1 Forest Carbon Partnership Facility (FCPF) Carbon Fund and Bio Carbon Fund (BioCF) Terms of Reference (TOR) Definition of policies, processes and procedures for in the land use climate funds A. Background and objectives 23 October 2018 The World Bank s Forest and Landscapes Team within the Climate Funds unit (GCCFM) sits in the Climate Change Cross Cutting Solutions Area (CCSA); it manages carbon funds and facilities, worth over $1.3 billion. There are two main carbon funds/facilities in the land sector: o o The BioCarbon Fund (BioCF) is the World Bank administered fund dedicated to forestry and agriculture projects and programs. Tranche 3 of the fund, along with the BioCFplus-ISFL (collectively known as the Initiative for Sustainable Forest Landscapes or ISFL ) has been launched with a focus on large, scaled up integrated activities, using a combination of technical assistance, investment funding, and results-based payments. See more information at and The Forest Carbon Partnership Facility (FCPF), which became operational in June 2008, is a global partnership focused on reducing emissions from deforestation and forest degradation, forest carbon stock conservation, the sustainable management of forests and enhancement of forest carbon stocks (REDD+). The FCPF has two separate but complementary funding mechanisms to achieve its strategic objectives: The FCPF Readiness Fund supports tropical and sub-tropical developing countries in preparing themselves to participate in possible future systems of positive incentives for REDD+; and The FCPF Carbon Fund is designed to pilot a performance-based payment system for emission reductions ( ERs ) to be generated through REDD+ activities under a host country s ER Program ( ER Program ). The FCPF has so far selected over 47 REDD+ countries into the partnership. More information can be found at Both the FCPF Carbon Fund and the BioCarbon Fund ISFL are piloting performance-based payments for emission reductions from large scale, jurisdictional, programs. By August 2018, 15 countries have submitted REDD+ emission reduction programs for consideration by the Forest Carbon Partnership Facility s Carbon Fund, and it is expected that 4 additional countries will submit in the near future. In addition, 5 countries will submit AFOLU based emission programs to the BioCF ISFL. It is expected that the first monitoring of emission reductions occurs at the end of 2019 and will continue until the end of the lifetime of the two funds (2025 for the FCPF Carbon Fund and 2030 for the BioCF ISFL). Before the funds can make payments for the emission reductions, the reported results will be subjected to by an independent third-party. It is expected that at least events might occur in a given year. 1

2 So although is also expected to occur in 2019, there is little that has been defined so far in terms of the process and the requirements for. A short list of potential firms has been identified, but the process itself and the requirements for the verifiers will need to be defined in the coming months. Under the ISFL, a firm is going to be engaged to conduct the technical assessment (validation) of ERPDs, but also to define the validation process and support in the definition of certain processes, procedures and policies: a) User requirement analysis to define the basis of the assignment; b) An outline of the proposed approach, including the expected level of assurance for the independent assessment and the procedures to be applied; c) Checklists and other materials to be used for each assignment including the draft assessment checklist highlighting how the ISFL ER Program requirements will be assessed. Although the GCCFM has some experience in s, these have been project level transactions and they rely on processes that already exist. Verification of ER programs under the FCPF or the ISFL are yet to be defined. This definition is critical for ensuring an efficient process and to set the basis for a future automation of processes. B. Objectives The general objective of this work is: To support the Facility Management Team of the FCPF and the ISFL (FMT) at the World Bank in defining the policy, processes and procedures related to under both the FCPF Carbon Fund and the Biocarbon Fund ISFL, including the preparation of manuals for the of Emission Reductions. More specifically the objectives are the following: 1. Bibliography review: Conduct a bibliography review of the accreditation requirements and technical manuals of the main GHG programs that exist in the voluntary and compliance markets (Air Resource Board, Alberta s GHG program, Verifier Carbon Standard, ) and relate these to the governance documents and requirements of the two funds; 2. User s requirement analysis: Consult the FMT, Carbon Fund Participants and ISFL Contributors in defining the process and requirements of under both funds based on the bibliography review above; 3. TOR definition: Define TORs for the hiring of the entities for the of ERs, including the requirements in terms of accreditation, liability insurance, personnel, etc. 4. Technical manual: Define a technical manual to allow entities to conduct ERs in line with the defined requirements; C. Tasks The FCPF and ISFL Facility Management Team (FMT) is seeking a firm to provide technical support to the FMT in the definition of the process and requirements. The tasks will be the following Tasks Description 2

3 1. Bibliography review: 2. User s requirement analysis: Conduct a bibliography review of the accreditation requirements and technical manuals of the main GHG programs that exist in the voluntary and compliance markets (Air Resource Board, Alberta s GHG program, Verifier Carbon Standard, ), other guidance (ISO ) and the requirements/guidelines under the Carbon Fund and ISFL. This will include the review of the main policy decisions and requirements under these GHG programs including: accreditation requirements for firms verifying under the GHG program; means of ; how the liability of firms are addressed; what are the requirements in terms of level of assurance and materiality for ; what are the documents that are made available to aid the process; what are the requirements to entities in terms of training and internal processes, etc. Relate this to the existing governance documents and requirements of the two funds including the respective Charters, process guidelines and methodological requirements. Consult the FMT and Carbon Fund Participants on the r the basis of based on the bibliography review. Based on the consultation identify the main elements that need to be defined under the Carbon Fund in terms of requirements and policy. Subsequently consult FMT members to understand what are the options for the different policy decisions and elements (standards, guidelines, procedures), needed from the Carbon Fund and ISFL. The consulting team will present the different options and PROS and CONs of the policy decisions and processes. Once this is clear, the Carbon Fund and ISFL donors will be requested for guidance to clarify some of the policy decisions. It is expected that some of these requirements will include: liability requirements for firms and other accreditation requirements; basis of for firms (level of assurance and materiality level); technical documents needed for guiding the. The team will also assess, in collaboration with the legal department of the World Bank, the legal implications in terms of liability for the potential firm. For instance, if the verifier is found liable for generating ERs that are verified but are not paid by the CF or the ISFL, what would be the implications from this side. Under the ISFL a firm will be engaged to help the FMT to define part of the policies, standards, processes and even procedures for validation, i.e. a) User requirement analysis to define the basis of the assignment; b) An outline of the proposed approach, including the expected level of assurance for the independent assessment and the procedures to be applied; c) Checklists and other materials to be used for each assignment including the draft assessment checklist highlighting how the ISFL ER Program requirements will be assessed. The firm is expected to participate in that consultancy, provide support to the FMT to help define the most adequate policies, ensure coherence and linkages between both works, etc. 3

