A NEW APPROACH IN THE AUDIT OF THE EU FUNDS

Size: px
Start display at page:

Download "A NEW APPROACH IN THE AUDIT OF THE EU FUNDS"

Transcription

1 A NEW APPROACH IN THE AUDIT OF THE EU FUNDS BRAGA FILOFTEIA VIORICA NAFTANAILA CRISTINA ALINA SPIRU HARET UNIVERSITY FACULTY OF ACCOUNTING AND FINANCE CÂMPULUNG Abstract According to the European Union norms, the operations financed from the European funds should be subject to the audit work. Until 2013 these activities are carried out according to the International Standard on Related Services (ISRS) 4400 Engagements to perform agreed upon procedures regarding the financial information; since 2014 will apply ISA 800 Audit of the financial statements prepared in accordance with special purpose frameworks and ISA 805 Audits of the individual components of the financial statements of the specific elements, accounts or other aspects of the financial statements. Therefore, in this paper I shall present the auditors responsibilities and the way of reporting in the new context, starting from some statistics that reflect the absorption situation of the European funds up to Keyword: audit, operations financed from the European funds, audit report JEL classification: M40, M42 Introduction EU aims to strengthen the economic and social cohesion in order to promote the harmonious, balanced and sustainable development of the Community. This measure is applied using funds (ERDF, ESF, and Cohesion Fund), the European Investment Bank (EIB) and other existing financial instruments. The measure aims to reduce the economic, social and territorial disparities which, particularly, have arisen in the countries and regions with developmental delays and related to the economic and social restructuring and population aging. The absorption of these funds was done in a different way by the European Union countries, depending on several factors such as experience, legal provisions, economic and social conditions and the possibility of co-financing, both at the public institutions and the commercial companies level etc. Below we present the state of implementation of the Operational Programs financed by the Structural Instruments in Romania. 1.1 Brief presentation on the implementation of the Operational Programs financed by the Structural Instruments on 31 December 2013 Situation of the submission and approval of the projects, contracts signing, making payments to the beneficiaries and the amounts reimbursed by the European Commission reported to the EU allocation for reached the sums of billion euro. [1] For those of seven operational programs were submitted 41,640 projects, totalling approximately 72.2 billion euros, of which approx billion euro represent the EU contribution. From all the submitted projects, 14,876 projects were approved, totalling approx billion euro of this amount, approx billion euro represent the EU contribution. There were signed 11,772 grant agreements with beneficiaries, with the eligible worth of approx billion euro of which approx billion euro represent the EU funds. The EU contribution for the signed contracts, in relation to the EU allocation is approximately of 93%. The total payments to the beneficiaries (pre-financing and reimbursements), except for reimbursement of VAT were amounted to about 7.84 billion euros. From this value, the EU contribution amounted approx. 7 billion euro, or 36.47% of the allocation. There was received from the European Commission, the total amount of 7.20 billion euro, which represents 37.48% of the allocation. From these funds, the intermediate reimbursed payments totalling billion euro, which represents 26.49% of the allocation. The value of the statements of expenditure submitted to the European Commission is billion euro, which means a current absorption of 33.47% of the EU allocation. Ministry of European Funds (MEF) informs the current absorption rate of the structural and cohesion funds reached 33.47% on December 30, 2013, four times higher than in early May 2012, when he was only 8, 53% how it is related by Agerpres. In the period 1 January to 30 December 2013 it was requested to the European Commission the reimbursement of over 3.56 billion euro, an amount greater than that required in the entire period

2 At that time, the rate of repayments to Romania by the European Commission was 26.49%, 3.5 times higher than that in early May Ministry explains in the press release quote: Romania has received 5.09 billion euro from the structural and cohesion funds in the current programming period. The amount of reimbursed funds to Romania in 2013 exceeds 2.88 billion euro, an amount greater than that received in all the years of In the first ten months of 2013, Romania registered the highest increase of the amounts reimbursed by the European Commission to all Member States: the amount of structural funds and the cohesion received by our country was 115% higher than in On 30 December, the European Commission has to reimburse to Romania an amount exceeding 1.34 billion euro. Teodorovici, minister of the European Funds, highlights in the press release that our country has recorded this year, two great performances. "This year has been a success in the absorption of structural and cohesion. Thanks to those who understand that this year is one in which Romania is required to obtain better results, in 2013, Romania has made two great performances: the absorption rate increased more than in all other years of the current programming period and our country did not lose a single euro from the structural and cohesion funds allocated by the European Union. The official says that in 2013, the European funds have been a strong support both for the economy and the private sector, a good example being the current absorption rate recorded in the Operational Programme Increase of Economic Competitiveness, which increased of 2.5 times this year, exceeding the 36% at December 30, will remain a reference year in absorption of the EU funds and due to the simplification and streamline measures that have been implemented. In 2014 we committed to complete the reform of the implementation system for absolutely all stages of using of the EU funds by the beneficiaries to be simplified to the maximum, and the economy to receive a consistently support from the funds provided by the EU, also says the minister Teodorovici. Even in the context of these results, Romania remains on the last place in the European Union regarding the absorption of European funds, how to statistics released by Brussels in October the latest available data at the Community level. Bulgaria overtook us since the end of Then, the absorption of the Structural Funds in Bulgaria was 10.2%, while in Romania it amounted to 8.6%, the lowest level of the EU states. As of October, the absorption rate of European funds allocated to Bulgaria reached 37%, said Zinaida Zlatanova, deputy in the government in Sofia. A report published at the beginning of that month, by the European Parliament, shows that Romania and Bulgaria are on the last places in terms of attracting the European funds. Regarding the audit on the beginning of 2014, professor Ph.D. Horia Neamţu, CAFR President and Minister of European funds, signed a Cooperation Agreement on the Organization and functioning of the financial audit for European funds and other non-reimbursable funds from other donors, which provides that the responsible authorities for licensing, regulation and supervision of the financial system of the structural instruments must work together to ensure transparency, stability and integrity of the system, and the protection against non-compliance with the practices of beneficiaries of funds established by national and European regulations. In turn, the financial auditors must take the responsibility for the Financial Independent Report on the independent opinion on the expenditure and funding sources of the project audited in accordance with International Standards on Auditing of the International Federation of Accountants (IFAC), fully adopted by Chamber. It is noted that this cooperation should focus, in particular, on issues arising from the interplay of what happened at the institutional and operational level, in order to prevent duplication of some activities. The objective of collaboration is undertaking the common actions to contribute to achieving the best conditions of the tasks and responsibilities of each authority, respectively: training of the auditors on national and 537

