1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FO OFFICIAL USE ONLY ESTUCTUING PAPE ON A POPOSED POJECT ESTUCTUING OF UBAN WATE SUPPLY AND SANITATION POJECT IBD LOAN NO ID TO THE EPUBLIC OF INDONESIA December 19, 2013 INDONESIA SUSTAINABLE DEVELOPMENT UNIT EAST ASIA PACIFIC EGION eport No: v1 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.
2 ABBEVIATIONS AND ACONYMS IBD KPI PA PAD PCU PDAM PIU PMM International Bank for econstruction and Development Key Performance Indicator Performance Agreement Project Appraisal Document Project Coordination Unit Perusahaan Daerah Air Minum (local water utility) Project Implementation Unit Project Management Manual egional Vice President: Country Director: Sector Manager: Task Team Leader: Axel van Trotsenburg odrigo A. Chaves Nathan M. Belete Irma Magdalena Setiono 2
3 INDONESIA ID-UBAN WATE SUPPLY AND SANITATION CONTENTS Page A. SUMMAY... 4 B. POJECT STATUS... 4 C. POPOSED CHANGES... 4 ANNEX 1: ESULTS FAMEWOK AND MONITOING... 6 ANNEX 2: LETTE FOM MINISTY OF FINANCE POPOSING POJECT ESTUCTUING
4 ID UBAN WATE SUPPLY AND SANITATION ESTUCTUING PAPE A. SUMMAY The proposed restructuring involves revision and update to the esults Framework and its key performance indicators described in the Project Appraisal Document (PAD) to ensure that a more efficient set of indicators are applied during project implementation and they are consistently presented in the Performance Agreements between Local Governments and their respective PDAMs. This revision will also include retrofitting inclusion of the core indicator for water supply, and to make correction and update to the baseline data and targets. This restructuring will better reflect progress of project implementation and its impact in improving service performance. The proposed restructuring does not involve changes to the project implementation period, the total loan amount, loan allocation between different categories, or changes to the mechanisms to ensure compliance with the safeguard policies. The proposed changes will also not result in change of impact in any other sections of the PAD. B. POJECT STATUS Based on the latest implementation support mission conducted in April and May 2013, project implementation progress is rated as Moderately Satisfactory. The project is currently rated as Satisfactory towards achievement of its Project Development Objectives and overall Implementation Progress is rated as Moderately Satisfactory. All other IS ratings are either S or MS and there are no major issues pending. Procurement processes and implementation of construction contracts have started and are progressing in all locations (some are already completed). Disbursements have been improving and will continue to improve in the future. Disbursement rate is at 59.93% and with completion of most project activities by end of June 2014, it is very likely that all funds will be used by closing date. All budgets to fund project activities has been fully allocated in the government s budgeting system (DIPA allocation) and all key ingredients for project implementation are in place (the Project Management Manual, the Project Coordination Unit PCU, the PCU Advisory Consultant, the Project Implementation Units PIUs and their supervision consultants). There are still delays in some construction activities although there will still be adequate time to complete all constructions prior to the end of project period. The PCU and PIUs are still having issues with monitoring and evaluation and reporting the progress of Key Performance Indicators achievement due to some confusion caused by inconsistencies of definition between the KPIs stated in their respective Performance Agreement and the definition stated in their regular reporting systems, as well as in the PAD 4
5 C. POPOSED CHANGES The proposed changes to be included in this restructuring include: (i) revision and update of the esults Framework (description and definition of Key Performance Indicators to include core indicator and to ensure consistency between all project documents); and (ii) to correct and update baseline data and targets. The changes are proposed to assist the PCU and PIUs in having more clarity and streamlined monitoring and evaluation process, thus improving the project s reporting mechanism. With this improved monitoring and evaluation process, the project will be better positioned to reflect the progress of implementation and its impact. Changes to the results/indicators include clarification of the definitions, correction and updating baseline data and targets, as well as inclusion of core indicator of water sector. The new sets of indicators are realistic, achievable and measurable, and take into account the capacities of the PIUs. The changes to the results/indicators are shown in the Annex 1. 5