4 3. TOR definition: Define TORs for the hiring of the entities for the of ERs, including the requirements in terms of accreditation, liability insurance, personnel, etc. This will be based on the information received in the previous phase. This will be the basis for launching a procurement process following the WB procurement processes to select a firm who will be in charge of conducting the These TORs will be presented at the CF meeting 4-7 February 2019 for confirmation from Carbon Fund Participants. These TORs and a presentation should be posted two weeks in advance to the CF meeting. 4. Technical manual: Define a technical manual to allow entities to conduct of ERs in line with the defined requirements and specify the interaction process between auditee and auditor. Verification entities require some guidance in order to conducting the. This includes guidance for setting the basis for (objectives, scope and criteria, materiality, level of assurance), planning (including risk assessment, planning analytics, materiality assessment, contribution analysis and design), execution (sampling, procedures) and completion (reporting, peer reviewing, statement). The guidance should allow stakeholders and verifiers to conduct s in line with CF or ISFL policies and defined processes. D. Deliverables and timeline The deliverables and expected dates would be the following: Phase Deliverable Date 0. Planning The firm will provide a detailed inception report for conducting the activities described in this TOR and adjusting them to the dates set below. 1. Bibliography review 2. User s requirement analysis 3. TOR definition Report on bibliography review showing the main elements that are defined for under GHG programs around the world. URA report showing the main policy and process decisions after consultations with members of FMT and participation in URA from firm under ISFL. Draft of TORs Second draft TORs addressing comments from the FMT 1 week after contract signature 4 weeks after contract signature 15 December December 15 January Presentations and other material for CF19 meeting 11 January 2019 Incorporation of feedback from CF19 15 February 2019 Draft for commenting 10 March

5 4. Technical manual Final Report 29 March 2019 E. Modalities of implementation The firm will travel, at least, twice to Washington for the delivery, presentation and discussion of the inception report and the final report and will maintain weekly meetings via WebEx with the project supervisor, the project coordinator and the WB team: FCPF Secretariat, BioCF ISFL. The language of the consultancy will be in English. F. WB primary contacts To be defined at RFP stage. G. Qualifications To be defined at RFP stage. H. Other requirements Communications: All communications regarding the assignment with any CF and ISFL contributors or the general public, must be authorized. Materials: All materials shared with, collected by or produced as part of this service are the property of the World Bank, and should not be shared with any other party without specific authorization from the World Bank. Right of Review of Documents: The World Bank retains the right to review any and all documents, prior to them being shared with CF and ISFL contributors. Staffing and Change of Staffing: The firm must inform the World Bank of any change in the composition of team members for the assessment. In case of failure to inform about changes in the composition of team members, the World Bank retains the right to cancel or modify the original contract. I. Conflict of interest In order to ensure no conflict of interest, the firm in charge of preparing the standard will not be allowed to conduct s under the CF and the ISFL. 5

Inception Report Verification policies, processes and procedures for land-use climate funds

Inception Report Verification policies, processes and procedures for land-use climate funds Inception Report Verification policies, processes and procedures for Contents Outline and revised work plan... 3 1. Product (1): Bibliography Review... 3 2. Product (2): User s Requirement Analysis...

More information

Forest Carbon Partnership Facility

Forest Carbon Partnership Facility Forest Carbon Partnership Facility Carbon Fund Long Term Financial Plan Second Meeting of the FCPF Carbon Fund (CF2) Berlin, Germany October 20-21, 2011 Background (1) Previously presented Carbon Fund

More information

WORLD BANKGROUP CLIMATE CHANGE BioCarbon Fund Initiative for Sustainable Forest Landscape (ISFL) Forest Carbon Partnership Facility (FCPF)

WORLD BANKGROUP CLIMATE CHANGE BioCarbon Fund Initiative for Sustainable Forest Landscape (ISFL) Forest Carbon Partnership Facility (FCPF) WORLD BANKGROUP CLIMATE CHANGE BioCarbon Fund Initiative for Sustainable Forest Landscape (ISFL) Forest Carbon Partnership Facility (FCPF) Franka Braun, Carbon Finance Specialist, FCPF and BioCF Operations

More information

Term. Explanation. Benefit Sharing

Term. Explanation. Benefit Sharing Note on Benefit Sharing for Emission Reductions Programs Under the Forest Carbon Partnership Facility and BioCarbon Fund Initiative for Sustainable Forest Landscapes January 2019 Version Introduction Benefit

More information

Guidance Note on the Preparation of Financing Plan of REDD+ and Landscape Emission Reduction Programs

Guidance Note on the Preparation of Financing Plan of REDD+ and Landscape Emission Reduction Programs Guidance Note on the Preparation of Financing Plan of REDD+ and Landscape Emission Reduction Programs Fund Management Unit Climate Change Group, The World Bank Washington DC August 2017 This note takes

More information

Private sector observer reflections

Private sector observer reflections Private sector observer reflections Paris, 19 th June 2017 Carbon Fund meeting Climate Market CMIA s mission is to provide leadership to the private sector in the delivery of climate investment policy

More information

Table of Contents. BioCF ISFL 2015 Annual Report

Table of Contents. BioCF ISFL 2015 Annual Report 2015 Annual Report Table of Contents Acronyms... 3 Introduction to the Report... 4 Initiative Objectives... 4 Annual Progress Report and the Year Ahead... 6 Initiative-level... 6 ISFL Notes and Approaches...

