2040 Long Range Transportation Plan. Financial Summary

Size: px
Start display at page:

Download "2040 Long Range Transportation Plan. Financial Summary"

Transcription

1 2040 Long Range Transportation Plan Financial Summary

2 FINANCIAL OUTLOOK Establishing MPO Transportation Plan fiscal forecasts for a twenty year planning horizon in today s transportation environment is a challenging endeavor. Federal transportation funds are typically authorized through six year legislative cycles. The current six year federal transportation legislation, SAFETEA-LU, expired on September 30, 2009 and has been extended several times on a temporary basis. It is unclear when the next transportation bill will pass but based on various draft bills that have been circulated significant changes to existing programs are expected. Funding levels also varied in the draft bills from 30 percent cuts to significant increases. Consistent with federal transportation regulations, MVRPC has developed planning level year of expenditure revenue projections and cost estimates through the year MVRPC projections include Federal, State, and local sources. These projections represent MVRPC s outlook on available future transportation program funding. MVRPC is projecting average growth in transportation program revenue at 2.1% and average project inflation at 2.1%. MVRPC s assumption is that over the Transportation Plan twenty-nine year planning horizon, existing revenue sources will keep pace with inflation. The Ohio Department of Transportation (ODOT), a key transportation stakeholder and project implementer in the MVRPC Region, also develops fiscal projections for its statewide programs and projects. ODOT prepares biennial Business Plans as a strategic planning tool to define its mission, establish and assess statewide transportation system performance measures, and manage resources. A key component of the Business Plan is to project future revenue and track inflationary trends. ODOT s Business Plan reflects increasing disparity between future revenue estimates and inflation trends. Long term ODOT is projecting average annual growth in transportation program revenue at 0% and 3.0% for state and federal sources respectively and an annual cost of inflation of 5.0%. ODOT s Business Plan revenue forecasts differ from MVRPC s in that they is shorter term ( ) and are used to establish statewide program budgets. ODOT program budgets are established at amounts needed to operate and maintain the state transportation system and to finance existing project commitments. MVRPC s forecasts are planning level assessments of transportation revenue likely to be available to the Region during the twenty-plus year planning horizon. MVRPC s revenue forecasts match ODOT s for the time frame (current ). Between 2016 and 2017 ODOT s forecasts reflect a more conservative funding outlook than do MVRPC s. While ODOT s and MVRPC s short term fiscal forecasts use somewhat differing methodologies, both produce reasonable results for their intended uses. MVRPC also worked closely with the Regional Transit Agencies. Financial forecasts for the Greene County Transit Board (Greene CATs) were provided by the agency in 2011 dollars. Funding for the periods beyond the was inflated by MVRPC using the FY 2013 US Office of Management and Budget US Budget Economic Assumptions for Consumer Price Index for FY 2016 (2.1 percent per year) to project inflation into the future. Financial forecasts for the Greater Dayton Regional Transit Authority and Miami County Transit were provided by each agency in year of expenditure dollars for the same periods, using the same (2.1 percent per year) inflation factor. For each mode, the costs of the 2012 through 2040 plan projects are balanced against projected revenues and, following SAFETEA-LU requirements, are expressed in year of expenditure dollars. The fiscal constraints for each transportation mode are summarized in Table 1.

3 Table 1 Fiscal Constraints of the 2040 LRTP Projects (in millions of Year of Expenditure dollars) Project Type Highway Transit Rideshare-Vanpool/Air Quality Bikeway and Pedestrian Transportation Enhancement Source: MVRPC Total Cost $2, $2, $32.68 $12.63 $6.14 Total Revenues Total Cost-Total Revenues $3, (i.e., fiscally constrained) $2, (i.e., fiscally constrained) $ (i.e., fiscally constrained) $ (i.e., fiscally constrained) $ (i.e., fiscally constrained) HIGHWAY COST AND REVENUE FORECASTS The LRTP s 29 year forecasted highway revenues were determined by considering two main funding sources: the and local funds. The includes funds from the Ohio Department of Transportation as well as other MPO-controlled funds. Local jurisdiction funds include Ohio Public Works funds and local ED/GE grants, in addition to local revenues. Detailed information about each program including eligibility, application process, funding levels, and contact information is available on the MVRPC website at: /transportation/financing/transportati on-infrastructure-program-facts-sheets The revenue forecast was completed by identifying the actual expenditures in years and using those as a base to calculate the year 2040 revenuee forecast. Therefore, the 29-year time period was separated into two increments. The first increment is from SFY 2012 to SFY 2015 and includes the actual programmed expenditures for that time period in the current. The second increment includes the remaining 25 years in the period and is further sub-divided into three additional increments for the purposes of applying inflationary factors,, and. The revenues outside the are based on average annual expenditures for years , excluding expenditures for I-75 Phase IA and IB, the segment of Warren I-75 widening project outside the MPO area, and ARRA related expenditures. ODOT also prepared a financial forecast for the MVRPC Region based on annual encumbrances for for state, federal, and local sources that excluded ARRA and emergency projects. The resulting annual averages are close to the MVRPC annual averages for federal and state sources. Local sources are significantly lower because ODOT did not account for local sources on local let projects and phases of projects fully funded by local funds. The estimates (SFY ) were determined by adding the amount of actual programmed expenditures in each funding source as shown in the. Expenditures were then divided between

