Tertiary Education Commission

Size: px
Start display at page:

Download "Tertiary Education Commission"

Transcription

1 Financial Review briefing to the Education and Science Committee 2008/09 Financial Year Tertiary Education Commission 1 17 February 2010

2 2 Assistance to the Committee The Education and Science Committee is conducting a financial review of the performance in the 2008/09 financial year and the current operations of the Tertiary Education Commission (the TEC) in accordance with Standing Order 335. The Controller and Auditor-General provides Parliament with assurance on the performance and accountability of public entities. The Office of the Auditor-General typically assists select committees with their financial reviews by providing further details on the results of the annual audit in Part A of our written briefings, and by suggesting lines of enquiry and questions relevant to the particular public entity under review in Part B of our written briefings. Our financial audits provide a high, but not absolute level of assurance about whether a public entity s financial statements comply with generally accepted accounting practice (GAAP) in New Zealand and fairly reflect its financial position and its financial performance for the period audited. Due to the volume of transactions, audit work is planned and performed to obtain evidence on a sample basis. Auditors use professional judgement to assess the evidence and ensure there is reasonable assurance that there are not material misstatements in the financial statements (that is, differences or omissions that would affect someone s overall understanding of the financial statements). We report, in our audit opinion, only material differences or omissions that we find. The lines of enquiry we suggest are informed by the Auditor-General s mandate under the Public Audit Act This mandate covers matters of performance, accountability, waste, probity, and authority within public entities. To identify lines of enquiry, we: analyse the results of the annual audit and the accountability documents; refer to any relevant performance audit or inquiry work; and use our specific knowledge of the entity gained during the audit process and by ongoing contact with the entity. In developing the advice within this briefing document, the Office of the Auditor-General consulted with such parties as was necessary to ensure that the advice was correct. This process involved providing factual information of audit interest to the parties concerned (in either oral or written form), and obtaining confirmation of those facts, before giving advice to the Committee. The process did not involve providing to the parties concerned any contemplated or actual advice. Contact for further explanation If any member of the Committee would like further explanation or elaboration of any aspect of this briefing document, please contact Pania Gray, Sector Manager, Parliamentary Group on or pania.gray@oag.govt.nz at the Office of the Auditor-General.

3 Summary of key issues 3 Part A: Results of the 2008/09 audit We issued an unqualified audit opinion on the Tertiary Education Commission (the TEC) s 2008/09 financial statements. We assessed the TEC s management control environment as good and its financial information systems and controls as good. We made a number of recommendations for improvement to the TEC, many of which the TEC is now implementing. We assessed the TEC s service performance information and associated systems and controls as poor. 1 The Statement of Intent (SOI) is not a sufficient basis for assessing the effectiveness of the TEC s operations and standard of service delivery. We identified a number of major improvements for the TEC to consider in developing its next SOI. We have emphasised the importance of the TEC improving its service performance information and associated systems and controls for our future grading of its management control environment. During our audit, we became aware that, in their 2008 financial statements, a number of tertiary education institutions (TEIs) had accounted for the Quality Reinvestment Fund (QRF) money that they had received from the Crown in a manner that was inconsistent with our expectation. We consider that they should have accounted for this funding as a capital contribution from the Crown in the respective TEIs Statement of Movements in Equity. After reviewing a few of the QRF funding agreements, we concluded that there is a need for the TEC to embed better quality assurance and monitoring controls over the drafting of its funding agreements. Part B: Advice to the Committee The key points we cover for the Committee, and suggest questions on, are: Financial performance we summarise and suggest the Committee ask questions about the TEC s 2008/09 financial performance. For the first time in four financial years, revenue has exceeded the cost of the TEC s operations enabling a net operating surplus - $2.876 million. There are a number of variances that we suggest the Committee enquire into, including some that relate to the costs of the 2008/09 restructuring. Measuring and reporting non-financial performance the TEC is responsible for measuring and reporting on its own performance as well as guiding the performance reporting of the education providers it funds. Our office and the Treasury are both working with the TEC to advance the quality of its service performance reporting. We suggest a range of questions about what progress the TEC has made in addressing our recommendations and areas for improvement. We also suggest that the Committee enquire into the TEC s work programme to improve the quality of the performance information of tertiary education providers. We raise some lines of enquiry about the TEC s monitoring of the Crown s ownership interest in TEIs, and advise of our decision to defer a performance audit of the TEC s monitoring of the Crown s ownership interest in TEIs. Organisational capability we explain the recent changes to the TEC s organisational structure. We also suggest a range of questions about how the TEC identifies and manages risk. 1 We have provided a grade for the service performance information and associated systems and controls for the first time in 2008/09. We did not grade this aspect in our 2006/07 and 2007/08 audits (see paragraph 2.3).

4 4 Overview of TEC The TEC is a Crown entity established on 1 January 2003 under section 159c of the Education Act Under the Crown Entities Act 2004, the TEC is classified as a Crown agent it is required to give effect to government policy upon direction by its Responsible Minister. The TEC is governed by a Board of Commissioners which is appointed by, and responsible to, the Minister for Tertiary Education (Hon Steven Joyce). 2 The TEC has independent statutory powers relating to the planning and approval of government funding for individual tertiary education organisations (TEOs) 3. It operates within the strategies and policies set by the Government of the day. 4 The TEC s 2009 SOI states: The TEC works with other agencies and the wider tertiary education sector to achieve outcomes that contribute to the government s tertiary education priorities. The TEC aims to support accountable, self-managing, self-improving tertiary education organisations to deliver high-quality, relevant tertiary education. 5 The TEC received total revenue of $3.125 billion in 2008/09. 6 This included revenue of $ million to fund the cost of its operations. 7 Its total operating net surplus for the year was $ million. Public equity increased to $ million at balance date. 8 The TEC s 2008/09 financial performance is discussed in more detail in Part B of our briefing. The TEC underwent significant structural changes in both 2006/07 and 2008/09. The newest structure came into effect on 1 July The new structure resulted in just over 50 redundancies and the closure of its 3 regional centres (Auckland, Rotorua and Christchurch). As at balance date, the TEC had 240 full-time equivalent staff located in its national office and a service centre in Manukau. The TEC s staff turnover rate for 2008/09 was 20.4% (2007/08: 24.4%) 9. There are currently nine commissioners on the board of the TEC. Mr David Shand has recently resigned as the Chair of the TEC. Ms Kaye Turner (Deputy Chair) has taken on the role of Acting Chair until a new Chair is appointed. There have been further changes at the commissioner level with three new appointments since the TEC last appeared before the Committee. 10 Dr Roy Sharp (former Vice-Chancellor of the University of Canterbury) replaced Ms Janice Shiner as the TEC s Chief Executive in August With the exception of a non-voting learner participant who is appointed by the Board, not the Minister. TEO is a general term used to describe all tertiary education organisations. It includes the 31 public tertiary education institutions (TEIs) TEC (2009), Statement of Intent , page 4. TEC (2009), Statement of Intent , page 7. TEC (2009), Annual Report for the year ended 30 June 2009, page 21. This figure relates to resignations from employment. Profile details for each of the commissioners can be found at

5 Part A: Results of the 2008/09 audit 5 1 Audit opinion 1.1 We issued an unqualified audit opinion on the TEC s 2008/09 financial statements. 2 Environment, systems and controls for measuring financial and service performance 2.1 Our conclusions on the TEC s management control environment, systems, and controls for measuring financial and service performance, for the year ended 30 June 2009, are set out in the table below. 2.2 We made our conclusions in the context of our work in forming an opinion on the financial and service performance statements. The purpose of commenting on the underlying environment, systems, and controls is to highlight areas for improvement identified during the audit. The grades assigned for 2008/09 reflect our recommendations for improvement as at 30 June This is not an assessment of overall management performance or of the TEC s effectiveness in achieving its financial and service performance objectives. (See the Appendix for an explanation of the grading scale and underlying assumptions.) 2.3 We have provided a grade for the service performance information and associated systems and controls for the first time in 2008/09. We did not grade this aspect in our 2006/07 and 2007/08 audits, as we have been updating the standards and methodology our auditors apply in auditing this area in response to the Crown Entities Act 2004, and carrying out reviews of public entities current performance information frameworks and reporting. We wanted to give public entities time to respond to the recommendations for improvement we have made resulting from our reviews and updated expectations of auditors. Management control environment 2008/09 Good 2007/08 Good Comment Improvements would be beneficial and we recommend that the TEC address these. Deficiencies we identified in 2007/08 have been largely resolved. Overall, the management control environment within the TEC continues to operate effectively, including during the last two months of the financial year following the organisational restructure. Impact of assessment on service performance and associated systems and controls on the overall management control environment We found that the control environment has remained stable during the organisational restructure process, and that management has maintained effective procedures and policies. TEC continued to maintain all key governance controls, such as the Audit and