More information

Forest Carbon Partnership Facility 6. Carbon Fund Budget for FY13

Forest Carbon Partnership Facility 6. Carbon Fund Budget for FY13 Forest Carbon Partnership Facility 6. Carbon Fund Budget for FY13 Fourth Meeting of the Carbon Fund (CF4) Santa Marta, Colombia, June 24-25, 2012 1 Outline of Today s Discussion I. The Budget Process of

More information

Forest Carbon Partnership Facility (FCPF) Readiness Fund

Forest Carbon Partnership Facility (FCPF) Readiness Fund Forest Carbon Partnership Facility (FCPF) Readiness Fund FY19 Proposed Budget for the FCPF Readiness Fund March 2018 This note is designed to present the proposed budget for FY19 of the Readiness Fund

More information

Forest Carbon Partnership Facility 7c. FY12 Annual Budget of the Readiness Fund

Forest Carbon Partnership Facility 7c. FY12 Annual Budget of the Readiness Fund Forest Carbon Partnership Facility 7c. FY12 Annual Budget of the Readiness Fund Participants Committee Meeting (FCPF PC9) Oslo, Norway, June 20-June 22, 2011 1 Outline of Today s Discussion I. The Budget

More information

Forest Carbon Partnership Facility (FCPF) Readiness Fund

Forest Carbon Partnership Facility (FCPF) Readiness Fund Forest Carbon Partnership Facility (FCPF) Readiness Fund FY15 Budget Status and FY16 Proposed Budget for the FCPF Readiness Fund May 2015 This note is designed to (A) present the status of the FY15 budget

More information

PARTNERSHIP FOR MARKET READINESS (PMR) PRESENTATION OF THE PMR FY17 EXPENSES AND PROPOSAL FOR THE PMR FY18 BUDGET

PARTNERSHIP FOR MARKET READINESS (PMR) PRESENTATION OF THE PMR FY17 EXPENSES AND PROPOSAL FOR THE PMR FY18 BUDGET PARTNERSHIP FOR MARKET READINESS (PMR) PRESENTATION OF THE PMR FY17 EXPENSES AND PROPOSAL FOR THE PMR FY18 BUDGET March 6, 2017 BACKGROUND 1. Per the PMR Governance Framework, the PMR Secretariat is responsible

More information

Forest Carbon Partnership Facility

Forest Carbon Partnership Facility Forest Carbon Partnership Facility 5b. Update on Developing Specifications for Registries Twelfth Meeting of the Carbon Fund (CF12) Paris, France April 28-30, 2015 Defining Transaction Registry A transaction

More information

Overview of FCPF REDD+ in Nepal

Overview of FCPF REDD+ in Nepal Environment & Natural Resources Global Practice Overview of FCPF REDD+ in Nepal Rajesh Koirala Carbon Finance Specialist (On behalf of the World Bank Task Team) Participants Assembly (PA9) and Participants

More information

Forest Carbon Partnership Facility FY18 Budget Status and FY19 Proposed Carbon Fund Budget

Forest Carbon Partnership Facility FY18 Budget Status and FY19 Proposed Carbon Fund Budget Forest Carbon Partnership Facility FY18 Budget Status and FY19 Proposed Carbon Fund Budget Eighteenth Meeting of the Carbon Fund (CF18) Paris, France, June 20-22, 2018 1 Outline of Budget Discussion I.

More information

Forest Carbon Partnership Facility 9. FY15 Readiness Fund Budget Proposal

Forest Carbon Partnership Facility 9. FY15 Readiness Fund Budget Proposal Forest Carbon Partnership Facility 9. FY15 Readiness Fund Budget Proposal Seventeenth Participants Committee Meeting (PC17) Lima, Peru, July 2-4, 2014 1 Outline I. The Budget Process of the FCPF Review

More information

Forest Carbon Partnership Facility 2a. Timing of World Bank Preparation Process

Forest Carbon Partnership Facility 2a. Timing of World Bank Preparation Process Forest Carbon Partnership Facility 2a. Timing of Preparation Process Fourteenth Meeting of the Carbon Fund (CF14) Paris, France, June 20-22, 2016 1 Today s Discussion I. Background Carbon Fund Process

More information

Forest Carbon Partnership Facility (FCPF) Carbon Fund

Forest Carbon Partnership Facility (FCPF) Carbon Fund Forest Carbon Partnership Facility (FCPF) Carbon Fund FY18 Budget Status and FY19 Proposed Budget for the FCPF Carbon Fund June 2018 This note is designed to (a) present the status of the FY18 budget and

More information

Forest Carbon Partnership Facility

Forest Carbon Partnership Facility Forest Carbon Partnership Facility Portfolio Management and Selection of ER-PINs Tenth meeting of the Carbon Fund (CF10) Bonn June 16-19, 2014 Outline Overview of portfolio management: What decisions need

More information

Forest Carbon Partnership Facility

Forest Carbon Partnership Facility Forest Carbon Partnership Facility Portfolio Management and Decisions on ER-PDs Eighteenth meeting of the Carbon Fund (CF18) Paris, France June 20-22, 2018 Outline of Presentation Portfolio decisions at

More information

November 23, International Bank for Reconstruction and Development. Charter Establishing The Forest Carbon Partnership Facility

November 23, International Bank for Reconstruction and Development. Charter Establishing The Forest Carbon Partnership Facility November 23, 2015 International Bank for Reconstruction and Development Charter Establishing The Forest Carbon Partnership Facility Table of Contents Page Chapter I Definitions...2 Article 1 Definitions...2

More information

Linking Country Level Monitoring and Evaluation to FCPF Progress Reporting

Linking Country Level Monitoring and Evaluation to FCPF Progress Reporting 1 Forest Carbon Partnership Facility Linking Country Level Monitoring and Evaluation to FCPF Progress Reporting September 26, 2013 Aim of this presentation Explain how the various monitoring and evaluation

More information

PMR Governance Framework*

PMR Governance Framework* PARTNERSHIP FOR MARKET READINESS (PMR) PMR Governance Framework* I. Objectives of the PMR The PMR aims to provide a platform for technical discussions and the exchange of information on market instruments

More information

BRAZIL MRP IMPLEMENTATION STATUS REPORT (ISR)