6 ANNEX 1: esults Framework and Monitoring Project Development Objective (PDO): Improved and expand water supply services in project areas by strengthening local water utilities to become operationally efficient and financially sustainable evised Project Development Objective: N/A PDO Level esults Indicators* Core D=Dropped C=Continue N= New =evised Unit of Measure Baseline (2009) Cumulative Target Values** Frequency Data Source/ Methodology esponsibility for Data Collection Indicator One: Increment in capacity of production system Indicator Two: Increment in number of connections Indicator Three: Number of new piped household water connections that are resulting from the project intervention Indicator Four: Improvements in customer satisfaction, indicated by: (a) Quality (b) Service Hours (c) eliability Increment in installed production capacity l/s 1, C HC 86,587 12,250 16,421 N HC 0 0 Improvements in customer satisfaction, indicated by: (a) Quality (a) % (b) Hours (c) % (b) 23 (c) , ,087 12,250 18,021 8,500 1,600 (b) 23.5 (c) , ,587 12,974 19,521 17,000 1,125 3,100 (b) 24 (c) , ,087 13,484 22,021 25,500 1,635 2,500 (b) 24 (c) , ,587 15,200 24,521 34,000 3,351 2,500 (b) 24 (c) > , ,087 17,700 27,021 42,500 5,851 2,500 (b) 24 (c) >95.00 Semi-annual project progress report Semi-annual financial management reports Annual Audit eports Annual or biannual Procurement Audit eports Annual eviews Mid Term eviews Final Completion eports PDAM s Annual Audited eport PDAM s Monthly eport Procurement Post eviews PCU Monitoring and Evaluations Bank Implementation Support Missions and Field Visits PIU/PDAM/ PEMDA PCU Independent Financial Auditor (BPKP)
7 (b) Service Hours (c) Complaint handling (b) 8.62 (c) M. Enim (b) 5 (c) 100 (b) (c) 91 (3 M. Enim (b) 5 (c) 89.2 (b) 9.5 (c) 90 M. Enim (b) 5 (c) 100 (b) 8.43 (c) 100 M. Enim (b) 5 (c) 100 (b) 14 (c) >95 M. Enim (a) >90 (b) 6 (c) >90 (b) 18 (c) >95 M. Enim (a) >90 (b) 12 (c) >90 Indicator Five: Operating atio Indicator Six: Debt Service Coverage atio (only for Bogor) C < < <1 <1 <1 <1 <1 <1 C 2.68 >1.3 >1.3 >1.3 >1.3 >1.3 <1 <1 <1 INTEMEDIATE ESULTS Intermediate esult (Outcome 1): Improved PDAM Operations One: Additional volume of water produced Two: Non-evenue Water Three: Number of bulk meters replaced, repaired or installed evised Intermediate esult (Outcome 1): N/A Increment volume of water produced C D l/s % Unit 1, , , , , ,
8 Four: Number of individual meters replaced or repaired One: Number of employees per connection Two: Water tariffs collection period Number of individual meters replaced or repaired, or calibrated Unit 19, , , Intermediate esult (Outcome Two): Improvement of PDAM Corporate Management evised Intermediate esult (Outcome Two): N/A Number of employees per 1,000 connections Water tariffs collection efficiency Staff % Intermediate esult (Outcome Two): Improvement in PEMDA Corporate Ownership evised Intermediate esult (Outcome Two): N/A C One: % Tariff increases to maintain operating ratio , > , >95 > , >95 > *Please indicate whether the indicator is a Core Sector Indicator (see further **Target values should be entered for the years data will be available, not necessarily annually. 8
9 Annex 2 Letter from Ministry of Finance
Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Operation Name: ID-Urban Water Supply and
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A
Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDONESIA INFRASTRUCTURE FINANCE FACILITY PROJECT LOAN 7731-ID JUNE 24, 2009 TO THE REPUBLIC
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE THIRD HIGHWAY PROJECT. IBRD 7889-AZ (May25, 2010) AND IDA 4723-AZ (May 25, 2010) TO THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Transport Sector Unit Europe and Central Asia Region Document of The World Bank RESTRUCTURING