6 6 Risk Committee. We acknowledge that the Board of Commissioners and management have committed a significant amount of time and effort to prepare the TEC s Statement of Intent (SOI) for 2009/ /12. This included discussion with both the Ministry of Education and central agencies. We note below that the TEC s service performance information and associated systems and controls are poor. Although service performance reporting and the associated systems form one aspect of our overall assessment of the management control environment, we advise that a poor rating, if left unchecked, is likely to adversely affect our assessment of the TEC s management control environment in future. The Auditor-General s revised auditing standard on service performance reporting (AG-4) takes effect for Crown entities in future reporting periods. In future, the quality of service performance information and associated systems and controls will have a greater impact on our overall management control environment assessment. We have recommended some improvements that the TEC should address, including the need to: complete work on its business continuity plan, as we had recommended in our 2007/08 audit; embed better quality assurance and monitoring controls over the drafting of its funding agreements with tertiary education institutions; and develop specific tendering processes for creating a pool of preferred providers for supplying Crown intervention services. We acknowledge that, since balance date, management has considered and started implementing our recommendations. We encourage management to set aside sufficient resources to complete implementing our recommendations before 30 June Financial information systems and controls 2008/09 Good Improvements would be beneficial and we recommend that the TEC address these. 2007/08 Very good No improvements were necessary. Comment The TEC should continue to follow up on the findings and recommendations arising from our data analysis of its payments and account payable records and ledgers. Although management s follow-up work completed since balance date does not suggest that the deficiencies we found were a significant risk to the TEC, there is the need to consolidate and rationalise those records. Service performance information and associated systems and controls 2008/09 Poor 2007/08 Not graded Comment Major improvements are required and we recommend that TEC should urgently address these. Deficiencies we identified in 2007/08 have been partially resolved. The following comments are based on our review of the forecast 2009/10 non-financial performance report and its supporting systems and controls, and our audit of the 2008/09 Statement of Service Performance (SSP) and its supporting systems and controls. The SOI is not a sufficient basis for assessing the effectiveness of the TEC s operations

7 and standard of service delivery. We identified a number of major improvements for the TEC to consider in developing its next SOI. These include: the SOI needs to provide clear intervention logic between the outcomes, strategic objectives, medium-term priorities, and output classes of the TEC; the TEC s output classes need to be presented within the context of its overall performance framework there should be discussion or illustration of the links between the output classes and the impacts they are intended to have; and all of the outputs in the forecast SSP need to have performance measures specified and criteria by which service performance can be objectively verified and on which success can be judged The Committee may wish to ask: We note the Auditor-General has recommended improvements to the TEC s management control environment and financial information systems and controls. What action has been taken to address recommendations in these areas? 2.5 We comment further, and suggest the Committee ask questions about the TEC s service performance information systems and controls in Part B of our briefing. 3 Significant matters of audit interest 3.1 We noted the following significant matters of interest from our audit of the TEC. Governance structure and organisational restructure process 3.2 The TEC underwent a significant internal restructure of its service delivery model and internal reporting lines during 2008/09. This has resulted in a substantially different business model and staff complement. As part of our audit, we reviewed both the restructuring process that the TEC followed and its management of the risks associated with the change. 3.3 As noted above, we found that the control environment remained stable during the organisational restructure process, and management maintained effective procedures and policies. Monitoring control and quality assurance over Quality Reinvestment Fund (QRF) programme agreements 3.4 During the year, we became aware that, in their 2008 financial statements, a number of tertiary education institutions (TEIs) had accounted for the Quality Reinvestment Fund (QRF) money that they had received from the Crown in a manner that was inconsistent with our expectation. We consider that they should have accounted for this funding as a capital

8 8 contribution from the Crown in the respective TEIs Statement of Movements in Equity. Although the total amount involved was not material, the fact that the TEIs did not account for the money received in accordance with the Crown s intention concerned the Auditor- General. 3.5 After reviewing a few of the QRF funding agreements, we concluded that there is a need for the TEC to embed better quality assurance and monitoring controls over the drafting of its funding agreements. This is to ensure that the agreements clearly state the intention of the Crown in making such funds available to TEIs. 4 Legislative compliance 4.1 We reviewed the systems and procedures that the TEC uses to identify and comply with legislative requirements. No issues arose that need to be drawn to the Committee s attention.

9 Part B: Advice to the Committee 9 5 Financial performance The TEC has two principal revenue streams TEC operating revenue (used to run the TEC) and TEC grants revenue (used to fund TEOs). In 2008/09, the TEC received total revenue of $3.125 billion. 12 This comprised $ million operating revenue (2007/08: $ million) and $3.043 billion in grants revenue (2007/08: $2.893 billion). 13 Both revenue streams come from three main sources: the Ministries of Education and Social Development and Immigration New Zealand. 5.2 Despite the increase in the TEC s 2008/09 operating and grants revenue on the previous year, both amounts were less than the TEC s 2008/09 forecast budget. The TEC s operating revenue is determined as a percentage of its grants revenue from each of the three source agencies. The TEC s 2008/09 grant revenue was lower than budget due to lower participation rates for a number of programmes. It is not clear what impact these variances had on the TEC s operations. 5.3 The Committee may wish to ask: We note the increases in the TEC s 2008/09 operating and grants revenue between years. However, we also note that both amounts were less than the TEC s 2008/09 forecast budget. What led to the increase in the TEC s operating and grants revenue between years? What impact did these budget variances have on the TEC s 2008/09 service performance levels, and to what extent is this reflected in its 2008/09 Statement of Service Performance? Please outline the reasons for the lower than anticipated grants revenue in 2008/09. To what extent is the TEC s operating and grant revenue tracking against budget in 2009/10? We understand that the TEC s operating revenue is determined as a percentage of its grants revenue from the Ministries of Education and Social Development and Immigration New Zealand. To what extent does this method for calculating the TEC s annual operating revenue impact on the TEC s corporate planning function and organisational management? Note 15 to the financial statements is a succinct statement of material variances for 2008/09.

10 10 The TEC s 2008/09 financial performance 5.4 The TEC s total operating surplus for the year was $ million. 14 This includes unallocated grants revenue. Its operating surplus (funds used to run the TEC) for the year was $2.876 million. 15 For the previous three financial periods, the TEC had incurred net operating deficits (2007/08: $8.416 million, 2006/07: $2.818 million and $671,000 in 2005/06 all net operating deficits). This is a substantial turn-around in financial performance in 2008/09. The TEC had forecast a break-even position for 2008/ We note that the TEC s 2009 SOI forecasts a net operating deficit of $540,000 in 2009/ The Committee may wish to ask: We note that the TEC achieved a net operating surplus of $2.876 million against a forecast breakeven position for 2008/09. We understand that up to and including 2007/08, the TEC had incurred three consecutive net operating deficits. What are the reasons for this turn-around in financial performance for 2008/09? To what extent does the 2008/09 net operating surplus signal a change in the recent trend of net operating deficits for the TEC? Despite achieving a net operating surplus in 2008/09, we note that the TEC s 2009 SOI forecasts a net operating deficit of $540,000 in 2009/10. What are the reasons for this forecast of a deficit in 2009/10? Is the TEC s 2009/10 financial performance year-to-date on track against its forecast net deficit? - If not, why not? Operating revenue and expenditure 5.7 The TEC s 2008/09 revenue of $ million was approximately $5 million less than forecast, and $17 million more than 2007/ As discussed above, the calculation method for the TEC s operating revenue means that the increase in grants revenue from the Ministry of Education has led to the increase in the TEC s operating revenue between years. Operating revenue from the other two sources remained either static or reduced between years. 5.8 The TEC s operating expenditure has also changed between years reflecting the change in revenue. While operating expenditure ($ million) was less than forecast ($ million), it was more than was spent in 2007/08 ($ million). 19 The most significant contributor to the increase in operating expenses is managing third party TEC (2009), Statement of Intent , page 31.