BRAZIL MRP IMPLEMENTATION STATUS REPORT (ISR) BRAZIL MRP IMPLEMENTATION STATUS REPORT (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: Federative Republic of Brazil Reporting Period: From 10/01/2015 to 09/30/2016 Report Date: 10/04/2016

More information

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment

Socialist Republic of Vietnam. Reporting Period: From 08/20/2017 to 04/03/2018 Report Date: 04/03/2018 Ministry of Natural Resources and Environment PMR Project Implementation Status Report (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: Socialist Republic of Vietnam Reporting Period: From 08/20/2017 to 04/03/2018 Report Date:

More information

Forest Carbon Partnership Facility

Forest Carbon Partnership Facility Forest Carbon Partnership Facility Cost Recovery Options Twelfth Meeting of the Carbon Fund (CF12) Paris, France April 28-30, 2015 Costs related to ER Program Preparation, pre-erpa signature e.g.: Cost

More information

For the Joint Implementation of. The Oromia Forested Landscape Program vertically and horizontally

For the Joint Implementation of. The Oromia Forested Landscape Program vertically and horizontally Memorandum of Understanding Among Oromia Environment, Forest and Climate Change Authority Oromia Bureau of Agriculture and Natural Resources Oromia Forest and Wildlife Enterprise Oromia Bureau of Rural

More information

UPDATE ON FINANCING CLIMATE MITIGATION IN DEVELOPING COUNTRIES AND THE ROLE OF THE WORLD BANK CARBON FINANCE UNIT

UPDATE ON FINANCING CLIMATE MITIGATION IN DEVELOPING COUNTRIES AND THE ROLE OF THE WORLD BANK CARBON FINANCE UNIT UPDATE ON FINANCING CLIMATE MITIGATION IN DEVELOPING COUNTRIES AND THE ROLE OF THE WORLD BANK CARBON FINANCE UNIT INTERNATIONAL MARITIME ORGANIZATION MARCH 30, 2011 SCOTT CANTOR CARBON FINANCE UNIT THE

More information

How to enhance coherence and coordination in public and private sources of forest finance? M. J. Sanz, FAO

How to enhance coherence and coordination in public and private sources of forest finance? M. J. Sanz, FAO How to enhance coherence and coordination in public and private sources of forest finance? M. J. Sanz, FAO Where we stand? Questions? How to match developing countries financial needs to achieve sustainable

More information

25 November 2015 Terms of Reference. UN-REDD Programme Multi-Partner Trust Fund

25 November 2015 Terms of Reference. UN-REDD Programme Multi-Partner Trust Fund 25 November 2015 Terms of Reference UN-REDD Programme Multi-Partner Trust Fund 1 Abbreviations & Acronyms AP: BioCF: CIF: CN: COP: CSO: CTA: DDFD: ER: EB: EoI: FAO: FCPF: FREL: FIP: GCF: GEF: GHG: IAS:

More information

GUYANA FORESTRY COMMISSION

GUYANA FORESTRY COMMISSION GUYANA FORESTRY COMMISSION Roadmap for Guyana EU FLEGT VPA Process (European Union Forest law Enforcement Governance and Trade, Voluntary Partnership Agreement) January, 2013 Developed with Assistance

More information

Operational Manual GUYANA REDD-Plus INVESTMENT FUND (GRIF)

Operational Manual GUYANA REDD-Plus INVESTMENT FUND (GRIF) Operational Manual GUYANA REDD-Plus INVESTMENT FUND (GRIF) This Operations Manual is not a legal document. It describes the operating principles, guidelines and procedures for the day-to-day operations

More information

ER Program Buffer Guidelines

ER Program Buffer Guidelines ER Program Buffer Guidelines Table of Contents 1. Introduction... 2 2. Use of ER Program Transaction Registries to Manage Buffer Reserves... 3 3. Establishing Buffer Reserve Accounts in the ER Program

More information

International Bank for Reconstruction and Development. Charter Establishing The Forest Carbon Partnership Facility

International Bank for Reconstruction and Development. Charter Establishing The Forest Carbon Partnership Facility International Bank for Reconstruction and Development Charter Establishing The Forest Carbon Partnership Facility 1 Table of Contents Page Chapter I Definitions...2 Article 1 Definitions...2 Section 1.1

More information

TRUSTEE REPORT FINANCIAL STATUS OF THE STRATEGIC CLIMATE FUND

TRUSTEE REPORT FINANCIAL STATUS OF THE STRATEGIC CLIMATE FUND SCF/TFC.4/4 October 13, 2009 Meeting of the SCF Trust Fund Committee Washington, D.C. October 28, 2009 TRUSTEE REPORT FINANCIAL STATUS OF THE STRATEGIC CLIMATE FUND Proposed Trust Fund Committee Decision

More information

Where Next for Carbon Markets? Carbon and Climate finance. Alexandre Kossoy The World Bank

Where Next for Carbon Markets? Carbon and Climate finance. Alexandre Kossoy The World Bank Where Next for Carbon Markets? Carbon and Climate finance Alexandre Kossoy The World Bank AIR TRANSPORT AT THE WORLD BANK Evolution of the World Bank s Air Transport Portfolio USD Mio $1,600 $1,400 $1,200

More information

Agenda. GCF/B.08/01/Rev.01 * 14 October Meeting of the Board October 2014 Bridgetown, Barbados Agenda item 2

Agenda. GCF/B.08/01/Rev.01 * 14 October Meeting of the Board October 2014 Bridgetown, Barbados Agenda item 2 Agenda * 14 October 2014 Meeting of the Board 14-17 October 2014 Bridgetown, Barbados Agenda item 2 * The provisional agenda as contained in document GCF/B.08/01 was adopted without amendment. Page 1 Agenda

More information

GOVERNANCE FRAMEWORK FOR

GOVERNANCE FRAMEWORK FOR December, 2011 GOVERNANCE FRAMEWORK FOR THE STRATEGIC CLIMATE FUND Adopted November 2008 and amended December 2011 Table of Contents A. Introduction B. Purpose and Objectives C. SCF Programs D. Governance