4 operation/maintenance (42%) and capacity (58%) based on the actual mix of such projects in the and according to the categories described in Table 2. The forecasted revenues for the entire 29 year period 2040 LRTP were then determined by adding actual and local expenditures to the projected figures of the remaining 25 year forecasts from both and local sources. The results can be seen in Table 3. Table 2 Project Types in /LRTP Analysis Operation/Maintenance Simple Resurfacing (no widening) Reconstruction (no widening) Guardrail and Pavement Markers Bridge Repair/ Replacement (no additional Width or lanes) Signal Installation (without interconnect) Street Maintenance Sign Upgrades Source: MVRPC Capacity Resurfacing/Reconstruction (includes new lanes) Intersection Widenings/Improvements Signalization Improvements (including interconnects) Curve Relocations/Elimination Bridge Replacement or Realignment (on new alignment, new lanes or lane widening) Bikeways (widen curb lanes or separate paths) Other Safety Upgrades (which modify road profile or geometry) The next step in the revenue forecasting process was to determine how much of the total revenue would be available for the operation/maintenance versus capacity improvement projects. According to MVRPC s annual survey data, the Region is expending approximately 56% of its roadway expenditures on operation/maintenance and 44% on capacity type of projects. The final step involved using inflation rates to adjust revenues beyond the years, to year of expenditure dollars for the three LRTP periods, and. After consulting several sources (National Highway Construction Cost Index, Congressional Budget Office) and finding similar long term inflationary trends, MVRPC used the latest FY 2013 US Office of Management and Budget US Budget Economic Assumptions for Consumer Price Index for FY 2016 (2.1 percent per year) to project inflation into the future. This resulted in inflation factors of 1.19, 1.37, and 1.69 for years 2018, 2025 and 2035, the mid-years of the three Plan periods,, and. These same factors were applied to cost estimates for any projects outside the years, therefore assuming that in the long run costs and revenues will approach each other. In summary, Table 3 presents the result of the total revenue forecast of $6, million, followed by Figure 1 showing the breakdown between operation/maintenance ($3, million) and capacity improvement ($3, million) projects. The revenue sources listed in Tables 3 do not include transit operating (FTA Section 5307 or 5311; ODOT or local), transit capital (FTA Section 5307/5309 formula, 5309 discretionary, 5310; 5316, or 5317; ODOT or local), bikeway capital, or transportation enhancement funds.

5 Table Forecasted Revenues for O/M and Capacity Improvements by Funding Source (in millions of 2011 / Year of Expenditure dollars) General Source Specific Source Federal Various Sources State Match ODOT/MPO State (Including 100%) Controlled Funds Other Funds (Local/OPWC/Issue 2 to Match State & Federal Funds) Ohio Public Works Ohio Public Works Commission (L And Issue 2) Local Match Grant Local ED/GE Local Contribution 100% Local, Private, Other Federal Subtotal State Local, Other Total (2011 dollars) Total (Year of Expenditure dollars) Source: MVRPC Revenues Shortt Term Long Term Plan Annual 29 Plan / Average Year Plan , , , , , , , /2, , % 90% 80% 70% $479 $427 $982 $1,211 $3,099 60% 50% 40% 30% 20% $368 $488 $1,123 $1,385 $3,363 10% 0% SHORT TERM MEDIUM TERM LONG TERM FULL PLAN CAPACITY O/M Figure 1 Breakdown of 2040 Forecasted Revenues forr Operation/Maintenancee and Capacity (in millions of Year of Expenditure dollars)

6 TRANSIT SERVICEE Greater Dayton Regional Transit Authority (GDRTA) The long range planning process used by GDRTA is based upon strategic plan priorities, as well as federal directives. This planning process has led to the current transit system and has also assisted in the development of the 2040 LRTP. GDRTA provides approximately 10 million passenger-trips per year through an extensive network of fixed routes, covering nearly 1,000 miles of directional roadways. Further, GDRTA s Transit Centers, located throughout Montgomery County, connect the central city and the suburban areas with bus services at centralized locations. The following assumptions were project lists, costs, and revenues: Service Configuration n made in developing the GDRTA Long Range Transportationn Plan Service area remains approximately the same GDRTA will continue its service evolution into a multiple hub/transfer concept GDRTA is in compliance with ADA and will continue to work with human services transportation coordination efforts Annual vehicle hours, vehicle miles, and ridershipp remain approximately constant Average fare to be modified consistent with inflation. Fleet fleet size With the fulll implementation of the regional hub plan and trolley plan, GDRTA anticipates a as follows, fleet will be replaced over the life of the plan; Electric Trolleys 57 Diesels 35 to Project Mobility Vehicles - 95 Simulated Streetcars remain at 4 Contingency 35 to 40 Diesels remain at 20 percent. Revenue Annual Section 5307/5309 formula capital allocation meets 80% of all future capital projects; STP/CMAQ allocation to GDRTA: none assumed; State allocation remains constant and can only be used for capital projects; Bonding capital: no new issues assumed; Sales tax: assumed to remain steady; Reserve: the availability of local reserve is predicated on the reserve base being built up to support the level of spending with the Long Range Plan being adjusted accordingly as funds are available; and Other (interest, advertising, rentals, etc.): will increase in order to seek other revenue sources to fund operations. Operating Costs Annual operating cost held constant and adjusted for inflation service goes to zero as the bonds are retired. while annual debt

7 The capital program, costs and revenues, and sources of revenues for are presented in detail in Tables 4 and 5. Table 4 GDRTA 2040 LRTP Costs and Revenues (in millions of Year of Expenditure dollars) Program 29 Year Plan Total Costs , , Capital Costs Operating Costs , Debt Service Total Revenues , , Specified Revenues , , Local Reserve Funds Source: GDRTA Table 5 GDRTA 2040 LRTP Sources of Revenues (in millions of Year of Expenditure dollars) Program 29 Year Plan Total Capital Funds Federal Funds - FTA FTA FTA Other GDRTA Capital Funds Total Operating Funds ,271.7 Local - Passenger Revenue Sales Tax , Other (interest, ads, misc.) Federal - Federal Federal Federal Other Grand Total - Revenue Sources , , Source: GDRTA