11 contracts. The TEC spent $ million for this purpose in 2008/09 compared to $6.024 million in 2007/ The Committee may wish to ask: We note that the TEC spent $ million on managing third party contracts in 2008/09, compared to $6.024 million in 2007/08. What does this work entail? Please outline the reasons for this 100% increase in this expenditure item between years. Is the level of 2008/09 expenditure on this activity expected to continue? - If so, why? - If not, why not? How is 2009/10 expenditure on managing third party contracts tracking against budget? 5.10 The TEC s personnel expenditure remains relatively static between years: $ million in 2008/09, compared to $ million in 2007/ The TEC restructured during 2008/09, with the new structure taking effect on 1 July The TEC disclosed restructuring costs of $3.348 million in 2008/09 (2007/08: $4.490 million) 22, as well as cessation compensation payments for 53 staff totalling $1.333 million for 2008/09 (2007/08: $230,584). 23 The Committee may wish to enquire about the impact of the restructuring on its static personnel expenditure. We discuss the restructuring in more detail in section 7 of this briefing The Committee may wish to ask: We note that the TEC s personnel expenditure remained relatively static between years despite the increase in grants revenue and operating revenue. Please outline the reasons for this. To what extent does this reflect the 2008/09 restructuring? We note that the TEC has disclosed restructuring costs of $3.348 million on page 31 of its 2008/09 Annual Report, as well as cessation compensation payments for 53 staff totalling $1.333 million on page 42 of its 2008/09 Annual Report. What was the total cost of the 2008/09 restructuring exercise? How does the total cost of the 2008/09 restructuring exercise compare with the costs incurred with the 2007 restructuring? TEC (2009), Annual Report for the year ended 30 June 2009, page 31. TEC (2009), Annual Report for the year ended 30 June 2009, page 31. TEC (2009), Annual Report for the year ended 30 June 2009, page 31. TEC (2009), Annual Report for the year ended 30 June 2009, page 42.

12 12 Grant revenue and expenditure 5.12 The TEC achieved a significant grants surplus in 2008/09: $ million (2007/08: $9.827 million). 24 The 2008/09 Annual Report states that movements in the Student Achievement Component (SAC) and Tertiary Education Organisation Component (TEOC) appropriations impacted on this variance, as well as the net effects of transfers of funding from 2007/08 and transfers from 2008/09 into out-years. 25 The forecast grants surplus for 2008/09 was $2 million. 26 In its previous annual report, the TEC reported expenditure against budget for each of its grant funding pools. This is absent in its 2008/09 Annual Report The Committee may wish to ask: The TEC achieved a significant grants surplus in 2008/09: $ million. What happened to this surplus (e.g. was it retained or returned to the Crown)? Please provide details of the TEC s expenditure against budget for each of its grant funding pools, and an explanation of any significant variances (+/- 5%). What was the impact on TEOs and/or students of the grants surplus? We note that the forecast grants surplus for 2008/09 was $2 million. On what basis did the TEC set its 2008/09 forecast grants surplus, and why? Please explain to what extent a significant variance in the TEC s grants surplus is an indicator of the TEC s management performance for a financial period. 6 Measuring and reporting non-financial performance Measuring and reporting on the TEC s performance 6.1 We considered the TEC s service performance information systems and controls as part of our 2008/09 audit. We have reported our results in Part A of our briefing. Overall, the TEC has a poor set of systems and controls for measuring and reporting on its service performance. We have made a number of recommendations for major improvements to the TEC s framework for measuring and reporting on its own performance. 6.2 The Treasury and our office are working collaboratively to advance the quality of public sector service performance reporting. As part of this work, the Treasury has selected the TEC as one of the priority agencies it will work with in 2009/10 to help improve the way in which the TEC measures and reports on its performance. 6.3 The Committee may wish to ask: TEC (2009), Annual Report for the year ended 30 June 2009, page 39.

13 We note that the Auditor-General has made a number of recommendations for major improvements to the TEC s framework for measuring and reporting on its own performance. 13 What progress has the TEC made in addressing each of the Auditor-General s recommendations? We understand that the Treasury has selected the TEC as one of the priority agencies it will work with in 2009/10 to help improve the way in which the TEC measures and reports on its performance. Please describe how Treasury is working with the TEC to help it improve how it measures and reports on its performance. What level of change is the TEC expecting to make in 2009/10 to its framework for measuring and reporting on its performance, and what changes will be made in future years? 6.4 The former Chair has reported that the development of good performance measures, while difficult in the tertiary education sector, is a shared responsibility of the TEC and individual tertiary education organisations (TEOs). 27 This comment is likely to reflect that in addition to measuring and reporting on its own non-financial performance, TEC has a role in guiding the measurement and reporting of the non-financial performance of the TEOs it funds. That is, the TEC uses the Investment Plan process to specify the performance measures that TEOs must report their performance against. 6.5 For its three strategic objectives, the TEC achieved 12 of the /09 performance measures. 28 The TEC s 2008/09 Statement of Service Performance (SSP) shows that it met over 75% of its service performance objectives in 2008/ The Committee may wish to ask: The former Chair has reported that the development of good performance measures, while difficult in the tertiary education sector, is a shared responsibility of the TEC and individual tertiary education organisations. To what extent is the TEC working with the tertiary education sector on the refinement of the outcome level measures it reports against. - If not, why not? Guiding the measurement and reporting of TEOs performance 6.7 During 2009, we reviewed a sample of TEIs 2007 service performance reporting. Our concluding view is that significant improvements could be made to the quality of service performance reporting in TEIs. It is likely that this conclusion could also be levelled at private providers of tertiary education. However, the Auditor-General is not the auditor of these organisations. In the context of comments on performance measurement, the former TEC (2009), Annual Report for the year ended 30 June 2009, page 5. TEC (2009), Annual Report for the year ended 30 June 2009, pages

14 14 Chair notes that further work is required to build a performance focus in the tertiary education sector, and that this would be a feature of the 2009/10 TEC work programme The Committee may wish to ask: We note that building a performance focus in the tertiary education sector is a feature of the 2009/10 TEC work programme. Please provide details of this work programme, and what progress has been made in the year to date. To what extent will this project require enduring effort beyond 2009/10 from the TEC, given the very large number of TEOs it funds. 6.9 The TEC has reported that it is taking a more hands off approach with those TEOs that are managing themselves well. 30 Related to this, the TEC reports that all TEOs that had agreed an Investment Plan with the TEC in 2008 received a full-year report on their 2008 performance The Committee may wish to ask: The TEC has reported that it is taking a more hands off approach with those TEOs that are managing themselves well. What criteria has the TEC used to assess that a TEO is managing itself well? What does a more hands off approach entail? Which TEOs are considered to be managing themselves well and are subject to this hands off approach? We note that all TEOs that had agreed an Investment Plan with the TEC in 2008 received a full-year report on their 2008 performance. What has TEC learnt from these reports about the Investment Plan process? What has TEC learnt from these reports about tertiary education sector performance in 2008, including value-for-money considerations? What, if any, impact has this stream of work had on the TEC s 2009/10 work programme? TEC s monitoring of TEIs performance 6.11 The TEC is responsible for monitoring the Crown s ownership interest in the 31 public TEIs. Our 2008/09 Annual Plan signalled our intent to carry out a performance audit of this TEC function. The TEC has developed a new monitoring framework for TEIs. It includes both TEC (2009), Annual Report for the year ended 30 June 2009, page 5. TEC (2009), Annual Report for the year ended 30 June 2009, page 5. TEC (2009), Annual Report for the year ended 30 June 2009, page 10. The TEC did not require some TEOs to agree an Investment Plan to access the TEC s funding. This was usually due to their small size.

15 financial and educational performance dimensions. 32 As a consequence of the five new monitoring processes that form part of this new monitoring framework, we have decided to defer our performance audit until 2011/ The Committee may wish to ask: We note that the TEC has developed a new monitoring framework for TEIs which includes both financial and educational performance dimensions. Please provide details of the monitoring framework. How does the framework improve the quality of ownership advice that the TEC provides to the Minister for Tertiary Education about TEIs? 6.13 The 2008/09 Annual Report states that all institutes of technology and polytechnics have been involved in a benchmarking exercise to better understand how well they are performing, and where they can improve the way that they operate and deliver better education and training. 33 All Investment Plans are being re-negotiated in 2010, to take effect for up to a three-year period, beginning in The Committee may wish to ask: We understand that institutes of technology and polytechnics have been involved in a benchmarking exercise to better understand how well they are performing, and where they can improve the way that they operate and deliver better education and training. How well are institutes of technology and polytechnics performing, as a group of education providers compared to whom? How can institutes of technology and polytechnics improve the way that they operate? In what ways can institutes of technology and polytechnics better deliver education and training? How does the TEC intend to use this benchmarking information for its 2011 Investment Plan decisions? 7 Organisational capability 2008/09 restructuring 7.1 In 2008, the Board of Commissioners requested a review of the TEC s structure and operations to ensure that the organisation continued to be fit for purpose. 34 This closely followed a 2007 restructuring which resulted in the closure of 11 area offices and the establishment of a number of stakeholder engagement managers TEC (2009), Annual Report for the year ended 30 June 2009, page 10. TEC (2009), Annual Report for the year ended 30 June 2009, page 11. TEC (2009), Annual Report for the year ended 30 June 2009, page 12.