More information

Relationship with UNFCCC and External Bodies

Relationship with UNFCCC and External Bodies Relationship with UNFCCC and External Bodies 19 June 2013 Meeting of the Board 26-28 June 2013 Songdo, Republic of Korea Agenda item 9 Page b Recommended action by the Board It is recommended that the

More information

California s Cap and Trade Program. Session 5 Use of Offsets. PMR Technical Workshop March 13, 2012

California s Cap and Trade Program. Session 5 Use of Offsets. PMR Technical Workshop March 13, 2012 California s Cap and Trade Program Session 5 Use of Offsets PMR Technical Workshop March 13, 2012 1 Key Offset Terms Compliance Offset issued by ARB for a project developed using an ARB compliance offset

More information

Advanced Draft Benefit Sharing Plan for the Mai-Ndombe Emission Reductions Program in the Democratic Republic of Congo

Advanced Draft Benefit Sharing Plan for the Mai-Ndombe Emission Reductions Program in the Democratic Republic of Congo Advanced Draft Benefit Sharing Plan for the Mai-Ndombe Emission Reductions Program in the Democratic Republic of Congo Draft as of June 15, 2018 Summary The National REDD+ framework of the Democratic Republic

More information

Introduction & Key Concepts for Adaptation Financing

Introduction & Key Concepts for Adaptation Financing HOW TO PREPARE BANKABLE PROJECTS FOR FINANCING CLIMATE CHANGE ADAPTATION IN TRANSBOUNDARY BASINS Dakar, Senegal, 21-23 June 2017 Introduction & Key Concepts for Adaptation Financing Ana Maria Kleymeyer

More information

Inter-American Development Bank (BID) Perú PROGRESS MONITORING REPORT (PMR) FOR THE FOREST CARBON PARTNERSHIP FACILITY (FCPF)

Inter-American Development Bank (BID) Perú PROGRESS MONITORING REPORT (PMR) FOR THE FOREST CARBON PARTNERSHIP FACILITY (FCPF) Inter-American Development Bank (BID) Perú PROGRESS MONITORING REPORT (PMR) FOR THE FOREST CARBON PARTNERSHIP FACILITY (FCPF) Operation number of grant: PE-T1294 Reporting period / Fiscal year: 01/2015-12/2015

More information

Green Bond Principles, 2014 Voluntary Process Guidelines for Issuing Green Bonds

Green Bond Principles, 2014 Voluntary Process Guidelines for Issuing Green Bonds Green Bond Principles, 2014 Voluntary Process Guidelines for Issuing Green Bonds January 13, 2014 I. EXECUTIVE SUMMARY Green Bonds enable capital-raising and investment for new and existing projects with

More information

Annual Review - Summary Sheet. December 2015

Annual Review - Summary Sheet. December 2015 Annual Review - Summary Sheet Title: Forest Carbon Partnership Facility (FCPF) Carbon Fund Programme Value: 141.5m UK investment ( 130m ICF + 11.5m ETF) Start Date: End Date: September 2014 December 2015

More information

Decision 3/CP.17. Launching the Green Climate Fund

Decision 3/CP.17. Launching the Green Climate Fund Decision 3/CP.17 Launching the Green Climate Fund The Conference of the Parties, Recalling decision 1/CP.16, 1. Welcomes the report of the Transitional Committee (FCCC/CP/2011/6 and Add.1), taking note

More information

MEMORANDO August

MEMORANDO August MEMORANDO August 27 2013 To: From: Subject: Sr. Walter Vergara Chief Division, (INE/CCS) Rodrigo Martinez (INE/CCS) Mission Report (BTOR). Guyana. The Bank sent an Orientation Mission to Guyana from July

More information

UN-REDD Viet Nam Phase II Multi-Partner Trust Fund: Terms of Reference

UN-REDD Viet Nam Phase II Multi-Partner Trust Fund: Terms of Reference UN-REDD Viet Nam Phase II Multi-Partner Trust Fund: Terms of Reference 30 November 2012 List of Acronyms AA AWP BDS CIPS CSO DARD EG FAO FCPF FIPI FPD GoV HACT HPPMG ICD LoA M&E MARD MARD/DoF MARD/FPD

More information

Administration Agreement

Administration Agreement CONFORMED COPY TRUST FUND MTO NO. 069017 Administration Agreement (Guyana REDD-Plus Investment Fund) between ROYAL NORWEGIAN MINISTRY OF FOREIGN AFFAIRS and INTERNATIONAL DEVELOPMENT ASSOCIATION Dated

More information

Supreme Audit Institutions Performance Measurement Framework. QUALITY ASSURANCE CHECKLIST FOR TERMS OF REFERENCE Draft version 1.1

Supreme Audit Institutions Performance Measurement Framework. QUALITY ASSURANCE CHECKLIST FOR TERMS OF REFERENCE Draft version 1.1 Supreme Audit Institutions Performance Measurement Framework QUALITY ASSURANCE CHECKLIST FOR TERMS OF REFERENCE Draft version 1.1 October 2014 INTOSAI-Donor Secretariat for the INTOSAI Working Group on

More information

Indicative Guidelines for Country-Specific Resource Mobilization Strategies

Indicative Guidelines for Country-Specific Resource Mobilization Strategies Indicative Guidelines for Country-Specific Resource Mobilization Strategies I. GENERAL PROVISIONS 1. In decision IX/11 B, the Conference of the Parties adopted the strategy for resource mobilization (SRM)

More information

REDD + ANNUAL COUNTRY PROGRESS REPORTING (with semi-annual update) COUNTRY: Argentina PERIOD: December 2016 June 2017

REDD + ANNUAL COUNTRY PROGRESS REPORTING (with semi-annual update) COUNTRY: Argentina PERIOD: December 2016 June 2017 REDD + ANNUAL COUNTRY PROGRESS REPORTING (with semi-annual update) COUNTRY: Argentina PERIOD: December 2016 June 2017 Background: This country reporting framework has been developed following the structure

