Annex A: Logical framework

Size: px
Start display at page:

Download "Annex A: Logical framework"

Transcription

1 Twinning Project Fiche Development of external audit and control of public finances in Ukraine Annex A: Logical framework Logical Framework for the Twinning Project: Development of external audit and control of public finances in Ukraine Programme and number: ENI 2015, UA 15 ENI FI (UA/56) Project completion date: May 2019 Duration: 24 months + 3 months Total budget: 1,500,000 Euro Intervention logic Benchmarks Sources of Information Assumptions (external to project) Overall Objective Improvement of the external state audit and control system by implementing INTOSAI standards (levels I-III), improvement of the quality of audits and strengthening the institutional capacity of the ACU. External state audit and control system is improved by implementing INTOSAI standards. Institutional capacity of the ACU is strengthened and quality of audits is improved. Reports on implementation of the EU- Ukraine Association Agenda and the European Union-Ukraine Association Agreement Final report of the Twinning project. Project Purpose - Legislation approximation in the area of external control and audit in line with INTOSAI standards (levels I-III). - Enhanced quality of audits. Legislation on the external control and audit is analysed (including elaborated drafts), recommendations, drafts of. Regular Twinning reports. Reports from other EUfunded projects. Parliament and the Government continue ensuring the policy of transparent and effective public external financial 1

2 Intervention logic Benchmarks Sources of Information Assumptions (external to project) - Improvement of internal policies of the Accounting Chamber focused on audit and control methodologies; risk management system; training and certification of staff. -Strengthening institutional capacity of the Accounting Chamber by enhancing cooperation between the ACU, the Parliament, the Government and Ukrainian public, specifically by ensuring proper followup and public access to the ACU reports. legislation, rules and procedures are prepared in line with the INTOSAI standards. Audit quality is enhanced by preparing manuals, conducting trainings and study visits, support of conducting pilot audits. Internal policies of the ACU regarding audit and control methodologies, risk management etc are improved. Institutional capacity of the ACU is strengthened by enhanced cooperation with key stakeholders (the Parliament, the Government and Ukrainian public). Final report of the Twinning project. Drafts of primary/secondary legislation, rules and procedures control. Commitment by other stakeholders. Political sustainability and stability. Responsiveness of twinning partners to a changing context. Necessary legal provisions, administrative arrangements and resources are available. The Parliament and the Government support strengthening interaction with the ACU Mandatory Results (Components) Component 1: Legislation approximation in the area of external audit and control in line with INTOSAI standards Result 1.1.: Provisions of the new Law of Ukraine On the Accounting Chamber and ISSAIs (levels I-III) are supported by appropriate/corresponding national legislation. Gaps related to levels I-II of ISSAIs in primary legislation related to the area of external audit and control are identified. Draft amendments or new legislation to Budget and Tax Codes as well as corresponding laws, relevant government. Gap analysis report with relevant recommendations, prepared by Twinning project. Draft amendments or new legislation to Budget and Tax Codes as well as corresponding laws, relevant government ACU management remains receptive to reform and is committed to the project ACU staff has sufficient time to engage with project Continued support of the Parliament Budget 2

3 Intervention logic Benchmarks Sources of Information Assumptions (external to project) Result 1.2.: The Strategic Development Plan (SDP) of the Accounting Chamber of Ukraine as well as Strategy for ISSAIs implementation as a part of the SDP are improved. decrees addressing identified gaps are developed. 1 round table focused on presentation of proposed amendments is organized The Strategic Development Plan of the ACU based on the EU best practices and internal operational planning system of the ACU is improved; ISSAIs implementation strategy as a part of SDP is developed; Improvement of monitoring and performance assessment system during SDP implementation process is facilitated. 1 round table is organized. decrees addressing identified gaps. Agenda and minutes of round table. Report on improvement of the SDP of the ACU prepared by Twinning project. Report with recommendations on development of the ISSAIs implementation strategy, prepared by Twinning project Report on improvement of monitoring and performance assessment system during SDP implementation process, prepared by Twinning project Agenda and minutes of round table. Committee. Evaluation can be carried out at the end of the Twinning Project. All works are performed by high level experts in coordination with Beneficiary representatives 3

4 Intervention logic Benchmarks Sources of Information Assumptions (external to project) Mandatory Results (Components) Component 2: Development of audit methodologies and reporting capacities Result 2.1.: Basic requirements of international standards ISSAI (levels I-III) are incorporated into guidelines and manuals of the Accounting Chamber of Ukraine on financial audit, compliance audit and performance audit as well as into audit practices. The guidelines (procedures/manuals) to conduct financial, compliance and performance audits are reviewed and improved with the advice of experts. 2 study visits for 6 people for gaining experience in matters of conducting audits in accordance with international standards of INTOSAI are conducted. 3 practical trainings with the participation of experts in relevant fields for the auditors are conducted. Pilot audits with the participation of experts are conducted. The follow-up mechanism for audit recommendations on the results of audits and approaches for opening information from follow-up reports are elaborated. Project report on implementation of ISSAIs in manuals and standards of the ACU,. Project reports on changes in system, procedures and standards of audit performance. Reports on results of pilot audits. Training materials Reports on results of conducted trainings and study visits. ACU management remains receptive to reform and is committed to the project ACU staff has sufficient time to engage with project Continued support of the Parliament Budget Committee. Evaluation can be carried out at the end of the Twinning Project. Training materials are prepared. 4

5 Intervention logic Benchmarks Sources of Information Assumptions (external to project) Result 2.2.: The risk management system as well as audit quality control and assurance system are implemented. Recommendations on implementation of riskbased management system are provided. Proposals for improvement of audits quality control and assurance system are developed (Twinning will not be able to improve the quality control system.) Approaches for government bodies anti-corruption risk assessment and risk analysis and monitoring process are elaborated. 1 study visit is conducned. Training materials for auditors prepared, trainings are conducted Project report with analysis and recommendations on implementation of riskbased management system. Project report with analysis and recommendations to improve audits quality control and assurance system. ACU management remains receptive to reform and is committed to the project ACU staff has sufficient time to engage with project Continued support of the Parliament Budget Committee. Evaluation can be carried out at the end of the Twinning Project. Result 2.3.: ISSAIs on IT audit are implemented with corresponding training for the auditors. Draft manual on IT auditing based on corresponding ISSAIs is developed. Practical trainings for IT auditors on conducting IT audits are conducted. Draft manual on IT auditing. Training materials and reports on results of conducted training events. Report on pilot IT audit. Pilot IT audit with the participation of experts is 5

