound of flesh )

The Institute of Chartered Shipbrokers Column Our word our bond : Professionalism and ethics in shipping. (How to avoid losing your pound of flesh ) The Institute of Chartered Shipbrokers Column Our word our bond : Professionalism and ethics in shipping. (How to avoid losing your pound of flesh ) John Wilson What is professionalism? On the main website

More information

STATEMENT OF AUDITING STANDARDS 421 AUDITING FAIR VALUE MEASUREMENTS AND DISCLOSURES

STATEMENT OF AUDITING STANDARDS 421 AUDITING FAIR VALUE MEASUREMENTS AND DISCLOSURES SAS SAS 421 (February 421 (June 05) 03) STATEMENT OF AUDITING STANDARDS 421 AUDITING FAIR VALUE MEASUREMENTS AND DISCLOSURES (Effective for audits of financial statements for periods beginning before 15

More information

Enterprise Risk Management process at Dragon Oil

Enterprise Risk Management process at Dragon Oil Enterprise Risk Management Risk Management Process Dragon Oil s business is potentially exposed to different risks. However, some business risks can be accepted by the Group provided that acceptance of

More information

DEVELOPING ASIAN CAPITAL MARKETS

DEVELOPING ASIAN CAPITAL MARKETS The EU Benchmarks Regulation Co-authored by ASIFMA and Herbert Smith Freehills December 2017 DEVELOPING ASIAN CAPITAL MARKETS 1 EXECUTIVE SUMMARY This paper provides a high level summary for non-eu benchmark

More information

Significant tax changes: UK implications for captive insurers

Significant tax changes: UK implications for captive insurers Tax Services Significant tax changes: UK implications for captive insurers Executive summary This alert sets out how recent developments in the global tax environment may impact UK-connected groups with

More information

RISK FACTORS RISKS RELATING TO OUR GROUP

RISK FACTORS RISKS RELATING TO OUR GROUP Potential investors should consider carefully all the information set out in this prospectus and, in particular, should consider and evaluate the following risks and uncertainties associated with an investment

More information

MAS 124 Public Disclosure

MAS 124 Public Disclosure Great American Insurance Company (Incorporated in United States of America) Singapore Branch Company Registration No. T15FC0029B MAS 124 Public Disclosure 31 December 2017 1 1. Purpose... 3 2. Company

More information

Re: Public consultation: CSD s and Harmonisation of Securities Settlement

Re: Public consultation: CSD s and Harmonisation of Securities Settlement To: European Commission DG Markt G2 D(201) 8641 Rue de Spa Brussels BE 1049 by email to: markt-consultation-csd@ec.europa.eu March 1 st 2011 From: Omgeo Ltd 33 Aldgate High St London GB - EC3N 1DL For

More information

EU Council Adopts Revised Nuclear Safety Directive

EU Council Adopts Revised Nuclear Safety Directive GLOBAL NUCLEAR GROUP CLIENT PUBLICATION 14 August 2014 EU Council Adopts Revised Nuclear Safety Directive If you wish to receive more information on the topics covered in this publication, you may contact

More information

British Virgin Islands private trust companies

British Virgin Islands private trust companies British Virgin Islands private trust companies Service area Trusts and Private Wealth Location British Virgin Islands Date March 2017 Introduction Private trust companies ( PTCs ) are widely used in international

More information

INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS

INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS Guidance Paper No. 2.2.6 INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS GUIDANCE PAPER ON ENTERPRISE RISK MANAGEMENT FOR CAPITAL ADEQUACY AND SOLVENCY PURPOSES OCTOBER 2007 This document was prepared

More information

NAFOP CONTRIBUTION TO THE CONSULTATION PAPER

NAFOP CONTRIBUTION TO THE CONSULTATION PAPER CONTRIBUTION TO THE CONSULTATION PAPER 10 July 2015 - THE NATIONAL ASSOCIATION OF FEE ONLY PLANNERS Association profile was founded in 2005, it is the Italian association of Independent Fee-only financial

More information

Governance and Management

Governance and Management Governance and Management Climate change briefing paper Climate change briefing papers for ACCA members Increasingly, ACCA members need to understand how the climate change crisis will affect businesses.

More information