8 Greene County Transit Board (Greene CATS) The service is a combination of traditional demand responsive and flex services. It is wheelchair accessiblee and serves a mix of fare-paying County, and surrounding counties as needed. In addition, the Greene County and contract riders. The transitt service area is Greene County, with trips to Montgomery Transit Board works with local social services agencies to help coordinate social services transportation and to provide a wider range of transportation options to social services agencies. The following assumptions were made in developing the Greene CATS project lists, expenses and revenues for the 2040 LRTP, a summary of the Greene CATS 2040 expenses and revenues are presented in Tables 6 and 7. No change in the service area or in the amount of service provided No change in fares: traditional demand responsive service $1.50 each way in Greene; $6 each way to Montgomery; flex services $0.50 each way, $0.25 for elderly and disabled riders No change in FTA or ODOT formula funding or local revenue sources Continue to work with social services agencies to foster coordination and brokerage programs Table 6 Greene CATS 2040 LRTP Expenses (in millions of 2011 / Year of Expenditure dollars) Operations $3.12/yr $12.48 Vehicle replacement $0.079/vehicle; $ in 12-15, 6.8/yr Shop/tool purchase $0.005/yr Facility construction TE $0.012/yr $0.02 $0.80 $0.48 Safety/security projects in 2012; $0.79 $0.012/yr thereafter Planning $0.185/yr Other capital Total (2011) Total (YOE) $0.74 $0.64 $17.69 $17.69 Source: Greene CATs and MVRPC $15.60 $31.2 $2.69 $5.38 $0.03 $0.06 $0 $0 $0.06 $0.12 $0.06 $0.12 $0.93 $1.86 $0.01 $0.02 $19.38 $ $38.76 $23.06 $ $53.10 $31.2 $5.38 $0.06 $0 $0.12 $0.12 $1.86 $0.02 $38.76 $ Year Plan $90.48 $15.19 $0.17 $0.800 $0.78 $1.09 $5.39 $0.69 $ $159.36

9 Table 7 Greene CATS 2040 LRTP Revenues (in millions of 2011 / Year of Expenditure dollars) 29 Year Plan Passenger Fares $0.066/yr $0.26 $0.33 $0.66 $0.66 $1.91 FTA formula $1.24/yr $4.96 $6.20 $12.40 $12.40 $35.96 ODOT formula $0.03/yr $0.12 $0.15 $0.30 $0.30 $0.87 Social Service Contracts $7.48 $9.35 $18.70 $18.70 $54.23 $1.87/yr Local matches $3.73 $2.50 $5.00 $5.00 $16.23 Local land contribution $0.30 $0 $0 $0 $0.30 Other $0.17/yr $0.84 $0.85 $1.70 $1.70 $5.09 Total (2011) $17.69 $19.38 $38.76 $38.76 $ Total (YOE) $17.69 $23.06 $53.10 $65.50 $ Source: Greene CATs and MVRPC

10 Miami County Transit System Miami County Transit System provides demand responsive transit services within Miami County. Miami County Transit provides service six days a week. The County anticipates continued increases in additional benefits for the local human service organizations. Many of these organizations will now have the opportunity to utilize Miami County Transit as a method of expanding existing programs. The Miami County Commissioners plan to utilize a combination of federal, state, and local funds to financially support the program and its capital requirements as shown in Tables 8 and 9. Program Table 8 Miami County Transit 2040 LRTP Costs (in millions of Year of Expenditure dollars) 29 Year Plan - Small Buses (4/year) Shop/Office Equipment Security Equipment Transit Enhancements Planning Projects Operating Costs Total Source: Miami County Transit Program Table 9 Miami County Transit 2040 LRTP Revenues (in millions of Year of Expenditure dollars) 29 Year Plan - FTA Formula FTA Discretionary ODOT Formula ODOT Fare Assistance Fares, Contract Rev., Misc Local Support Total Source: Miami County Transit

11 Public Transit Human Services Transportation In the Dayton urbanized area, MVRPC in cooperation with the regional transit agencies took the lead in developing the Human Services Plan and is also the designated recipient for Section 5316 and The Human Services Plan was endorsed by the Board of Directors in April Financial forecasts for human services transportation are based on annual averages as shown in the current SFY and assumed to be in 2011 dollars. Based on the annual averages three plan periods were forecasted: , and The results can be seen in Table 10. Program Table Forecasted Cost and Revenues for Human Services Transportation (in millions of 2011 / Year of Expenditure dollars) Annual Average Cost/Revenues 29 Year Plan Section * Section Section Total (2011 dollars) Total (YOE dollars) Note: *Section 5310 funding is not forecasted since regional allocation varies annually due to statewide application process (based on 2011 awards on the MPO area) Source: MVRPC

12 SUSTAINABLE GROWTH INITIATIVES As the Region grows, it is essential to plan a comprehensive transportation system that serves the needs of travelers using all modes of transportation, allowing for reasonable mobility choices for all residents. The 2040 LRTP addresses future transportation needs by including programs and projects that provide alternatives to traditional forms of transportation. In addition to curtailing the demand for single occupancy vehicle travel therefore reducing congestion, harmful emissions, and the reliance on petroleum-based products, sustainable growth strategies can also spur economic development in existing communities, create strong places with a sense of community, and help preserve open space and environmentally sensitive areas. Financial forecasts for the programs and projects described in this chapter are based on annual averages as shown in the current SFY and are assumed to be in 2011 dollars. Based on the annual averages three plan periods were forecasted: , and The results can be seen in Table 11 below. As a result the scope of programs and projects will be constrained by available future revenue. It is also important to note that MVRPC does not forecast funding for the regional bikeway or transportation enhancement programs; these programs are funded as revenues become available. Program Table Forecasted Cost and Revenues for Sustainable Growth Strategies (in millions of 2011 / Year of Expenditure dollars) Annual Average Cost/Revenues 29 Year Plan Rideshare Vanpool Subsidy Air Quality Bikeway/Pedestrian Transp. Enhancement Total (2011 dollars) Total (YOE dollars) Source: MVRPC

INVESTING STRATEGICALLY

INVESTING STRATEGICALLY 11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program

More information

QUALITY TRANSPORTATION SUMMARY

QUALITY TRANSPORTATION SUMMARY QUALITY TRANSPORTATION SUMMARY Quality Transportation Overview... 126 Department of Transportation... 127 Traffic Field Operations... 129 Winston-Salem Transit Authority... 131 Quality Transportation Non-Departmental...