6 Intervention logic Benchmarks Sources of Information Assumptions (external to project) conducted. 1 training course is developed and conducted. 1 study visit is conducted. Training materials are prepared. Result 2.4.: IDEA software is incorporated with supporting training for improvement of financial audit. The ACU was provided with IDEA software/idea software was updated for the ACU. Training for auditors on IDEA software usage is conducted. Project reports with relevant analysis and recommendations. Reports on practical trainings for auditors on IDEA software usage. ACU management remains receptive to reform and is committed to the project ACU staff has sufficient time to engage with project Relevant software can be procured or developed and incorporated within existing IT infrastructure. Component 3: Strengthening of the ACU's institutional capacity and improving impact of the ACU s audit results Result 3.1.: Recommendations on the improvement of organisational structure and functions of the ACU are developed. Assessment of the professional capacities of ACU staff to implement ISSAIs is conducted. The internal organisational structure of the ACU is reviewed in accordance with the new Law of Ukraine On the Accounting Chamber and the best practice of European SAIs. Assessment report on ACU staff professional capacities, prepared by Twinning project. Draft new/updated ACU organigram and internal regulations. Policy papers, draft manuals and procedures for new management system. ACU management remains receptive to reform and is committed to the project ACU staff has sufficient time to engage with project ACU have access to sufficient qualified and skilled staff to work alongside MS experts on the 6

7 Intervention logic Benchmarks Sources of Information Assumptions (external to project) Functional responsibilities of each ACU organizational unit, job descriptions for auditors and advisors for Members of the Board, establishing lines of authority and responsibility by updating the internal regulation of the institution are developed. Internal regulations, including Rules of Procedures of the Accounting Chamber, the Code of Ethics are reviewed. The training events on strengthening of institutional capacities of the ACU in the areas of HR management, staff training are conducted. Suggestions to improve internal document management system are developed. Functional responsibilities of ACU organizational unit, job descriptions for auditors and advisors for Members of the Board. Draft suggestions to improve internal document management system. Training materials and reports on results of conducted training events. development program. Evaluation can be carried out at the end of the Twinning Project. 7

8 Intervention logic Benchmarks Sources of Information Assumptions (external to project) Result 3.2.: The interactive web-site of the ACU is made fully operational, including online dialogue with civil society, subscription to news, on-line comments to audit reports, user-friendly design of the web-site. The system of audit reports publication, informing stakeholders and the public on completed audits is enhanced. The ACU s web-site as an integral part of designing the communications strategy is modernized. The modern communications strategy to enhance public credibility, and establish schemes for online communication with public is developed. Project report with relevant analysis and recommendations on upgrade of the ACU s web-site. Draft Strategy. Communication ACU management remains receptive to reform and is committed to the project ACU staff has sufficient time to engage with project ACU have access to sufficient qualified and skilled staff to work alongside MS experts on the development program. Evaluation can be carried out at the end of the Twinning Project. Result 3.3.: The framework of interaction between the ACU and key stakeholders (the President of Ukraine, the Budget Committee of the Parliament of Ukraine, the Cabinet of Ministers of Ukraine, the Ministry of Finance of Ukraine, State Treasury Service of Ukraine, key budget holders etc.) including evaluation of follow up on audit reports by the Budget Committee of the Parliament is developed. The current state of cooperation between the ACU and Parliament/ Government is analyzed. The draft interaction framework with Budget Committee, Parliament, the Government and audited entities in accordance with EU best practices is developed. Guidelines to support the improvement of the procedures on follow up of ACU decisions, based on Project reports with relevant analysis and recommendations on cooperation between the ACU and the Parliament/ Government. Draft framework. interaction Draft guidelines to support the improvement of the procedures on follow up of ACU decisions. Draft concept and design of the ACU Annual Commitments of the key stakeholders involved in public finance audit. Key stakeholders clearly understand the purpose, methods and consequences of the ACU s Effective cooperation with key stakeholders, especially the Parliament of Ukraine and the Government. ACU management remains receptive to reform and is committed to the project 8

9 Intervention logic Benchmarks Sources of Information Assumptions (external to project) the experience of the EU are developed. Proposals on improving structure of the reports submitted to the Parliament and the corresponding committees and reporting models based on the EU good practices are prepared. Training events for the auditors who prepare such reports are conducted. Proposal on new concept and design of the ACU Annual Report to the Parliament according to art. 30 of the Law of Ukraine On the Accounting Chamber is developed. Report. Training materials and reports on results of conducted training events. ACU staff has sufficient time to engage with project ACU have access to sufficient qualified and skilled staff to work alongside MS experts on the development program. Intervention logic Benchmarks Assumption 9

10 Intervention logic Benchmarks Assumption Activities Kick-off meeting to launch the Project Presentation of the project, the Project office of the Resident Twinning Advisor (RTA) in the premises of the Accounting Chamber of Ukraine is conducted with support of 2 interpreters (simultaneous interpretation). 0.2 Final round-table discussions (closure meeting) 0.3 Round table meetings Revise and identify gaps related to levels I-III of ISSAIs in primary legislation related to the area of external audit and control. The results of the project are presented, including presentations on the project s achievements and raising public awareness with support of 2 interpreters (simultaneous interpretation). The round table meetings are organized, involving the Budget Committee, Government bodies, civil society, professional organizations and academia, aimed at discussion of the main challenges related to the value and benefits of external audit, particularly, the value of financial auditing, interaction with Parliament, the Government and audited entities, external audit role in detecting and reducing corruption. Revision and identification of gaps is conducted through 1 STE x 4 missions x 5 days + interpretation (5 days) + 1 The activities and the number of man/days for STEs proposed in the logical framework are indicative. 10

11 Intervention logic Benchmarks Assumption Develop new legislation and/or draft amendments to Budget and Tax Codes and as well as corresponding laws, relevant government decrees addressing identified gaps. translation (100 pages). Draft amendments or new legislation is prepared through 2 STEs x 3 missions x 10 days + interpretation (9 days) + translation (200 pages). partners Improve the Strategic Development Plan 2 of the ACU based on EU best practices and internal planning system framework for elaboration the supportive planning of operational Develop ISSAIs implementation strategy as a part of SDP Facilitate improvement of monitoring and performance assessment system during SDP implementation process. Improvement recommendations are prepared through 1 STE x 1 mission x 5 wdays + translation (100 pages). Draft ISSAI implementation strategy is developed with support of 1 STE x 2 missions x 5 wdays + translation (100 pages). Monitoring and performance assessment system is improved through 1 STE mission x 5 days + translation (100 pages). Report with recommendations provided. 2 Strategic Development Plan includes Strategy of ACU capacity, institutional and professional development and Action Plan for its implementation. 11