16 A new organisational structure came into effect on 1 July The new structure resulted in just over 50 redundancies and the closure of its 3 regional centres (Auckland, Rotorua and Christchurch). The TEC now comprises a national office in Wellington and a service centre in Manukau. 7.3 The Committee may wish to ask: We note that a new organisational structure came into effect on 1 July What were the objectives of the 2008/09 restructuring exercise? Has the restructuring exercise fulfilled its objectives? - If not, why not? - If so, how has this been assessed? What were the capability risks of the 2008/09 restructuring exercise? - How were these managed? Please outline any unintended consequences of the 2008/09 restructuring exercise. What has been the impact of the two recent restructurings on staff engagement and morale? 7.4 The Chief Executive reports that while the TEC is a funding agency, its role is also to understand the system, optimise the system and provide stewardship of the system The Committee may wish to ask: To what extent has the new organisational structure better enabled the TEC to fulfil its role of understanding the system, optimising the system and providing stewardship of the system? Risk management 7.6 The TEC reports that it promotes a risk management culture. 36 The TEC has adopted a systematic approach to identifying, communicating, analysing, evaluating, treating and monitoring key risks to the TEC. It also reports that it is working with other education sector agencies to manage sector strategic and operational risks The Committee may wish to ask: TEC (2009), Annual Report for the year ended 30 June 2009, page 6. TEC (2009), Annual Report for the year ended 30 June 2009, page 13. TEC (2009), Annual Report for the year ended 30 June 2009, page 13.

17 The TEC reports that it promotes a risk management culture. What is the TEC s definition of a risk management culture? 17 How does the TEC promote its risk management culture? How does the TEC assess whether it is being effective in identifying and mitigating risk? The TEC reports that it has adopted a systematic approach to identifying, communicating, analysing, evaluating, treating and monitoring key risks to the TEC. What are the key risks to the TEC? - How are these key risks being managed? To what extent is the TEC working with the Ministry of Education, as its monitoring department, on the mitigation of these key risks? We note that the TEC is working with other education sector agencies to manage sector strategic and operational risks. Which education agencies are involved, and which agency is leading this work? What are the tertiary education sector strategic and operational risks? - How are these risks being managed, and by whom?

18 18 APPENDIX Explanation of scope and grades Management Control Environment Financial Information Systems and Controls Service Performance Information and Associated Systems and Controls Indicative Areas This is the foundation of the control environment and may include consideration of the following: clarity of strategic planning/the way the entity manages and reports performance; communication and enforcement of integrity and ethical values; commitment to competence; participation by those charged with governance for example, the involvement and influence of Audit Committee and Board (or equivalent); management philosophy and operating style; organisational structure; assignment of authority and responsibility; human resources policies and practices; risk assessment and risk management; key entity-level control policies and procedures; information systems and communication (including information technology planning and decision-making); monitoring; and legislative compliance arrangements. These are the systems and controls (including application-level computer controls) over financial performance and financial reporting and include the following: appropriateness of information provided; presentation of financial information; reliability of systems; control activity (including process-level policies and procedures); and monitoring. This concerns the quality of the service performance measures selected for reporting against, as well as the systems and controls (including application-level computer controls) over service performance reporting, and includes the following: appropriateness of information provided and reported; presentation of SSP information; reliability of systems; control activity (including process-level policies and procedures); and monitoring. Comments and grades are based on conclusions drawn on the 2009/ /12 SOI and the 2008/09 SSP.

19 Grade Very good Good Needs improvement Poor Explanation of grade No improvements are necessary. Improvements would be beneficial and we recommend that the entity addresses these. Improvements are necessary and we recommend that the entity should address these at the earliest reasonable opportunity. Major improvements are required, and we recommend the entity should urgently address these The reporting under Part A of this briefing, Environment, Systems, and Controls for Measuring Financial and Service Performance, is a by-product of the underlying audit work carried out to form an opinion on the financial and service performance statements. Its scope is limited to those areas of the management control environment, information systems, and controls the auditor has given attention to during the course of the audit. 2. Recommendations for improvement are generally limited to those findings that the auditor considers are the more notable weaknesses in the design or operation of the management control environment, information systems, or controls. The recommended improvements determine the grade assigned. A single, serious deficiency drawing a recommendation for improvement may, of itself, determine the grade. Similarly, the most serious deficiency among several will draw a stronger recommendation and affect the grade accordingly. 3. Deficiencies in the management control environment, information systems, or controls are the gaps between what auditors observe and what auditors consider, in their professional judgement, constitutes best practice (see below). Auditors professional judgement is informed by many factors, including national and international standards, knowledge of best practice, and standards and expectations for the public sector in New Zealand. 4. To help ensure the relevance to all entities of the auditor s recommendations and grading, the auditor s recommendations are made with reference to what is considered best practice given the size, nature, and complexity of the entity. Thus, notions of best practice will vary among entities because what is considered necessary, sufficient, or beneficial for some entities may not be so for others. There is therefore not a one size fits all standard across the public sector. Rather, recommendations for improvement are based on the auditor s assessment of how far short the entity is from a standard that is appropriate for the entity s size, nature, and complexity of its business. 5. Further, notions of best practice may vary over time in response to change for example, changes in the operating environment, changes to standards, and changes in general expectations. Grades assigned to entities may therefore fluctuate from year to year according to how entities respond to changes in the environment and in best-practice expectations. Grades may also be affected from year to year because of changes in emphases, in accordance with the auditor s risk-based approach to testing systems and controls. 6. Improvements are recommended only when it is considered, in the auditor s judgement, that the benefits of the improvements would justify the costs. 7. Recommendations for improvement are based on the auditor s conclusions about the state of the entity s management control environment, information systems, and controls as at the end of the financial year.

WorkSafe New Zealand. Annual Review briefing to the Transport & Industrial Relations Committee. 2015/16 Financial Year.

WorkSafe New Zealand. Annual Review briefing to the Transport & Industrial Relations Committee. 2015/16 Financial Year. Annual Review briefing to the Transport & Industrial Relations Committee WorkSafe New Zealand 1 2015/16 Financial Year 9 February 2017 2 2 Assistance to the Committee The Transport & Industrial Relations

More information

Office of the Auditor-General Briefing to the Local Government and Environment Committee. Vote Conservation. 2010/11 Year.

Office of the Auditor-General Briefing to the Local Government and Environment Committee. Vote Conservation. 2010/11 Year. Office of the Auditor-General Briefing to the Local Government and Environment Committee Vote Conservation 1 2010/11 Year 17 June 2010 2 Assistance to the Committee The Local Government and Environment

More information

Statement of Performance Expectations

Statement of Performance Expectations E.75iii Statement of Performance Expectations 2016/2017 Published by the Tertiary Education Commission Te Amorangi Mātauranga Matua 44 The Terrace PO Box 27048 Wellington, New Zealand Date: 23 June 2016

More information

MINUTES OF THE CORPORATION MEETING HELD ON MONDAY 17 OCTOBER Independent Member. - Independent Member (Vice-Chair)

MINUTES OF THE CORPORATION MEETING HELD ON MONDAY 17 OCTOBER Independent Member. - Independent Member (Vice-Chair) Item 3 MINUTES OF THE CORPORATION MEETING HELD ON MONDAY 17 OCTOBER 2016 Meeting commenced: 6.00 p.m. Meeting closed: 8.00 p.m. Present: Mr J Lyne Ms A Ashworth Mr M Mistry Mrs J Ryan Mr M Dinsdale Mr

More information

Contents. 3 Definition in Public Finance Act Role of the Portfolio Ministers and the Responsible Minister 9 Vote Issues

Contents. 3 Definition in Public Finance Act Role of the Portfolio Ministers and the Responsible Minister 9 Vote Issues Contents 3 Definition in Public Finance Act 1989 4 Role of the Portfolio Ministers and the Responsible Minister 9 Vote Issues 1 Briefing for the Minister Responsible for the Department of Internal Affairs

More information

ISBN: (online) Internet

ISBN: (online) Internet ISBN: 978-0-478-33075-5 (online) Internet This document will be made available on the State Services Commission s internet site. The URL for this site is www.crownentities.ssc.govt.nz It will also be available

More information

B.29[17d] Medium-term planning in government departments: Four-year plans

B.29[17d] Medium-term planning in government departments: Four-year plans B.29[17d] Medium-term planning in government departments: Four-year plans Photo acknowledgement: mychillybin.co.nz Phil Armitage B.29[17d] Medium-term planning in government departments: Four-year plans

More information

NHS Isle of Wight CCG

NHS Isle of Wight CCG NHS Isle of Wight CCG Annual Audit Letter for the year ended 31 March 2016 June 2016 Ernst & Young LLP Contents Contents Executive Summary... 2 Purpose... 6 Responsibilities... 8 Financial Statement Audit...