3 European legislation harmonized with the requirements of eligibility of the expenditure and income and their legal approaching in terms of financial and adopting the common measures on the supervisory of the auditors. So, the Chamber of Financial Auditors of Romania will ensure the takeover from the Ministry of European Funds and dissemination to the auditors of the rules by which auditors are required to achieve the assurance services for a special purpose (ISA ) on the eligibility of the expenditure and sources of funding received and/or required by applications for reimbursement by the beneficiaries and to provide reasonable assurance to the Managing Authority or to other entities involved in the management and certification of the non-reimbursable funds from other donors on any information required in connection with the audit. 2.2 Audit of the financing contracts from the European funds until 2013 Until 2013 the expenditure verification activity and reporting on the financing contract is achieved both in accordance with these technical specifications and: - In accordance with the International Standard on Related Services 4400 ( ISRS ) Commitment to achieve the agreed procedures on the financial information issued by IFAC and adopted by the CAFR; - In accordance with the Code of Ethics by IFAC and adopted by the CAFR. Although ISRS 4400 provides that independence is not a requirement for the commitments of the agreed procedures, the Managing Authority / Intermediate Body require that the auditor to respect the independence requirements of the Code of Ethics. ISRS 4400 requires performing the specific agreed procedures in accordance with a commitment between the beneficiary of the funding and auditor, regarding the expenditure verification of a non-reimbursement financing contract. The objective of the commitment is to verify by the financial auditor that the amounts claimed for reimbursement by the Beneficiary in the requesting of the reimbursement for the financed action under the financing contract were performed (reality of deployment) are legal (legality), accurate (accuracy) and eligible as well as the submission of the report of the factual findings on the performed procedures to the Beneficiary. Such commitment is not an assurance commitment, the auditor does not provide an audit opinion and not expresses an assurance. The financial auditor should plan the activity so that to perform an effective verification of the expenses. For this purpose the auditor performs the specified procedures in the Technical Specifications of the funding program (scope of activity - procedures to be performed) and uses the evidence obtained from these procedures as the basis for the report of the factual findings. The auditor should use the documents that are important in providing the evidence to support the Report on the Factual Findings and evidence showing that the work was carried out in accordance with ISRS 4400 and Technical Specifications. The report of the factual findings should describe the purpose and the agreed procedures of this commitment in sufficient details, so, to allow the Beneficiary and the Managing Authority/ Intermediate Body to understand the nature and extent of the procedures performed by the auditor. Using the reporting format it is compulsory the one proposed by the ST. During the completion of these procedures the Auditor may apply techniques such as inquiry and analysis, (re)calculation, comparison, other accuracy varification, observation, inspection of the records and documents, inspection of the assets and obtaining the confirmations. The financial auditor obtains sufficient and appropriate evidence from these procedures to draw up a report of the factual findings. On this purpose, he may use the guidance provided by the International Standard on Auditing 500 Audit Evidence and particularly the paragraphs that refer to sufficient and appropriate audit evidence. The auditor exercises a professional judgment about what constitutes the sufficient and appropriate evidence if it considers that the guidance provided by ISA 500, the terms and conditions of the financing contract and ST for this commitment are not enough. The indicative list of the types and nature of evidence which the auditor can often find at the verification of the expenditure, include: Accounting records (electronic or manual) from the Beneficiary's accounting system as Journal Register, its subchapters and salary accounts, fixed asset registers and other relevant accounting information; Proof of the procurement procedures and the auctions documents, offers for auction and the evaluation reports; Proof of commitments such as contracts and the order forms; Proof of providing the services such as approved reports, time sheets, transport tickets (including boarding passes), evidence for participation at seminars, conferences and training courses (including relevant documentation and obtained material, certificates), etc.; Proof of receiving the goods and the reception documents from the suppliers; Proof of completion the works such as invoices and receipts; Proof of payment such as bank statements, notices of payment, proof of payment of the subcontractors; 538

4 For the petrol and diesel costs, a centralizing list of the covered distances, consumption of the used vehicles, fuel and maintenance costs; Registers on the salary payments and staff and the related contracts, the payroll and the time sheets. For the recruited locally staff for a fixed period contracts, details of the paid remuneration, proved by the locally responsible persons, broken down into gross salary, social contributions related, insurance and net salary. For the experts and/or staff from the EU (if the activity is implemented in Europe) analyzes and breakdowns of monthly expenditure of the labour services: assessed based on the unit prices per quantifiable unit of time and broken down into gross salary, contributions and social insurance and net salary. This can vary depending on the nature of the costs and practices in the country concerned. 2.3 Audit of the financing contracts from the European funds from 2014 Financing contracts from European funding represent a reporting framework with special purpose and the auditing concerns the aspects of the financial statements. Therefore, starting from January 1, 2014 it will be applied ISA 805 Audits of the individual components of the financial statements, specific elements, accounts or other aspects of the financial statements, and ISA 800 Audit of the financial statements prepared in accordance with general frameworks with special purpose. This involves the application and adaptation of all relevant auditing standards and issuing an audit report in which to express the independent opinions on the expenditure and financing sources of the audited project. The objective of the auditor in applying ISAs in an audit of the individual components of the financial statements or of a specific element, account or issue of a financial situation is to adequately address the specific considerations that are relevant to: (a) Accepting the mission; (b) Planning and conducting that mission, and (c) Formulate an opinion and reporting on the individual financial situation or the specific element, account or appearance of the financial statements [2]. ISA 200, Objectives and General Principles Governing an Audit of Financial Statements requires the auditor to comply with: (a) Relevant ethical requirements, including those relating to independence, relating to the audits of financial statements, and (b) All the relevant ISAs for the audit. It also provides that the auditor to comply with each requirement of an ISA unless the entire ISA is not relevant or the requirement is not relevant because it is a condition that does not exist. In the exceptional circumstances, the auditor may consider necessarily to depart from a relevant requirement of an ISA, he performing the alternative audit procedures to achieve that requirement. Formulation of the audit opinion ISA 210, Terms of Audit Engagements provides that agreed terms of the audit mission include the expected form of any reports to be issued by the auditor. In case of an audit of individual components of the financial statements or a specific element of the financial statements, the auditor should consider the extent to which the expected form of opinion is appropriate in the circumstances. When the auditor is formulating an opinion and reporting on an individual component of the financial statements or a specific element of the financial statements, he should apply the requirements of ISA 700 The Auditor's Report on Financial Statements adapted as necessary in the circumstances of the mission. The purpose of this International Standard on Auditing (ISA) is to establish rules and provide guidance on the form and content of the audit report issued as a result of an audit by an independent auditor on the financial statements of an entity. Basics elements of the audit report The audit report includes the following basic elements, usually presented in the below format: (a) Title; (b) Receiver; (c) Opening or introductory paragraph (i) Identifying the audited financial statements; (ii) A statement of responsibility of the entity management and the auditor's responsibility. (d) Paragraph on the scope of the engagement (in which it is presented the nature of an audit) (i) A reference to IAS or to the standards or national practices or relevant auditing; (ii) A presentation of the audit report; (e) The paragraph regarding the opinion, which contains 2 2 Paragraph 5 (e) reflects the revised text and becomes effective for the audit engagement of the financial statements for periods ending on or after 30 September Initial paragraph 5 (e) is shown below: (e) Opinion paragraph containing an expression of opinion on the financial statements 539