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE EMERGENCY SCHOOL CONSTRUCTION AND REHABILITATION PROJECT (ESCRP TF GRANT )
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE WESTERN PROVINCES RURAL WATER SUPPLY, SANITATION AND HYGIENE PROMOTION PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationRESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING FOR A KENYA YOUTH EMPOWERMENT PROJECT. CREDIT IDA 4697 (Board Approval Date: May 4, 2010) TO THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social Protection Unit South East/South AFTSE Africa Region Document of The World Bank
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SECOND STATE PENSION REFORM TECHNICAL ASSISTANCE LOAN PARSEP II. January 10, 2007 TO THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: PROPOSED PROJECT RESTRUCTURING
More informationImplementation Status & Results Indonesia Local Government and Decentralization Project (P111577)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Operation Name: Local Government
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE INFORMAL SETTLEMENTS IMPROVEMENT PROJECT CREDIT 4873-KE
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: 104604 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationPublic Disclosure Copy
EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Technical Assistance Loan FY 2013 Seq No: 4 ARCHIVED on 28-Dec-2015 ISR21722
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A
Public Disclosure Authorized Document of The World Bank Document of The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No: RES22488 Public Disclosure Authorized
More informationNelson. b.were the project objectives/key associated outcome targets revised during implementation? No
Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14909 1. Project Data: Date Posted: 06/01/2016 Public Disclosure Authorized Public Disclosure Authorized Country:
More informationThe World Bank Urban Transport Corridor Development in Surabaya - RETF (P147893)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No:
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF GEOTHERMAL POWER GENERATION DEVELOPMENT PROJECT GEF TF IND APPROVED ON MAY 29, 2008
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING PROVINCIAL AND RURAL INFRASTRUCTURE PROJECT (CREDIT 3822-KH)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sustainable Development Department Southeast Asia Country Management Unit East Asia and
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE
Public Disclosure Authorized Document of The World Bank Public Disclosure Authorized RESTRUCTURING PAPER ON A Report No: RES19152 Public Disclosure Authorized Public Disclosure Authorized PROPOSED PROJECT
More informationDocument of The World Bank FOR OFFICIAL USE ONLY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING ELECTRICITY SECTOR EFFICIENCY ENHANCEMENT PROJECT CR SE. April 25, 2005 TO THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationCountry Practice Area(Lead) Additional Financing Social, Urban, Rural and Resilience P Indonesia Global Practice
Public Disclosure Authorized 1. Project Data Report Number : ICRR0021284 Public Disclosure Authorized Public Disclosure Authorized Project ID P111577 Project Name ID-Local Government and Decentralization
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ENERGY EFFICIENCY PROJECT GEF TRUST FUND GRANT NUMBER TF OCTOBER 14, 2004 TO THE
Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized Public isclosure Authorized ocument of The World Bank RESTRUCTURING PAPER ON A PROPOSE PROJECT RESTRUCTURING OF ENERGY
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016
Public Disclosure Authorized The World Bank REPORT NO.: RES31986 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:
More informationDocument of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER 23, 2016
Public Disclosure Authorized The World Bank REPORT NO.: RES31608 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING INTERNAL AUDIT APPROVED ON SEPTEMBER
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TRANSPARENCY AND ACCOUNTABILITY CAPACITY BUILDING PROJECT (CREDIT NO.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationThe World Bank Transport Connectivity and Asset Management Project (P132833)