More information

The Mid Yorkshire Hospitals NHS Trust

The Mid Yorkshire Hospitals NHS Trust The Mid Yorkshire Hospitals NHS Trust 2008/09 14 September 2009 The Mid Yorkshire Hospitals NHS Trust Annual Audit Letter 2008/09 Purpose of this Letter The purpose of this (letter) is to summarise the

More information

Preparing the Statement of Intent. Guidance and Requirements for Crown Entities. ew Zealand Treasury

Preparing the Statement of Intent. Guidance and Requirements for Crown Entities. ew Zealand Treasury D Preparing the Statement of Intent Guidance and Requirements for Crown Entities November 2010 ew Zealand Treasury Strategy Development Identify/confirm government, sector and entity outcomes and expectations

More information

The Annual Audit Letter for Chorley and South Ribble Clinical Commissioning Group

The Annual Audit Letter for Chorley and South Ribble Clinical Commissioning Group The Annual Audit Letter for Chorley and South Ribble Clinical Commissioning Group Year ended 31 March 2016 June 2016 Fiona Blatcher Engagement Lead T 0161 234 6393 E fiona.c.blatcher@uk.gt.com Gareth Winstanley

More information

Vote Building and Housing

Vote Building and Housing Office of the Auditor-General Briefing to the Social Services Committee Vote Building and Housing 1 2015/16 Year 3 June 2015 2 Assistance to the Committee The Social Services Committee is conducting an

More information

Report of the Auditor General of Alberta

Report of the Auditor General of Alberta Report of the Auditor General of Alberta OCTOBER 2016 Mr. David Shepherd, MLA Chair Standing Committee on Legislative Offices I am honoured to send my Report of the Auditor General of Alberta October

More information

Audit engagement letter

Audit engagement letter Attachment 1 to Report 17.143 10 May 2017 Chris Laidlaw Chair Greater Wellington Regional Council PO Box 11646 Wellington 6142 Level 2 (Reception), 100 Molesworth Street Thorndon, Wellington PO Box 99,

More information

Performance audit report. Inland Revenue Department: Performance of taxpayer audit follow-up audit

Performance audit report. Inland Revenue Department: Performance of taxpayer audit follow-up audit Performance audit report Inland Revenue Department: Performance of taxpayer audit follow-up audit Office of the Auditor-General Private Box 3928, Wellington Telephone: (04) 917 1500 Facsimile: (04) 917

More information

Ministry of Defence and NZ Defence Force

Ministry of Defence and NZ Defence Force Financial Review briefing to the Foreign Affairs and Trade Committee 2011/12 Financial Year Ministry of Defence and NZ Defence Force 1 6 December 2012 2 Assistance to the Committee The Foreign Affairs

More information

JULY 2017 HM Treasury

JULY 2017 HM Treasury JULY 2017 HM Treasury Whole of Government Accounts 2015-16 Our vision is to help the nation spend wisely. Our public audit perspective helps Parliament hold government to account and improve public services.

More information

Toolkit for Boards of Education Financial Health & Other Questions Financial Health Questions

Toolkit for Boards of Education Financial Health & Other Questions Financial Health Questions Toolkit for Boards of Education Financial Health & Other Questions Financial Health Questions Financial Health Indicators Questions to ask about Financial Information Questions that Audit Committees or

More information

Statement of Intent healthalliance (FPSC) Ltd. Incorporating the Statement of Performance Expectations

Statement of Intent healthalliance (FPSC) Ltd. Incorporating the Statement of Performance Expectations Statement of Intent healthalliance (FPSC) Ltd Incorporating the Statement of Performance Expectations 2016-2020 Contents About healthalliance (FPSC) Limited... 2 Our Environment & Focus... 3 Role... 4

More information

B.20 SPE (2017) Statement of Performance Expectations

B.20 SPE (2017) Statement of Performance Expectations B.20 SPE (2017) Statement of Performance Expectations 1 July 2017 Contents Statement from the Board 1 The Authority 3 Investment 5 Schemes 11 Forecast Financial Statements 15 Government Superannuation

More information

Annual Audit Letter. Buckinghamshire Hospitals NHS Trust Audit 2008/09 September 2009

Annual Audit Letter. Buckinghamshire Hospitals NHS Trust Audit 2008/09 September 2009 Annual Audit Letter Buckinghamshire Hospitals NHS Trust Audit 2008/09 September 2009 Contents Key messages 3 Financial statements and statement on internal control 7 Use of resources 9 Closing remarks

More information

Oversight of financial management in local authority maintained schools

Oversight of financial management in local authority maintained schools REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1517 SESSION 2010 2012 19 OCTOBER 2011 Department for Education Oversight of financial management in local authority maintained schools Oversight of financial

More information

Auditor-General s Auditing Standards 2017

Auditor-General s Auditing Standards 2017 B.28(AS) Auditor-General s Auditing Standards 2017 Presented to the House of Representatives under section 23(1) of the Public Audit Act 2001 March 2017 ISBN 978-0-478-44259-5 3-1 Preface Section 23(1)

More information

Senior Pay Report. Including Chief Executive Remuneration Disclosure 2016/17

Senior Pay Report. Including Chief Executive Remuneration Disclosure 2016/17 Senior Pay Report Including Chief Executive Remuneration Disclosure 2016/17 State Services Commissioner s Introduction The State Services Commission has been disclosing chief executive (CE) remuneration

More information

B.29[13l] Public entities in the social sector: Our audit work

B.29[13l] Public entities in the social sector: Our audit work B.29[13l] Public entities in the social sector: Our audit work Office of the Auditor-General PO Box 3928, Wellington 6140 Telephone: (04) 917 1500 Facsimile: (04) 917 1549 Email: reports@oag.govt.nz Website:

More information

NZTA National Office Board Room, Level 2, Chews Lane Building Victoria Street, Wellington

NZTA National Office Board Room, Level 2, Chews Lane Building Victoria Street, Wellington MINUTES OF THE NZ TRANSPORT AGENCY BOARD MEETING HELD ON THURSDAY 31 MARCH 2011 AT 8.30AM NZTA National Office Board Room, Level 2, Chews Lane Building 44-50 Victoria Street, Wellington Approved by the

More information

The Annual Audit Letter for Mersey Care NHS Trust

The Annual Audit Letter for Mersey Care NHS Trust The Annual Audit Letter for Mersey Care NHS Trust Year ended 31 March 2015 June 2015 Michael Thomas Director T +44 (0)161 214 6368 E mike.thomas@uk.gt.com Gerard Small Manager T +44 (0)161 214 6372 E ged.w.small@uk.gt.com

More information

Public Accounts of the Province

Public Accounts of the Province CHAPTER FIVE Public Accounts of the Province INTRODUCTION The Public Accounts for each fiscal year, ending March 31, are prepared under the direction of the Minister of Finance as required by the Ministry

More information

Independent Auditor s Report To the readers of Wellington Cable Car Limited s financial statements and performance information for the year ended 30 June 2017 The Auditor-General is the auditor of Wellington

More information

Audit Proposal for the 2017, 2018 and 2019 Financial Years and the 2016/2017 Annual Report Audit Engagement Letter

Audit Proposal for the 2017, 2018 and 2019 Financial Years and the 2016/2017 Annual Report Audit Engagement Letter Agenda Memorandum Date 27 March 2017 Memorandum to Chairperson and Members Executive, Audit and Risk Committee Subject: Approved by: Audit Proposal for the 2017, 2018 and 2019 Financial Years and the 2016/2017