More information

CHAPTER 9 FINANCIAL CONSIDERATIONS

CHAPTER 9 FINANCIAL CONSIDERATIONS CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the Berryessa Extension Project (BEP) Alternative and the Silicon Valley Rapid Transit

More information

Chapter 5: Cost and Revenues Assumptions

Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the

More information

INVESTMENT STRATEGIES

INVESTMENT STRATEGIES 3 INVESTMENT STRATEGIES 70 INVESTMENT STRATEGIES 71 A key role of Mobilizing Tomorrow is to outline a strategy for how the region will invest in transportation infrastructure over the next 35 years. This

More information

QUALITY TRANSPORTATION SUMMARY

QUALITY TRANSPORTATION SUMMARY SUMMARY Transportation systems influence virtually every aspect of community life. They are the means for moving people, goods, and services throughout the community, and they play a significant role in

More information

Birmingham-Jefferson County Transit Authority P.O. Box Birmingham, AL Phone: (205) Fax: (205)

Birmingham-Jefferson County Transit Authority P.O. Box Birmingham, AL Phone: (205) Fax: (205) Birmingham-Jefferson County Transit Authority P.O. Box 10212 Birmingham, AL 35202-0212 Phone: (205) 521-0161 - Fax: (205) 521-0154 Program of Projects For Federal Fiscal Year 2018 (Utilizing FFY 2017 Apportionments)

More information

OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY

OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY TABLE OF CONTENTS MPO AND LARGE CITY PROGRAM OVERVIEW.. 3 MPO AND LARGE CITY SFY 2015 STP BUDGET SUMMARY......... 4 MPO AND LARGE CITY SFY 2015

More information

8. FINANCIAL ANALYSIS

8. FINANCIAL ANALYSIS 8. FINANCIAL ANALYSIS This chapter presents the financial analysis conducted for the Locally Preferred Alternative (LPA) selected by the Metropolitan Transit Authority of Harris County (METRO) for the.

More information

Financial Capacity Analysis

Financial Capacity Analysis FINANCIAL CAPACITY ANALYSIS Introduction Federal transportation planning rules require that metropolitan area transportation plans include a financial capacity analysis to demonstrate that the plan is

More information

OHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY

OHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY OHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY Revised 9/19/2017 TABLE OF CONTENTS MPO AND LARGE CITY PROGRAM OVERVIEW... 3 MPO AND LARGE CITY SFY 2017 STBG BUDGET SUMMARY... 4 MPO AND LARGE CITY

More information

In addition to embarking on a new dialogue on Ohio s transportation priorities,

In addition to embarking on a new dialogue on Ohio s transportation priorities, Strategic Initiatives for 2008-2009 ODOT Action to Answer the Challenges of Today In addition to embarking on a new dialogue on Ohio s transportation priorities, the Strategic Initiatives set forth by

More information

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 Amendment Conformity Report for August 20, 2008 Amendments (Amendment # 2008-028 thru 2008-030) On August 20, 2008 the Executive Board

More information

Contents. Alamo Area Metropolitan Planning Organization. Introduction S. St. Mary s Street San Antonio, Texas 78205

Contents. Alamo Area Metropolitan Planning Organization. Introduction S. St. Mary s Street San Antonio, Texas 78205 Contents Introduction 1 Alamo Area Metropolitan Planning Organization Tel 210.227.8651 Fax 210.227.9321 825 S. St. Mary s Street San Antonio, Texas 78205 www.alamoareampo.org aampo@alamoareampo.org Pg.

More information

Chapter 3: Regional Transportation Finance

Chapter 3: Regional Transportation Finance Chapter 3: Regional Transportation Finance This chapter examines the sources of funding for transportation investments in the coming years. It describes recent legislative actions that have changed the

More information

CHAPTER 9 FINANCIAL CONSIDERATIONS

CHAPTER 9 FINANCIAL CONSIDERATIONS CHAPTER 9 FINANCIAL CONSIDERATIONS 9.1 INTRODUCTION This chapter presents anticipated costs, revenues, and funding for the BEP and the SVRTP. A summary evaluation of VTA s financial plan for the proposed

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

8.0 FINANCIAL ANALYSIS

8.0 FINANCIAL ANALYSIS Chapter 8 Financial Analysis 8.0 FINANCIAL ANALYSIS This chapter presents a summary of the financial analysis for the Central Corridor Light Rail Transit (LRT) Project, a description of the Project Sponsor

More information

Review and Update of Year 2035 Regional Transportation Plan

Review and Update of Year 2035 Regional Transportation Plan Review and Update of Year 2035 Regional Transportation Plan #217752 1 Background Every four years, the Year 2035 Plan is reviewed Elements of review Validity of Plan Year 2035 forecasts Transportation

More information

MIAMI VALLEY REGIONAL PLANNING COMMISSION MONTGOMERY COUNTY, OHIO

MIAMI VALLEY REGIONAL PLANNING COMMISSION MONTGOMERY COUNTY, OHIO MIAMI VALLEY REGIONAL PLANNING COMMISSION MONTGOMERY COUNTY, OHIO AUDIT REPORT FOR THE YEAR ENDED JUNE 30, 2011 Charles E. Harris and Associates, Inc. Certified Public Accountants and Government Consultants

More information

CHAPTER 4 1 Transportation Financial Analysis

CHAPTER 4 1 Transportation Financial Analysis CHAPTER 4 1 Transportation Financial Analysis COMPASS commissioned a financial analysis, finalized in 2012, to support the CIM 2040 update. The analysis, Financial Forecast for the Funding of Transportation

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

Technical Memorandum. Finance. Prepared for: Prepared by: In cooperation with: High Street Consulting Group

Technical Memorandum. Finance. Prepared for: Prepared by: In cooperation with: High Street Consulting Group Technical Memorandum Finance Prepared for: Prepared by: In cooperation with: High Street Consulting Group April 25, 2013 i Table of Contents 1. Ohio Finance... 1 1.1 Baseline Projection -- Highways...