5 (i) A reference to the financial reporting framework used to prepare the financial statements (including identifying the country of origin 3 of the financial reporting framework when the used framework is not represented by the International Accounting Standards), and (ii) An expression of opinion on the financial statements; (f) Date of the report; (g) Address of the auditor, and (h) Auditor's signature. The object of the audit report is the of reimbursement request of the expense. The auditor should ensure MA/IB as the grant awarded that was spent in accordance with the terms and conditions of the financing contract. Basically, the auditor considers if those expenses required for reimbursement by the beneficiary are conformed to the financing contract, that it respects the criteria: 1. Eligible (according to HG 759/2007 and the contract) 2. Legal (there are legal back transactions and justified documents) 3. Real (there are real back transactions) 4. Accurate (the declared amounts are accurate and correctly classified) What happens if the auditor undertakes a mission to audit of a full set of circumstances and one to report on an individual component of the financial statements or a specific element of the financial statements in the same company? If the auditor undertakes a mission to report on the individual components of the financial statements or a specific element of the financial statements with an audit mission of a complete set of the financial statements, the auditor should express a separate opinion for each mission. If the auditor's report on a complete set of the financial statements is changed, the auditor should determine the effect that may have on the auditor's report to a specific element of those financial statements. If it is considered adequately, the auditor has to modify the opinion on the individual component of the financial statements or to its specific element, or to include a paragraph of comments or an explanatory paragraph in the auditor's report, as appropriate. Even when the changed report over the complete set of the financial statements is not related to the audited item, the auditor may refer to changes in the other explanatory paragraph in his report on the component of the financial statements or on the element because he considers that it is relevant to users' understanding the audited financial statements component or of the audited element or the related auditor's report. If the auditor concludes that it is necessary to express an adverse opinion or is unable to express an opinion on the complete set of the financial statements of the entity as a whole, but in the context of a separate audit of a specific element included in those financial statements, the auditor still considers adequately to express an unmodified opinion on that element, the auditor should do so, only if: (a) The auditor is not prohibited by law or regulation to do so; (b) That opinion is expressed in an auditor's report that is not published along with the auditor's report containing the contrary opinion or it is impossible to express an opinion, and (c) Specific element does not constitute a significant part of the complete set of the financial statements of the entity Conclusions and proposals Ø in there were submitted 41,640 projects, 14,876 projects were approved which represent 35.72%, and there were signed 11,772 financing contracts with beneficiaries, which mean 28.27%, Ø rate of the current absorption of the structural and cohesion funds reached 33.47% on December 30, 2013, four times higher than that in the beginning of May 2012, when it was only 8.53%, Ø In the period of 1 January to 30 December 2013 there were requested to the European Commission the reimbursement of over 3.56 billion euro, an amount greater than that required in the entire period At that time, the rate of repayments to Romania by the European Commission was 26.49%, which was of 3.5 times higher than that in the beginning of May Ø Until 2013, the auditing of the reimbursement applications is conducted in accordance with International Standard on Related Services 4400 ( ISRS ) Commitment to achieve the agreed procedures on the financial information. Such a commitment with the assumption of issuing an audit report and an opinion, but issuing a report of the factual findings; Ø The approved projects for , will be audited in accordance with ISA 805, Audits of the individual components of the financial statements, of the specific elements, accounts or other aspects of Financial Statements which requires more responsibility from the auditors, issuing an audit report and expression of an opinion. Such report follows applying of all the relevant standards provides a high assurance but not absolute. A comparison between the results of applying of the two standards is presented in Table. 1 3 In some circumstances it may be necessary to refer to a particular jurisdiction of the country of origin to clearly identify the used financial reporting framework. 540

6 Table 1 Comparison between ISRS 4400 and ISA 805 ISRS 4400 ISA 805 Not available insurance High insurance, not absolute Report of Factual Findings Opinion expressed in an auditor's report Different Letter of Commitment Different Letter of Commitment Higher materiality Lower materiality Independence is not necessarily required Independence is required by applying the Code of Ethics There are applied: The agreed procedures All ISA adapted Less coverage More coverage Restriction in using of the report Restriction in using of the report ISA optional ISA-compulsory but can be adapted and will be used only the relevant Testing the internal control system, risk Testing the internal control, risk assessment, fraud - assessment, fraud - optional compulsory Source: Chamber of Financial Auditors from Romania References: Manual of the International Regulations of the Quality Control, Auditing, Review, Other Services and Assurance and Related Services, Edition 2012, vol. I IAASB, translated and republished by CAFR, Bucharest, 2013; 3. Regulation (CE) no. 1083/2006 for establishing the certain general provisions on the European Regional Development Fund, European Social Fund and the Cohesion Fund as amended

or institution which in turn is a member of the International Federation of Accountants (IFAC).

or institution which in turn is a member of the International Federation of Accountants (IFAC). Terms of Reference for an Expenditure Verification of a Grant Contract for Estonia - Latvia- Russia Cross Border Cooperation Programme within the European Neighbourhood and Partnership Instrument 2007-2013

More information

TERMS OF REFERENCE FOR AN EXPENDITURE VERIFICATION OF A GRANT CONTRACT - EXTERNAL ACTION OF THE EUROPEAN UNION -

TERMS OF REFERENCE FOR AN EXPENDITURE VERIFICATION OF A GRANT CONTRACT - EXTERNAL ACTION OF THE EUROPEAN UNION - TERMS OF REFERENCE FOR AN EXPENDITURE VERIFICATION OF A GRANT CONTRACT - EXTERNAL ACTION OF THE EUROPEAN UNION - HOW TO USE THIS TERMS OF REFERENCE MODEL? All text highlighted in yellow in this ToR model

More information

Certification of Financial Statements for ICT PSP projects

Certification of Financial Statements for ICT PSP projects DG INFORMATION SOCIETY AND MEDIA ICT Policy Support Programme Competitiveness and Innovation Framework Programme Certification of Financial Statements for ICT PSP projects Version 1.0 (03-03-2008) Certification

More information

MODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENTS

MODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENTS Grant Agreement number: [insert number] [insert acronym] [insert call identifier of the master call] H2020 Model Grant Agreement: Multi-beneficiary General MGA: December 2013 ANNEX 5 MODEL FOR THE CERTIFICATE