More information

National REDD Policy Project Tanzania. End-of-project Review. Final Report

National REDD Policy Project Tanzania. End-of-project Review. Final Report National REDD Policy Project Tanzania End-of-project Review Final Report February 25 th, 2014 List of contents ACRONYMS AND ABBREVIATIONS... II EXECUTIVE SUMMARY... III 1. INTRODUCTION AND BACKGROUND TO

More information

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase

Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase Additional Modalities that Further Enhance Direct Access: Terms of Reference for a Pilot Phase GCF/B.10/05 21 June 2015 Meeting of the Board 6-9 July 2015 Songdo, Republic of Korea Provisional Agenda item

More information

SCF/TFC.5/4 March 5, Meeting of the SCF Trust Fund Committee Manila, Philippines March 16, 2010 TRUSTEE REPORT ON FINANCIAL STATUS OF THE SCF

SCF/TFC.5/4 March 5, Meeting of the SCF Trust Fund Committee Manila, Philippines March 16, 2010 TRUSTEE REPORT ON FINANCIAL STATUS OF THE SCF SCF/TFC.5/4 March 5, 2010 Meeting of the SCF Trust Fund Committee Manila, Philippines March 16, 2010 TRUSTEE REPORT ON FINANCIAL STATUS OF THE SCF Proposed Trust Fund Committee Decision The Trust Fund

More information

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) 1. SUMMARY INFORMATION PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) Implementing Country/Technical Partner: Brazil Reporting Period: From 10/01/2017 to 09/30/2018 Report Date: 09/28/2018 Implementing

More information

AFOLU LEDS Finance Mapping Asia LEDS Forum John Costenbader, Climate Focus Yogyakarta, 10 November 2014

AFOLU LEDS Finance Mapping Asia LEDS Forum John Costenbader, Climate Focus Yogyakarta, 10 November 2014 AFOLU LEDS Finance Mapping Asia LEDS Forum 2014 John Costenbader, Climate Focus Yogyakarta, 10 November 2014 Outline 1. Key Financial Instruments 2. International Public Finance 3. Private Sector Finance

More information

PARTNERSHIP FOR MARKET READINESS (PMR) Eighth Partnership Assembly Meeting Mexico City, March 3-5, Resolution No. PA8/2014-3

PARTNERSHIP FOR MARKET READINESS (PMR) Eighth Partnership Assembly Meeting Mexico City, March 3-5, Resolution No. PA8/2014-3 PARTNERSHIP FOR MARKET READINESS (PMR) Eighth Partnership Assembly Meeting Mexico City, March 3-5, 2014 Resolution No. PA8/2014-3 Amendment to the PMR Governance Framework Whereas: (1) The PMR Governance

More information

JORDAN. Terms of Reference

JORDAN. Terms of Reference JORDAN Terms of Reference Jordan: Strengthening municipal financial management systems to sustain service delivery in municipalities affected by the refugee crisis Assessment of Municipal Public Financial

More information

47. This section presents the core budget for the biennium as proposed by the Executive Secretary:

47. This section presents the core budget for the biennium as proposed by the Executive Secretary: This is an extract from the UNFCCC official document FCCC/SBI/2017/4 to highlight chapter IV. IV. Proposed budget 47. This section presents the core budget for the biennium 2018 2019 as proposed by the

More information

MODALITY FOR FUNDING ADDITIONAL ACTIVITIES UNDER THE PMR: DRAFT PROPOSAL FOR DISCUSSION. PMR Note PA

MODALITY FOR FUNDING ADDITIONAL ACTIVITIES UNDER THE PMR: DRAFT PROPOSAL FOR DISCUSSION. PMR Note PA MODALITY FOR FUNDING ADDITIONAL ACTIVITIES UNDER THE PMR: DRAFT PROPOSAL FOR DISCUSSION PMR Note PA13 2015-4 October 14, 2015 I. INTRODUCTION 1. In an effort to further facilitate discussions on the PMR

More information

Financing REDD Projects. Agus Sari Nairobi, March 2010

Financing REDD Projects. Agus Sari Nairobi, March 2010 Financing REDD Projects Agus Sari Nairobi, March 2010 Sources of Funds Market Non Market Public Compliance markets Creditable NAMA Bilateral Markets Centralized (Global) Fund Decentralized (National) Fund

More information

Annual Progress Report to the FCPF for Papua New Guinea. for the period 1 January - 31 December 2017 United Nations Development Programme

Annual Progress Report to the FCPF for Papua New Guinea. for the period 1 January - 31 December 2017 United Nations Development Programme Annual Progress Report to the FCPF for Papua New Guinea for the period 1 January - 31 December 2017 United Nations Development Programme The United Nations Development Programme (UNDP) partners with people

More information

Dated: 0 VltA r. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Dated: 0 VltA r. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DOCUMENT OFFIClIL The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK

More information

State and trends of carbon pricing initiatives around the world

State and trends of carbon pricing initiatives around the world Destination Green ICAO Symposium on Aviation and Climate Change, Destination Green, 14 16 May 2013 State and trends of carbon pricing initiatives around the world Alexandre Kossoy Climate Policy and Finance

More information

Morocco Final Market Readiness Proposal

Morocco Final Market Readiness Proposal Morocco Final Market Readiness Proposal MRP Objective and Focus Implementation of a scaled-up crediting mechanism in three key sectors of the economy (electricity generation, cement production, and phosphate

More information

Chile Final Market Readiness Proposal. Ignacio Fernandez Ministry of Energy March 11, 2013

Chile Final Market Readiness Proposal. Ignacio Fernandez Ministry of Energy March 11, 2013 Chile Final Market Readiness Proposal Ignacio Fernandez Ministry of Energy March 11, 2013 Progress since last PMR Meeting Key themes: Consideration of feedback from PMR Assembly on Draft MRP Institutional

More information

ER Monitoring Report (ER-MR)

ER Monitoring Report (ER-MR) Forest Carbon Partnership Facility (FCPF) Carbon Fund ER Monitoring Report (ER-MR) ER Program Name and Country: Reporting Period covered in this report: Number of net ERs generated by the ER Program during