More information

Disclosure of Board and Management Matters

Disclosure of Board and Management Matters Disclosure of Board and Management Matters An Exploratory Study on Charity Governance in Singapore isabel sim HOE SIU LOON BOOKLET 3 A Project by the Centre for Social Development Asia November 2017 TABLE

More information

State Sector Amendment Act (No 2) 2004

State Sector Amendment Act (No 2) 2004 State Sector Amendment Act (No 2) 2004 Public Act 2004 No 114 Date of assent 21 December 2004 Commencement see section 2 Contents 1 Title 57B Breaches of minimum 2 Commencement standards 3 Title amended

More information

State Sector Amendment Act (No 2) 2004

State Sector Amendment Act (No 2) 2004 State Sector Amendment Act (No 2) 2004 Public Act 2004 No 114 Date of assent 21 December 2004 Commencement see section 2 Contents I 2 3 4 5 6 7 8 9 10 1\ Title Commencement Title amended Interpretation

More information

Page 1 healthalliance (FPSC) Limited Statement of Intent

Page 1 healthalliance (FPSC) Limited Statement of Intent Page 1 healthalliance (FPSC) Limited Statement of Intent 2017-2021 Page 1 healthalliance (FPSC) Limited Statement of Intent 2017-2021 Contents Message from the CEO... 4 About healthalliance (FPSC)... 5

More information

B.29[19a] Matters arising from our audits of the long-term plans

B.29[19a] Matters arising from our audits of the long-term plans B.29[19a] Matters arising from our audits of the 2018-28 long-term plans Photo acknowledgement: istock LazingBee B.29[19a] Matters arising from our audits of the 2018-28 long-term plans Presented to the

More information

Financial Monitoring Framework Guidelines for Tertiary Education Institutions

Financial Monitoring Framework Guidelines for Tertiary Education Institutions Financial Monitoring Framework Guidelines for Tertiary Education Institutions July 2016 Financial Monitoring Framework Guidelines Financial Monitoring Framework Guidelines for Tertiary Education Institutions

More information

Phase 1 Evaluation of The Training Incentive Allowance

Phase 1 Evaluation of The Training Incentive Allowance Phase 1 Evaluation of The Training Incentive Allowance C. Adamson J. Forbes T. Woodson Centre for Social Research and Evaluation Te Pokapü Rangahau Arotake Hapori June 2003 The view and opinions expressed

More information

Vote Prime Minister and Cabinet

Vote Prime Minister and Cabinet Vote Prime Minister and Cabinet APPROPRIATION MINISTER(S): Minister of Civil Defence (M11), Prime Minister (M52), Minister for Greater Christchurch Regeneration (M85), Minister Responsible for the Earthquake

More information

Office of the Auditor-General. Vote Customs. Briefing to the Foreign Affairs, Defence and Trade Committee. 2018/19 Year.

Office of the Auditor-General. Vote Customs. Briefing to the Foreign Affairs, Defence and Trade Committee. 2018/19 Year. Office of the Auditor-General Briefing to the Foreign Affairs, Defence and Trade Committee Vote Customs 2018/19 Year 14 June 2018 Assistance to the Committee The Foreign Affairs, Defence and Trade Committee

More information

Section 4 Governors Guidance notes on the Management of School Finances

Section 4 Governors Guidance notes on the Management of School Finances Section 4 Governors Guidance notes on the Management of School Finances 1. Introduction Governors should be aware of their roles and responsibilities, accountability for public money and the school s model

More information

Annual Audit Letter. Hereford Hospitals NHS Trust Audit 2010/11

Annual Audit Letter. Hereford Hospitals NHS Trust Audit 2010/11 Annual Audit Letter Hereford Hospitals NHS Trust Audit 2010/11 Contents Key messages...2 Current and future challenges...4 Financial statements and statement on internal control...5 Overall conclusion

More information

Takeovers Panel HALF YEAR REPORT

Takeovers Panel HALF YEAR REPORT Annual Report Ref: 790-063 / 315919 Takeovers Panel HALF YEAR REPORT for the period ended 31 December CONTENTS Statement of Responsibility... 3 Summary of performance to date... 4 The Panel s financial

More information

The Mid Yorkshire Hospitals NHS Trust

The Mid Yorkshire Hospitals NHS Trust The Mid Yorkshire Hospitals NHS Trust 2007/08 4 September 2008 The Mid Yorkshire Hospitals NHS Trust Annual Audit Letter 2007/08 Purpose of this Letter and scope of our audit The purpose of this (letter)

More information

Appointing public sector auditors and setting audit fees

Appointing public sector auditors and setting audit fees Appointing public sector auditors and setting audit fees Published under section 21 of the Public Audit Act 2001. August 2011 ISBN 978-0-478-38310-2 (online) 2 Contents Part 1 Introduction 3 Part 2 How

More information

B.29 [16c] A review of public sector financial assets and how they are managed and governed

B.29 [16c] A review of public sector financial assets and how they are managed and governed B.29 [16c] A review of public sector financial assets and how they are managed and governed Photo acknowledgement: istock woraput B.29[16c] A review of public sector financial assets and how they are managed

More information

B.29[15i] Being accountable to the public: Timeliness of reporting by public entities

B.29[15i] Being accountable to the public: Timeliness of reporting by public entities B.29[15i] Being accountable to the public: Timeliness of reporting by public entities Photo acknowledgement: mychillybin.co.nz Steve Harper B.29[15i] Being accountable to the public: Timeliness of reporting

More information

The Audit Plan for Worcestershire County Pension Fund

The Audit Plan for Worcestershire County Pension Fund The Audit Plan for Worcestershire County Pension Fund Year ended 31 March 2017 24 March 2017 John Gregory Director T 0121 232 5333 E john.gregory@uk.gt.com Helen Lillington Audit Manager T 0121 232 5312

More information

STATEMENT OF PERFORMANCE EXPECTATIONS

STATEMENT OF PERFORMANCE EXPECTATIONS B.21 STATEMENT OF PERFORMANCE EXPECTATIONS FOR THE PERIOD 01 JULY 2016 TO 30 JUNE 2017 GUARDIANS OF NEW ZEALAND SUPERANNUATION Contents SECTION 1 Introduction... 1 SECTION 2 Our Mandate... 2 SECTION 3

More information

Disclosure of fees paid to auditors by listed issuers April 2014

Disclosure of fees paid to auditors by listed issuers April 2014 Disclosure of fees paid to auditors by listed issuers April 2014 Financial Markets Authority Website: www.fma.govt.nz Auckland Office Level 5, Ernst & Young Building 2 Takutai Square, Britomart PO Box

More information

B.28AP(17) Annual Plan 2017/18

B.28AP(17) Annual Plan 2017/18 B.28AP(17) Annual Plan 2017/18 B.28AP(17) Annual Plan 2017/18 Presented to the House of Representatives under section 36(4) of the Public Audit Act 2001. June 2017 ISSN 1178-8488 Contents Overview 3 Part

More information

Presentation Overview

Presentation Overview Canada s Application of Strategic Environmental Assessment: An Audit George G. Stuetz, Director International Experience and Perspectives in SEA IAIA Conference, Prague, Czech Republic September 26-30,

More information

Vote Prime Minister and Cabinet

Vote Prime Minister and Cabinet Vote Prime Minister and Cabinet APPROPRIATION MINISTER(S): Minister of Civil Defence (M11), Prime Minister (M52), Minister for Greater Christchurch Regeneration (M85), Minister Responsible for the Earthquake

More information

Overview of delivery in the ITP sector

Overview of delivery in the ITP sector Overview of delivery in the ITP sector This document provides an overview of tertiary education delivery in the institutes of technology and polytechnics (ITP) sector and highlights key s since 2008. Delivery

More information

Annual Audit Letter Year ending 31 March NHS South Devon and Torbay Clinical Commissioning Group 4 July 2018

Annual Audit Letter Year ending 31 March NHS South Devon and Torbay Clinical Commissioning Group 4 July 2018 Annual Audit Letter Year ending 31 March 2018 NHS South Devon and Torbay Clinical Commissioning Group 4 July 2018 Contents Section Page 1. Executive Summary 3 2. Audit of the Accounts 5 3. Value for Money

More information

Local auditor reporting in England 2018

Local auditor reporting in England 2018 A picture of the National Audit Office logo Report by the Comptroller and Auditor General Cross-government Local auditor reporting in England 2018 HC 1864 SESSION 2017 2019 10 JANUARY 2019 4 Key facts

More information

E.17. Office of the Health and Disability Commissioner. Te Toihau Hauora, Hauātanga

E.17. Office of the Health and Disability Commissioner. Te Toihau Hauora, Hauātanga E.17 Office of the Health and Disability Commissioner Te Toihau Hauora, Hauātanga Statement of Performance Expectations 2018/2019 Published by the Health and Disability Commissioner PO Box 1791, Auckland

More information

Good Group (International) Limited

Good Group (International) Limited IFRS Core Tools Good Group (International) Limited Illustrative consolidated financial statements for the year ended 31 December 2015 International GAAP Contents Abbreviations and key... 2 Introduction...