More information

Model terms of reference for the certificate on the financial statements

Model terms of reference for the certificate on the financial statements Model terms of reference for the certificate on the financial statements Terms of erence for an Independent Report of Factual Findings on costs declared under a Grant Agreement financed under the Call

More information

Amendments to the Audit Report for the Review of International Standards on Auditing

Amendments to the Audit Report for the Review of International Standards on Auditing Amendments to the Audit Report for the Review of International Standards on Auditing Mortură Laura-Alexandra 1 December 1918 University of Alba Iulia, România mortur_laura@yahoo.com Abstract As a result

More information

Guidance document on. management verifications to be carried out by Member States on operations co-financed by

Guidance document on. management verifications to be carried out by Member States on operations co-financed by Final version of 05/06/2008 COCOF 08/0020/04-EN Guidance document on management verifications to be carried out by Member States on operations co-financed by the Structural Funds and the Cohesion Fund

More information

Table of contents. Introduction Regulatory requirements... 3

Table of contents. Introduction Regulatory requirements... 3 COCOF 08/0020/02-EN DRAFT Guidance document on management verifications to be carried out by Member States on projects co-financed by the Structural Funds and the Cohesion Fund for the 2007 2013 programming

More information

ALLEGATO A ANNEX VII Special Conditions Grant Contract Expenditure Verification

ALLEGATO A ANNEX VII Special Conditions Grant Contract Expenditure Verification ALLEGATO A ANNEX VII Special Conditions Grant Contract Expenditure Verification TERMS OF REFERENCE FOR AN EXPENDITURE VERIFICATION OF A GRANT CONTRACT - EXTERNAL ACTIONS OF THE EUROPEAN COMMUNITY - ANNEX

More information

EUROPEAN FUNDS AUDIT IN ROMANIA

EUROPEAN FUNDS AUDIT IN ROMANIA Annals of the University of Petroşani, Economics, 15(1), 2015, 253-262 253 EUROPEAN FUNDS AUDIT IN ROMANIA ANCA SIMINA POPESCU * ABSTRACT: To become a a net beneficiary of EU funds, Romania must ensure

More information

Cemr! Government Audi t Svice

Cemr! Government Audi t Svice Postbus 20201, 2500 EE Den Haag, The Netherlands Mistry oflïrz irice Cemr! Government Audi t Svice -r M?Tusrerle van Finandën k1tj1c9t Rijk t appended to this Report. this engagement and we have reported

More information

Report for an Expenditure Verification of a Grant Contract External Actions of the European Union Contract The Book Platform ENPI 2011/

Report for an Expenditure Verification of a Grant Contract External Actions of the European Union Contract The Book Platform ENPI 2011/ Report for an Expenditure Verification of a Grant Contract External Actions of the European Union Contract The Book Platform ENPI 20/255-894 TABLE OF CONTENTS REPORT OF FACTUAL FINDINGS......2. INFORMATION

More information

Investing in your future

Investing in your future Investing in your future ESF Certifying Authority, Department of Education and Skills Circular 1/2012 (Replacing ESF Certifying Authority, Department of Enterprise Trade and Employment Circular 1/2008)

More information

TERMS OF REFERENCE FOR PROJECT ANNUAL EXTERNAL AUDIT

TERMS OF REFERENCE FOR PROJECT ANNUAL EXTERNAL AUDIT TERMS OF REFERENCE FOR PROJECT ANNUAL EXTERNAL AUDIT I. INTRODUCTION Marie Stopes International Afghanistan, MSIA, wishes to engage the services of an audit firm, the Auditor, for the purpose of auditing

More information

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities

Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Coordinators' day on ICT PSP project management Financial Issues, Reporting, payments, cost claims and Certification Modalities Ann Van Menxel DG CNECT H6 Brussels, 17 December 2013 Legal references Reimbursement

More information

Control and audit. One of the main concerns of the EU COMM. Single audit system recommended by European Court of Auditors:

Control and audit. One of the main concerns of the EU COMM. Single audit system recommended by European Court of Auditors: Control and audit One of the main concerns of the EU COMM. Single audit system recommended by European Court of Auditors: Integrated audit approach whereby the work of auditors at one level may be used

More information

REPORT. on the annual accounts of the European Asylum Support Office for the financial year 2016, together with the Office s reply (2017/C 417/12)

REPORT. on the annual accounts of the European Asylum Support Office for the financial year 2016, together with the Office s reply (2017/C 417/12) 6.12.2017 EN Official Journal of the European Union C 417/79 REPORT on the annual accounts of the European Asylum Support Office for the financial year 2016, together with the Office s reply (2017/C 417/12)

More information

Simplified financial reporting system for enterprises with balance sheet total under 5 mln EUR

Simplified financial reporting system for enterprises with balance sheet total under 5 mln EUR The Body of Expert Accountants and Licensed Accountants in Romania (CECCAR) Additional Information Relating to the IFAC Assessment of the Regulatory and Standard-Setting Framework Questionnaire Background

More information

Means of Improving the Management of Projects Financed by the European Union

Means of Improving the Management of Projects Financed by the European Union Means of Improving the Management of Projects Financed by the European Union Răzvan NISTOR 1 Ioana Natalia MUREŞAN Abstract Projects financed by the European Union generate effects on organizations that

More information

THE COUNCIL OF MINISTERS DECREED:

THE COUNCIL OF MINISTERS DECREED: DECREE No. 62 of 21 MARCH 2007 ADOPTING NATIONAL RULES ON ELIGIBILITY OF EXPENDITURE UNDER THE OPERATIONAL PROGRAMMES, CO-FINANCED BY THE STRUCTURAL FUNDS AND THE COHESION FUND OF THE EUROPEAN UNION, WITHIN

More information

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Law No. 06/L 032 ON ACCOUNTING, FINANCIAL REPORTING AND AUDITING Assembly of the Republic of Kosovo, Based on Article

More information

South East Europe (SEE) SEE Control Guidelines

South East Europe (SEE) SEE Control Guidelines South East Europe (SEE) SEE Control Guidelines Version 1.4. Final version approved by the MC 10 th June 2009 1 st amendment to be approved by MC (2.0) 1 CONTENTS 1 Purpose and content of the SEE Control

More information

Effective as of 1 January 2007 Promulgated, SG, No 78 of 28 September 2007

Effective as of 1 January 2007 Promulgated, SG, No 78 of 28 September 2007 DECREE No 231 OF 20 SEPTEMBER 2007 ON ADOPTION OF DETAILED RULES FOR ELIGIBILITY OF EXPENDITURE UNDER OPERATIONAL PROGRAMME ADMINISTRATIVE CAPACITY, CO-FINANCED BY THE EUROPEAN SOCIAL FUND, FOR THE 2007-2013

More information

It is currently the institution whose role consists of supporting the promotion of:

It is currently the institution whose role consists of supporting the promotion of: The supreme audit institution of Romania, the Court of Accounts, was initially set up in 1864 and operated until 1948. For the following 25 years financial control was initially the responsibility of the

More information

Report on the annual accounts of the European Schools for the financial year together with the Schools replies

Report on the annual accounts of the European Schools for the financial year together with the Schools replies Report on the annual accounts of the European Schools for the financial year 2016 together with the Schools replies 12, rue Alcide De Gasperi - L - 1615 Luxembourg T (+352) 4398 1 E eca-info@eca.europa.eu

More information

Mono-Beneficiary Model Grant Agreement

Mono-Beneficiary Model Grant Agreement European Research Council (ERC) Mono-Beneficiary Model Grant Agreement ERC Proof of Concept (H2020 ERC MGA PoC Mono) Version 5.0 18 October 2017 Disclaimer This document is aimed at assisting applicants

More information

Guidance on a common methodology for the assessment of management and control systems in the Member States ( programming period)

Guidance on a common methodology for the assessment of management and control systems in the Member States ( programming period) Final version of 12/09/2008 EUROPEAN COMMISSION DIRECTORATE-GENERAL MARITIME AFFAIRS AND FISHERIES EFFC/27/2008 Guidance on a common methodology for the assessment of management and control systems in

More information

REPORT. on the annual accounts of the Education, Audiovisual and Culture Executive Agency for the financial year 2013 together with the Agency s reply

REPORT. on the annual accounts of the Education, Audiovisual and Culture Executive Agency for the financial year 2013 together with the Agency s reply 10.12.2014 EN Official Journal of the European Union C 442/67 REPORT on the annual accounts of the Education, Audiovisual and Culture Executive Agency for the financial year 2013 together with the Agency

More information

Official Journal of the European Union

Official Journal of the European Union 13.5.2014 L 138/5 COMMISSION DELEGATED REGULATION (EU) No 480/2014 of 3 March 2014 supplementing Regulation (EU) No 1303/2013 of the European Parliament and of the Council laying down common provisions

More information

Multi-Beneficiary Model Grant Agreement

Multi-Beneficiary Model Grant Agreement H2020 Programme Multi-Beneficiary Model Grant Agreement Pre-Commercial Procurement (PCP) and Procurement of Innovative Solutions (PPI) (H2020 MGA PCP/PPI Multi) Version 5.0 18 October 2017 Disclaimer This

More information

Financial Guidelines for Beneficiaries EDCTP Association October 2016

Financial Guidelines for Beneficiaries EDCTP Association October 2016 Financial Guidelines for Beneficiaries EDCTP Association October 2016 This document is prepared as a supplement to the Grant Agreement (GA), where majority of the information is extracted from. In the

More information

INTERREG III B CADSES. Payment Claim Manual

INTERREG III B CADSES. Payment Claim Manual INTERREG III B CADSES Payment Claim Manual 1) Background / Description of involved actors The following chapters give a short overview about the actors involved in the PIC Interreg III B Cadses, their

More information

ELIGIBILITY OF EXPENSES: APPLICABLE RULES

ELIGIBILITY OF EXPENSES: APPLICABLE RULES INFO DAY ON PROJECT IMPLEMENTATION 1 ST CALL FOR PROJECT PROPOSALS ELIGIBILITY OF EXPENSES: APPLICABLE RULES Hierarchy of rules on eligibility of expenditure Rules defined in EU legal framework ERDF Programme

More information

EACEA. Cluster Meeting

EACEA. Cluster Meeting EACEA Cluster Meeting European Policy Experimentations the Way Forward 21 June 2017 Audit Type I & II Certificates Alexandre Virosztek Unit R2 «Legal and Regulatory» 1 Controls & Checks Controls (wide)

More information

Guidance on Simplified Cost Options (SCOs):

Guidance on Simplified Cost Options (SCOs): EGESIF_14-0017 29/08/2014 EUROPEAN COMMISSION European Structural and Investment (ESI) Funds Guidance on Simplified Cost Options (SCOs): Flat rate financing, Standard scales of unit costs, Lump sums (under

More information

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS

CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS CERTIFICATES ISSUED BY EXTERNAL AUDITORS GUIDANCE NOTES FOR BENEFICIARIES AND AUDITORS MATERIALS PREPARED BY THE WORKING GROUP ON CERTIFICATE ON THE METHODOLOGY UNDER FP7: DG RESEARCH AND INNOVATION DG

More information

together with the Foundation s reply

together with the Foundation s reply Report on the annual accounts of the European Foundation for the Improvement of Living and Working Conditions for the financial year 2014 together with the Foundation s reply 12, rue Alcide De Gasperi

More information

COMMISSION DELEGATED REGULATION (EU)

COMMISSION DELEGATED REGULATION (EU) L 148/54 20.5.2014 COMMISSION DELEGATED REGULATION (EU) No 532/2014 of 13 March 2014 supplementing Regulation (EU) No 223/2014 of the European Parliament and of the Council on the Fund for European Aid

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2006R1828 EN 01.12.2011 003.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B C1 COMMISSION REGULATION (EC) No 1828/2006 of

More information

(Legislative acts) REGULATIONS

(Legislative acts) REGULATIONS 24.6.2010 Official Journal of the European Union L 158/1 I (Legislative acts) REGULATIONS REGULATION (EU) No 539/2010 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 16 June 2010 amending Council Regulation

More information

Guidance for Member States on the Drawing of Management Declaration and Annual Summary

Guidance for Member States on the Drawing of Management Declaration and Annual Summary EGESIF_15-0008-02 19/08/2015 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on the Drawing of Management Declaration and Annual Summary Programming period 2014-2020

More information

IFAD Handbook for Financial Reporting and Auditing of IFAD- Financed Projects

IFAD Handbook for Financial Reporting and Auditing of IFAD- Financed Projects - 2018 IFAD Handbook for Financial Reporting and Auditing of IFAD- Financed Projects 1 The IFAD Handbook for Financial Reporting and Auditing for IFAD-Financed Projects is available online for public use

More information

Checklist for Assessing Action Budget and Simplified Cost Options for Grant Contracts

Checklist for Assessing Action Budget and Simplified Cost Options for Grant Contracts Checklist for Assessing Action Budget and Simplified Cost Options for Grant Contracts The checklist is composed of procedures and checks that apply to - each cost category / subcategory - specific cost

More information

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms 2014-2021 Table of Contents 1. Introduction... 3 1.1 Objectives

More information

DIRECTIVES. Having regard to the Treaty on the Functioning of the European Union, and in particular Article 113 thereof,

DIRECTIVES. Having regard to the Treaty on the Functioning of the European Union, and in particular Article 113 thereof, 29.12.2017 L 348/7 DIRECTIVES COUNCIL DIRECTIVE (EU) 2017/2455 of 5 December 2017 amending Directive 2006/112/EC and Directive 2009/132/EC as regards certain value added tax obligations for supplies of