More information

Chapter 15. Transportation Improvements Financing. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan

Chapter 15. Transportation Improvements Financing. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan Chapter 15 Transportation Improvements Financing Ohio Kentucky Indiana Regional Council of Governments 2030 Regional Transportation Plan CHAPTER 15 TRANSPORTATION IMPROVEMENTS FINANCING INTRODUCTION As

More information

Technical Report No. 4. Revenue and Costs

Technical Report No. 4. Revenue and Costs Technical Report No. 4 Revenue and Costs Technical Report No. 4 REVENUE AND COSTS PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph (727) 847-8140, fax (727)

More information

Chapter 4: Regional Transportation Finance

Chapter 4: Regional Transportation Finance 4.1 Chapter 4: Regional Transportation Finance 2040 4.2 CONTENTS Chapter 4: Transportation Finance Overview 4.3 Two Funding Scenarios 4.4 Current Revenue Scenario Assumptions 4.5 State Highway Revenues

More information

Transportation Trust Fund Overview

Transportation Trust Fund Overview Transportation Trust Fund Overview Created pursuant to New Jersey Transportation Trust Fund Authority Act of 1984 Established to finance the cost of planning, acquisition, engineering, construction, reconstruction,

More information

CHAPTER 16: FINANCIAL ANALYSIS

CHAPTER 16: FINANCIAL ANALYSIS CHAPTER 16: FINANCIAL ANALYSIS FISCAL CONSTRAINT MAP-21 regulations require that the Regional Transportation Plan be a fiscally constrained document. To ensure financial constraint, it is necessary to

More information

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION 2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION TEMPO Meeting July 21, 2016 Current Initiatives On-going efforts to address performance-based planning and programming processes as required

More information

Financial Snapshot October 2014

Financial Snapshot October 2014 Financial Snapshot October 2014 Financial Snapshot About the Financial Snapshot The Financial Snapshot provides answers to frequently asked questions regarding MoDOT s finances. This document provides

More information

Financial Analysis Working Paper 1 Existing Funding Sources Draft: April 2007

Financial Analysis Working Paper 1 Existing Funding Sources Draft: April 2007 Financial Analysis Working Paper 1 Existing Funding Sources Draft: April 2007 Prepared for: By: TABLE OF CONTENTS INTRODUCTION... 1 REVIEW OF FRED AND VRE EXISTING FUNDING SOURCES... 1 Federal Funding...

More information

Development of the Cost Feasible Plan

Development of the Cost Feasible Plan March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan P a g e 1 Development

More information

WASATCH FRONT REGIONAL TRANSPORTATION PLAN FINANCIAL PLAN. Technical Report 47 May 2007 DAVIS MORGAN SALT LAKE TOOELE WEBER

WASATCH FRONT REGIONAL TRANSPORTATION PLAN FINANCIAL PLAN. Technical Report 47 May 2007 DAVIS MORGAN SALT LAKE TOOELE WEBER WASATCH FRONT REGIONAL TRANSPORTATION PLAN 2007-2030 FINANCIAL PLAN Technical Report 47 May 2007 DAVIS MORGAN SALT LAKE TOOELE WEBER 2030 RTP Financial Plan WASATCH FRONT REGIONAL TRANSPORTATION PLAN

More information

Honolulu High-Capacity Transit Corridor Project Alternatives Analysis

Honolulu High-Capacity Transit Corridor Project Alternatives Analysis Alternatives Analysis Financial Feasibility Report November 30, 2006 Prepared for: City and County of Honolulu Prepared by: PB Consult Inc. Under Subcontract to: Parsons Brinckerhoff Quade & Douglas, Inc.

More information

Financial Forecasting Assumptions for Plan 2040 (DRAFT)

Financial Forecasting Assumptions for Plan 2040 (DRAFT) Financial Forecasting Assumptions for Plan 2040 (DRAFT) Inflation and Long Range Cost Escalation For the FY 2012 2017 TIP period, ARC will use the GDOT recommended 4 percent inflation rate. This conservative

More information

Chapter 4: Available Funds and Financial Scenarios

Chapter 4: Available Funds and Financial Scenarios Funding the Plan Federal and State requirements say that a Long Range Transportation Plan (LRTP) must include a financial plan. The financial plan must indicate resources from public and private sources

More information

ALL Counties. ALL Districts

ALL Counties. ALL Districts TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation

More information

Appendix. G RTP Revenue Assumptions REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY

Appendix. G RTP Revenue Assumptions REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY Appendix G RTP Revenue Assumptions REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY Exhibit G-1 2014 RTP REVENUE FORECAST ASSUMPTIONS LOCAL REVENUES Measure K Sales Tax Renewal Program: Description:

More information

MPO Staff Report Technical Advisory Committee: April 12, 2017 MPO Executive Board: April 19, 2017

MPO Staff Report Technical Advisory Committee: April 12, 2017 MPO Executive Board: April 19, 2017 MPO Staff Report Technical Advisory Committee: April 12, 2017 MPO Executive Board: April 19, 2017 RECOMMENDED ACTION: Approve Candidate Projects for the ND FTA 5339 & 5310 Grant in the priority order given.

More information

CHAPTER 4 FINANCIAL STRATEGIES: PAYING OUR WAY

CHAPTER 4 FINANCIAL STRATEGIES: PAYING OUR WAY The financial analysis of the recommended transportation improvements in the 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP or the Plan ) focuses on four components: Systems

More information

Governor s FY 2016 Revised, FY 2017 and Capital Budget Recommendations House Finance Committee April 13, 2016

Governor s FY 2016 Revised, FY 2017 and Capital Budget Recommendations House Finance Committee April 13, 2016 Governor s FY 2016 Revised, FY 2017 and Capital Budget Recommendations House Finance Committee April 13, 2016 Quasi-public agency Established in 1964 Responsible: Fixed route bus service and Americans

More information

Appendix E: Revenues and Cost Estimates

Appendix E: Revenues and Cost Estimates Appendix E: Revenues and Cost Estimates Photo Source: Mission Media Regional Financial Plan 2020-2040 Each metropolitan transportation plan must include a financial plan. In this financial plan, the region

More information

APPENDIX 5 FINANCIAL ANALYSIS

APPENDIX 5 FINANCIAL ANALYSIS APPENDIX 5 FINANCIAL ANALYSIS Background Starting with the Intermodal Surface Transportation Equity Act of 1991, it has been a consistent requirement of federal law and regulation that the projects included

More information

University Link LRT Extension

University Link LRT Extension (November 2007) The Central Puget Sound Regional Transit Authority, commonly known as Sound Transit, is proposing to implement an extension of the Central Link light rail transit (LRT) Initial Segment

More information

OHIO STATEWIDE TRANSIT NEEDS STUDY

OHIO STATEWIDE TRANSIT NEEDS STUDY OHIO STATEWIDE TRANSIT NEEDS STUDY SUMMARY OF FINDINGS The Ohio Statewide Transit Needs Study was tasked with quantifying Ohio s transit needs, as well as recommending programmatic and policy initiatives