12 Intervention logic Benchmarks Assumption Review and improve, with the advice of experts, the guidelines (procedures/manuals) to conduct financial, compliance and performance audits Conduct study visits for gaining experience in matters of conducting audits in accordance with international standards of INTOSAI Provide practical training sessions on annual audit planning of the Accounting Chamber Conduct staff training for audit of EU funds. Recommendations for improvement of guidelines (procedures/manuals) to conduct financial, compliance and performance audits are prepared with support of 2 STEs x 3 missions x 10 wdays + interpretation (12 days) + translation (150 pages). Four 5-days study visits to EU countries for 6 people organized and conducted. Study tour report prepared and discussed. Four practical trainings for the auditors provided with the support of 3 STEs x 3 missions x 3 wdays + translation (100 pages). Two practical trainings for the auditors provided with the support of 2 STEs x 2 missions x 3 wdays + translation (100 pages). ACU staff able to assimilate modern audit techniques. ACU staff able to assimilate modern audit techniques. Trained personnel/auditors remain in the ACU. ACU staff able to assimilate modern audit techniques. Availability and commitment of the auditors participate in trainings. Trained personnel/auditors remain in the ACU. Trained personnel / auditors work in ACU. 12

13 Intervention logic Benchmarks Assumption Identify and conduct pilot audits (performance, financial, compliance) with the participation of experts Elaborate the follow-up mechanism for audit recommendations on the results of audits and approaches for opening information from follow-up reports. Pilot audits (performance, financial and compliance) are identified and conducted through 2 STEs x 8 missions x 5 wdays + interpretation (15 days) + translation (120 pages). Follow-up mechanism is elaborated with support of 1 STE x 1 mission x 5 days. ACU staff able to assimilate modern audit techniques. Trained personnel / auditors remain in ACU Provide recommendations on implementation of risk-based management system Improve audits quality control and assurance system Work out approaches for government organizations anti-corruption risk assessment and risk analysis and monitoring process. Recommendations on implementation of risk-based management system are elaborated through 1 STE x 1 mission x 10 wdays + translation (40 pages). Recommendations on audits quality control and assurance system elaborated through 2 STEs x 1 mission x 5 wdays + translation (100 pages). Report with recommendations provided. Approaches for government organizations anti-corruption risk assessment and risk analysis and monitoring process are worked out with assistance of 1 STE x 2 missions x 5 wdays. Report with recommendations partners and stakeholders. partners and stakeholders. partners and stakeholders. 13

14 Intervention logic Benchmarks Assumption provided Develop Manual on IT auditing based on corresponding ISSAIs Conduct practical trainings for IT auditors on conducting IT audits Conduct pilot IT audit with the participation of experts. 1 STE x 3 missions x 5 days + translation (80 pages). Draft Manual on IT auditing is provided. Three practical trainings for the auditors provided with the support of 2 STEs x 3 missions x 5 wdays + translation (100 pages). Pilot audit is conducted through 2 STEs x 3 missions x 5 wdays + interpretation (15 days) + translation (100 pages). ACU staff able to assimilate modern audit techniques. ACU staff able to assimilate modern audit techniques. Trained personnel / auditors remain in ACU. ACU staff able to assimilate modern audit techniques. Trained personnel / auditors remain in ACU Update/Provide IDEA software for the ACU. IDEA software is updated/provided for the ACU use with support of 1 STE x 2 missions x 5 wdays + translation (100 pages). ACU staff able to assimilate modern audit techniques. 14

15 Intervention logic Benchmarks Assumption Provide supportive training for the ACU staff. Supportive training is provided through 1 STE x 3 missions x 5 wdays + interpretation (15 days) + translation (60 pages). Report with recommendations provided. ACU staff able to assimilate modern audit techniques. Trained personnel / auditors remain in ACU Assess the professional capacities of ACU staff to implement ISSAIs Review the internal organisational structure of the ACU in accordance with the new Law of Ukraine On the Accounting Chamber and the best practice of European SAIs. Assessment is conducted through 1 STE x 2 missions x 5 wdays) + interpretation (10 days) + translation (100 pages). Report with recommendations provided. The internal organisational structure of the ACU is reviewed through 1 STE x 2 missions x 5 wdays + interpretation (5 days) + translation (50 pages) Develop functional responsibilities of each ACU organizational unit, job descriptions for auditors and advisors for Members of the Board, establishing lines of authority and responsibility by updating the internal regulation of the institution Review internal regulations, including Rules of Procedures of the Accounting Chamber, the Code of Ethics. Draft functional responsibilities are elaborated through 1 STE x 3 missions x 5 wdays + interpretation (15 days) + translation (80 pages). Internal regulations of the ACU are reviewed through 1 STE x 1c mission x 5 days + translation (100 pages). 15

16 Intervention logic Benchmarks Assumption Conduct the training events on strengthening the institutional capacities of the ACU in the areas of annual planning of activities, including audit planning, budget planning, HR, staff training etc Develop suggestions to improve internal management document system Report with recommendations provided. Trainings are conducted through 2 STEs x 2 missions x 5 wdays + interpretation (5 days) + translation (50 pages). Report with corresponding suggestions is provided through 1 STE x 1 mission x 5 wdays + translation (40 pages). Trained personnel / auditors remain in ACU Develop concept for modernization of the web-site as an integral part of designing the modern communications strategy Design and develop the modern communications strategy to enhance public credibility, and establish schemes for online communication with public. Report with corresponding suggestions to modernize the ACU web-site is provided through 1 STE x 2 mission x 5 wdays + translation (30 pages). Draft communications strategy is developed through 1 STE x 1 mission x 5 days + translation (40 pages) Analyze the current state of cooperation between the ACU and Parliament/Government. Report with analysis is provided through 1 STE x 1 mission x 5 days + interpretation (5 days) + translation 16

17 Intervention logic Benchmarks Assumption (50 pages) Develop a draft interaction framework with Budget Committee, Parliament, the Government and audited entities in accordance with EU best practices Develop guidelines to support the improvement of the procedures on follow up of ACU decisions, based on the experience of the EU Improve the structure of the reports submitted to the Parliament and the corresponding committees by preparing reporting models based on the EU good practices and conduct training events for the auditors who prepare such reports Develop new concept and design of the ACU Annual Report to the Parliament according to art. 30 of the Law of Ukraine On the Accounting Chamber. Draft interaction framework is developed through 1 STE x 1 mission x 5 days + interpretation (5 days) + translation (100 pages). Draft guidelines are developed through 1 STE x 1 mission x 5 days + translation (30 pages). Draft reporting models are prepared through 1 STE x 2 mission x 5 days + translation (30 pages). Study visit to MS country is conducted. New concept and design of the ACU Annual Report is developed through 1 STE x 2 mission x 5 days + translation (30 pages). Study visit to MS country is conducted Conduct study visits Study visits are conducted for 6 experts of the ACU x 4 study tours x 5 days 17