More information

THE COOPERATION PROGRAMME BETWEEN SWITZERLAND AND ROMANIA PROJECT AGREEMENT

THE COOPERATION PROGRAMME BETWEEN SWITZERLAND AND ROMANIA PROJECT AGREEMENT THE COOPERATION PROGRAMME BETWEEN SWITZERLAND AND ROMANIA PROJECT AGREEMENT BETWEEN SWITZERLAND REPRESENTED BY THE STATE SECRETARIAT FOR ECONOMIC AFFAIRS (SECO) AND THE GOVERNMENT OF ROMANIA REPRESENTED

More information

Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation (EC) No 1083/2006

Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation (EC) No 1083/2006 REVISED VERSION 08/02/2012 COCOF_10-0014-05-EN EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Revised 1 Guidance Note on Financial Engineering Instruments under Article 44 of Council Regulation

More information

THE GREEK ANTI-FRAUD STRATEGY FOR STRUCTURAL ACTIONS - ACTION PLAN (update 2017)

THE GREEK ANTI-FRAUD STRATEGY FOR STRUCTURAL ACTIONS - ACTION PLAN (update 2017) THE GREEK ANTI-FRAUD STRATEGY FOR STRUCTURAL - ACTION PLAN (update 2017) COMPETENT AUTHORITY TARGET GROUPS INDICATORS OF SUCCESS (/IN OBJECTIVE 1: Promote and establish an Ethical, Anti-Fraud Culture 1.1

More information

Rural Renewable Energy Agency (RREA) Financial Audit Report. for the period from 1 March 2016 to 30 June Project ID: P

Rural Renewable Energy Agency (RREA) Financial Audit Report. for the period from 1 March 2016 to 30 June Project ID: P Public Disclosure Authorized Public Disclosure Authorized Rural Renewable Energy Agency (RREA) Financial Audit Report for the period from 1 March 2016 to 30 June 2017 Public Disclosure Authorized Liberia

More information

First Level Control and Verifications of ESI Funds

First Level Control and Verifications of ESI Funds First Level Control and Verifications of ESI Funds 2014 2020 l Interactive Workshop 15 16 November 2018 Nice, France EXPERTS This two day intensive workshop focuses on: Maeve Hamilton Head of EU Managing

More information

Multi-Beneficiary Model Grant Agreement

Multi-Beneficiary Model Grant Agreement European Research Council (ERC) Multi-Beneficiary Model Grant Agreement ERC Starting Grants, Consolidator Grants and Advanced Grants (H2020 ERC MGA Multi) Version 5.0 18 October 2017 Disclaimer This document

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2006R1083 EN 25.06.2010 004.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COUNCIL REGULATION (EC) No 1083/2006 of 11 July

More information

The Control of the Implementation and Management of European Funds

The Control of the Implementation and Management of European Funds Vol. 4, No. 1, March 218, pp. 89 93 ISSN 2393-4913, ISSN On-line 2457-5836 The Control of the Implementation and Management of European Funds Vasile Burja 1, Ioana Jeler (Popa) 2 1,2 1 Decembrie 1918 University,

More information

Multi-beneficiary Model Grant Agreement

Multi-beneficiary Model Grant Agreement Partnership for Research and Innovation in the Mediterranean Area Programme (PRIMA) Multi-beneficiary Model Grant Agreement Version 5.0 30 January 2018 Disclaimer This document is aimed at assisting applicants

More information

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT 17 April 2009 This document has been produced with the financial

More information

BUDGETARY CLASSIFICATIONS ROLE IN PUBLIC FINANCIAL MANAGEMENT

BUDGETARY CLASSIFICATIONS ROLE IN PUBLIC FINANCIAL MANAGEMENT BUDGETARY CLASSIFICATIONS ROLE IN PUBLIC FINANCIAL MANAGEMENT Gyorgy Attila Bucharest Academy of Economic Studies Faculty of Finance, Assurance, Banks and Stock Exchanges Gyorgy Adina Cristina Bucharest

More information

Report on budgetary and financial management. ENISA - Financial Year 2013 Version May

Report on budgetary and financial management. ENISA - Financial Year 2013 Version May Report on budgetary and financial management ENISA - Financial Year 2013 Version 2.0 05 May 2014 www.enisa.europa.eu Table of Contents 1. Introduction 3 2. Finance and Accounting functions 3 3. Budgetary

More information

GUIDING PRINCIPLES FOR BUDGET MAKING IN PHASE 2 WINDOW 1

GUIDING PRINCIPLES FOR BUDGET MAKING IN PHASE 2 WINDOW 1 GUIDING PRINCIPLES FOR BUDGET MAKING IN PHASE 2 WINDOW 1 Phase 1 For the purposes of a Phase 1 application, an estimate of the grant applied for is expected for an amount not exceeding 12 million DKK for

More information

Background paper. The ECA s modified approach to the Statement of Assurance audits in Cohesion

Background paper. The ECA s modified approach to the Statement of Assurance audits in Cohesion Background paper The ECA s modified approach to the Statement of Assurance audits in Cohesion December 2017 1 In our 2018-2020 strategy the European Court of Auditors (ECA) decided to take a fresh look

More information

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME WORKING NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP/ COORDINATION GROUP

More information

AUDIT REFERENCE MANUAL FOR THE STRUCTURAL FUNDS

AUDIT REFERENCE MANUAL FOR THE STRUCTURAL FUNDS Final version of 28/05/2009 COCOF 09/0023/00-EN EUROPEAN COMMISSION AUDIT REFERENCE MANUAL FOR THE STRUCTURAL FUNDS Commission européenne, B-1049 Bruxelles / Europese Commissie, B-1049 Brussel - Belgium.