Public Disclosure Authorized SOUTH ASIA Sri Lanka Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2016 Seq No: 2 ARCHIVED on 30-Jan-2017 ISR26613 Implementing Agencies: Public Disclosure
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF TRANSMISSION GRID STRENGTHENING PROJECT LOAN
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22644 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationFOR OFFICIAL USE ONLY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF URBAN III - PHASE II PROJECT GRANT IDA-H3300 APPROVED ON JULY 9, 2007
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationImplementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785) Operation Name:
More informationRESTRUCTURING PAPER ON A
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 63424-AR PROPOSED PROJECT
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationPublic Disclosure Copy
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Uzbekistan Water Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 12-Jan-2018 ISR30620 Implementing Agencies: Republic
More informationThe World Bank Kabul Urban Transport Efficiency Improvement Project (P131864)
Public Disclosure Authorized SOUTH ASIA Afghanistan Transport & Digital Development Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 09-Feb-2018
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF CAMEROON HEALTH SECTOR SUPPORT INVESTMENT PROJECT CREDIT: 4478-CM TO THE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationThe World Bank Building a Modern Fiscal System Technical Assistance (P154694)
Public Disclosure Authorized EAST ASIA AND PACIFIC China Macro Economics & Fiscal Management Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 15-Jun-2017 ISR26699 Implementing
More informationImplementation Status & Results Indonesia Local Government and Decentralization Project (P111577)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Report No: ISR66 o C Operation
More informationDocument of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL CREDIT DOCUMENT INTERNATIONAL DEVELOPMENT ASSOCIATION
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Water and Urban I1 Africa Region Document of The World Bank FOR OFFICIAL USE ONLY SUPPLEMENTAL
More informationIndonesia: Metropolitan Medan Urban Development Project
Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS
More informationThe World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 24-Dec-2017 ISR31037 Implementing Agencies:
More informationProject Progress Report
Competitiveness and Jobs Project IBRD RBM Landing Operation Project ID: P152104 Project Progress Report January Jun 2016 Public Policy Secretariat, Republic of Serbia for Inter-Ministerial Working Body
More informationResults-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)
Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Water Global Practice Requesting Unit: EACVF Responsible Unit: GWA02 IBRD/IDA Program-for-Results Financing FY 2013 Team Leader(s): Lilian Pena
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jun ,670,000.00
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020366 Public Disclosure Authorized Public Disclosure Authorized Project ID P107666 Country Peru Project
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
Public Disclosure Authorized The World Bank REPORT NO.: RES30835 RESTRUCTURING PAPER Public Disclosure Authorized Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF REHABILITATION AND
More informationImplementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD)
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE PROJECT (CASA-1000)
Public Disclosure Authorized The World Bank REPORT NO.: RES29565 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF CENTRAL ASIA SOUTH ASIA ELECTRICITY TRANSMISSION
More informationThe World Bank Albania-Enhancing Quality of Financial Reporting (EQ-FINREP) (P152567)
EUROPE AND CENTRAL ASIA Albania Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 2 ARCHIVED on 17-Oct-2017 ISR29727 Implementing Agencies: Key Dates
More informationImplementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313) Operation Name: SAMOA HEALTH
More informationSECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities
State Accountability Revitalization Project (RRP INO 38354) Sector Road Map SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. Fiscal decentralization.