18 Intervention logic Benchmarks Assumption 18

STANDARD TWINNING PROJECT FICHE

STANDARD TWINNING PROJECT FICHE STANDARD TWINNING PROJECT FICHE 1. Basic Information 1.1 Publication reference Number: EuropeAid/ 136-263/IH/ACT/AL 1.2 Programme: IPA National programmes/component I (2013) 1.3 Twinning Number: AL 13

More information

It is currently the institution whose role consists of supporting the promotion of:

It is currently the institution whose role consists of supporting the promotion of: The supreme audit institution of Romania, the Court of Accounts, was initially set up in 1864 and operated until 1948. For the following 25 years financial control was initially the responsibility of the

More information

DAC-code Sector Public Sector Policy and Administrative Management

DAC-code Sector Public Sector Policy and Administrative Management ANNEX 1 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementatio n Framework Programme in support of EU-Ukraine Agreements CRIS: ENPI/2012/23714

More information

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen JOB PROFILE 17/08/2013 Job Description and Requirements Programme Manager State-building and Governance Job no. 127004 in the EU Delegation to the Republic of Yemen Job Type: Contract Agent Function Group

More information

Twinning Project Fiche

Twinning Project Fiche 1. Basic Information Twinning Project Fiche 1.1. Programme: European Neighborhood and Partnership Instrument - National Action Programme 2009 1.2. Twinning Number: AZ11/ENP-PCA/TP/18 1.3. Title: Approximation

More information

At the present time Accounting Chamber is known as a source of independent, reliable and professional expertise both in Ukraine and abroad.

At the present time Accounting Chamber is known as a source of independent, reliable and professional expertise both in Ukraine and abroad. National paper Accounting Chamber of Ukraine Subtheme 1: Enhancing Stakeholder Confidence: Auditing Management Integrity, Accountability and Tone at the Top VII EUROSAI-OLACEFS Conference 17-19 September

More information

EU Enlargement. its Financial Support. Istanbul 27 June European Commission. EU Enlargementand

EU Enlargement. its Financial Support. Istanbul 27 June European Commission. EU Enlargementand and its Financial Support Istanbul 27 June 2012 European Commission The 2012 enlargement agenda How to get in: conditions for membership Copenhagen criteria (1993) Political Stable democratic institutions

More information

Global Call for Proposals SAI Serbia Concept Note

Global Call for Proposals SAI Serbia Concept Note Global Call for Proposals SAI Serbia Concept Note 1. Concept note proposal and SAI background 1.1 Applicant SAI Serbia Application approved by: Dr. Duško Pejovic, Auditor General 1.2 Legal Applicant SAI

More information

REPIM Curriculum Vitae Sharon Hanson-Cooper

REPIM Curriculum Vitae Sharon Hanson-Cooper RESEARCH ON ECONOMIC POLICY IMPLEMENTATION & MANAGEMENT FERNWOOD HOUSE, WEST WOODFOOT, SLALEY, HEXHAM, NE47 0DF, NORTHUMBERLAND, ENGLAND. TEL: 00 44 1434 673385 e mail: enquiries@repim.eu Name: SHARON

More information

STANDARD TWINNING LIGHT PROJECT FICHE

STANDARD TWINNING LIGHT PROJECT FICHE STANDARD TWINNING LIGHT PROJECT FICHE 1. Basic Information 1.1 Publication notice reference: 1.2 Programme: Transition Facility IPA/2013/24986 (Annex of C(2013) 8057 final); Institution Building Envelope

More information

17. Communication, Dissemination and Exploitation. Revised

17. Communication, Dissemination and Exploitation. Revised EN HORIZON 2020 WORK PROGRAMME 2014 2015 17. Revised This Work Programme was adopted on 10 December 2013. The parts that relate to 2015 (topics, dates, budget) have, with this revised version, been updated.

More information

Annual Implementation Report CITIZEN S SUMMARY

Annual Implementation Report CITIZEN S SUMMARY INTERREG V-A Italy Croatia 2014-2020 CCI 2014TC16RFCB042 Annual Implementation Report CITIZEN S SUMMARY Article 50(9) of Regulation (EU) No 1303/2013 Draft 2/2017 XX.06.2016 The INTERREG V A Cross-border

More information

Audit manual - general part

Audit manual - general part Audit manual - general part Audit manual - general part Helsinki 2015 National Audit Office Registry no. 23/01/2015 The National Audit Office of Finland (hereafter National Audit Office) is Finland's

More information

Standard Project Fiche. 1.2 Title: Further Institutional Strengthening of the Court of Accounts

Standard Project Fiche. 1.2 Title: Further Institutional Strengthening of the Court of Accounts Standard Project Fiche 1. Basic Information 1.1 Desiree Number: RO-2002/000-586.03.03 1.2 Title: Further Institutional Strengthening of the Court of Accounts 1.3 Sector: Finance 1.4 Twinning component:

More information

ANNEX C1: Twinning Fiche

ANNEX C1: Twinning Fiche ANNEX C1: Twinning Fiche Project title: Reform of the initial and continuous training of the police system in the Republic of Moldova Beneficiary administration: Ministry of Internal Affairs and the General

More information

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary Project fiche 1.1: Strengthening the capacity of the institutions to manage and implement the Operational Programmes 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Strengthening the capacity

More information

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument

ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument ANNEX 15 of the Commission Implementing Decision on the 2015 Annual Action programme for the Partnership Instrument Action Fiche for EU- Brazil Sector Dialogues Support Facility 1. IDENTIFICATION Title

More information

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Support to the Tax Administration Action summary This Action aims to support Montenegro in the process of fulfilling the EU preaccession

More information

1. BASIC INFORMATON 2. OBJECTIVE

1. BASIC INFORMATON 2. OBJECTIVE 1. BASIC INFORMATON 1.1 PROGRAMME ENP National Annual Action Program 2007 for Azerbaijan. 1.2 TWINNING NUMBER AZ10/ENP-PCA/FI/15 1.3 TITLE Assisting the Public Financial Control Service (PFCS) in improving

More information

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18

Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18 Standard Summary Project Fiche IPA centralised programmes Project Fiche: 18 1. Basic information 1.1. CRIS Number: 2010/022-154 1.2. Title: Technical Assistance and Project Preparation Facility (TA&PPF)

More information

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP EUROPEAN COMMISSION EUROPEAN EXTERNAL ACTION SERVICE VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP ***LAST UPDATE 24 SEPTEMBER 2010*** Table of Contents PART I An Overview of the Eastern

More information

SIGMA Summary Report

SIGMA Summary Report SIGMA Support for Improvement in Governance and Management A joint initiative of the OECD and the European Union, principally financed by the EU SIGMA Peer Assistance Review of the Lithuanian National