More information

Treasury Management Framework v Page 1 of 28

Treasury Management Framework v Page 1 of 28 UC Policy Library Treasury Management Framework Last Modified April 2017 Review Date May 2018 Approval Authority Chair, University Council Contact Officer Chief Financial Officer Financial Services Table

More information

QUALIFICATIONS WALES. Framework Document

QUALIFICATIONS WALES. Framework Document QUALIFICATIONS WALES Framework Document Qualifications Wales Framework Document This framework document has been drawn up by the Education and Public Services Group in consultation with the Qualifications

More information

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 597 SESSION OCTOBER Cross government. Managing budgeting in government

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 597 SESSION OCTOBER Cross government. Managing budgeting in government REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 597 SESSION 2012-13 18 OCTOBER 2012 Cross government Managing budgeting in government 4 Key facts Managing budgeting in government Key facts 2,601bn total

More information

Network Rail Limited (the Company ) Terms of Reference. for. The Audit and Risk Committee of the Board

Network Rail Limited (the Company ) Terms of Reference. for. The Audit and Risk Committee of the Board Network Rail Limited (the Company ) Terms of Reference for The Audit and Risk Committee of the Board Membership of the Audit and Risk Committee 1 The Audit and Risk Committee (the Committee ) shall comprise

More information

South Central Ambulance Service NHS Trust. Annual Audit Letter Audit 2006/07 October 2007

South Central Ambulance Service NHS Trust. Annual Audit Letter Audit 2006/07 October 2007 South Central Ambulance Service NHS Trust Annual Audit Letter Audit 2006/07 October 2007 External audit is an essential element in the process of accountability for public money and makes an important

More information

AG ISA (NZ) 300 THE AUDITOR-GENERAL S STATEMENT ON PLANNING THE ANNUAL AUDIT. Contents

AG ISA (NZ) 300 THE AUDITOR-GENERAL S STATEMENT ON PLANNING THE ANNUAL AUDIT. Contents AG ISA (NZ) 300 THE AUDITOR-GENERAL S STATEMENT ON PLANNING THE ANNUAL AUDIT Contents Page Introduction 3-2801 Scope of this Statement 3-2801 Application 3-2801 Objectives 3-2801 Definitions 3-2802 Requirements

More information

Crown Law Office. Statement of Intent. for the year ending 30 June 2004 E.33 SOI (2003)

Crown Law Office. Statement of Intent. for the year ending 30 June 2004 E.33 SOI (2003) E.33 SOI (2003) Statement of Intent for the year ending 30 June 2004 Presented to the House of Representatives Pursuant to Section 34A of the Public Finance Act 1989. ISSN: 1176-2128 1 E.33 SOI (2003)

More information

The Treasury. Social Bonds Information Release. Release Document April

The Treasury. Social Bonds Information Release. Release Document April The Treasury Social Bonds Information Release Release Document April 2017 www.treasury.govt.nz/publications/informationreleases/socialbonds Key to sections of the Official Information Act 1982 under which

More information

2014/15 Annual review of the Ministry of Social Development

2014/15 Annual review of the Ministry of Social Development 2014/15 Annual review of the Ministry of Social Development Report of the Social Services Committee Contents Recommendation 2 Introduction 2 Reducing welfare dependency 3 Stand-down period 4 Monitoring

More information

STATEMENT OF PERFORMANCE EXPECTATIONS

STATEMENT OF PERFORMANCE EXPECTATIONS E.48 Statement of Performance Expectations 2018-2019 STATEMENT OF PERFORMANCE EXPECTATIONS 2018-2019 1 Education New Zealand CONTENTS Statement of responsibility... 3 Education New Zealand s Outcome Framework...

More information

B.20 SPE (2018) Statement of Performance Expectations

B.20 SPE (2018) Statement of Performance Expectations B.20 SPE (2018) Statement of Performance Expectations 1 July 2018 Contents Statement from the Board 1 The Authority 3 Investment 5 Schemes 10 Forecast Financial Statements 15 Government Superannuation

More information

AG ISA (NZ) 706 (Revised) Emphasis of matter paragraphs and other matter paragraphs

AG ISA (NZ) 706 (Revised) Emphasis of matter paragraphs and other matter paragraphs AG ISA (NZ) 706 (Revised) Emphasis of matter paragraphs and other matter paragraphs AG ISA (NZ) 706 (REVISED) THE AUDITOR-GENERAL S STATEMENT ON EMPHASIS OF MATTER PARAGRAPHS AND OTHER MATTER PARAGRAPHS

More information

FINANCIAL STATEMENTS

FINANCIAL STATEMENTS FINANCIAL STATEMENTS Statement of Management Responsibility Including Internal Control over Financial Reporting Responsibility for the integrity and objectivity of the accompanying financial statements

More information

Vote Prime Minister and Cabinet

Vote Prime Minister and Cabinet Vote Prime Minister and Cabinet APPROPRIATION MINISTER(S): Minister of Civil Defence (M11), Prime Minister (M52), Minister supporting Greater Christchurch Regeneration (M85), Minister for Communications

More information

The Audit Findings for University Hospitals of Morecambe Bay NHS Foundation Trust

The Audit Findings for University Hospitals of Morecambe Bay NHS Foundation Trust The Audit Findings for University Hospitals of Morecambe Bay NHS Foundation Trust. Year ended 31 March 2014 28 May 2014 Gary Devlin Engagement Lead T 0131 659 8554 E gary.j.devlin@uk.gt.com Gareth Kelly

More information

Audit of Financial Statements Report and Management Letter Cardiff and Vale of Glamorgan Pension Fund

Audit of Financial Statements Report and Management Letter Cardiff and Vale of Glamorgan Pension Fund Audit of Financial Statements Report and Management Letter Cardiff and Vale of Glamorgan Pension Fund Audit year: 2014-15 Issued: September 2015 Document reference: 481A2015 Status of report This document

More information

TECHNICAL RELEASE. re:assurance THE ICAEW ASSURANCE SERVICE ON UNAUDITED FINANCIAL STATEMENTS. Interim Technical Release AAF 03/06

TECHNICAL RELEASE. re:assurance THE ICAEW ASSURANCE SERVICE ON UNAUDITED FINANCIAL STATEMENTS. Interim Technical Release AAF 03/06 TECHNICAL RELEASE re:assurance THE ICAEW ASSURANCE SERVICE ON UNAUDITED FINANCIAL STATEMENTS Interim Technical Release AAF 03/06 THE ICAEW ASSURANCE SERVICE ON UNAUDITED FINANCIAL STATEMENTS Interim Technical

More information

TE OHU S BUSINESS MODEL. Feedback from Regional Hui held in February Ka ora ki tai ka hua ki uta A bountiful ocean will sustain us.