More information

An overview of the eligibility rules in the programming period

An overview of the eligibility rules in the programming period Rules and conditions applicable to actions co-financed from Structural Funds and Cohesion Fund An overview of the eligibility rules in the programming period 2007-2013 FEBRUARY 2009 1 Table of contents

More information

T HE EUROPEAN COURT OF AUDITORS D EFINITION & T REATMENT OF DAS ERRORS

T HE EUROPEAN COURT OF AUDITORS D EFINITION & T REATMENT OF DAS ERRORS T HE EUROPEAN COURT OF AUDITORS D EFINITION & T REATMENT OF DAS ERRORS E N G L II S H Introduction 4 Error definition & classification concerning the different DAS Sources 5 General situation 5 Weaknesses

More information

REPORT. on the annual accounts of the European Union Intellectual Property Office for the financial year 2016, together with the Office s reply

REPORT. on the annual accounts of the European Union Intellectual Property Office for the financial year 2016, together with the Office s reply 6.12.2017 EN Official Journal of the European Union C 417/187 REPORT on the annual accounts of the European Union Intellectual Property Office for the financial year 2016, together with the Office s reply

More information

Novelties of Accounting Standard No.15 on Micro-Units

Novelties of Accounting Standard No.15 on Micro-Units Novelties of Accounting Standard No.15 on Micro-Units Bitila Shosha, PhD Candidate Lecturer, Aleksandër Moisiu University, Business Faculty Durrës, Albania E-mail: bitilashosha@yahoo.com Doi:10.5901/mjss.2013.v4n2p637

More information

The Assurance Package: Get Ready for February 2019! Annual Accounts Management Declaration Annual Summary Annual Control Report

The Assurance Package: Get Ready for February 2019! Annual Accounts Management Declaration Annual Summary Annual Control Report The Assurance Package: Get Ready for February 2019! Annual Accounts Management Declaration Annual Summary Annual Control Report Interactive Workshop EXPERTS Simon Hannah (Chair & Speaker) ERDF Compliance

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 25.11.2016 C(2016) 7553 final COMMISSION DECISION of 25.11.2016 modifying the Commission decision of 7.3.2014 authorising the reimbursement on the basis of unit costs for

More information

Audit certificate template for Horizon2020 projects funded by SERI

Audit certificate template for Horizon2020 projects funded by SERI Audit certificate template for Horizon2020 projects funded by SERI Under Article 4.1 of the subsidy agreement concluded between SERI and the Swiss research institution (hereinafter referred to as beneficiary),

More information

EU FUNDS AFTER THE ACCESSION TO THE EUROPEAN UNION - TOWARDS A NEW FINANCIAL PERSPEKTIVE

EU FUNDS AFTER THE ACCESSION TO THE EUROPEAN UNION - TOWARDS A NEW FINANCIAL PERSPEKTIVE EU FUNDS AFTER THE ACCESSION TO THE EUROPEAN UNION - TOWARDS A NEW FINANCIAL PERSPEKTIVE PPT Title: Good practice examples and experiences from Lithuania Viktoras Sirvydis, Resident Twinning Adviser EU

More information

IFAD Handbook for Financial Reporting and Auditing of IFAD-financed Projects

IFAD Handbook for Financial Reporting and Auditing of IFAD-financed Projects IFAD Handbook for Financial Reporting and Auditing of IFAD-financed Projects The IFAD Handbook for Financial Reporting and Auditing of is available online for public use and dissemination. It is primarily

More information

Department of Enterprise, Trade & Employment

Department of Enterprise, Trade & Employment Department of Enterprise, Trade & Employment Circular No. ESF/PA/1-2001 31 July 2001 FINANCIAL MANAGEMENT AND CONTROL PROCEDURES FOR THE EUROPEAN SOCIAL FUND (ESF) 2000-2006 1. Background The purpose of

More information

FCH JU GRANT AGREEMENT

FCH JU GRANT AGREEMENT FCH JU GRANT AGREEMENT COORDINATORS DAY Brussels, September 23 rd 2016 Georgiana Buznosu Legal framework of a H2020 project EU Financial Regulation 1. H2020 Rules for Participation Applicable Work Plan

More information

Report on the annual accounts of the Office for Harmonization in the Internal Market for the financial year 2014 together with the Office s reply

Report on the annual accounts of the Office for Harmonization in the Internal Market for the financial year 2014 together with the Office s reply Report on the annual accounts of the Office for Harmonization in the Internal Market for the financial year 2014 together with the Office s reply 12, rue Alcide De Gasperi - L - 1615 Luxembourg T (+352)

More information

Edition Volume II

Edition Volume II International Auditing and Assurance Standards Board Handbook of International Quality Control, Auditing, Review, Other Assurance, and Related Services Pronouncements 2016 2017 Edition Volume II The structures

More information

REPORT. on the annual accounts of the European Agency for Safety and Health at Work for the financial year 2016, together with the Agency s reply

REPORT. on the annual accounts of the European Agency for Safety and Health at Work for the financial year 2016, together with the Agency s reply 6.12.2017 EN Official Journal of the European Union C 417/201 REPORT on the annual accounts of the European Agency for Safety and Health at Work for the financial year 2016, together with the Agency s

More information

Council of the European Union Brussels, 28 November 2017 (OR. en)

Council of the European Union Brussels, 28 November 2017 (OR. en) Council of the European Union Brussels, 28 November 2017 (OR. en) Interinstitutional File: 2016/0370 (CNS) 14126/17 LEGISLATIVE ACTS AND OTHER INSTRUMTS Subject: FISC 256 ECOFIN 922 UD 257 COUNCIL DIRECTIVE

More information

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi)

European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement. (EMPIR MGA - Multi) European Metrology Programme for Innovation and Research (EMPIR) Multi-beneficiary Model Grant Agreement (EMPIR MGA - Multi) Version 5.0 12 March 2018 Version Publication Date 1.0 16.07.2015 Initial version

More information

Initial Audit Engagements Opening Balances

Initial Audit Engagements Opening Balances International Auditing and Assurance Standards Board ISA 510 April 2009 International Standard on Auditing Initial Audit Engagements Opening Balances International Auditing and Assurance Standards Board

More information

INTRA-COMMUNITY TRADE

INTRA-COMMUNITY TRADE INTRA-COMMUNITY TRADE Dimitrie Cantemir Christian University Knowledge Horizons - Economics Volume 6, No. 4, pp. 150 156 P-ISSN: 2069-0932, E-ISSN: 2066-1061 2014 Pro Universitaria www.orizonturi.ucdc.ro

More information

Rules. Unofficial translation. - for aid from the EUDP to projects within research, development and demonstration.

Rules. Unofficial translation. - for aid from the EUDP to projects within research, development and demonstration. Energy Technology Development and Demonstration Programme Rules - for aid from the EUDP to projects within research, development and demonstration. Table of contents 1 INTRODUCTION... 5 2 BENEFICIARIES

More information

Mono-Beneficiary Model Grant Agreement

Mono-Beneficiary Model Grant Agreement Justice Programme & Rights, Equality and Citizenship Programme Mono-Beneficiary Model Grant Agreement (JUST/REC MGA Mono) Version 2.0 10 January 2017 Disclaimer This document is aimed at assisting applicants

More information

REPORT (2016/C 449/35)

REPORT (2016/C 449/35) C 449/188 EN Official Journal of the European Union 1.12.2016 REPORT on the annual accounts of the European Foundation for the Improvement of Living and Working Conditions for the financial year 2015,

More information

AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE WORKING NOTES 6 TH FRAMEWORK PROGRAMME WORKING NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP VERSION 1 APPROVED