More information

Overview of Minnesota Highway and Transit Finance. Metropolitan Council Transportation Committee June 22, 2015 and July 13, 2015

Overview of Minnesota Highway and Transit Finance. Metropolitan Council Transportation Committee June 22, 2015 and July 13, 2015 Overview of Minnesota Highway and Transit Finance Metropolitan Council Transportation Committee June 22, 2015 and July 13, 2015 Today s topics MN and Metro Area transportation revenues and expenditures

More information

CASH MANAGEMENT & CONTRACT AWARDS

CASH MANAGEMENT & CONTRACT AWARDS CASH MANAGEMENT & CONTRACT AWARDS Brian Ragland, Chief Financial Officer Bill Hale, Chief Engineer Randy Hopmann, Director of District Operations Footer Text Date I. Cash Management Practices 2 FY 2018-2019

More information

Budget Performance in Millions of Dollars Favorable/Unfavorable to Budget. Suburban Suburban

Budget Performance in Millions of Dollars Favorable/Unfavorable to Budget. Suburban Suburban v System Status Budget Performance in Millions of Dollars Favorable/Unfavorable to Budget 6 4 2 0-2 -4-6 -8 Suburban Suburban Suburban ADA Suburban ADA ADA ADA Revenue Expenses Funding Required Net Funding

More information

MIAMI VALLEY REGIONAL PLANNING COMMISSION MONTGOMERY COUNTY JUNE 30, Table of Contents. Independent Auditor s Report... 1

MIAMI VALLEY REGIONAL PLANNING COMMISSION MONTGOMERY COUNTY JUNE 30, Table of Contents. Independent Auditor s Report... 1 MIAMI VALLEY REGIONAL PLANNING COMMISSION MONTGOMERY COUNTY Single Audit For the Year Ended June 30, 2017 TITLE MIAMI VALLEY REGIONAL PLANNING COMMISSION MONTGOMERY COUNTY JUNE 30, 2017 Table of Contents

More information

Funding Local Public Transportation

Funding Local Public Transportation Funding Local Public Transportation I. Metro A. SORTA, early history In 1969 the Southwest Ohio Regional Transit Authority was established by Hamilton County with Hamilton County as its jurisdiction. In

More information

House Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2.

House Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2. House Bill 20 Implementation Tuesday,, 1:00 P.M. Capitol Extension E2.020 INTRODUCTION In response to House Bill 20 (HB 20), 84 th Legislature, Regular Session, 2015, and as part of the implementation

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

APPENDIX I REVENUE PROJECTION AND ASSUMPTIONS

APPENDIX I REVENUE PROJECTION AND ASSUMPTIONS APPENDIX I REVENUE PROJECTION AND ASSUMPTIONS The 2018 StanCOG Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) financial forecasts provide revenue projections for StanCOG member

More information

7.0 Financially Feasible Plan

7.0 Financially Feasible Plan Livability 2040 Regional Transportation Plan 7-1 7.0 Financially Feasible Plan The Memphis MPO used a performance-based approach to rank projects for Livability 2040 and incorporated state and local priorities

More information

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction FY 2009-2018 Statewide Capital Investment Strategy.. asset management, performance-based strategic direction March 31, 2008 Governor Jon S. Corzine Commissioner Kris Kolluri Table of Contents I. EXECUTIVE

More information

APPENDIX B TECHNICAL MEMORANDUM #2 TRANSPORTATION FUNDING

APPENDIX B TECHNICAL MEMORANDUM #2 TRANSPORTATION FUNDING APPENDIX B TECHNICAL MEMORANDUM #2 TRANSPORTATION FUNDING CONTENTS Purpose... B1 Summary of Transportation Funding Sources... B1 Figure B-1: Average Annual Transportation Revenue Breakdown by Source (2011-2015)...B1

More information

Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017

Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017 2017-2021 Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017 HIGHWAY AMENDMENTS FEDERAL FISCAL YEAR 2017 Part 1A: Federal Aid Target Projects Increase cost of (604033)

More information

CENTRAL CITY LINE PROJECT UPDATE AND SMALL STARTS EVALUATION & RATINGS APPLICATION UPDATED & REVISED 4/20/17

CENTRAL CITY LINE PROJECT UPDATE AND SMALL STARTS EVALUATION & RATINGS APPLICATION UPDATED & REVISED 4/20/17 CENTRAL CITY LINE PROJECT UPDATE AND SMALL STARTS EVALUATION & RATINGS APPLICATION UPDATED & REVISED 4/20/17 EXECUTIVE SUMMARY The Central City Line (CCL) is a proposed 6-mile long high performance Bus

More information

MnDOT Highway Construction Outlook

MnDOT Highway Construction Outlook MnDOT Highway Construction Outlook Mark Gieseke MnDOT Office of Capital Programs & Performance Measures Minnesota Transportation Alliance November 1, 2012 MnDOT Highway Construction Outlook Forecast Accuracy

More information

BAKERY vs PUBLIC GOOD

BAKERY vs PUBLIC GOOD BAKERY vs PUBLIC GOOD Clear provider/customer Competition Individual choice Flexibility, bankruptcy -- writedown of assets Technology & innovation Unclear, lumpy customer Public monopoly Complex political

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT 10-Year Capital Highway Investment Plan DRAFT 2018-2027 DRAFT AUGUST 2017 1 Table of Contents PURPOSE OF 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN... 1 This page intentionally left blank. SUMMARY OF INVESTMENT

More information

DALLAS / FORT WORTH DISTRICT

DALLAS / FORT WORTH DISTRICT -2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM TRANSIT DALLAS / FORT WORTH DISTRICT - 2014 TIP 7-2010 2014 Transportation Improvement Program Chapter VI Public Transportation Services Within North

More information

Appendix D Total Project Cost and Year of Expenditure Breakdown

Appendix D Total Project Cost and Year of Expenditure Breakdown Total Project Cost and Year of Expenditure Breakdown p. D -1 Total Project Cost and Year of Expenditure Breakdown Financial Constraint Methodology using Total Project Cost and Year of Expenditure Dollars