More informationThe World Bank LK GPOBA - Access to Sanitation Project (P111161)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WEST AFRICA REGIONAL BIOSAFETY PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationRESTRUCTURING PAPER ON A
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationThe World Bank Palestinian Recovery & Development Plan MDTF (P110690)
Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA West Bank and Gaza Recipient Executed Activities Adaptable Program Loan FY 2008 Seq No: 6 ARCHIVED on 21-Mar-2017 ISR27335 Implementing Agencies:
More informationPublic Disclosure Copy. Implementation Status & Results Report Federally Administered Tribal Areas (FATA) Governance and Policy Program (P156412)
SOUTH ASIA Pakistan Governance Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 06-Apr-2017 ISR27349 Implementing Agencies: Economic Affairs Division,
More informationINFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 MINISTRY OF ECONOMY AND FINANCE, MEF,MINISTRY OF FINANCE AND ECONOMY
DOCUMENT OF THE WORLD BANK REPORT NO.: RES29941 RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INFRASTRUCTURE & INSTITUTIONS EMERGENCY RECOVERY APPROVED ON MARCH 18, 2010 TO TRANSPORT & ICT
More informationImplementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845) Operation Name: Afghanistan
More informationMyanmar Southeast Asia Disaster Risk Management Project (P160931)
Public Disclosure Authorized EAST ASIA AND PACIFIC Myanmar Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 26-Aug-2018
More informationThe World Bank Research and Innovation in Science and Technology Project (P121842)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Education Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 7 ARCHIVED on 07-Dec-2016 ISR25509 Implementing Agencies: Ministry
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING BOR REGIONAL DEVELOPMENT PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SUSTAINABLE DEVELOPMENT UNIT EUROPE AND CENTRAL ASIA Document of The World Bank FOR OFFICIAL
More informationFOR OFFICIAL USE ONLY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR STRENGTHENING PROJECT LOAN OCTOBER 25, 2010 TO THE
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES14735 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE ENERGY SECTOR
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE APPROACH (SWAP) DEVELOPMENT PROJECT
Public Disclosure Authorized The World Bank REPORT NO.: RES30161 RESTRUCTURING PAPER Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF RWANDA ELECTRICITY ACCESS SCALE-UP AND SECTOR WIDE
More informationDOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE
Public Disclosure Authorized DOCUMENT OF THE WORLD BANK REPORT NO.: RES30282 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE Public Disclosure Authorized MEXICO
More informationThe World Bank Indonesia Power Transmission Development Project (P117323)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 13 ARCHIVED on 28-Dec-2017 ISR30911 Implementing
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE TAX MODERNIZATION PROJECT TO THE REPUBLIC OF TANZANIA AUGUST 30, 2006
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
More informationSECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Indonesia, 2012 2014 SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Fiscal decentralization.
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND ADDITIONAL FINANCING (CREDIT 4987-CM) BOARD APPROVAL DATE: JUNE 23, 2011
Public Disclosure Authorized Document of The World Bank Report No: 65071-CM Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SECOND
More informationPublic Disclosure Copy
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Armenia Energy & Extractives Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 1 ARCHIVED on 24-Sep-2015 ISR20717
More informationRESTRUCTURING PAPER ON A
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER ON A Report No: 59553-KH PROPOSED PROJECT
More informationPublic Disclosure Copy
Public Disclosure Authorized EAST ASIA AND PACIFIC Myanmar Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 06-Jan-2016 ISR21425 Implementing Agencies:
More informationThe World Bank Indonesia Power Transmission Development Project (P117323)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 7 ARCHIVED on 07-Jul-2015 ISR18557 Implementing Agencies:
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Nigeria Governance Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq
More informationPublic Disclosure Copy
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 12 ARCHIVED on 08-Dec-2017
More informationImplementation Status & Results Tajikistan Tax Administration (P127807)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tajikistan Tax Administration (P127807) Operation Name: Tax Administration (P127807) Project Stage:
More informationThe World Bank NP: Strengthening the Office of the Auditor General (P127040)
Public Disclosure Authorized SOUTH ASIA Nepal Financial Management Global Practice Recipient Executed Activities Specific Investment Loan FY 2012 Seq No: 3 ARCHIVED on 20-Feb-2015 ISR18017 Implementing
More informationPublic Disclosure Copy
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Public Private Partnership Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 29-Jun-2017