TE OHU S BUSINESS MODEL. Feedback from Regional Hui held in February Ka ora ki tai ka hua ki uta A bountiful ocean will sustain us. TE OHU S BUSINESS MODEL Feedback from Regional Hui held in February 2016 Ka ora ki tai ka hua ki uta A bountiful ocean will sustain us Contents Purpose... 2 Introduction... 2 Draft resolutions... 3 A:

More information

Allotts Business Services Limited. Management Report to Consilium Academies

Allotts Business Services Limited. Management Report to Consilium Academies Allotts Business Services Limited Management Report to Consilium Academies Year Ended 31 August 2017 Contents 1 Introduction 1 1.1 Acknowledgements 1 2 Overall objective 2 2.1 2.2 Audit approach Approach

More information

The Welsh Consolidated Fund Receipts and Payment Account. 1 April 2013 to 31 March 2014

The Welsh Consolidated Fund Receipts and Payment Account. 1 April 2013 to 31 March 2014 The Welsh Consolidated Fund Receipts and Payment Account 1 April 2013 to 31 March 2014 FOREWORD BACKGROUND 1. The Welsh Consolidated Fund (the Fund) was established on 1 April 2007 under the Government

More information

The Annual Audit Letter for Royal Borough of Greenwich

The Annual Audit Letter for Royal Borough of Greenwich The Annual Audit Letter for Royal Borough of Greenwich Year ended 31 March 2017 October 2017 Paul Dossett Partner T 020 7728 3180 E paul.dossett@uk.gt.com Tom Slaughter Manager T 020 7728 2972 E thomas.m.slaughter@uk.gt.com

More information

STATEMENT OF AUDITING STANDARDS 600 AUDITORS' REPORTS ON FINANCIAL STATEMENTS

STATEMENT OF AUDITING STANDARDS 600 AUDITORS' REPORTS ON FINANCIAL STATEMENTS STATEMENT OF AUDITING STANDARDS 600 AUDITORS' REPORTS ON FINANCIAL STATEMENTS (Issued August 1994; revised April 2000, June 2001; February 2004, September 2004 (name change), December 2005 and October

More information

Process and methods Published: 18 February 2014 nice.org.uk/process/pmg18

Process and methods Published: 18 February 2014 nice.org.uk/process/pmg18 Guide to the technology appraisal aisal and highly specialised technologies appeal process Process and methods Published: 18 February 2014 nice.org.uk/process/pmg18 NICE 2014. All rights reserved. Contents

More information

Portsmouth Hospitals NHS Trust

Portsmouth Hospitals NHS Trust Portsmouth Hospitals NHS Trust Annual Audit Letter for the year ended 31 March 2016 June 2016 Ernst & Young LLP Contents Contents Executive Summary... 2 Purpose... 6 Responsibilities... 8 Financial Statement

More information

NHS Great Yarmouth and Waveney CCG

NHS Great Yarmouth and Waveney CCG NHS Great Yarmouth and Waveney CCG Annual Audit Letter for the year ended 31 March 2016 July 2016 Ernst & Young LLP Contents Contents Executive Summary... 2 Purpose... 6 Responsibilities... 8 Financial

More information

Chief Constable of North Yorkshire Police

Chief Constable of North Yorkshire Police Chief Constable of North Yorkshire Police Annual Audit Letter 2015/16 October 2016 Mazars LLP Rivergreen Centre Aykley Heads Durham DH1 5TS October 2016 Mr D Jones Chief Constable North Yorkshire Police

More information

Annual Audit Report for Police & Crime Commissioner for Gwent and Chief Constable of Gwent Police

Annual Audit Report for Police & Crime Commissioner for Gwent and Chief Constable of Gwent Police Annual Audit Report for 2015-16 Police & Crime Commissioner for Gwent and Chief Constable of Gwent Police Audit year: 2015-16 Date issued: November 2016 Document reference: 639A2016 This document has been

More information

Annual Audit Letter Year ending 31 March St George s University Hospitals NHS Foundation Trust 24 July 2018

Annual Audit Letter Year ending 31 March St George s University Hospitals NHS Foundation Trust 24 July 2018 Annual Audit Letter Year ending 31 March 2018 St George s University Hospitals NHS Foundation Trust 24 July 2018 Contents Section Page 1. Executive Summary 3 2. Audit of the Accounts 5 3. Value for Money

More information

Manchester Health and Care Commissioning. Finance Committee. Terms of Reference

Manchester Health and Care Commissioning. Finance Committee. Terms of Reference Manchester Health and Care Commissioning Finance Committee Terms of Reference 1.0 Name The Committee shall be known as the Finance Committee. 2.0 Overview The Finance Committee forms a key element of the

More information

Export Education Levy Annual Report

Export Education Levy Annual Report (Print) ISSN 2230-6110 (Online) ISSN 2230-6129 Export Education Levy Annual Report For the financial year ended 30 June 2015 Presented to the House of Representatives pursuant to section 238I (3) of the

More information

IOPS Technical Committee DRAFT GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES. Version for public consultation

IOPS Technical Committee DRAFT GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES. Version for public consultation IOPS Technical Committee DRAFT GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES Version for public consultation DRAFT GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES Introduction:

More information

Paper 3 Measuring Performance in Public Financial Management

Paper 3 Measuring Performance in Public Financial Management Paper 3 Measuring Performance in Public Financial Management Key Issues 1. Effective financial management of public resources is essential to achieve the objectives of development programmes. It also promotes

More information

Audit of Regional Operations Manitoba Region

Audit of Regional Operations Manitoba Region Audit of Regional Operations Manitoba Region WESTERN ECONOMIC DIVERSIFICATION CANADA Audit & Evaluation Branch December 2010 Table of Contents 1.0 Executive Summary 2 Findings 2 Statement of Assurance

More information

REPORT ON APPROPRIATIONS

REPORT ON APPROPRIATIONS B.14 Vote Vulnerable Children, Oranga Tamariki Ministry for Vulnerable Children, Oranga Tamariki REPORT ON APPROPRIATIONS 1 APRIL 2017-30 JUNE 2017 1 CONTENTS Purpose statement Statement of responsibility

More information

VOTE Government Superannuation Fund

VOTE Government Superannuation Fund VOTE Government Superannuation Fund VOTE Government Superannuation Fund OVERVIEW Appropriations sought for Vote Government Superannuation Fund in 1999/2000 total $671.905 million excluding the reduction

More information

NZQF Offshore Programme Delivery Rules 2012

NZQF Offshore Programme Delivery Rules 2012 Approved version 2 NZQF Offshore Programme Delivery Rules 2012 1. Authority 1.1 These Rules are made under section 253 of the Education Act 1989. 2. Commencement and application 2.1 These Rules commence

More information

The Office of the Provincial Auditor

The Office of the Provincial Auditor CHAPTER TWO The Office of the Provincial Auditor MISSION STATEMENT Our mission is to report to the Legislative Assembly objective information and recommendations resulting from our independent audits of

More information

MINISTRY OF EDUCATION

MINISTRY OF EDUCATION MINISTRY OF EDUCATION EXPORT EDUCATION LEVY ANNUAL REPORT 2002! 2003 MINISTRY OF EDUCATION EXPORT EDUCATION LEVY ANNUAL REPORT 2002! 2003 E13 TABLE OF CONTENTS Page Background 3 Commentary 4 Financial

More information

TONGA NATIONAL QUALIFICATIONS AND ACCREDITATION BOARD

TONGA NATIONAL QUALIFICATIONS AND ACCREDITATION BOARD TONGA NATIONAL QUALIFICATIONS AND ACCREDITATION BOARD RISK MANAGEMENT FRAMEWORK 2017 Overview Tonga National Qualifications and Accreditation Board (TNQAB) was established in 2004, after the Tonga National

More information

G.60 MINISTRY OF SOCIAL DEVELOPMENT ANNUAL REPORT 2015/2016. Financial Statements

G.60 MINISTRY OF SOCIAL DEVELOPMENT ANNUAL REPORT 2015/2016. Financial Statements Financial Statements 87 Ministry of Social Development Statement of Accounting Policies: Departmental These financial statements are for the year ended 30 June and include unaudited forecast financial

More information

The Annual Audit Letter for Torbay and Southern Devon Health and Care NHS Trust

The Annual Audit Letter for Torbay and Southern Devon Health and Care NHS Trust The Annual Audit Letter for Torbay and Southern Devon Health and Care NHS Trust. Period ended 30 September 2015 31 July 2016 Geri Daly Engagement lead T 0117 305 7741 E geri.n.daly@uk.gt.com David Johnson

More information

Performance Measurement of Supreme Audit Institutions in 4 Anglo-Saxon Countries: Leading by Example

Performance Measurement of Supreme Audit Institutions in 4 Anglo-Saxon Countries: Leading by Example Performance Measurement of Supreme Audit Institutions in 4 Anglo-Saxon Countries: Leading by Example Nobuo AZUMA* Director, Study Division, Board of Audit I. Introduction In Japan, performance measurement

More information

Remuneration of Public Service and State sector chief executives as at 30 June 2015

Remuneration of Public Service and State sector chief executives as at 30 June 2015 of Public Service and State sector chief executives as at 30 June 2015 State Services Commission Published by the State Services Commission November 2015 ISBN 978-0-478-43448-4 (online version) Copyright/Terms

More information