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) L 46/8 Official Journal of the European Union 19.2.2013 REGULATIONS COMMISSION IMPLEMENTING REGULATION (EU) No 135/2013 of 18 February 2013 amending Implementing Regulation (EU) No 926/2011 for the purposes

More information

IMPLEMENTATION OF THE EUROPEAN UNION COHESION POLICY FOR PROGRAMMING PERIOD: EVOLUTIONS, DIFFICULTIES, POSITIVE FACTORS

IMPLEMENTATION OF THE EUROPEAN UNION COHESION POLICY FOR PROGRAMMING PERIOD: EVOLUTIONS, DIFFICULTIES, POSITIVE FACTORS IMPLEMENTATION OF THE EUROPEAN UNION COHESION POLICY FOR 2007-2013 PROGRAMMING PERIOD: EVOLUTIONS, DIFFICULTIES, POSITIVE FACTORS PhD Candidate Ana STĂNICĂ Abstract In an European Union that integrated

More information

Producer Organisation Scheme

Producer Organisation Scheme EMFF Operational Programme 2014-2020 Producer Organisation Scheme 2014-15 EUROPEAN UNION This measure is part-financed by the European Maritime and Fisheries Fund Ireland s EU Structural and Investment

More information

Creative Europe Sub-programme Culture Financial management

Creative Europe Sub-programme Culture Financial management Creative Europe Sub-programme Culture Financial management 10 November 2014 Sandra Delespesse & Maria-Paz Benito 1 Content Financial tasks Eligibility of costs Important documents Checks, audit and evaluation

More information

Implementation Manual Poverty Alleviation Programme

Implementation Manual Poverty Alleviation Programme Pagina 1 din 37 Implementation Manual Poverty Alleviation Programme Table of Contents 1. OVERVIEW... 4 1.1. Scope of the manual... 4 1.2. Applicable law... 5 1.3. Roles and Responsibilities during the

More information

CHECK-LIST FOR CONTROLLERS/AUDITORS

CHECK-LIST FOR CONTROLLERS/AUDITORS Managing Authority Ministry of Finance of the Republic of Estonia Estonia Russia Cross Border Cooperation Programme 2014 2020 CHECK-LIST FOR CONTROLLERS/AUDITORS Template of control check-list Audit firm/public

More information

ESF Certifying Authority, Department of Education and Skills Circular 1/2016 (replacing Circular 1/2015)

ESF Certifying Authority, Department of Education and Skills Circular 1/2016 (replacing Circular 1/2015) ESF Certifying Authority, Department of Education and Skills Circular 1/2016 (replacing Circular 1/2015) ELIGIBILITY RULES FOR THE 2014-2020 EUROPEAN SOCIAL FUND AND YOUTH EMPLOYMENT INITIATIVE 1. Background

More information

PARLIAMENT OF THE REPUBLIC OF MACEDONIA

PARLIAMENT OF THE REPUBLIC OF MACEDONIA 20100661178 PARLIAMENT OF THE REPUBLIC OF MACEDONIA Based on Article 75, paragraph 1 and 2 of the Constitution of the Republic of Macedonia, the President of the Republic of Macedonia and the President

More information

MEMORANDUM OF UNDERSTANDING BETWEEN THE GOVERNMENT OF THE REPUBLIC OF BULGARIA AND THE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

MEMORANDUM OF UNDERSTANDING BETWEEN THE GOVERNMENT OF THE REPUBLIC OF BULGARIA AND THE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT MEMORANDUM OF UNDERSTANDING BETWEEN THE GOVERNMENT OF THE REPUBLIC OF BULGARIA AND THE INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT ON PARTNERSHIP THE AND SUPPORT IN IMPLEMENTATION OF THE EUROPEAN

More information

ESF Certifying Authority, Department of Education and Skills Circular 1/2015

ESF Certifying Authority, Department of Education and Skills Circular 1/2015 ESF Certifying Authority, Department of Education and Skills Circular 1/2015 ELIGIBILITY RULES FOR THE 2014-2020 EUROPEAN SOCIAL FUND AND YOUTH EMPLOYMENT INITIATIVE 1. Background This Circular is to advise

More information

GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY. for the programming period

GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY. for the programming period Final version of 25/07/2008 COCOF 08/0014/02-EN GUIDANCE DOCUMENT ON THE FUNCTIONS OF THE CERTIFYING AUTHORITY for the 2007 2013 programming period Table of contents 1. Introduction... 3 2. Main functions

More information

Financial Procedures Pertaining to Contracts for Services, Work and Labour

Financial Procedures Pertaining to Contracts for Services, Work and Labour Financial Procedures Pertaining to Contracts for Services, Work and Labour Accounting Notes Relating to the General Terms of Contract governing Contracts for Consulting Services, February 2007 These accounting

More information

DECREE No 104 OF 17 MAY 2008 ON ORGANIZATION AND COORDINATION OF MANAGEMENT OF RESOURCES FROM THE FUNDS OF THE EUROPEAN UNION

DECREE No 104 OF 17 MAY 2008 ON ORGANIZATION AND COORDINATION OF MANAGEMENT OF RESOURCES FROM THE FUNDS OF THE EUROPEAN UNION DECREE No 104 OF 17 MAY 2008 ON ORGANIZATION AND COORDINATION OF MANAGEMENT OF RESOURCES FROM THE FUNDS OF THE EUROPEAN UNION Effective as of 20 May 2008 Promulgated, SG No 47 of 20 May 2008, as amended,

More information

DG Regional Policy DG Employment, Social Affairs and Equal Opportunities

DG Regional Policy DG Employment, Social Affairs and Equal Opportunities Final version of 17/03/2010 COCOF 10/0002/02/EN EUROPEAN COMMISSION DG Regional Policy DG Employment, Social Affairs and Equal Opportunities Guidance note to Certifying Authorities on reporting on withdrawn

More information

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014)

FAQ. Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) FAQ Questions and answers relating to the 2014 call for proposals for NGO operating grants for funding in 2015 (Latest update September 2014) CORRIGENDUM: In the first version of the Application Guide,

More information

ISA 705, Modifications to the Opinion in the Independent Auditor s Report

ISA 705, Modifications to the Opinion in the Independent Auditor s Report International Auditing and Assurance Standards Board ISA 705 (Revised and Redrafted) October 2008 Revised and Redrafted International Standard on Auditing ISA 705, Modifications to the Opinion in the Independent

More information

Standard Project Fiche. 1.2 Title: Further Institutional Strengthening of the Court of Accounts

Standard Project Fiche. 1.2 Title: Further Institutional Strengthening of the Court of Accounts Standard Project Fiche 1. Basic Information 1.1 Desiree Number: RO-2002/000-586.03.03 1.2 Title: Further Institutional Strengthening of the Court of Accounts 1.3 Sector: Finance 1.4 Twinning component:

More information