More information

Chapter 9 Financial Considerations. 9.1 Introduction

Chapter 9 Financial Considerations. 9.1 Introduction 9.1 Introduction Chapter 9 This chapter presents anticipated costs, revenues, and funding for the NEPA BART Extension Alternative. A summary of VTA s financial plan for the BART Extension Alternative is

More information

SKATS FY 2018-FY 2023

SKATS FY 2018-FY 2023 SKATS FY 2018-FY 2023 Metropolitan Transportation Improvement Program and Air Quality Conformity Determination PUBLIC REVIEW Salem-Keizer Area Transportation Study Cover Photos Top left: 45th Avenue NE

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway

More information

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION 2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION HGAC Transportation Policy Council Meeting Current Initiatives On-going efforts to address performance-based planning and programming processes

More information

Regional Transportation Plan 2040

Regional Transportation Plan 2040 South Jersey Transportation Planning Organization Regional Transportation Plan 2040 Technical Appendix #6: Financial Plan SJTPO July 2012 Version: July 16, 2012 The FHWA and FTA developed and issued the

More information

The Oregon Department of Transportation Budget

The Oregon Department of Transportation Budget 19 20 The Oregon Department of Transportation Budget The Oregon Department of Transportation was established in 1969 to provide a safe, efficient transportation system that supports economic opportunity

More information

MEMORANDUM. Requested Action Provide comments and questions to staff regarding the proposed TIP projects funding scenario.

MEMORANDUM. Requested Action Provide comments and questions to staff regarding the proposed TIP projects funding scenario. MEMORANDUM To: MPO Technical and Citizens Advisory Committees From: Joshua Desmond, AICP BMCMPO Director Date: March 15, 2017 Re: FY 20182021 TIP s Proposal The MPO is developing the s 2018 through 2021

More information

Financial. Snapshot An appendix to the Citizen s Guide to Transportation Funding in Missouri

Financial. Snapshot An appendix to the Citizen s Guide to Transportation Funding in Missouri Financial Snapshot An appendix to the Citizen s Guide to Transportation Funding in Missouri November 2017 Financial Snapshot About the Financial Snapshot The Financial Snapshot provides answers to frequently

More information

Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda

Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda Northern Virginia s economic growth and global competitiveness are directly tied to the region s transit network. Transit

More information

Washington Metropolitan Area Transit Authority Metro Budget Overview

Washington Metropolitan Area Transit Authority Metro Budget Overview Washington Metropolitan Area Transit Authority Metro Budget Overview February 2011 Metro 10,877 Employees (10,974 budgeted) 1,491 Buses 588 Escalators and 237 Elevators 106 Miles of Track 92 Traction Power

More information

Metropolitan Council Budget Overview: State Fiscal Year

Metropolitan Council Budget Overview: State Fiscal Year February 1, 2017 Metropolitan Council Budget Overview: State Fiscal Year 2018-2019 Presentation to the Senate Transportation Finance and Policy Committee Transportation for a growing region 2 Regional

More information

2035 Long Range Transportation Plan Update

2035 Long Range Transportation Plan Update Broward MPO 2035 Long Range Transportation Plan Update Technical Report # 6 Prepared by: In association with: December 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Purpose... 1 1.2 Methodology and

More information

Governor s FY 2018 Revised, FY 2019 and Capital Budget Recommendations House Finance Committee April 12, 2018

Governor s FY 2018 Revised, FY 2019 and Capital Budget Recommendations House Finance Committee April 12, 2018 Governor s FY 2018 Revised, FY 2019 and Capital Budget Recommendations House Finance Committee April 12, 2018 Quasi-public agency Established in 1964 Responsible: Fixed route bus service and Americans

More information

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY CERTIFICATION NARRATIVE FY 2016

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY CERTIFICATION NARRATIVE FY 2016 BINGHAMTON METROPOLITAN TRANSPORTATION STUDY CERTIFICATION NARRATIVE FY 2016 The Binghamton Metropolitan Transportation Study Policy Committee is designated by the Governor of New York as the Metropolitan

More information

CHAPTER 7: Financial Plan

CHAPTER 7: Financial Plan CHAPTER 7: Financial Plan Report Prepared by: Contents 7 FINANCIAL PLAN... 7-1 7.1 Introduction... 7-1 7.2 Assumptions... 7-1 7.2.1 Operating Revenue Assumptions... 7-2 7.2.2 Operating Cost Assumptions...

More information

Public Transportation

Public Transportation Public Transportation Municipal Manager Public Transportation Administration Marketing and Customer Service Program Planning Transit Operations and Maintenance Transit Planning Transit Operations Para

More information

2011 Citizens' Summary

2011 Citizens' Summary 2011 Citizens' Summary Transmittal Letter Executive Summary TL - 1 A Strategic Approach to the Budget TL - 4 Program and Project Initiatives TL - 5 Fare Structure TL - 6 General Fund TL - 7 Service Levels

More information

FY17 FY16 Valley Metro RPTA Sources of Funds FY17 vs FY16

FY17 FY16 Valley Metro RPTA Sources of Funds FY17 vs FY16 FY17 ADOPTED ANNUAL OPERATING AND CAPITAL BUDGET Valley Metro Regional Public Transportation Authority (RPTA) provides public transportation services for Maricopa County located in the metro Phoenix, Arizona.

More information

Amendment 6 - OKI 2030 REGIONAL TRANSPORTATION PLAN

Amendment 6 - OKI 2030 REGIONAL TRANSPORTATION PLAN Amendment 6 - OKI 2030 REGIONAL TRANSPORTATION PLAN February, 2011 Prepared by the Ohio-Kentucky-Indiana Regional Council of Governments Acknowledgments Title Amendment 6 - OKI 2030 Regional Transportation

More information

GREATER DAYTON REGIONAL TRANSIT AUTHORITY MONTGOMERY COUNTY DECEMBER 31, 2016 TABLE OF CONTENTS. Independent Auditor s Report... 1

GREATER DAYTON REGIONAL TRANSIT AUTHORITY MONTGOMERY COUNTY DECEMBER 31, 2016 TABLE OF CONTENTS. Independent Auditor s Report... 1 GREATER DAYTON REGIONAL TRANSIT AUTHORITY MONTGOMERY COUNTY DECEMBER 31, 2016 TABLE OF CONTENTS TITLE PAGE Independent Auditor s Report... 1 Prepared by Management: Management s Discussion and Analysis...