More information

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630

ANNEX. Support to the reform of criminal justice system in Georgia - CRIS N ENPI/2008/19630 ANNEX ACTION FICHE GEORGIA PI AAP 2008 1. IDTIFICATION Title Total cost 16 M Aid method / management mode Support to the reform of criminal justice system in Georgia - CRIS N PI/2008/19630 Sector Policy

More information

Standard Summary Project Fiche for the Transition Facility

Standard Summary Project Fiche for the Transition Facility Standard Summary Project Fiche for the Transition Facility 1 Basic Information 1.1 CRIS Number: 2006/01/-176.05.01 1.2 Title: Unallocated IB envelope 1.3 Sector: Other IB actions 1.4 Location: Hungary*

More information

How to Develop High-Quality Full Application Writing a Winning Proposal

How to Develop High-Quality Full Application Writing a Winning Proposal How to Develop High-Quality Full Application Writing a Winning Proposal Information and Training Workshop Presentations held at the Country Workshops in Moldova, Ukraine and Georgia Day 1 Day!One!!!! Workshop

More information

Paper 3 Measuring Performance in Public Financial Management

Paper 3 Measuring Performance in Public Financial Management Paper 3 Measuring Performance in Public Financial Management Key Issues 1. Effective financial management of public resources is essential to achieve the objectives of development programmes. It also promotes

More information

THEMATIC COMPILATION OF RELEVANT INFORMATION SUBMITTED BY RWANDA ARTICLE 9, PARAGRAPHS 2 AND 3 UNCAC MANAGEMENT OF PUBLIC FINANCES

THEMATIC COMPILATION OF RELEVANT INFORMATION SUBMITTED BY RWANDA ARTICLE 9, PARAGRAPHS 2 AND 3 UNCAC MANAGEMENT OF PUBLIC FINANCES THEMATIC COMPILATION OF RELEVANT INFORMATION SUBMITTED BY RWANDA RWANDA (SIXTH MEETING) ARTICLE 9, PARAGRAPHS 2 AND 3 UNCAC MANAGEMENT OF PUBLIC FINANCES Measures to promote transparency and accountability

More information

State Audit Office of Georgia

State Audit Office of Georgia State Audit Office of Georgia Public Finance Management Report 2016 Action Plan (January - December) 1. Enhance the impact of financial, compliance and performance audits in accordance with international

More information

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies

Mid Term Review of Project Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Mid Term Review of Project 00059714 Support for enhancing capacity in advising, examining and overseeing macroeconomic policies Final Evaluation Report Date of Report: 8 August 2013 Authors of Report:

More information

Action Fiche for Libya

Action Fiche for Libya Action Fiche for Libya 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation Public administration capacity-building facility (ENPI/2011/276-708) EU contribution: EUR 4.5 million

More information

TAIEX AND TWINNING INSTRUMENTS FOR SHARING EU EXPERTISE

TAIEX AND TWINNING INSTRUMENTS FOR SHARING EU EXPERTISE TAIEX AND TWINNING INSTRUMENTS FOR SHARING EU EXPERTISE Lazar Todorov Team Leader FINANCIAL INFORMATION: CATALYST FOR GROWTH SENIOR OFFICIALS WORKSHOP, 28-29 March 2017, Brussels DG Neighbourhood and Enlargement

More information

Annex 1 Citizen s summary 1

Annex 1 Citizen s summary 1 Programming process Annex 1 Citizen s summary 1 The process of preparation of the Cooperation Programme was coordinated by the Managing Authority (Ministry of Regional Development and EU Funds of the Republic

More information

Guidelines for the AF DSP call for proposals

Guidelines for the AF DSP call for proposals Guidelines for the AF DSP call for proposals A stream of cooperation edited by the Managing Authority/Joint Secretariat Budapest, Hungary, 2018 Programme co-funded by the European Union Table of content

More information

Accounting and Audit Community of Practice (A&A CoP) STAREP

Accounting and Audit Community of Practice (A&A CoP) STAREP Accounting and Audit Community of Practice (A&A CoP) STAREP Requirements to financial reporting applied to different types of business entities in UKRAINE Participants of A&A CoP Ukraine: 1. Mr. Oleg Kantsurov

More information

Bilateral Guideline. EEA and Norwegian Financial Mechanisms

Bilateral Guideline. EEA and Norwegian Financial Mechanisms Bilateral Guideline EEA and Norwegian Financial Mechanisms 2014 2021 Adopted by the Financial Mechanism Committee on 9 February 2017 09 February 2017 Contents 1 Introduction... 4 1.1 Definition of strengthened

More information

IMPLEMENTATION OF THE STRATEGY ON MODERNISATION OF PUBLIC ADMINISTRATION MONITORING PERIOD: OCTOBER 2015 OCTOBER 2016

IMPLEMENTATION OF THE STRATEGY ON MODERNISATION OF PUBLIC ADMINISTRATION MONITORING PERIOD: OCTOBER 2015 OCTOBER 2016 IMPLEMENTATION OF THE STRATEGY ON MODERNISATION OF PUBLIC ADMINISTRATION MONITORING PERIOD: OCTOBER 2015 OCTOBER 2016 January 2017 1 1. INTRODUCTION The strategic framework on Public Administration Reform

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

Report on the annual accounts of the Single European Sky Air Traffic Management Research Joint Undertaking for the financial year 2017

Report on the annual accounts of the Single European Sky Air Traffic Management Research Joint Undertaking for the financial year 2017 Report on the annual accounts of the Single European Sky Air Traffic Management Research Joint Undertaking for the financial year 2017 Together with the Joint Undertaking s reply 12, rue Alcide De Gasperi

More information

FINAL VERSION. 1. Basic information. 1.1 CRIS Number: 2009/

FINAL VERSION. 1. Basic information. 1.1 CRIS Number: 2009/ FINAL VERSION 1. Basic information 1.1 CRIS Number: 2009/021-665 1.2 Title: Strengthening the capacity of the Ministry of Finance for macroeconomic analysis and policy formulation in order to improve policy

More information

Standard Summary Project Fiche for the Transition Facility

Standard Summary Project Fiche for the Transition Facility 01. Basic Information Standard Summary Project Fiche for the Transition Facility 01.1. CRIS Number: 2004/16762.04.02. 01.2. Title 01.3. Sector Twinning light: MT04-IB-SO-02 Capacity strengthening of the

More information

The Sustainable Development Goals Monitoring and Coordination of SDG 16. Country: Georgia. Mariam Tutberidze IDFI

The Sustainable Development Goals Monitoring and Coordination of SDG 16. Country: Georgia. Mariam Tutberidze IDFI The Sustainable Development Goals Monitoring and Coordination of SDG 16 Country: Georgia Mariam Tutberidze IDFI 04.09.2017 Summary 1. Implementation of SDG agenda in Georgia 2. Government coordination