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF EMERGENCY BRIDGE RECONSTRUCTION & VULNERABILITY REDUCTION PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE INSTITUTIONS BUILDING TECHNICAL ASSISTANCE PROJECT (IBTAL)
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES18226 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationWest Bank and Gaza: Finance for Jobs (P151089)
MIDDLE EAST AND NORTH AFRICA West Bank and Gaza Finance & Markets Global Practice Special Financing Investment Project Financing FY 2016 Seq No: 1 ARCHIVED on 18-Apr-2016 ISR23000 Implementing Agencies:
More informationImplementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296) Operation Name: URBAN SECTOR DEVELOPMENT
More informationKENYA: Primary Education Development Project (PRIEDE), Grant No. P Implementation Support Review March 12 to 21, 2018 Aide Memoire
KENYA: Primary Education Development Project (PRIEDE), Grant No. P146797 Implementation Support Review March 12 to 21, 2018 Aide Memoire A. INTRODUCTION AND MISSION OBJECTIVES 1. During March 12 to 21,
More informationRevenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)
Public Disclosure Authorized SOUTH ASIA Bangladesh Governance Global Practice Requesting Unit: SACBD Responsible Unit: GGOES IBRD/IDA Program-for-Results Financing FY 2014 Team Leader(s): Furqan Ahmad
More informationPublic Disclosure Copy
SOUTH ASIA Bangladesh Financial Management Global Practice Recipient Executed Activities Technical Assistance Loan FY 2011 Seq No: 4 ARCHIVED on 26-Feb-2015 ISR18034 Implementing Agencies: Key Dates Key
More informationDebt Management Strengthening Programme at Ministry of Finance, Government of Pakistan (P161451)
SOUTH ASIA Pakistan Macroeconomics, Trade and Investment Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 27-Jun-2018 ISR33129 Implementing Agencies:
More informationCountry Practice Area(Lead) Additional Financing Uzbekistan Energy & Extractives P133633,P165054
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021115 Public Disclosure Authorized Public Disclosure Authorized Project ID P118737 Project Name ENERGY
More informationProject development objective/outcomes
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE SAINT VINCENT & THE GRENADINES HIV/AIDS PREVENTION AND CONTROL PROJECT PE-PO76799
More informationCountry Practice Area(Lead) Additional Financing Indonesia Water P161514
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020651 Public Disclosure Authorized Public Disclosure Authorized Project ID P096532 Project Name ID:
More informationPublic Disclosure Copy
Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Lebanon Social Protection & Labor Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 09-Jan-2017
More informationImplementation Status & Results Vietnam Second Northern Mountains Poverty Reduction Project (P113493)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Second Northern Mountains Poverty Reduction Project (P113493) Operation Name: Second Northern
More informationImplementation Status & Results Madagascar Integrated Growth Poles (P083351)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized Implementation tatus & Results Madagascar Integrated Growth Poles (P83351) Operation Name: Integrated
More informationThe World Bank Land Husbandry, Water Harvesting and Hillside Irrigation (P114931)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LAND HUSBANDRY, WATER HARVESTING AND HILLSIDE IRRIGATION PROJECT APPROVED
More informationKey Dates. Project Development Objectives. Components. Overall Ratings
Public Disclosure Authorized AFRICA Madagascar Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 08-Jun-2018 ISR32759 Implementing
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Copy AFRICA Ethiopia Social Protection & Labor Global Practice IBRD/IDA Sector Investment and Maintenance Loan FY 2013 Seq No: 12 ARCHIVED on 09-Oct-2015
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY ANALYSIS CAPACITY APPROVED ON APRIL 28, 2017
Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31490 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF STRENGTHENING TAX SYSTEMS AND BUILDING TAX POLICY
More informationImplementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING VILLAGES PROJECT APPROVED ON JUNE 10, 2016
Public Disclosure Authorized The World Bank RESTRUCTURING PAPER REPORT NO.: RES31013 Public Disclosure Authorized ON A PROPOSED PROJECT RESTRUCTURING OF EARLY CHILDHOOD CARE AND DEVELOPMENT FOR FLOATING
More informationImplementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation
More informationDocument of The World Bank RESTRUCTURING PAPER
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank RESTRUCTURING PAPER Report No: 71429-IQ ON A PROPOSED PROJECT
More informationThe World Bank Water and Sanitation in Tourist Areas (P054221)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF WATER AND SANITATION IN TOURIST AREAS APPROVED ON APRIL 2, 2009 TO THE
More informationCountry Practice Area(Lead) Additional Financing Croatia Finance & Markets P129220
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020731 Public Disclosure Authorized Public Disclosure Authorized Project ID P116080 Project Name EXPORT
More information