More information

Guidance from the twentysecond session of the Conference of the Parties: Co-Chairs proposal

Guidance from the twentysecond session of the Conference of the Parties: Co-Chairs proposal Meeting of the Board 13 15 December 2016 Apia, Samoa Provisional agenda item 10(a) GCF/B.15/04 9 December 2016 Guidance from the twentysecond session of the Conference of the Parties: Co-Chairs proposal

More information

Call for Board inputs REDD+ Results-Based Payments

Call for Board inputs REDD+ Results-Based Payments Page 1 Call for Board inputs REDD+ Results-Based Payments The GCF aims to support a paradigm shift in the global response to climate change, for which It allocates ex-ante resources to low-emission and

More information

Republic of Kazakhstan. Director Climate Change Department. Ministry of Energy

Republic of Kazakhstan. Director Climate Change Department. Ministry of Energy PMR Project Implementation Status Report (ISR) The PMR Project Implementation Status Report should be prepared by the Implementing Country or Technical Partner, with the support of the Delivery Partner

More information

From Readiness to Full Implementation: Financial Support Considerations from a Multilateral Perspective Maria Jose Sanz-Sanchez (UN-REDD/FAO)

From Readiness to Full Implementation: Financial Support Considerations from a Multilateral Perspective Maria Jose Sanz-Sanchez (UN-REDD/FAO) From Readiness to Full Implementation: Financial Support Considerations from a Multilateral Perspective DAY1 From Readiness to Full Implementation: Financial Support Considerations from a Multilateral

More information

with Caribbean Community Climate Change Centre (5Cs) for Belize 14 December 2016 NDA Strengthening & Country Programming

with Caribbean Community Climate Change Centre (5Cs) for Belize 14 December 2016 NDA Strengthening & Country Programming with Caribbean Community Climate Change Centre (5Cs) for Belize 14 December 2016 NDA Strengthening & Country Programming PAGE 1 OF 16 28 July 2016 Readiness and Preparatory Support Proposal Readiness -

More information

To reduce emissions from your AFOLU sector, what critical challenges must be overcome?

To reduce emissions from your AFOLU sector, what critical challenges must be overcome? To reduce emissions from your AFOLU sector, what critical challenges must be overcome? Coordination of specific activity data/ information sharing Weak institutional and human capacity Finance Lack of

More information

Page 1 of 5. APPROVED e-requisition

Page 1 of 5. APPROVED e-requisition United Nations Development Programme GENERAL INFORMATION Title: Senior Technical Officer for Secretariat in Directorate General Communicable Diseases Control (National Consultant) Project Name: Health

More information

International Climate Fund: Annual Review - Summary Sheet. 09 December 2017

International Climate Fund: Annual Review - Summary Sheet. 09 December 2017 International Climate Fund: Annual Review - Summary Sheet Title: Forest Carbon Partnership Facility (FCPF) Carbon Fund Programme Value: 141.5m UK investment ( 130m ICF + 11.5m ETF) Start Date: End Date:

More information

Western Climate Initiative, Inc. Budget for Calendar 2019 and Projected Expenditures for 2020 and 2021 October 11, 2018

Western Climate Initiative, Inc. Budget for Calendar 2019 and Projected Expenditures for 2020 and 2021 October 11, 2018 October 11, 2018 draft for Board Consideration Western Climate Initiative, Inc. Budget for Calendar 2019 and Projected Expenditures for 2020 and 2021 October 11, 2018 Contents Introduction 1 Cap-and-Trade

More information

Western Climate Initiative, Inc. Budget for Calendar 2018 and Projected Expenditures for 2019 and 2020 October 12, 2017

Western Climate Initiative, Inc. Budget for Calendar 2018 and Projected Expenditures for 2019 and 2020 October 12, 2017 Western Climate Initiative, Inc. Budget for Calendar 2018 and Projected Expenditures for 2019 and 2020 October 12, 2017 Contents Introduction 1 Cap-and-Trade Services 3 Compliance Instrument Tracking System

More information

Adaptation Fund: Helping Countries Adapt to Climate Change through a Range of Flexible Finance Modalities. Washington, D.C.

Adaptation Fund: Helping Countries Adapt to Climate Change through a Range of Flexible Finance Modalities. Washington, D.C. Adaptation Fund: Helping Countries Adapt to Climate Change through a Range of Flexible Finance Modalities Washington, D.C., 1 December 2016 Outline of Presentation Background of the Adaptation Fund and

More information

Republic of Kazakhstan. Director Climate Change Department. Ministry of Energy

Republic of Kazakhstan. Director Climate Change Department. Ministry of Energy PMR Project Implementation Status Report (ISR) The PMR Project Implementation Status Report should be prepared by the Implementing Country or Technical Partner, with the support of the Delivery Partner

More information

Duration of Assignment: Apprx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Governance and Institutional Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA

More information

Forest Carbon Partnership Facility

Forest Carbon Partnership Facility Forest Carbon Partnership Facility FCPF Carbon Fund Methodological Framework: Presentation of Draft Meth. Framework Text Proposed by the Carbon Fund Working FCPF Carbon Fund Working Group Meeting Paris,

More information

Benin 27 August 2015

Benin 27 August 2015 Benin 27 August 2015 PAGE 1 OF 6 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country (or region) Benin Submission Date 27/08/2015 NDA or Focal Point Directorate

More information

INDONESIA PHASE II OF THE INDONESIA GREEN GROWTH PROGRAM OVERVIEW HIGHLIGHTS OVERALL OBJECTIVES CONTEXT. RELEVANT SDGs

INDONESIA PHASE II OF THE INDONESIA GREEN GROWTH PROGRAM OVERVIEW HIGHLIGHTS OVERALL OBJECTIVES CONTEXT. RELEVANT SDGs INDONESIA PHASE II OF THE INDONESIA GREEN GROWTH PROGRAM OVERVIEW Country / Global implementation Thematic area Indonesia Lower Middle Income Country (LMIC) Multi-sectoral Project start date Q1 2016 Funding