More information

Transportation Package HB 2017

Transportation Package HB 2017 Transportation Package HB 2017 Increases in Rates and Revenue Raised Some traditional, and some new and innovative Commonly considered increases: Gas Tax and use fuel increase (Total 10 cents increase)

More information

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012)

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012) TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012) Summary Description Proposed Project: Commuter Rail 37.6 Miles, 14 Stations (12 new, two existing) Total Capital Cost ($YOE):

More information

Transportation Budget Trends

Transportation Budget Trends 2018 2019 Transportation Budget Trends Transportation Budget Trends 2018 2019 Wisconsin Department of Transportation The report provides a comprehensive view of transportation budget information presented

More information

FY TRANSPORTATION IMPROVEMENT PROGRAM

FY TRANSPORTATION IMPROVEMENT PROGRAM FY 2017 2020 TRANSPORTATION IMPROVEMENT PROGRAM Approved for Public Review and Comment: April 18, 2016 Table of Contents Permian Basin MPO Membership and Structure... 3 Mission Statement... 3 Vision Statement...

More information

Regional Connector Transit Corridor Draft Environmental Impact Statement/ Draft Environmental Impact Report APPENDIX HH FINANCIAL ANALYSIS REPORT

Regional Connector Transit Corridor Draft Environmental Impact Statement/ Draft Environmental Impact Report APPENDIX HH FINANCIAL ANALYSIS REPORT Draft Environmental Impact Statement/ Draft Environmental Impact Report APPENDIX HH FINANCIAL ANALYSIS REPORT State Clearinghouse Number: 2009031043 April 2010 Prepared for Los Angeles County Metropolitan

More information

TSCC Budget Review TriMet

TSCC Budget Review TriMet TSCC Budget Review 2017-18 TriMet 1. Introduction to the District: The Tri-County Metropolitan Transportation District (TriMet) boundary covers about 575 square miles of the urban portions of Multnomah,

More information

ESTIMATING THE NATIONAL ECONOMIC IMPACTS OF COORDINATED TRANSPORTATION SERVICES

ESTIMATING THE NATIONAL ECONOMIC IMPACTS OF COORDINATED TRANSPORTATION SERVICES Section III ESTIMATING THE NATIONAL ECONOMIC IMPACTS OF COORDINATED TRANSPORTATION SERVICES Major coordination strategies were addressed in the previous section, including tapping currently unused sources

More information

City Engineers Association of Minnesota Annual Conference January 31, 2013

City Engineers Association of Minnesota Annual Conference January 31, 2013 City Engineers Association of Minnesota Annual Conference January 31, 2013 Highway User Tax Distribution (HUTD) Fund Gas Tax Registration Tax Motor Vehicle Sales Tax (MVST) Trunk Highway Fund County State

More information

TABLE OF CONTENTS. Page. Page

TABLE OF CONTENTS. Page. Page TABLE OF CONTENTS Page Overview Board of Directors... Overview-1 TriMet Officials... Overview-1 Budget Message... Overview-2 2017-2018 TriMet Organization Chart... Overview-10 Financial Summary General

More information

2045 Long Range Transportation

2045 Long Range Transportation The Jackson Area Comprehensive Transportation Study 2045 Long Range Transportation June 2018 Jackson Area Comprehensive Transportation Study 2045 Long Range Transportation Plan Jackson County, Michigan

More information

ADOPTED BUDGET As Adopted by the Board of Directors on June 22, 2017 CHERRIOTS

ADOPTED BUDGET As Adopted by the Board of Directors on June 22, 2017 CHERRIOTS ADOPTED BUDGET 2017-18 As Adopted by the Board of Directors on June 22, 2017 CHERRIOTS SALEM AREA MASS TRANSIT DISTRICT TABLE OF CONTENTS Table of Contents Page Budget Message... 1 Resolution Adopting

More information

VALLEY METRO RPTA FY18 Budget EXECUTIVE SUMMARY

VALLEY METRO RPTA FY18 Budget EXECUTIVE SUMMARY VALLEY METRO RPTA FY18 Budget EXECUTIVE SUMMARY FY18 ADOPTED ANNUAL OPERATING AND CAPITAL BUDGET Valley Metro Regional Public Transportation Authority (RPTA) provides public transportation services for

More information

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0 UTP November Update - Funding Adjustments Summary (Amounts in millions) District/Division//TMA Fiscal Year Adjusted Amount Post Public Meeting Adjustments Austin 3 SH 130 Concession FY $6,500,000 3 SH

More information

Federal Assistance 13% Charges for Services 5% Appropriated Fund Balance.5% Other 3% Administration 6% Building Maintenance 3% Other 2%

Federal Assistance 13% Charges for Services 5% Appropriated Fund Balance.5% Other 3% Administration 6% Building Maintenance 3% Other 2% TRANSIT FUND The Transit Fund is used to account for the operations of the Town s public transit system. Federal Assistance 13% Transit Revenues State Assistance 12% Charges for Services 5% Appropriated

More information

Governor s FY 2017 Revised, FY 2018 and Capital Budget Recommendations House Finance Committee April 12, 2017

Governor s FY 2017 Revised, FY 2018 and Capital Budget Recommendations House Finance Committee April 12, 2017 Governor s FY 2017 Revised, FY 2018 and Capital Budget Recommendations House Finance Committee April 12, 2017 Quasi-public agency Established in 1964 Responsible: Fixed route bus service and Americans

More information

PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE

PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE November 20, 2015 Revised December 18, 2015 to reflect FAST Act PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE This is a collaborative product jointly developed by the Pennsylvania Planning

More information

FY TRANSPORTATION IMPROVEMENT PROGRAM

FY TRANSPORTATION IMPROVEMENT PROGRAM FY 2019 2022 TRANSPORTATION IMPROVEMENT PROGRAM Approved for Public Review and Comment: April 16, 2018 Approved by the Policy Board: May 21, 2018 Table of Contents Permian Basin MPO Membership and Structure...

More information