More information

EXCERPT FROM THE AUDIT REPORT ON THE GENERAL SECRETARIAT OF THE GOVERNMENT

EXCERPT FROM THE AUDIT REPORT ON THE GENERAL SECRETARIAT OF THE GOVERNMENT EXCERPT FROM THE AUDIT REPORT ON THE GENERAL SECRETARIAT OF THE GOVERNMENT Type of audit: Audited entity: Subject of audit: Audit duration: Auditing Board members: Financial audit and regularity audit

More information

Consolidated Procurement Plan

Consolidated Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Consolidated Procurement Plan 2. Project information: ZIMBABWE The Zimbabwe PFM Enhancement Project responds

More information

COMPLIANCE ACTIVITY REPORT

COMPLIANCE ACTIVITY REPORT 2 1 006 6 COMPLIANCE ACTIVITY REPORT CONTENTS STATEMENT BY THE CHAIRMAN OF THE BOARD OF THE INTERNATIONAL INVESTMENT BANK STATEMENT BY THE CHAIRMAN OF THE BOARD 1 INTRODUCTION 2 CORE ACTIVITY 3 Since the

More information

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI

Annex I Action Fiche for West Bank and Gaza Strip/ ENPI Annex I Action Fiche for West Bank and Gaza Strip/ ENPI 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementation PEGASE: Support to Recurrent Expenditures of the PA EUR 158,500,000

More information

SUMMARY PROJECT FICHE

SUMMARY PROJECT FICHE SUMMARY PROJECT FICHE 1. BASIC INFORMATION 1.1 Title: Development of the VAT Service through a Reform and Modernization programme to apply and enforce the Acquis. 1.2. Code : CY0001.02.02 1.3. Sector:

More information

Project fiche IPA National programmes 2012/ Component I

Project fiche IPA National programmes 2012/ Component I Project fiche IPA National programmes 2012/ Component I 1. IDENTIFICATION Project Title Implementation of a modern Financial Management and Control system and Public Financial Inspection in Albania CRIS

More information

PRIORITIES ALBANIA MAY 2013

PRIORITIES ALBANIA MAY 2013 www.sigmaweb.org PRIORITIES ALBANIA MAY 2013 This document has been produced with the financial assistance of the European Union. The views expressed herein can in no way be taken to reflect the official

More information

Report of the Seventeenth Meeting of the Independent Expert Oversight Advisory Committee (IEOAC) of the World Health Organization

Report of the Seventeenth Meeting of the Independent Expert Oversight Advisory Committee (IEOAC) of the World Health Organization Report of the Seventeenth Meeting of the Independent Expert Oversight Advisory Committee (IEOAC) of the World Health Organization (Geneva, 20 22 October 2015) The meeting was the third and last of three

More information

STANDARD TWINNING PROJECT FICHE

STANDARD TWINNING PROJECT FICHE STANDARD TWINNING PROJECT FICHE 1. Basic Information 1.1 Publication reference number: EuropeAid/ 138-930/DH/ACT/BA 1.2 Programme: IPA 2015 (direct management mode) 1.3 Twinning Number: BA 15 IPA ST 01

More information

EUROPEAN COMMISSION Job Description Form. Job description version2 (Active) Job no in DEVCO.F.DEL.Afghanistan Valid from 04/01/2018 until

EUROPEAN COMMISSION Job Description Form. Job description version2 (Active) Job no in DEVCO.F.DEL.Afghanistan Valid from 04/01/2018 until EUROPEAN COMMISSION Job Description Form Job description version2 (Active) Job no.273628 in DEVCO.F.DEL.Afghanistan Valid from 04/01/2018 until Job Holder Name Job Profile Position CONTRACT AGENT FGIV

More information

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF MINISTRY OF TRADE, INDUSTRY AND COOPERATIVES FOR THE YEAR ENDED 30 TH JUNE 2017

REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF MINISTRY OF TRADE, INDUSTRY AND COOPERATIVES FOR THE YEAR ENDED 30 TH JUNE 2017 THE REPUBLIC OF UGANDA REPORT OF THE AUDITOR GENERAL ON THE FINANCIAL STATEMENTS OF MINISTRY OF TRADE, INDUSTRY AND COOPERATIVES FOR THE YEAR ENDED 30 TH JUNE 2017 OFFICE OF THE AUDITOR GENERAL UGANDA

More information

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs.

Project costs have to be actually incurred due to the project implementation, in order to be considered as eligible costs. Financial issues Extract from the guide for BONUS applicants 1 8. How to prepare project budget? Only the real costs required for the implementation should be indicated in the planned budget for the project.

More information

STANDARD TWINNING PROJECT FICHE

STANDARD TWINNING PROJECT FICHE STANDARD TWINNING PROJECT FICHE 1. Basic Information 1.1 Publication notice reference: EuropeAid/ 137-954/IH/ACT/HR 1.2 Programme: Transition Facility IPA/2013/24986 (Annex of C(2013) 8057 final); Institution

More information

THE GREEK ANTI-FRAUD STRATEGY FOR STRUCTURAL ACTIONS - ACTION PLAN (update 2017)

THE GREEK ANTI-FRAUD STRATEGY FOR STRUCTURAL ACTIONS - ACTION PLAN (update 2017) THE GREEK ANTI-FRAUD STRATEGY FOR STRUCTURAL - ACTION PLAN (update 2017) COMPETENT AUTHORITY TARGET GROUPS INDICATORS OF SUCCESS (/IN OBJECTIVE 1: Promote and establish an Ethical, Anti-Fraud Culture 1.1

More information

Presentation of work programme Competence Centre Administrative Capacity. Pascal Boijmans. Joint COCOF ESF WG meeting Brussels, 26 June 2013

Presentation of work programme Competence Centre Administrative Capacity. Pascal Boijmans. Joint COCOF ESF WG meeting Brussels, 26 June 2013 Presentation of work programme Competence Centre Administrative Capacity Pascal Boijmans Joint COCOF ESF WG meeting Brussels, 26 June 2013 DG Regional and Urban Policy - Unit E1 "Competence Centre for

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme 2003 2006 2005 Project Fiche for Programme Support 1. Basic Information 1.1 CRIS Number: BG 2005/017-455.01;04 1.2 1.2 Title:

More information

Compliance Audit Guidelines. General Introduction I N T O S A I ISSAI 4000

Compliance Audit Guidelines. General Introduction I N T O S A I ISSAI 4000 ISSAI 4000 The International Standards of Supreme Audit Institutions, ISSAI, are issued by the International Organization of Supreme Audit Institutions, INTOSAI. For more information visit www.issai.org.

More information

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level. ` Standard Summary Project Fiche Project number: TR 0305.01 Twinning number: TR03-SPP-01 1. Basic Information 1.1 Title: SUPPORT TO THE STATE PLANNING ORGANIZATION GENERAL DIRECTORATE FOR REGIONAL DEVELOPMENT

More information

17. Communication, Dissemination and Exploitation

17. Communication, Dissemination and Exploitation HORIZON 2020 WORK PROGRAMME 2014 2015 17. Important Notice on the First Horizon 2020 Work Programme This Work Programme covers 2014 and 2015. Due to the launching phase of Horizon 2020, parts of the Work

More information

Local Government Budget Management System. 1.1 CRIS Number: 2006/ Twinning No: PL/06/IB/FI/02

Local Government Budget Management System. 1.1 CRIS Number: 2006/ Twinning No: PL/06/IB/FI/02 Local Government Budget Management System 1 Key Information 1.1 CRIS Number: 2006/018-180.01-04 Twinning No: PL/06/IB/FI/02 1.2. Title: Local Government Budget Management System 1.3. Sector: Public Finance

More information

Twinning Projects. in the Field of Food and Agriculture

Twinning Projects. in the Field of Food and Agriculture Twinning Projects in the Field of Food and Agriculture What is Twinning? Twinning projects are aimed at assisting countries seeking to join the European Union in adopting the collected body of EU law (

More information

SUMMARY PROJECT FICHE

SUMMARY PROJECT FICHE SUMMARY PROJECT FICHE 1. Title: Reinforcement of institutional and administrative capacity of the financial sector 2. Project nº: ES 9904 3. Location: Ministry of Finance, Securities Inspectorate, (Bank

More information

Official web site of the Ministry:

Official web site of the Ministry: HUNGARY POLICY FRAMEWORK The Ministry of Foreign Affairs of the Republic of Hungary is responsible for planning and coordinating the Hungarian international development cooperation and humanitarian aid

More information

Bangladesh Should Adopt International Public Sector Accounting Standards.

Bangladesh Should Adopt International Public Sector Accounting Standards. EXECUTIVE SUMMARY 1. This assessment of public sector accounting and auditing is meant generally to help implement more effective Public Financial Management (PFM) through better quality accounting and

More information

BOSNIA AND HERZEGOVINA

BOSNIA AND HERZEGOVINA INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 BOSNIA AND HERZEGOVINA European Integration Facility Action Summary The Action is designed to provide support to institutions in Bosnia and Herzegovina

More information

Standard Summary Project Fiche

Standard Summary Project Fiche Standard Summary Project Fiche 1. Basic Information 1.1 CRIS Number: BG2003/004-937.09.04 1.2 Title: Further Development of the Independent Public External Audit Institution 1.3 Sector: Customs and Finance

More information

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED 2014-2020 1. IDENTIFICATION (max. 200 characters) The purpose of this section is to identify only the programme concerned. It

More information

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357

More information

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization

Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization Completion Report Project Number: 46-01 Technical Assistance Number: 7857 April 016 Lao People's Democratic Republic: Strengthening the Capacity of the State Audit Organization This document is being disclosed

More information

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV 1. Basic information 1.1 CRIS Number: 2009 / 021-650 1.2 Title: Preparation for IPA components

More information

Oil for Development in South Sudan. Program Document for an Institutional Cooperation between

Oil for Development in South Sudan. Program Document for an Institutional Cooperation between Oil for Development in South Sudan Program Document for an Institutional Cooperation between The Ministry of Petroleum and Mining, Republic of South Sudan and The Ministry of Petroleum and Energy, Norway

More information

URBACT III Programme Manual

URBACT III Programme Manual URBACT III Programme Manual Fact Sheet 4B National URBACT Points Section 1. National URBACT Points in the URBACT III Operational programme: context and objective Section 2. Role of National URBACT Points

More information

NEPAD/Spanish Fund for African Women s empowerment

NEPAD/Spanish Fund for African Women s empowerment NEPAD/Spanish Fund for African Women s empowerment Project Proposal Format Annex 0 1 P age Proposal Format Proposal Cover Page: PROPOSAL TO THE NEPAD- SPANISH FUND FOR AFRICAN WOMEN s EMPOWERMENT Organization

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS ASSIGNMENT TITLE: International Planning/Budgeting Expert Discussion Paper - Integration of the SDGs into Myanmar s Planning and Budgeting Frameworks DURATION:

More information

TWINNING: A TESTED EXPERIENCE IN A BROADER EUROPEAN CONTEXT

TWINNING: A TESTED EXPERIENCE IN A BROADER EUROPEAN CONTEXT TWINNING: A TESTED EXPERIENCE IN A BROADER EUROPEAN CONTEXT European Commission Directorate General Enlargement Institution Building Unit INTRODUCTION The Twinning programme was established in 1998 to

More information

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE EEA FINANCIAL MECHANISM between ICELAND, THE PRINCIPALITY OF LIECHTENSTEIN,

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE EEA FINANCIAL MECHANISM between ICELAND, THE PRINCIPALITY OF LIECHTENSTEIN, MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE EEA FINANCIAL MECHANISM 2014-2021 between ICELAND, THE PRINCIPALITY OF LIECHTENSTEIN, THE KINGDOM OF NORWAY, hereinafter referred to as the Donor

More information

STANDARD TWINNING PROJECT FICHE

STANDARD TWINNING PROJECT FICHE STANDARD TWINNING PROJECT FICHE 1. Basic Information 1.1 Publication reference number: EuropeAid/ 137-889/IH/ACT/BA 1.2 Programme: IPA 2014 1.3 Twinning Number: BA 14 IB FI 01 R 1.4 Title: Improving capacity

More information

01.05 Tax administration/1

01.05 Tax administration/1 01.05 Tax Administration 1. Basic Information 1.1 Desiree Number: PL0003.05 1.2 Title: Tax Administration 1.3 Sector: Finance - Twinning code: PL2000/IB/FI04 1.4 Location: Poland 2. Objectives 2.1 Wider

More information

Training Seminar on Auditing Sustainable Development

Training Seminar on Auditing Sustainable Development Training Seminar on Auditing Sustainable Development Dr Vivi Niemenmaa Training Day of the 14th Eurosai WGEA Annual Meeting Skopje, 26.9.2015 Structure of the training day 9:00-11:00 Dr Vivi Niemenmaa,

More information

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments

EN 1 EN. Annex. Sector Policy Support Programme: Sector budget support (centralised management) DAC-code Sector Trade related adjustments Annex 1. Identification Title/Number Trinidad and Tobago Annual Action Programme 2010 on Accompanying Measures on Sugar; CRIS reference: DCI- SUCRE/2009/21900 Total cost EU contribution : EUR 16 551 000

More information

Standard Summary Project Fiche. Project number: TR Twinning number: TR02-JH-05

Standard Summary Project Fiche. Project number: TR Twinning number: TR02-JH-05 Standard Summary Project Fiche 1. Basic Information Project number: TR 0204.04 Twinning number: TR02-JH-05 1.1 Desiree Number 2.1 Title Strengthening the Fight against Money Laundering 3.1 Sector AD 4.1

More information

Official Journal of the European Union DECISIONS

Official Journal of the European Union DECISIONS 6.7.2018 L 171/11 DECISIONS DECISION (EU) 2018/947 OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 4 July 2018 providing further macro-financial assistance to Ukraine THE EUROPEAN PARLIAMT AND THE COUNCIL

More information

EXTERNAL AUDIT AND OVERSIGHT TOPIC GUIDE COMPILED BY THE ANTI-CORRUPTION HELPDESK

EXTERNAL AUDIT AND OVERSIGHT TOPIC GUIDE COMPILED BY THE ANTI-CORRUPTION HELPDESK EXTERNAL AUDIT AND OVERSIGHT TOPIC GUIDE COMPILED BY THE ANTI-CORRUPTION HELPDESK Transparency International is a global movement with one vision: a world in which government, business, civil society and

More information

STANDARD TWINNING LIGHT PROJECT FICHE

STANDARD TWINNING LIGHT PROJECT FICHE STANDARD TWINNING LIGHT PROJECT FICHE 1 Basic Information 1.1 Publication notice reference: 1.2 Programme: IPA 2012 1.3 Twinning Number: HR 12 IB SPP 02 TWL 1.4 Title: Strengthening of the Agency for the

More information

Background paper. The ECA s modified approach to the Statement of Assurance audits in Cohesion

Background paper. The ECA s modified approach to the Statement of Assurance audits in Cohesion Background paper The ECA s modified approach to the Statement of Assurance audits in Cohesion December 2017 1 In our 2018-2020 strategy the European Court of Auditors (ECA) decided to take a fresh look

More information

Activities Implemented to Date 1. FOREIGN DIRECT INVESTMENT POLICIES AND PROGRAMMES

Activities Implemented to Date 1. FOREIGN DIRECT INVESTMENT POLICIES AND PROGRAMMES MONTENEGRO 101 Summary The activities of the Government of in 2000 were aimed at transformation and privatisation of the economy and the establishment of the structural preconditions for a functioning

More information

Public Financial Management Reform in Greece (General Government Accounting Framework)

Public Financial Management Reform in Greece (General Government Accounting Framework) Public Financial Management Reform in Greece (General Government Accounting Framework) 21 Sandra Cohen, Athens University of Economics and Business scohen@aueb.gr Reform key objectives Goal: Transparency

More information

REPORT. on the annual accounts of the Education, Audiovisual and Culture Executive Agency for the financial year 2013 together with the Agency s reply

REPORT. on the annual accounts of the Education, Audiovisual and Culture Executive Agency for the financial year 2013 together with the Agency s reply 10.12.2014 EN Official Journal of the European Union C 442/67 REPORT on the annual accounts of the Education, Audiovisual and Culture Executive Agency for the financial year 2013 together with the Agency

More information

31 March, OECD, 2 rue André-Pascal, Paris

31 March, OECD, 2 rue André-Pascal, Paris ACN Anti-Corruption Network for Eastern Europe and Central Asia Anti-Corruption Division Directorate for Financial and Enterprise Affairs Organisation for Economic Co-operation and Development (OECD) 2,

More information

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM between THE KINGDOM OF NORWAY,

MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM between THE KINGDOM OF NORWAY, MEMORANDUM OF UNDERSTANDING ON THE IMPLEMENTATION OF THE NORWEGIAN FINANCIAL MECHANISM 2014-2021 between THE KINGDOM OF NORWAY, hereinafter referred to as Norway and THE REPUBLIC OF, hereinafter referred

More information

European Commission proposal on the accessibility of public sector bodies' websites

European Commission proposal on the accessibility of public sector bodies' websites Initial appraisal of a European Commission Impact Assessment European Commission proposal on the accessibility of public sector bodies' websites Impact Assessment (SWD (2012) 0401, SWD (2012) 402 (summary))

More information

SUMMARY Special Measure 2016 for Public Administration Reform in favour of Ukraine to be financed from the general budget of the European Union

SUMMARY Special Measure 2016 for Public Administration Reform in favour of Ukraine to be financed from the general budget of the European Union SUMMARY Special Measure 2016 for Public Administration Reform in favour of Ukraine to be financed from the general budget of the European Union 1. Identification Budget heading 22 04 02 01 22 04 03 03

More information

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1698 SESSION MAY HM Treasury and Cabinet Office. Assurance for major projects

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1698 SESSION MAY HM Treasury and Cabinet Office. Assurance for major projects REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1698 SESSION 2010 2012 2 MAY 2012 HM Treasury and Cabinet Office Assurance for major projects 4 Key facts Assurance for major projects Key facts 205 projects

More information

Project Summary. The overall aims of USAID BEP work in these areas are to:

Project Summary. The overall aims of USAID BEP work in these areas are to: USAID Business Enabling Project in Serbia Contract No. 169-C-00-11-00001-00 Scope of Work for Technical Assistance to the Ministry of Finance in Streamlining Planning, Evaluation, Prioritization, and Monitoring

More information

PRIORITIES TURKEY MAY Authorised for publication by Karen Hill, Head of the SIGMA Programme

PRIORITIES TURKEY MAY Authorised for publication by Karen Hill, Head of the SIGMA Programme PRIORITIES TURKEY MAY 2014 Authorised for publication by Karen Hill, Head of the SIGMA Programme These priorities have been produced with the financial assistance of the European Union. They should not

More information

EU FLOODS DIRECTIVE: SHARING A METHODICAL PROCESS TO IMPROVE FLOOD RISK MANAGEMENT

EU FLOODS DIRECTIVE: SHARING A METHODICAL PROCESS TO IMPROVE FLOOD RISK MANAGEMENT Prevention, Preparedness and Response to Natural and Man-made Disasters in the Eastern Partnership Countries www.pprdeast2.eu www.facebook.com/pprdeast2/ EU FLOODS DIRECTIVE: SHARING A METHODICAL PROCESS

More information

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I)

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I) Action Fiche for Syrian Arab Republic 1. IDTIFICATION Title/Number Support to the EU-Syria Association Agreement Programme (SAAP I) Total cost EU contribution: EUR 5 000 000 Beneficiary contribution: tbc

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FICHE 1. Basic Information 1.1 CRIS Number 2006/018-176.04.01 Twinning light HU/2006/IB/FI/01 TWL 1.2 Title: Improvement of the efficiency of risk-based selection of taxpayers

More information