More information

with UNDP for the Republic of Liberia 07 December 2015 NDA Strengthening and Country Programming

with UNDP for the Republic of Liberia 07 December 2015 NDA Strengthening and Country Programming with UNDP for the Republic of Liberia 07 December 2015 NDA Strengthening and Country Programming PAGE 1 OF 7 (Please submit completed form to countries@gcfund.org) Executive Summary(in one page) Country

More information

Norwegian Submission on Strategies and Approaches for Scaling up Climate Finance

Norwegian Submission on Strategies and Approaches for Scaling up Climate Finance Norwegian Submission on Strategies and Approaches for Scaling up Climate Finance 29 November 2018 1. Introduction Decision 3. CP/19 requested developed country Parties to update their strategies and approaches

More information

UNICEF Moldova. Terms of Reference

UNICEF Moldova. Terms of Reference UNICEF Moldova Terms of Reference Individual Consultancy on Public Finance for Development of the National Action Plan for Gradual Implementation of the Sanitary and Hygiene Norms for Preschools Duration

More information

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming

with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming with the Ministry of Finance and Planning for the United Republic of Tanzania 08 November 2015 NDA Strengthening & Country Programming PAGE 1 OF 8 (Please submit completed form to countries@gcfund.org)

More information

with the National Agency on Climate Change for the People's Democratic Republic of Algeria 22 December 2017 NDA Strengthening & Country Programming

with the National Agency on Climate Change for the People's Democratic Republic of Algeria 22 December 2017 NDA Strengthening & Country Programming with the National Agency on Climate Change for the People's Democratic Republic of Algeria 22 December 2017 NDA Strengthening & Country Programming PAGE 1 OF 14 Ver. 20 March 2017 Readiness and Preparatory

More information

Fourth Report of the Green Climate Fund to the Conference of the Parties to the United Nations Framework Convention on Climate Change

Fourth Report of the Green Climate Fund to the Conference of the Parties to the United Nations Framework Convention on Climate Change Fourth Report of the Green Climate Fund to the Conference of the Parties to the United Nations Framework Convention on Climate Change GCF/B.10/08 26 June 2015 Meeting of the Board 6 9 July 2015 Songdo,

More information

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG)

UNDP Initiation Plan to programme the project preparation grant received from the GEF. (otherwise called GEF PPG) UNDP Initiation Plan to programme the project preparation grant received from the GEF (otherwise called GEF PPG) effective for all PIFs approved as of GEF November work programme 2017 A. Background: The

More information

China s National ETS. LIU Wenbo, SU Chang CHINA Kyiv, Ukraine

China s National ETS. LIU Wenbo, SU Chang CHINA Kyiv, Ukraine China s National ETS LIU Wenbo, SU Chang CHINA 2018.4.24 Kyiv, Ukraine ontents I. Background II. China's National ETS III.Next Step Part I Background Background Joint climate change statement between China

More information

THE NORWEGIAN FAST-START FINANCE CONTRIBUTION

THE NORWEGIAN FAST-START FINANCE CONTRIBUTION Working Paper THE NORWEGIAN FAST-START FINANCE CONTRIBUTION THORVALD MOE, STEFFEN KALLBEKKEN, SMITA NAKHOODA, TARYN FRANSEN, AND ALICE CARAVANI EXECUTIVE SUMMARY Developed country governments have repeatedly

More information

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA

PEFA Handbook. Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA PEFA Handbook Volume I: The PEFA Assessment Process Planning, Managing and Using PEFA October 18, 2016 PEFA Secretariat Washington DC USA 1 Table of Contents PEFA ASSESSMENT HANDBOOK... 5 Preface... 5

More information

GUIDE Beta Version 1.0 Current as at: 12 November 2018

GUIDE Beta Version 1.0 Current as at: 12 November 2018 GUIDE Beta Version 1.0 Current as at: 12 November 2018 Contact Reef Credit Secretariat www.reefcredit.org Acknowledgements In 2017, natural resource management not-for-profits, Terrain NRM and NQ Dry Tropics,

More information

TOWARDS THE FULL OPERATIONALIZATION OF THE GREEN CLIMATE FUND

TOWARDS THE FULL OPERATIONALIZATION OF THE GREEN CLIMATE FUND TOWARDS THE FULL OPERATIONALIZATION OF THE GREEN CLIMATE FUND Informal meeting of prospective GCF Board members and other interested parties New York City 22-23 March 2012 MEETING SUMMARY I. Purpose and

More information

Support to the implementation of the ICGLR's Regional Initiative on Natural Resources This project is co-financed by the European Union

Support to the implementation of the ICGLR's Regional Initiative on Natural Resources This project is co-financed by the European Union 1 Support to the implementation of the ICGLR's Regional Initiative on Natural Resources This project is co-financed by the European Union International Conference on the Great Lakes Region (ICGLR) Terms

More information

Duration of Assignment: Approx. 150 working days from January to September 2015

Duration of Assignment: Approx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Gender Poverty Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports

More information

SUBMISSION BY DENMARK AND THE EUROPEAN COMMISSION ON BEHALF OF THE EUROPEAN UNION AND ITS MEMBER STATES

SUBMISSION BY DENMARK AND THE EUROPEAN COMMISSION ON BEHALF OF THE EUROPEAN UNION AND ITS MEMBER STATES SUBMISSION BY DENMARK AND THE EUROPEAN COMMISSION ON BEHALF OF THE EUROPEAN UNION AND ITS MEMBER STATES Bonn, 25 May 2012 Subject: EU Fast Start Finance Report Key Messages In accordance with developed

More information

READINESS INCEPTION DOCUMENT TEMPLATE. Summary. Country. Date of Submission 26/02/2016. NDA or Focal Point contact details

READINESS INCEPTION DOCUMENT TEMPLATE. Summary. Country. Date of Submission 26/02/2016. NDA or Focal Point contact details PAGE 1 OF 36 (Please submit completed form to countries@gcfund.org) Summary Country GUYANA Date of Submission 26/02/2016 NDA or Focal Point contact details l NDA: Name: Lt. Col. (Ret) Joseph Harmon Position: