KRA 1: Revenue Management Outputs P-Indicators Indicator Baseline 2011

Size: px
Start display at page:

Download "KRA 1: Revenue Management Outputs P-Indicators Indicator Baseline 2011"

Transcription

1 KRA 1: Revenue Management Outputs P-Indicators Indicator Baseline 2011 PFMRP IV REVISED MONITORING AND EVALUATION FRAMEWORK Indicator Target 2017 Milestones 2012/ /14 Milestone 2014/15 Output 1.1: Improved quality of forecasting of fiscal aggregates for three years on a rolling Aggregate revenue out-turn compared to original approved budget (PEFA: PI-3) Actual domestic revenue collection was below 92% of budgeted domestic revenue Actual domestic revenue collection is below 94% of budgeted Undertake a study to identify ways of improving tax revenue forecast and action plan by June 2014 basis estimated in no more domestic revenue than one of the last in no more than three years. (PEFA: C) one of the last three years. (PEFA: B) Increase in number and quality of participating MDAs and LGAS with staff capable providing Less than 5% of participating MDAs and LGAS providing accurate, realistic revenue projections in 50% of participating MDAs and LGAS providing accurate, realistic A team of trainers in revenue forecasting developed by June 2014 (milestone to be reviewed in line with recommendations from the study) accurate, realistic 2010/11 revenue revenue projections projections by 2017 Output 1.2: The Government improves efficiency in domestic revenue mobilization both at the policy and the administration levels by updating legal Increase in collection of Total and non-tax revenues as percentage of GDP Total revenue collection was 16.5 % of GDP in 2010/11 Non-tax revenue was 1.2% of GDP in 2010/11 Total revenue collection will be at least 17.8% of GDP by 2013/14- Non-tax revenue will be at least 1.9% of GDP by The study on Non Tax Revenue (NTR)- Integration and Harmonization of Revenue Collection Systems completed by November Submission of a bill to Parliament to Action plan to implement the recommendations from review of non-tax collection developed by June Costed action plan incorporated in FY2015/16 for implementation

2 instruments towards international best practices 2013/14 enact Tax Administration Act for the purpose of establishing a common tax procedure among different taxes collected by Tanzania revenue authority (TRA) by Feb Take policy action to improve revenue mobilization from natural resource sectors by June Review Laws, rules and Regulations for Local Government revenue system to improve LGA s own sources in line with best practices by June, Computerized revenue collection to at least 50% from MNRT by 2016 Tax exemptions as a percentage of GDP 2.2% Target : 2012: 1.9% 2013: 1.6% 2014: 1.2% Review the current system of tax exemptions with the value-added Tax (VAT) regime and amend the VAT Act with a view to be in line with international best practices by November 2014 Output 1.4: Increase of donor funding that flows through the exchequer system by 2016 Percentage of disbursement of direct project fund portfolio via the exchequer 20% 50% National framework for managing development co-operation (Development Cooperation Framework, DCF) reviewed, disseminated and put in operation by March National framework for managing development co-operation (Development Cooperation Framework, DCF) reviewed, disseminated and put in operation by June Revised AMP user guideline clearly communicated to both parties by Dec Analysis of trends of the direct project fund portfolio disbursed via the exchequer system published and shared annually by June

3 KRA 2: Planning and Budgeting Outputs P-Indicator Indicator Baseline 2011 Indicator Target 2016 Milestones-2012/ /14 Milestone 2014/15 Output 2.1: Strengthened capacity of MDAs, RSs and LGAs in implementing program based budgeting by June Presence of Programs-based budget classification (PI-5) The 2008/09 budget formulation and execution is based on administrative and GFS compatible economic classification. There is no CoFoG-based functional classification and budget documentation and reporting system (PI- The budget formulation and execution will be based on administrative, economic and functional classification (Using at least the 10 main CoFoG functions), using GFS/CoFoG standards or a standard data can produce consistent documentation according to those standards (PI-5B) All sub programs, objectives and performance indicators defined by Dec Chart of accounts Modified to accommodate program based budgeting by August MTEF reviewed to make program based budget compatible by September Progress on the PBB Action Plan implementation annually 5C) Increase in number of MDAs and RSs with skilled staff for implementing a program based budgeting In 2011, there are no staff in MDAs and RSs with necessary skills to implement program based budgeting 95 % of MDAs and RSs have staff with necessary skills to implement program based budgeting Completed phased training for all MDAs and RSs by Sept Completed phased training for all LGAs by Sept 2016 Output 2.2: Increased effective utilization of Planning and budgeting tools by 2016 Percentage increase in number of MTEF budgets meeting the MTSPBM requirements by 2016 In 2011, less than 75% of MTEF budgets are meeting the standards of MTSPBM 98% of MTEF budgets are meeting the MTSPBM standards Sixty MDAs, 21 RSs and 133 LGA trained in MTSPBM by June Reviewed MTSPBM to be applied during FY 2013/ MTSPBM reviewed by June Sixty MDAs, 21 RSs and 133 LGA trained in MTSPBM by December

4 Orderliness and participation in the annual budget process by 2016 (PI- 11) i) A comprehensive budget calendar exists but delays are sometimes experienced. MDAs have 6 8 weeks to submit their budget ii) A comprehensive budget circular and budget preparation guidelines are issued but the MDAs ceilings are not always approved by cabinet before issue (B) i)a clear annual budget calendar exists, is generally adhered to and allows MDAs enough time (at least six weeks from receipt of budget circular) to meaningfully completes their detailed estimates on time ii) A comprehensive and clear budget circular is issued to MDAs which reflect ceilings approved by cabinet or equivalent prior to the circular distribution to MDAs(A) Annexes to budget book volume II for Executive Agencies completed by June Action plan on implementation of recommendations on budget legal framework completed by At least 10 PER Main Dialogue meetings held by June 2016 Percentage reduction In 2011, the Actual expenditure Phased training to MDAs, RSs and in deviation of actual percentage of deviated from budgeted LGAs Budget Committees on resource expenditure from deviation of actual expenditure by an prioritization and planning approved budget recurrent expenditure amount equivalent to MDAs budget at vote not more than 10% level compared to approved budget but excluding salary adjustments, contingency and debt service was at 13.7% 4

5 Quality and timeliness of in-year budget report (P-24) by 2016 Comparison to budget is possible only for main administrative headings. Expenditure is captured either at commitment or at payment stage (not both) Reports are prepared quarterly( Possibly excluding first quarter), and issued within 8 weeks of end of quarter There are some concerns about the accuracy of information, which may not always be highlighted in the Classification allows comparison to budget but only with some aggregation. Expenditure is covered at both commitment and payment stages. Reports are prepared quarterly and issued within 6 weeks of end of quarter There are some concerns about the accuracy, but data issues are generally highlighted in the reports and do not compromise overall consistency/usefulness (B) Mechanism for quality assurance of Quarterly Budget Performance Reports (level of detail, timeliness, accuracy, consistency and usefulness to decision makers, as well as for budget transparency to citizens) established by June 2013 reports, but this does not fundamentally undermine their basic usefulness (C+ Increase budget credibility (Minimise deviations in Aggregate Out-turn and Composition Government approves actions for improving budget credibility based on a review of reallocation warrants in the past four years - by Feb Budget reallocation warrants published by September every year. Variance) Output 2.4 Quality and comprehensiveness of Public Access to key Action plan for improving quality Public Access to key fiscal information: Timely publication of key 5

6 budget documentation as well as public access to key fiscal information (shifted from KRA 5.4) fiscal information and comprehensiveness of budget documentation based on PEFA assessment developed by December 2013 fiscal information as listed below: a. Budget guidelines published by December every year b. Executive budget proposal (Vol. I to IV) as submitted to Parliament published by June every year c. Approved budget (all volumes) published by September every year d. Quarterly budget execution report published within a month after end of quarter. e. Year-end budget execution report published by October every year Citizen s budget published by November every year Changes in quality and comprehensiveness of budget documentation reflected in budget documentation KRA 3: Budget Execution, Accountability and Transparency Outputs P- Indicator Indicator Baseline 2011 Indicator Target 2016 Milestones 2012/ /14 Milestone 2014/2015 Output 3.1: Number of Public None( to be % increase in number New public procurement Action plan for implementing 6

7 Strengthened public sector procurement by procurement regulations issued established after baseline study) of Public procurement regulations issued regulations prepared and issued by June 2014 PPA is developed by Dec 2014 June 2015 Number of Skilled procurement staff None( to be established after baseline study) % increase in number of skilled Procurement personnel in PEs Procurement training needs assessment exercise completed by Dec [300] procurement staff trained on public procurement by June, 2017 as per TNA Strategy to develop Procurement Management Unit (PMU) structures in Public Sector by June, Procurement and supplies staff database maintained and updated by December, 2015 Presence of procurement policy draft by June, 2013 PPDs capacity enhanced by June, 2013 None None National procurement policy developed and disseminated to stakeholders i) Motor vehicle and office equipment acquired Stakeholders comments incorporated by June, Twenty (20) members of PPPD staff equipped with skills on public policy formulation, implementation and evaluation by June, National procurement policy draft finalized by Dec PPPDs capacity enhanced by June National procurement policy developed and shared by December, National procurement policy ii) Short training for strategy developed and National procurement policy None 20 members of PPD staff 7 implemented by June Printing and uploading the NPP

8 and procurement law synchronised Stakeholders acquainted with the National procurement policy National procurement policy strategy in place by December, 2013 None None None conducted Public Procurement Act 2011 reviewed 800 Stakeholders acquainted with the National procurement policy National procurement policy strategy implemented on the website by June, National procurement policy and procurement law synchronised by June, Monitoring the implementation of the National procurement policy by June, Evaluation and feedback of the implementation of the National procurement policy by June, Stakeholders acquainted with the National procurement Policy by June, Strategy on raising stakeholders awareness on contract award, complaints/disputes developed and implemented by June 2016 Output 3.2: Strengthened capacity of MDAs, RSs and LGAs in Cash management by 2015 Increase in number of staff with adequate skills on cash management 10 staff with cash management skills 610 staff with cash management skill staff of MDAs and LGAs Trained on cash Management using standardized materials by June The 2012 supervision mission noted that the milestone may need to be reviewed and aligned after the East AFRITAC recommendations on Cash and Banking Arrangement Mission. ACGEN to confirm if this is done. 8

9 Decrease in the The aggregate number 3938 bank accounts will Six bank accounts operated by aggregate number of of bank accounts be closed by December each LGAs by December 2013 bank accounts operated by LGA are 2013 operated by LGAs by 4,736 in Strengthen monitoring of payment arrears ACGEN to present a monthly report on payment arrears to ceiling committee effective Dec 2013 Output 3.3: Strengthened public debt management capacity by 2015 Recording and management of each cash balance, debt and debt guarantees (P1-17) by 2016 i) The various databases containing debt data are currently in the process of being merged. Data quality is considered fair and minor reconciliation problems occur. For the data entered in CS DRMS, statistical reports are regularly produced (B) i) Domestic and foreign debt records are complete, updated and reconciled on a monthly basis with data considered of high integrity. Comprehensive management and statistical reports (cover debt service, stock and operations) are produced at least quarterly (A) Debt management policy developed and shared by June Capacity of 50 Public Debt management staff enhanced to undertake DSA on external, domestic debt and contingent liabilities by June Review of Government Loans, Debt Management department established by June 2016 Indicator: DSA, risk analysis, Revised Act (ceiling provisions annually) ii) The balances of several government bank accounts in commercial banks are not consolidated, though there is a plan to do so (D). ii) Calculations and consolidation of most government cash balances take place at least monthly, but the system used does not allow consolidation of bank balances (C). Guarantees and Grants Act by June

10 iii) Contracting of loans and issuing guarantees is approved by Minister of MOF in line with rules, but there are no ceilings (C) iii) Central Government s contracting of loans and issuance of guarantees are made within limits for total debt and total guarantees (B). Management of risk emanated from Contingent liabilities created by PA & OB's by June Quarterly detailed report on public debt published on disclose on its website with information on both domestic and external debt, all outstanding loans guarantees Quarterly monitoring of contingent liabilities of PA&OBs Annual monitoring of guarantees approved by GoT for PA&OBs and for PPP financed projects Detailed and quarterly debt report prepared and published. granted by the GOT, all liabilities of those PA&OBs owned by the GOT, and outstanding borrowings by PA&OBs from the Public Pension Funds with GOT guarantee Output 3.4: Improved integrity and content of government financial statements and the migration from IPSAS cash to IPSAS accrual Quality and timeliness of annual financial statements (PI-25) i) Central Government final accounts include revenue, expenditure and bank balances, and since 2007/08 data on most financial i) Central Government final accounts disclose full information on revenue, expenditure and bank balances, financial assets and Completed review of the IPSAS guideline issued by PMORALG in 2008/09 to accommodate the recent IPSAS updates by June 2013 (MOVED TO PMO-RALG) Public Finance Act of 2001 and Regulations reviewed to address migration to IPSAS accrual by June Consolidated template of financial statements to include MDAs, Rs, LGAs, Controlled 10

11 accounting for all government accounts is progressing in accordance with plans. assets and liabilities are disclosed with few exceptions. (B) ii) Financial Statement are submitted for external audit within 6 months of the end of fiscal year. (A) iii) Cash basis IPSAS has been applied since 2007/08. (B liabilities (A) ii) Target for staff and iii) (ii)financial Statements are submitted for external audit within 6 months of the end of fiscal year. (A) IPSAS applicable to all financial statement Training to the MDAs, RSs and LGAs accounting officers to develop awareness on IPSAS Accrual by June Capacity building to 250 staffs from MDAS and RSs and Embassies to enhance skills in IPSAS accrual by 2014 entities &GBEs developed by June 2016 Stage of the transition confirmed against approved action plan. Reports of the Auditor General confirm improvement The decision to transition all government accounts to full accrual accounting has been made but detailed action plan has not been finalized or approved Government accounts received an adverse opinion. Central Government final accounts include revenue, expenditure and bank balances, and since 2007/08 data on most financial assets and liabilities are disclosed with few exceptions. (B) IPSAS Accrual migration action plan has been completed approved and is in process of execution. Implementing migration plan as targeted. Quality and integrity of government financial statements is improved as evidenced by the reports of the Auditor General Financial Statements are submitted for external audit within 6 months of the end of fiscal year. (A) government accountants in MDAs /LGAs trained in IPSAS accrual and accrual modules for Epicor by September Plan for migration towards IPSAS Accrual accounting is completed by December Plan is approved for execution and stakeholder information sessions have been completed by January All legislative and policy supports decisions have been identified by December Milestones for the transition have been identified and approved (e.g. Public Finance Act.2001 and Regulations amendments) by October Consolidated accounts with IPSAS Accrual by June ACGEN to compile and produce financial statements disaggregated on the basis of economic classification and by sectors 11

12 Financial Statement are submitted for external audit within 6 months of the end of fiscal year. (A) Cash basis IPSAS has been applied since 2007/08. (B) Output 3.5: Improved accountability in management of Government Assets for supporting migration to IPSAS Accrual Number of MDAs which are now reporting their financial position through IPSAS Accrual Number of MDAs which have been valued and uploaded in the EPICOR None 20 MDAs (28%) have been valued and uploaded in EPICOR % increase of MDAs reporting their financial position through EPICOR asset management module by 2016 (Targets to be set after migration action plan towards IPSAS Accrual Accounting is completed) % increase of MDAs valued and uploaded in EPICOR by June 2016 (Targets to be set after migration plan towards IPSAS Accrual Accounting is completed) Asset Management (tracking) software installed, tested and users are trained on use of software by June Uploading of asset information for 70 additional MDAs in SAGE by June GAM capacity enhanced on asset management function by June Asset Management Policy and Strategy developed and submitted by June Valuation of Government assets in 34 MDAs and RSs completed by June 2017 KRA 4: Budget Control and Oversight Outputs P-Indicator Indicator Baseline 2009 Indicator Target 2016 Milestones 2012/ /14 Milestone 2014/15 12

13 Output 4.1: Increased coverage and quality of the internal audit functions by 2016 Percentage increase in unqualified opinion in the external audit report for MDAs and LGAs 54% of MDAs and 65% LGAs obtained unqualified opinion in 2009/ % MDAs and 75% LGAs will get unqualified opinion in 2015/2016 % of IAUs conforming with IAGD guidelines which are based on international standards Internal audit manual/guidelines, standards and quality assurance improvement programme, which complies with international standards and best practices, will be in place by June Internal auditors trained Quality Assurance and Improvement Programme Procedures Manual by June Independent quality assurance assessment of (Internal Audit Units) IAUS in MDAs and LGAs completed by June 2016 Effectiveness of internal audit (PI-21) i) Internal audit function exists in most MDAs, and it is estimated that 20 percent of staff time is allocated to system based reviews and high risk areas (C) ii) Reports are issued for Most MDAs but these are not copied to NAO (C) iii) To some i) Internal audit is operational for all Central and Local government entities, and generally meet professional standards. ii) At least 50% of staff time is allocated to system based reviews and high risk areas. iii) Reports adhere to a fixed schedule and are distributed to the audited entity, Ministry of Finance and NAO (B) The Pilot stage of Computerised Audit will be finalized by June Effective IAU and audit committee established and internal auditors conduct compliance audit and evaluate effectiveness of internal control in MDAs and LGAs by June The Pilot stage of Computerised Audit will be finalized by June Computerised Audit in place by June

14 degree actions are taken by management on major issues but often with delays (C) iv) Action by management on internal audit findings will be taken within one month after issuing a report and should be comprehensive across Central and Local government entities (B) Technical Audits conducted for 20 Projects in Technical Audit conducted by Technical Audits are conducted for 70 Projects by June, 2016 Ensure agreed corrective measures in response to audit findings are taken Improve adherence to financial regulations and controls - Continue to monitor compliance with IA benchmarks Number of staff equipped with skills on risk-based audit 31 (10%) IAUs in MDAs and LGAs have submitted quarterly reports with reference to CAG follow-up 100 staff trained in risk based internal audit % of MDAs and LGAs have submitted quarterly reports with reference to CAG follow-up 550 internal audit staff are trained in risk based audit Implementation status of corrective measures for internal and external audits (CAG recommendations) submitted by all the IAUs in MDA/LGA to IAGD on quarterly basis by June internal auditors and other stakeholders trained in risk management process and risk 14

15 Capacity enhancement on guidelines for Fraud Risk Management, Internal Control, Risk management Monitoring and Evaluation 300 Accounting Officers, Head of Departments, Audit Committee members and internal Auditors on the guideline for Fraud Risk management, Internal control, Risk Management Monitoring and Evaluation Study based audit by June, To train 300 Accounting Officers, Head of Departments, Audit Committee members and internal Auditors on the guideline for Fraud Risk management, Internal control, Risk Management Monitoring and Evaluation by June Study to assess the ICT needs for effective internal audit management and control by June recommendations to inform next course of action Output 4.2: Strengthened External audit functions by 2016 NAO reaches AFROSAI-E Level 3 Increase in number of NAO staff capable of issuing audit reports as per Level 2 NAO did not reach at level 3 in 2010 as planned because of lacking two criteria. Out of 10 criteria, NAO cleared 8criteria. Other 2 criteria are (1) NAO staff should not be Civil Servants, and (2) Appointment of CAG by the Parliament. The 2005 assessment scored NAO as level 1. A committee was formed to conduct NAO to reach Level 3 by 2016 Capacity of NAO audit service strengthened by % of Auditors to have be accommodated in own offices 800 Auditors trained on Risk Based Audit and 400 in IT audit Five value for money audit reports to be produced each year by Auditors trained on Risk Based Audit and 200 in IT audit by Two (2) Value for Money audit reports to be produced each year by NAO staff without technical assistance from external consultant by Auditors trained on international standards of auditing and full adoption of International Audit Standards by Auditors trained on international standards of auditing and full adoption of International Audit Standards by % of auditors are moved from auditee premises to NAO offices by

16 international technical and professional practices Value for Money Audits to be conducted by NAO staff with minimum technical support by external Consultant legal review and will submit a report on needs of legal amendments to reach at level 3. The committee members visited South Africa, Kenya and Uganda. Most Auditors are accommodated in Auditees premises NAO staff without technical assistance from external consultant 800 auditors trained on International standards of auditing and Full adoption of International audit standards Adoption and application of 100 Auditors trained on Risk Based Audit International auditing Standards in all audit assignments One VFM report is produced by NAO staff each year without technical assistance by external Consultant 200 auditors trained on International standards on auditing (ISSAI, IPSAS.ISSAI,IFRS,ISA) Number of MDAs. LGAs and Parastatals reached for financial audit All 86 MDA, 134 LGAs and about 122 Parastatals were covered by Financial All MDA, LGAs and Parastatals are covered by Financial Audits by Closing of books of accounts for Parastatals harmonized and audit modalities agreed by Closing of books of accounts for Parastatals harmonized and audit modalities agreed by

17 Audits. Scope, nature and follow-up of external audit (PI-26) by 2016 Increased application of ICT in auditing and connectivity (by Wide Area Network ) of NAO offices i) In the last three years, the audit report, including consolidated financial statements of government, was presented to the legislature six months after the receipt of financial statements (B) ii) No electronic system currently exists to consolidate and easily access data regarding outstanding audit findings and recommendations, including their age. 20 staff trained on ICT application in auditing NAO offices are not connected i) Audit reports are submitted to the President within 9 months (per the Public Audit Act) of after the end of the financial year. ii) Fully operational and easily accessible database to support Government s efforts to reduce outstanding matter(findings and recommendations). 600 Auditors trained on Audit Commanding Language (ACL) and other audit based software Audit methodology in line with ISSAIs guidelines adopted by June Scoping study to ascertain the parameters of the outstanding matters database is completed by November Establish a database that will separate findings (monetary and non monetary) and recommendations including by age, and record follow Up actions (ice matters closing) by December Auditors trained on audit commanding language (ACL) and other audit based software by NAO Headquarter is connected to 10 Regional offices using WAN by Scoping study to ascertain the parameters of the outstanding matters database is completed by November Two of five Team Mate modules applied in auditing by October 2015 One TeamMate module (Electronic working papers) is applied in auditing NAO Headquarters is connected by all 21 regional offices using WAN by 2016 All five Teammate 17

18 modules applied in auditing by 2016 Output 4.3: Improved transparency on audit reports (central, local and parastatal levels) to strengthen scrutiny and accountability. Citizen Audit Report (simplified audit reports accessible by the general public) are published 4 Consolidated audit reports (central, local, POABs and VfM/Performance) are publicly available on the NAO website after tabling. NAO set up a booth at Trade Fair (Saab Saba) and Public service week where general audit reports are distributed to visitors. All General audit reports are accompanied by a citizens audit report (short summary of the key audit findings and recommendations, in both Swahili and English) and are available in a timely manner (within 4 weeks after tabling) on the NAO website and at NAO offices all over the country by Citizen audit reports published annually for the 5 General audit reports two months by June 2017 Output 4.4: Improved performance of parastatals by June Increase in number of Parastatals implementing performance contracts by June Parastatals (TRL & TPA) were implementing Performance contract in 2009 All Parastatals will be implementing Performance Contracts by June Ten Pilot Parastatals Signed Performance contracts with TR by June Ten Pilot Parastatals Signed Performance contracts with TR by December 2014 Oversight of aggregate fiscal risk from other public sector entities (PI-9) by 2016 There is weak Monitoring of Parastatals as their final number is still to be established and All Parastatals will submit fiscal reports including audited account to TR and consolidates overall Database on Parastatals set up and functioning by December M&E mechanism for measuring Parastatals compliance rate set

19 Increase compliance rate on TR s Act by Parastatals by June 2016 their consolidated overview is missing Compliance rate on TR s Act by Parastatals fiscal risk issues into an Annual TR Financial Statements (B) Compliance rate on TR s Act will be 100% by June 2016 up, reviewed and implemented by June is below 70% in 2010/11 (PI-9: D) Increase in Revenue from Parastatals as percentage of Approved domestic revenue collection Revenue from Parastatals was 0.55 % of total approved domestic revenue collection in 2010/11 Revenue from Parastatals will be 4% of total approved domestic revenue collection by June New TR's Bill presented to the Parliament by June Parastatals Acts Reviewed to be in line with the New TR Act by June TR s Office Capacities enhanced by June 2015 Output 4.5: Strengthened capacity Number of PAC members trained Evidence of PAC members making Capacity building interventions to PACs conducted annually of oversight functions follow-up on financial of Parliamentary audit recommendations Accounts Committee in in the respective MDAs Tanzania Mainland and LGA Output 4.6: Improved public procurement performance by PEs by 2015 Average level of compliance of i) all procuring entities (for follow-up audits) and ii) the top 20 procuring entities with the (revised) Procurement Act Old target (63% +75%)/2=68% i. 66 % of tenders under open tendering process were advertised in fiscal year 2006/2007 (B) Target will be based on new set of indicators +20% of baseline (new BL by October 2012) i) Accurate data on the method used to award public contracts exists Revised procurement implementation and monitoring tools issued by March PPRA operational and outreach Annual PPRA audit results confirm positive trend on a yearly basis New Public Procurement Act, 2011, Regulations and Tools disseminated to major PEs and other key stakeholders by 19

20 2011 Competition, value for money and controls in procurement (PI 19) Increase in number of PEs using e- procurement system (PMIS) ii. Using less competitive procurement methods is allowed with justification. PPRA audits in 2008/09 show that the great majority of contracts now use the correct methods (B) iii. A comprehensive complaints mechanism operates, but for unknown reasons the number of complaints has declined (B) Currently, 203 PEs are using PMIS (Procurement Management Information System) and shows that more than 75% of contracts above the threshold are awarded on the basis of open competition(a) ii) Other less competitive methods when used are justified in accordance with clear regulatory requirements (A) iii) A process (defined by legislation) for submission and timely resolution of procurement process complaints is operative and subject to oversight of an external body with data on resolution of complaints accessible to public scrutiny (A) 393 PEs will have a functional PMIS and pilot e-procurement system will start functioning by Nov capacity strengthened by June 2014 December Procurement plans aligned with MDAs, LGAs and parastatal Institution Strategic plans by June Value for money procurement enhanced through Framework contract in procurement of common use items and services by June PPRA operational and outreach capacity strengthened by June All (493) PEs will have a fully functional PMIS as a reporting tool for procuring entities to report back to PPRA by Nov e-procurement will start functioning as pilot stage by Nov 2016 Increase in number of PEs reached for procurement audit Currently 330 PEs have already been audited. In June 2012 all 393 PE s will be audited, then beyond F/Y 2012/2013 will be Follow-up Completion of audits of one-third of all PEs annually (current total PEs: 493) Follow up audit of 100 PEs to be 20

21 Audits (should be repeatedly process especially on Top 20 PE s done annually by Annual Procurement Performance Evaluation Report prepared and published Annually Output 4.7. HCMIS entrenched in service delivery points in selected sectors and its sustainability attained HCMIS ownership at SDP for effective accountability, HR Management, Budget expenditure and Payroll in the relevant sectors. Human error and checks and balances reinforced in the management of payroll through improved systems User requirements, gap analysis and Infrastructure requirements identified for 160 SDP undertaken by October Installation of HCMIS at 160 SDP by June 2016 KRA 5: Change Management and Programme Monitoring and Communications. Outputs P-Indicator Indicator Baseline 2011 Indicator Target Milestone ( ) Milestone (2014/15) Output 5.1: Coordinate Integration, interfacing and rationalization of Government financial systems. Interface central and local Government financial management system and tools MDA /LGA IFMIS systems are not harmonized and or integrated and are not being centrally DFISM with overarching technical control for all government IFMIS systems is fully staffed and operational Integration/ Interfacing plan is engaged and series of planned actions are being executed and completed by October, 2015 managed. Stand alone software continues to be acquired and implemented. ICT Infrastructure capable of supporting approved systems architecture is in place All Government 21

22 financial systems ( SBAS, PlanRep, RIMKU, IFMS) have been integrated and interfaced and financial data is smooth exchanged between systems. 162 LGAs, 25 RSs and 3 institutions under PMO RALG connected with IFMIS by Dec.2015 Evidence of analytical reports generated from the system available at MDAs and LGAs level 133 LGAs are connected to the IFMS 133 LGAs, 21 RSs and 3 PMORALG institutions could produce. Operation Reports, and Management Reports 167 LGAs, 25 RSs and 3 institutions will be connected to the IFMS 162 LGAs, 25 RSs and 3 Institutions will be able to produce; Operation Reports Management Reports Final account reports (Financial Statements), and Other reports like Council financial and development report s (CFR & CDR), Mkukuta MoF IFMS (EPICOR) linked to PMO-RALG IFMS to the immediate capture of the Approved Budget and all Exchequer transfers to RSs and LGAs respectively by June Completed capacity building to key users of IFMS from the new 35 LGAs, RS and PMORALG institutions by June IFMS infrastructure installed to new 35 LGAs, RSs and PMORALG institutions and connected to central server at Dodoma and MoF by Dec IFMS infrastructure installed to new 35 LGAs, RSs and PMO-RALG institutions and connected to central server at Dodoma and MoF by Dec Audit of IFMS in LGAs conducted by June

23 Output 5.2: Utilization of EPICOR modules Increased from seven to ten Upgraded version of EPICOR with ten modules in-place. The new modules are: Multi Site Management. Replication Server License. Advanced Financial Report Designer EPICOR module are not fully utilized strategies implementation report by target, etc. Upgraded EPICOR with ten modules in-place EPICOR system upgrade completed by December ACGEN staff capacity enhanced by December Training for IFMS end users on the upgraded modules conducted by December Output 5.3: All software development and module upgrades are coordinated with the overarching plans for ICT integration. Number of systems that are linked into an IFMIS platform and available for common use ICT Planning is single purpose and not coordinated with other harmonization activities All software development is integrated within a fully rationalized ICT architecture FISM is operationalized and controls are put in place to manage software acquisition and development by FISM staff capacity enhanced by June, Output 5.4: Improved communication and public access to key fiscal information to stakeholders Public access to key fiscal information: 1. Annual budget documentation, 2. In-year budget execution reports, 3. Year-end financial statements, The government makes available to the public 5 out of 6 types of information, but two of them are not complete: in-year budget execution reports and contract awards. The government makes available to the public 5 out of 6 types of information- (A) Special surveys undertaken within the last 3 years have MoF Communication Strategy developed and implemented by June Support the Budget Division and Policy Analysis Division to publish the relevant budget documents and fiscal information Develop an action plan to modernise MoF website (structure, content and user friendliness) by 23

24 4. External audit reports, 5. Contract awards, 6. Resources available to primary service delivery units (PI-10) Resources available to primary service providers are not published (A) Special surveys were undertaken within the last three years, but their results and methodologies used have not been seen (D) demonstrated the level of resources received in cash and in kind by either primary schools or primary health clinics covering a significant part of the country OR by primary service delivery units at local community level in several other sectors June 2015 (C) Output 5.5: Coordination and Standardization of PFM Training Achieved. Number of trained staff in PFM Quality of service delivery from trained staff. None None... of staff trained Presence of trained staff providing quality service Capacity building Plan developed and shared with key Stakeholders by Feb An impact assessment of PFM training is conducted to measure staff performance following various trainings by June 2015 Output 5.6: PFMRP component Managers are being guided by detailed multi-year operating plans. Program components are completed in sequence based on priority and the reform is keeping pace with the agreed milestones PFMRP component activities are not always derived from and/or described within the context of detailed component operating plan Relevance, sequence and costs are difficult PFM activities are governed by multi-year component operating plans that provide context for relevance, sequence and cost All activities are presented for inclusion in PFMRP annual work plan are presented within the context of a detailed multi-year operating plans annually to assess 24

25 Output 5.7: PFM activities are effectively planned and implemented Component managers have capacity to develop and manage strategic operational plans. Component Component managers have not had the necessary level of capacity development in strategic planning and results based management 150 staff from KRAs trained on change management and strategic planning. 60 staff trained on RBM methods Training on Change Management and Strategic Planning completed by December Results Based Management training has been delivered to 60 PFM RP Component managers by June 2015 managers have developed capacity in the use RBM methodology Output 5.8: Effective coordination of activities and support provided to the program implementers Secretariat support is facilitating program performance. Under resourced secretariat with short term contract Functional secretariat providing a range of needs based program supports Secretariat work plan is completed annually alongside the PFMRP annual work plan PFMRP coordination secretariat facilitated annually. Output 5.9: PFM Program oversight and review is being guided by clearly defined Milestones derived from an agreed M&E framework, Performance expectations for each component are clearly defined and understood by all stakeholders Performance expectations are not clear and the absence of context makes qualitative aspects of program oversight difficult. Approved M&E framework sets out clear and relevant performance expectations Annual review and amendment of the M&E framework to ensure ongoing congruence and relevance annually Output 5.10: All major PFM reforms have been coordinated with and informed by the relevant government and DP stakeholder groups Stakeholders have knowledge of reforms and change initiatives that will impact on them or their units and are collaborating or Coordination of major reforms with stakeholder groups is not prioritized. Significant information Major PFM reforms are all supported by a communication / collaboration strategy which ensures that all stakeholders have the PFM information session completed to disseminated results of: ICT mapping exercise, ICT Harmonization Integration Plan by March 2013; IAG action plan, ACGEN s Plan to transition to Accrual Accounting 25

26 supporting implementation. Stakeholders have adequate time to develop the necessary adaptive capacity. and capacity gaps exist. opportunity to provide input and to receive necessary information in time to adapt to the change Dec.31st each year Minimum of one PFM reform information day conducted for CSOs, DPs and GoT during Public Service day annually Change resistance is minimized Output 5.11: PFMRP implemented efficiently and effectively through result based management approach. Comprehensive annual work plan and budget Progress report on place on 15th day after end of quarter Strong and effective dialogue structure Number of coordinated dialogue meeting Approved by August annually Progress report in place Weak dialogue structure 6 meeting Work plans and budgets are approve by June annually Funds are released by July 1/annually Periodic report prepared quarterly Presence of strong and effective dialogue structure as per MoU. Working Group and Joint Steering Committee meetings are attended by KRAs decision makers PFMRP implemented according to annual work plan and milestones are being met Annual supervision mission are conducted by Sept 30 of each year commencing Independent program evaluations are completed towards end 2014/ Dialogue structures are working as evidenced by combined DP/GoT surveys/independent evaluations to ensure effective program implementation. KRA teams are meeting monthly schedule. 26

27 Donor representatives are well informed on reform initiatives. Output 5.12: National systems and processes for intergovernmental transfers to LGAs Streamlined and rationalized System and processes are documented with target timelines for each process step. No overall view of systems and processes for intergovernmental transfers. Flow of funds and information on the same is not in parallel and tied to one system. In 2010 it took 7days for funds to reach MDAs and RSs (after receipt of complete set of fund request). Effectiveness and efficiency of the system has increased Number of key actions implemented (Target to be set after mapping exercise) Decreased number of days of fund transfer time to RSs LGAs and MDAs TORs (for Streamlining and rationalizing National systems and processes for intergovernmental transfers to LGAs) completed by July Mapping commences September Review and mapping of the systems and processes for intergovernmental transfers initiated with inception report finalized by October Reports to be produced annually by end September. Share of Non-salary (OC+DEV) funds released to RSs and LGAs by end Q3, as percentage of the Resources budgeted and available (OC+DEV) for the year 42.1% of resources available to RSs and LGAs at Q3 70% of resources available to RSs and LGAs at Q3by Comprehensive and sequenced action plan on a recommendation of the mapping exercises on the intergovernmental transfers finalized by June Output 5.13: Strengthened Public Financial Management Support to jointly (DPs, ZNZ and MoF) agreed Strategic plan on PFM reform in Zanzibar 27

28 Reforms in Zanzibar by 2016 KRA 6: LGA REFORM SUB PROGRAMME Outputs P-Indicator Indicator Baseline 2011 Indicator Target Milestone ( ) Milestone (2014/15) Output 6.1: Strengthened capacity of local government authorities to collect revenue by 2015 Local Government Own source revenue to GDP Actual revenue collection by LGAs 2010/11: Tsh 158,280 million and 0.46 % of GDP Local Government Own source revenue will be 1.5% of GDP Completed assessment and evaluation of revenue potential for all major own sources of revenue to all LGAs by June Local Authorities Tax Establishment of known and clear revenue data base by each source of revenue, presence of trained personnel and a clear follow up arrangement at PMORALG and RS levels by June, 2015 administration teaching and practice modules established and TOT completed for all finance management staff at the regional level by June PMO - RALG staff and Finance Management Officers at RS to be trained in tax revenue plans and budgets to spearhead LGAs tax reviews and reforms. June Four (4) Revenue Accountants, 3 Council management team members and 1 FMO from each LGA and RS are trained on own source revenue management by June Local Government legislation reviewed by 2016 (Act No. 7, 8 The last amendment of the Local Government Finances Local Government Finances Act No Completed a study on the effectiveness, relevancy and A bill for an act to attend the Local Government Finances Act No.9 of 1982 is finalized and 28

29 and 9) Act No.9 of 1982 was done in year The act does not adequately address issues of equity, change of technology and other reviewed by 2014 sufficiency of the provisions of the Local Government Finances Act No. 9 by June 2014 submitted to the Cabinet by Nov Improvement of Financial management in LGAs by June 2015 administrative issues to enhance local revenue mobilization considering the present and future LGAs circumstances. Output 6.2: Strengthened capacity of LGAs for MTEF preparation by 2015 Comprehensiveness of information included in budget documentation (PI-6) Various studies in fiscal transfers and decentralization process in Tanzania indicate that Budget allocation to LGAs reflects a more inequitable distribution of resources to LGA, and that the Currently there no sufficient information on LGAs revenue planning and budgeting which is included in the budget documentation. Currently budget allocation formula follow, population, land area and poverty level, Supportive and verifiable revenue data and information to be included in the LGAs budget documentation. Budget allocation formula reflects resource needs, distances from service facilities, special area diseases, number of projects to be implemented, number of orphans etc Recommendations of various studies on LGAs budget allocation formulas reviewed by June Agreement on improvement of LGAs budget allocation formulas among the Sector Ministries (PMO-RALG, MOF, PO-PSM and Sectors) completed by June, Proposal for budget information to be included in the Budget guideline to be submitted to National Budget Guideline committee by October annually All LGAs budget allocation formulae reviewed by June, All reviewed LGA budget allocation formulae applied in the budget preparation during 2014/15 for the FY 15/16 budget Monitoring arrangements in place for measuring deviations in actual releases against all formula-based allocations to LGAs for FY 15/16. allocation formulae 29

30 are not fully applied. There is a need to revisit all the existing budget allocation formulae to clearly reflect equitable allocation of financial resources by June Output 6.3: LGA (and LLGs) receive 40% of development budget allocation within five months of financial year and 90% of development budget within 10 months of financial year by June 2017 Output 6.4: Own revenue mobilization by LGAs doubled in three years by June 2017 Output 6.5: PFM capacity in Improve the fiscal transfer mechanism and monitoring of Fiscal Transfers from Central Government to LGAs Monitoring of resource flows from LGAs to LLGs Tax payers database (i-tax) rolled out across all LGAs Create a cadre of regional PFM champions

Public Financial Management Reform Programme (PFMRP) Joint Supervision Mission AIDE MEMOIRE (REPORT) FINAL. 16 Sept 1 Oct 2013

Public Financial Management Reform Programme (PFMRP) Joint Supervision Mission AIDE MEMOIRE (REPORT) FINAL. 16 Sept 1 Oct 2013 Public Financial Management Reform Programme (PFMRP) Joint Supervision Mission AIDE MEMOIRE (REPORT) FINAL 16 Sept 1 Oct 2013 4 Dec 2013 List of Acronyms (Not exhaustive) AccGen AFROSAI-E BoT CAG CPAD

More information

FIVE YEAR MEDIUM TERM STRATEGIC PLAN FOR THE PUBLIC FINANCE MANAGEMENT REFORM PROGRAMME (PFMRP) PHASE V 2017/ /22

FIVE YEAR MEDIUM TERM STRATEGIC PLAN FOR THE PUBLIC FINANCE MANAGEMENT REFORM PROGRAMME (PFMRP) PHASE V 2017/ /22 FIVE YEAR MEDIUM TERM STRATEGIC PLAN FOR THE PUBLIC FINANCE MANAGEMENT REFORM PROGRAMME (PFMRP) PHASE V 2017/18-2021/22 SEPTEMBER, 2017 i ii Table of Contents ABBREVIATIONS AND ACRONYMS...v Foreword...

More information

PEFA Training. Dakar, Senegal January & February 1, #PEFA. PEFA Secretariat

PEFA Training. Dakar, Senegal January & February 1, #PEFA. PEFA Secretariat www.pefa.org #PEFA PEFA Training Dakar, Senegal January 30-31 & February 1, 2019 PEFA Secretariat Improving public financial management. Supporting sustainable development. INTRODUCTION Introductions Participant

More information

The United Republic of Tanzania Ministry of Finance. Memorandum of Understanding. Between. The Government of the United Republic of Tanzania

The United Republic of Tanzania Ministry of Finance. Memorandum of Understanding. Between. The Government of the United Republic of Tanzania The United Republic of Tanzania Ministry of Finance Memorandum of Understanding Between The Government of the United Republic of Tanzania And Development Partners In Support of The Public Finance Management

More information

Overview of the Budget Cycle. Karen Rono Development Initiatives

Overview of the Budget Cycle. Karen Rono Development Initiatives Overview of the Budget Cycle Karen Rono Development Initiatives Outline The national budget: what it is, and how it should look like The budget Process: what are the 4 main stages of the process Why do

More information

Assessment of reallocation warrants in Tanzania

Assessment of reallocation warrants in Tanzania ANALYSIS OF REALLOCATION WARRANTS Final report: Assessment of reallocation warrants in Tanzania July 2014 Scanteam: Team leader Torun Reite and team member Erlend Nordby ANALYSIS OF REALLOCATION WARRANTS

More information

Republic of Trinidad and Tobago Public Expenditure and Financial Accountability

Republic of Trinidad and Tobago Public Expenditure and Financial Accountability Republic of Trinidad and Tobago Public Expenditure and Financial Accountability Public Financial Management Performance Assessment Report Final Report Client: European Commission Delegation Trinidad and

More information

PUBLIC EXPENDITURE MANAGEMENT COUNTRY ASSESSMENT AND ACTION PLAN (AAP) TANZANIA

PUBLIC EXPENDITURE MANAGEMENT COUNTRY ASSESSMENT AND ACTION PLAN (AAP) TANZANIA DRAFT PUBLIC EXPENDITURE MANAGEMENT COUNTRY ASSESSMENT AND ACTION PLAN (AAP) TANZANIA PREPARED BY THE STAFF OF THE IMF IN COLLABORATION WITH WORLD BANK STAFF AND THE TANZANIAN AUTHORITIES 1 July, 2004

More information

Public Financial Management

Public Financial Management UNITAR Mustofi Fellowship Hiroshima, Japan 18 22 February 2012! Index! Overview and Objectives! Limitations and Problems! Public Financial Systems! Financial Management System Boundaries! Framework! Government

More information

Reforms to Budget Formulation in Uganda

Reforms to Budget Formulation in Uganda Reforms to Budget Formulation in Uganda The challenges of building and maintaining and a credible process Tim Williamson tim@praxisdevelopment.net 1 Why Uganda? Successful Reforms to Public Expenditure

More information

IMF EAST AFRITAC FY 2018 WORK PLAN REVENUE ADMINISTRATION

IMF EAST AFRITAC FY 2018 WORK PLAN REVENUE ADMINISTRATION IMF EAST AFRITAC FY 2018 WORK PLAN REVENUE ADMINISTRATION Beneficiary Strategic Objective Topic Objective Activity Title Outcome Milestone AFE Complete AFE corporate activities Complete AFE corporate activities

More information

Limited Repeat and Sectoral PEFA Trinidad and Tobago. Final Report. Volume 1 - Central Government

Limited Repeat and Sectoral PEFA Trinidad and Tobago. Final Report. Volume 1 - Central Government Limited Repeat and Sectoral PEFA 2013 Trinidad and Tobago Final Report Volume 1 - Central Government January 2014 The contents of this publication are the sole responsibility of ACE International Consultants

More information

The World Bank Ghana: Public Financial Management Reform Project (P151447)

The World Bank Ghana: Public Financial Management Reform Project (P151447) Public Disclosure Authorized AFRICA Ghana Governance Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 27-Dec-2016 ISR26534 Implementing Agencies: Ministry of Finance

More information

GHANA AID HARMONISATION AND EFFECTIVENESS MATRIX

GHANA AID HARMONISATION AND EFFECTIVENESS MATRIX Ownership Ghana Action Plan (1) Countries have operational development strategies Coherent long-term vision CDF methodology: Medium term strategy derived from vision Country specific development targets

More information

LOCAL GOVERNMENT DEVELOPMENT GRANT (LGDG) SYSTEM

LOCAL GOVERNMENT DEVELOPMENT GRANT (LGDG) SYSTEM THE UNITED REPUBLIC OF TANZANIA PRIME MINISTER S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT LOCAL GOVERNMENT DEVELOPMENT GRANT (LGDG) SYSTEM PROPOSED CHANGES AND RECOMMENDATIONS FOR EFFECTIVE

More information

Ghana Harmonisation and Aid Effectiveness Action Plan 1

Ghana Harmonisation and Aid Effectiveness Action Plan 1 Ghana Harmonisation and Aid Effectiveness Action Plan 1 Group A: Country Environment National strategy (indicator 1) Country Fiduciary Systems (indicator 2a + 2b) Country Results Framework (indicator 11)

More information

Module 2 Planning and Budgeting Processes

Module 2 Planning and Budgeting Processes Module 2 Planning and Budgeting Processes 7 HOURS By the end of this module, the participants will have: LEARNING OUTCOMES discussed the process of budget decision-making in Kenya, focusing on public participation;

More information

International Monetary Fund Washington, D.C.

International Monetary Fund Washington, D.C. 2010 International Monetary Fund May 2010 IMF Country Report No. 10/138 November 2009 January 29, 2001 January 29, 2001 January 29, 2001 January 29, 2001 Maldives: Action Plan for PFM Reforms Based on

More information

Financing (In USD Million) Financing Source

Financing (In USD Million) Financing Source Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 06-Dec-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED

More information

PUBLIC EXPENDITURE REVIEW

PUBLIC EXPENDITURE REVIEW ANNUAL NATIONAL POLICY DIALOGUE PUBLIC EXPENDITURE REVIEW MEDIUM TERM STRATEGY AND CROSS CLUSTER MTEF December 3, 2010 1 Outline Introduction Recent economic performance Public financial management Budget

More information

LAGOS STATE PUBLIC FINANCIAL MANAGEMENT WORK PLAN AND MATRICES. Priority 1: BUDGETING

LAGOS STATE PUBLIC FINANCIAL MANAGEMENT WORK PLAN AND MATRICES. Priority 1: BUDGETING LAGOS STATE PUBLIC FINANCIAL MANAGEMENT WORK PLAN AND MATRICES Priority 1: BUDGETING Strategy Budgeting is a key process in translating government policies, programmes and activities into real services

More information

COUNTRY RESULTS FRAMEWORK KENYA. By Monica Asuna Resource Mobilization Department National Treasury KENYA

COUNTRY RESULTS FRAMEWORK KENYA. By Monica Asuna Resource Mobilization Department National Treasury KENYA COUNTRY RESULTS FRAMEWORK KENYA By Monica Asuna Resource Mobilization Department National Treasury KENYA Working Definition of GPI R&MA A country Results Framework (CRF) is an institutionalized and functioning

More information

THE UNITED REPUBLIC OF TANZANIA

THE UNITED REPUBLIC OF TANZANIA THE UNITED REPUBLIC OF TANZANIA GUIDELINES FOR THE PREPARATION OF ANNUAL PLAN AND BUDGET FOR 2014/15 IN THE IMPLEMENTATION OF THE FIVE YEAR DEVELOPMENT PLAN 2011/12-2015/16 Issued by: President s Office,

More information

JORDAN. Terms of Reference

JORDAN. Terms of Reference JORDAN Terms of Reference Jordan: Strengthening municipal financial management systems to sustain service delivery in municipalities affected by the refugee crisis Assessment of Municipal Public Financial

More information

Country Public Financial Management System Assessment. Republic of Armenia: Seismic Safety Improvement Program

Country Public Financial Management System Assessment. Republic of Armenia: Seismic Safety Improvement Program Country Public Financial Management System Assessment Project Number: 49078 Loan Number(s): June 2015 Republic of Armenia: Seismic Safety Improvement Program ABBREVIATIONS ADS - Armenian Development Strategy

More information

PEFA Handbook. Volume III: Preparing the PEFA Report FINAL VERSION

PEFA Handbook. Volume III: Preparing the PEFA Report FINAL VERSION PEFA Handbook Volume III: Preparing the PEFA Report FINAL VERSION March, 2016 PEFA Secretariat Washington DC USA 1 P age Preface PEFA 2016 HANDBOOK About PEFA The Public Expenditure and Financial Accountability

More information

Policy Forum January December 2012 Annual Work plan

Policy Forum January December 2012 Annual Work plan Policy Forum January December 2012 Annual Work plan OBJECTIVE 1: The effectiveness of the accountability system including planning, expenditure, performance, integrity and oversight of government at both

More information

SPECIFIC TERMS OF REFERENCE. EU contribution to 2012 Federal PEFA assessment in Pakistan

SPECIFIC TERMS OF REFERENCE. EU contribution to 2012 Federal PEFA assessment in Pakistan SPECIFIC TERMS OF REFERENCE EU contribution to 2012 Federal PEFA assessment in Pakistan FWC BENEFICIARIES 2009 - LOT 11: Macro economy, Statistics and Public finance management DCI-ASIE/2011/277245/1 1

More information

The United Republic of Tanzania. Agricultural Sector Development Programme (ASDP) ASDP Basket Fund. Financial Mechanism Document

The United Republic of Tanzania. Agricultural Sector Development Programme (ASDP) ASDP Basket Fund. Financial Mechanism Document The United Republic of Tanzania Agricultural Sector Development Programme (ASDP) ASDP Basket Fund Financial Mechanism Document February 2006 Contents Contents i Abbreviations used iv 1 Introduction to

More information

Public Expenditure and Financial Accountability Baseline Report. Central Provincial Government

Public Expenditure and Financial Accountability Baseline Report. Central Provincial Government Public Expenditure and Financial Accountability Baseline Report Central Provincial Government 1 Table of Contents Summary Assessment... 4 (i) Integrated assessment of PFM performance... 4 (ii) Assessment

More information

DISBURSEMENT-LINKED INDICATORS (FY2014 FY2017)

DISBURSEMENT-LINKED INDICATORS (FY2014 FY2017) Secondary Education Sector Investment Program (RRP BAN 44213) DISBURSEMENT-LINKED INDICATORS (FY2014 FY2017) DLIs and Definition Baseline Results Area 1. Enhanced Quality and Relevance of Secondary Education

More information

Kaduna State Government

Kaduna State Government Kaduna State Government Change Programme 2011/2012 Annual Performance Report Bureau of Public Service Reform Office of the Head of Service May 2013 Table of Contents ACRONYMS AND GLOSSARY OF TERMS... 3

More information

Consolidated Procurement Plan

Consolidated Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Consolidated Procurement Plan 2. Project information: ZIMBABWE The Zimbabwe PFM Enhancement Project responds

More information

The PEFA Performance Measurement Framework and the Strengthened Approach to Supporting PFM Reform

The PEFA Performance Measurement Framework and the Strengthened Approach to Supporting PFM Reform The PEFA Performance Measurement Framework and the Strengthened Approach to Supporting PFM Reform Budgeting and Public Financial Management September 2007 Ivor Beazley World Bank Page 1 CONTENT What is

More information

Fostering Accountability

Fostering Accountability Fostering Accountability Sub-National (Local Government) PEFA Assessment in Tanzania Mvomero District Council Final Report July 2016 Contents Acronyms 4 1. Summary assessment 6 1.1. Context of the assessment-

More information

Study of relationship between Ministry of Health and Ministry of Finance in Ghana

Study of relationship between Ministry of Health and Ministry of Finance in Ghana Study of relationship between Ministry of Health and Ministry of Finance in Ghana Presentation at the Global Health Initiative, Woodrow Wilson International Center for Scholars June 24, 2009 Content of

More information

FINANCING HIV/AIDS IN TANZANIA. Beng i Issa

FINANCING HIV/AIDS IN TANZANIA. Beng i Issa FINANCING HIV/AIDS IN TANZANIA Beng i Issa LGAs Response to HIV/AIDS Introduction Outline Sources of financing HIV/AIDS Volume of resources in Tanzania Financing and implementation Framework Budgeting

More information

Managing Fiduciary Risk when providing Poverty Reduction Budget Support

Managing Fiduciary Risk when providing Poverty Reduction Budget Support How to note 22 SEPTEMBER 2004 Managing Fiduciary Risk when providing Poverty Reduction Budget Support Introduction What is the purpose of this note? 1. DFID s policy on managing fiduciary risk sets out

More information

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness

SURVEY GUIDANCE CONTENTS Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness SURVEY GUIDANCE 2011 Survey on Monitoring the Paris Declaration Fourth High Level Forum on Aid Effectiveness This document explains the objectives, process and methodology agreed for the 2011 Survey on

More information

QUESTIONNAIRE ON FISCAL INSTITUTIONS [COUNTRY]

QUESTIONNAIRE ON FISCAL INSTITUTIONS [COUNTRY] QUESTIONNAIRE ON FISCAL INSTITUTIONS [COUNTRY] This questionnaire is designed to gather basic information on fiscal institutions and practices as a basis for review of a country's fiscal management system

More information

PUBLIC FINANCE MANAGEMENT CONFERENCE FOR AFRICA

PUBLIC FINANCE MANAGEMENT CONFERENCE FOR AFRICA PUBLIC FINANCE MANAGEMENT CONFERENCE FOR AFRICA Public Financial Management and Accountability Reforms - The Kenyan Scenario PRIDE INN PARADISE HOTEL, MOMBASA, 19 th -21 st APRIL 2017 Uphold. Public. Interest

More information

Fostering Accountability

Fostering Accountability Fostering Accountability Sub-National (Local Government) PEFA Assessment in Tanzania Mwanza City Council Final Report July 2016 Table of Contents Contents Acronyms 4 1. Summary assessment 7 1.1. Overview

More information

Public Finance Management Workshop

Public Finance Management Workshop Public Finance Management Workshop INTEGRATED FINANCIAL MANAGEMENT INFORMATION SYSTEM (IFMIS CPA Andrew Rori City Blue Hotel & Suites, Mombasa 9th 10th August, 2018 Uphold. Public. Interest Session Outline

More information

Implementation Status & Results Kosovo Public Sector Modernization Project (P101614)

Implementation Status & Results Kosovo Public Sector Modernization Project (P101614) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Kosovo Public Sector Modernization Project (P101614) Operation Name: Public Sector Modernization Project (P101614)

More information

Climate Change Finance Mainstreaming: A Snapshot

Climate Change Finance Mainstreaming: A Snapshot Climate Change Finance Mainstreaming: A Snapshot The Budget Cycle: Three basic Phases Oversight Preparation Implementation 2 Key Concepts Government/ CC Mitigation and Adaptation Policies Public Financial

More information

Draft Policy Brief: Revised Indicator 9a for the Global Partnership Monitoring Framework

Draft Policy Brief: Revised Indicator 9a for the Global Partnership Monitoring Framework Draft Policy Brief: Revised Indicator 9a for the Global Partnership Monitoring Framework March 2015 This policy brief has been produced with the kind assistance of the European Union and the German Ministry

More information

Republic of Kosovo. Public Financial Management Reform Action Plan (PFM RAP)

Republic of Kosovo. Public Financial Management Reform Action Plan (PFM RAP) Republic of Kosovo Public Financial Management Reform Action Plan (PFM RAP) November 2009 1 Table of Contents 1 INTRODUCTION...5 2. REFORM THEMES...6 2.1 CREDIBLE POLICY BASED BUDGET...6 2.2 TAX ADMINISTRATION...9

More information

Fieldguide. for undertaking an assessment using the PEFA performance measurement framework

Fieldguide. for undertaking an assessment using the PEFA performance measurement framework Fieldguide for undertaking an assessment using the PEFA performance measurement framework May 3 rd, 2012 Foreword In the 7 years since the Framework was launched, almost 300 PEFA assessments have been

More information

IFMIS Systems - Capacity Development

IFMIS Systems - Capacity Development IFMIS Systems - Capacity Development Peter Murphy, B.Sc (Hons), M.Sc, CPFA P Murphy, Washington, IFMIS Conference, Nov 2007 1 What are the key challenges in development of Public Financial Management?

More information

PUBLIC FINANCE MANAGEMENT WORKSHOP

PUBLIC FINANCE MANAGEMENT WORKSHOP PUBLIC FINANCE MANAGEMENT WORKSHOP NYANZA BRANCH IFMIS AN ENABLER OR INHIBITOR 28 th 29 th August 2018 Presented by : Hillary Onami, Manager, Devolution & Branches Public Policy and Research, ICPAK @ Nyakoe

More information

Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775)

Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775) Operation Name: LR-Public Financial Management

More information

Vanuatu. Vanuatu is a lower-middle-income country with a gross national income (GNI) of

Vanuatu. Vanuatu is a lower-middle-income country with a gross national income (GNI) of 00 Vanuatu INTRODUCTION Vanuatu is a lower-middle-income country with a gross national income (GNI) of USD 2 620 per capita (2009) and a population of 240 000 (WDI, 2011). Net official development assistance

More information

Decentralization Support Activity Project

Decentralization Support Activity Project CIVIL SERVICE REFORM PROGRAM DSA Project Brief Project Report: M-52 March 29, 2005 Decentralization Support Activity Project THE NETHERLANDS MINISTER FOR DEVELOPMENT COOPERATION The DSA project is implemented

More information

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF FINANCE

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF FINANCE THE UNITED REPUBLIC OF TANZANIA MINISTRY OF FINANCE Telegrams: TREASURY, DAR ES SALAAM Tel: 2111174-6, Fax: 2110326, Telex: 41329 (All official communications should be addressed to the Permanent Secretary

More information

PROGRAM-FOR-RESULTS FINANCING INTERIM GUIDANCE NOTE TO STAFF: FIDUCIARY SYSTEMS ASSESSMENT. Operations Policy and Country Services

PROGRAM-FOR-RESULTS FINANCING INTERIM GUIDANCE NOTE TO STAFF: FIDUCIARY SYSTEMS ASSESSMENT. Operations Policy and Country Services PROGRAM-FOR-RESULTS FINANCING INTERIM GUIDANCE NOTE TO STAFF: FIDUCIARY SYSTEMS ASSESSMENT These interim guidance notes are intended for internal use by Bank staff to provide a framework to conduct assessments

More information

Report of the Court on the implementation of International Public Sector Accounting Standards*

Report of the Court on the implementation of International Public Sector Accounting Standards* International Criminal Court Assembly of States Parties Distr.: General 21 June 2011 ICC-ASP/10/3 Original: English Tenth session New York, 12-21 December 2011 Report of the Court on the implementation

More information

Strengthening Public Financial Management and Accountability

Strengthening Public Financial Management and Accountability T H E R E P U B L I C O F U G A N DA National Consultative Budget Conference FY2014/2015 Strengthening Public Financial Management and Accountability By Keith Muhakanizi Permanent Secretary/Secretary to

More information

JOINT POLICY REFORM MATRIX, FY2016 FY2018

JOINT POLICY REFORM MATRIX, FY2016 FY2018 Building Macroeconomic Resilience Subprogram 2 (RRP TON 48361-002) JOINT POLICY REFORM MATRIX, FY2016 FY2018 Version: March 2017 I. SUPPORTING FISCAL RESILIENCE Fiscal strategy Partners: ADB, IMF, PFTAC,

More information

PUBLIC SECTOR ACCOUNTING DEVELOPMENTS. Credibility. Professionalism. AccountAbility

PUBLIC SECTOR ACCOUNTING DEVELOPMENTS. Credibility. Professionalism. AccountAbility PUBLIC SECTOR ACCOUNTING DEVELOPMENTS Credibility. Professionalism. AccountAbility Session Objectives Legal framework of public sector accounting standards PSASB (K) and ICPAK PSASB s strategic direction

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

PFM Reform Programmes

PFM Reform Programmes PFM Reform Programmes Presentation by Mary Betley WBI/CABRI/East AFRITAC PFM Training Seminar 18-20 June 2007 Outline Overview of PEFA Lessons from experience - Do s and Don t s Case Studies Zambia and

More information

Financial report and audited financial statements. Report of the Board of Auditors

Financial report and audited financial statements. Report of the Board of Auditors General Assembly Official Records Sixty-ninth Session Supplement No. 5C A/69/5/Add.3 United Nations Children s Fund Financial report and audited financial statements for the year ended 31 December 2013

More information

2011 SURVEY ON MONITORING THE PARIS DECLARATION

2011 SURVEY ON MONITORING THE PARIS DECLARATION TASK TEAM ON MONITORING THE PARIS DECLARATION 2011 SURVEY ON MONITORING THE PARIS DECLARATION Revised Survey Materials Initial Annotated Draft 3 May 2010 FOR COMMENT This initial text with annotations

More information

Arrangements for the revision of the terms of reference for the Peacebuilding Fund

Arrangements for the revision of the terms of reference for the Peacebuilding Fund United Nations A/63/818 General Assembly Distr.: General 13 April 2009 Original: English Sixty-third session Agenda item 101 Report of the Secretary-General on the Peacebuilding Fund Arrangements for the

More information

Open Budget Survey 2015 Sierra Leone

Open Budget Survey 2015 Sierra Leone Open Budget Survey 2015 Section 1. Public Availability of Budget Docs. Section One: The Availability of Budget Documents contains a series of four tables that allow the researcher to examine and map the

More information

IPSAS WORKSHOP. The benefits, Challenges and way forward of IFMIS in Kenya. Golf Hotel - Kakamega, 18 th -19 th July Uphold. Public.

IPSAS WORKSHOP. The benefits, Challenges and way forward of IFMIS in Kenya. Golf Hotel - Kakamega, 18 th -19 th July Uphold. Public. IPSAS WORKSHOP The benefits, Challenges and way forward of IFMIS in Kenya Golf Hotel - Kakamega, 18 th -19 th July 2017 Uphold. Public. Interest Outline of Presentation Introduction to PFMS - definitions

More information

Fostering Accountability

Fostering Accountability Fostering Accountability Sub-National (Local Government) PEFA Assessment in Tanzania Longido District Council Final Report July 2016 Table of Contents Contents Acronyms 4 1. Summary Assessment 7 1.1. Overview

More information

All Permanent Secretaries/Heads of Departments

All Permanent Secretaries/Heads of Departments REF NO: FROM: TO: MF-BB/06/2012/03 The Financial Secretary All Permanent Secretaries/Heads of Departments DATE: 25 th June, 2012 Cc: Hon. Minister of Finance and Economic Development Hon. Deputy Ministers

More information

Terms of Reference (ToR)

Terms of Reference (ToR) Terms of Reference (ToR) Mid -Term Evaluations of the Two Programmes: UNDP Support to Deepening Democracy and Accountable Governance in Rwanda (DDAG) and Promoting Access to Justice, Human Rights and Peace

More information

TANZANIA: TRACKING POVERTY-REDUCING SPENDING: COUNTRY ASSESSMENT AND ACTION PLAN (AAP) December 3, 2001

TANZANIA: TRACKING POVERTY-REDUCING SPENDING: COUNTRY ASSESSMENT AND ACTION PLAN (AAP) December 3, 2001 TANZANIA: TRACKING POVERTY-REDUCING SPENDING: COUNTRY ASSESSMENT AND ACTION PLAN (AAP) Prepared by Fund staff 1 In collaboration with World Bank staff and the Tanzanian authorities December 3, 2001 1 The

More information

Presentation at ICA & IFAC Round Table Conference on IPSAS

Presentation at ICA & IFAC Round Table Conference on IPSAS Presentation at ICA & IFAC Round Table Conference on IPSAS 1 Presented by : Mac-Effort K. Adadey Topic: GIFMIS & IPSAS Implementation May 22, 2015 Labadi Beach Hotel Accra Introduction Timely, clear and

More information

Policy Coordination Process: Status, Experience and Way Forward Preliminary Draft for Discussion only

Policy Coordination Process: Status, Experience and Way Forward Preliminary Draft for Discussion only Policy Coordination Process: Status, Experience and Way Forward Preliminary Draft for Discussion only Prof. Samuel Wangwe Chairman and Researcher Daima Associates swangwe@daima.co.tz Paper prepared for

More information

Governance Assessment (Summary) Nepal

Governance Assessment (Summary) Nepal Governance Assessment (Summary) Nepal Country Partnership Strategy: Nepal, 2013 2017 A. Current State of Governance GOVERNANCE ASSESSMENT 1. Nepal is passing through a historic political transition. The

More information

Fostering Accountability

Fostering Accountability Fostering Accountability Sub-National (Local Government) PEFA Assessment in Tanzania Mwanga District Council Final Report July 2016 Table of Contents Contents Acronyms 4 1. Summary assessment 6 1.1. Overview

More information

International Monetary Fund Washington, D.C.

International Monetary Fund Washington, D.C. 2008 International Monetary Fund April 2008 IMF Country Report No. 08/129 Pakistan: Report on Observance of Standards and Codes Fiscal Transparency Module An Update This update to the Report on the Observance

More information

Reforming Public Financial Management in Papua New Guinea: The Role of Accountants. Dr Ken Ngangan Secretary for Finance

Reforming Public Financial Management in Papua New Guinea: The Role of Accountants. Dr Ken Ngangan Secretary for Finance Reforming Public Financial Management in Papua New Guinea: The Role of Accountants Dr Ken Ngangan Secretary for Finance DEPARTMENT OF FINANCE PFM REFORMS Outline key PFM reforms that the Department of

More information

FINAL TEXT OF THE THREE REVISED INDICATORS FOR THE PERFORMANCE MEASUREMENT FRAMEWORK

FINAL TEXT OF THE THREE REVISED INDICATORS FOR THE PERFORMANCE MEASUREMENT FRAMEWORK FINAL TEXT OF THE THREE REVISED INDICATORS FOR THE PERFORMANCE MEASUREMENT FRAMEWORK PI-2 Composition of expenditure out-turn compared to original approved budget Where the composition of expenditure varies

More information

Fostering Accountability

Fostering Accountability Fostering Accountability Sub-National (Local Government) PEFA Assessment in Tanzania Kigoma Ujiji Municipal Council Final Report July 2016 Table of Contents Contents 1. Summary assessment 6 1.1. Overview

More information

Curriculum Vitae. Harriet Naitore Date of birth 1952 Public Finance and Management Consultant

Curriculum Vitae. Harriet Naitore Date of birth 1952 Public Finance and Management Consultant Curriculum Vitae Name: Harriet Naitore Date of birth 1952 Profession: Public Finance and Management Consultant Nationality: Kenyan Education: Currently studying for a MSC in Public Policy and Management,

More information

The United Republic of Tanzania MINISTRY OF FINANCE AND PLANNING

The United Republic of Tanzania MINISTRY OF FINANCE AND PLANNING The United Republic of Tanzania MINISTRY OF FINANCE AND PLANNING ASSESSMENT OF THE PUBLIC FINANCE MANAGEMENT SYSTEMS OF THE CENTRAL GOVERNMENT APPLYING THE PEFA 2016 FRAMEWORK FINAL REPORT OCTOBER, 2017

More information

IDI Results Framework

IDI Results Framework IDI Results Framework To effectively monitor the performance of IDI during the Strategic Plan period 2014-2018, the IDI Results Framework has been developed. The framework will monitor the results in the

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

OFFICIAL DOCUMENTS. (a) Promptly following countersignature f 3,100,000. (b) By 31 August 2014 f 1,250,000. (c) By 30 April 2015 f 1,500,000

OFFICIAL DOCUMENTS. (a) Promptly following countersignature f 3,100,000. (b) By 31 August 2014 f 1,250,000. (c) By 30 April 2015 f 1,500,000 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized OFFICIAL DOCUMENTS Administration Arrangement between the Government of the United Kingdom

More information

DEVELOPMENT COOPERATION FRAMEWORK (DCF)

DEVELOPMENT COOPERATION FRAMEWORK (DCF) P a g e iata THE UNITED REPUBLIC OF TANZANIA MINISTRY OF FINANCE DEVELOPMENT COOPERATION FRAMEWORK (DCF) i TABLE OF CONTENTS Abbreviations... 4 Chapter 1: INTRODUCTION... 6 1.1 Introduction... 6 1.2 Rationale

More information

Fostering Accountability

Fostering Accountability Fostering Accountability Sub-National (Local Government) PEFA Assessment in Tanzania Kasulu District Council Final Report July 2016 Contents Acronyms 4 1. Summary Assessment 6 1.1. Overview of Ratings

More information

OFFICIAL DOCUMENTS. Republic of Seychelles Ministry of Finance, Trade and the Blue Economy. Public Disclosure Authorized. Public Disclosure Authorized

OFFICIAL DOCUMENTS. Republic of Seychelles Ministry of Finance, Trade and the Blue Economy. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Mr. Jim Yong Kim President The World Bank Group Washington DC OFFICIAL DOCUMENTS Republic of Seychelles Ministry of Finance, Trade and the Blue

More information

GOVERNMENT OF LESOTHO

GOVERNMENT OF LESOTHO GOVERNMENT OF LESOTHO THIRD QUARTER PERFORMANCE BUDGET AND FISCAL BULLETIN MINISTRY OF FINANCE 31 JANUARY 2017 M I N I S T R Y O F F I N A N C E ; P. O B O X 3 9 5 ; M A S E R U 1 0 0 & Fiscal Bulletin

More information

LINKED DOCUMENT 2: PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA) 1

LINKED DOCUMENT 2: PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA) 1 Policy-Based Lending 2008 2017: Performance, Results, and Issues of Design, Linked Document 2 LINKED DOCUMENT 2: PUBLIC EXPENDITURE AND FINANCIAL ACCOUNTABILITY (PEFA) 1 A. Armenia: 2008 and 2013 1. Overall,

More information

2. PEFA indicators and report

2. PEFA indicators and report 2. PEFA indicators and report Introduction to PEFA (2011 version) Skopje, Macedonia February 2015 PEFA Secretariat The PEFA Framework Launched in June 2005, updated 2011 (upgraded extensively 2015 - draft)

More information

Decentralization Support Activity Project

Decentralization Support Activity Project CIVIL SERVICE REFORM PROGRAM " DSA Project Brief " Project Report: M-52 March 28, 2005 Decentralization Support Activity Project THE NETHERLANDS MINISTER FOR DEVELOPMENT COOPERATION The DSA project is

More information

URBAN LOCAL GOVERNMENT STRENGTHENING PROGRAMME URBAN PERFORMANCE GRANT

URBAN LOCAL GOVERNMENT STRENGTHENING PROGRAMME URBAN PERFORMANCE GRANT THE UNITED REPUBLIC OF TANZANIA THE PRIME MINISTER S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT URBAN LOCAL GOVERNMENT STRENGTHENING PROGRAMME URBAN PERFORMANCE GRANT PERFORMANCE ASSESSMENT MANUAL

More information

PERFORMANCE MANAGEMENT AN OVERVIEW

PERFORMANCE MANAGEMENT AN OVERVIEW PERFORMANCE MANAGEMENT AN OVERVIEW Rama Krishnan, Sr Financial Management Specialist, South Asia Region, vramakrishnan@worldbank.org Presentation Scheme Performance Management Concept Performance Measures

More information

JOINT POLICY REFORM MATRIX, 2015/ /18 Version: March 2016

JOINT POLICY REFORM MATRIX, 2015/ /18 Version: March 2016 Building Macroeconomic Resilience Program, SP1 (RRP TON 48361) JOINT POLICY REFORM MATRIX, 2015/16 2017/18 Version: March 2016 Reform area FY2015/16 Actions FY2016/17 Actions FY2017/18 Actions Results

More information

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Support to the Tax Administration Action summary This Action aims to support Montenegro in the process of fulfilling the EU preaccession

More information

SUMMARY FINANCIAL MANAGEMENT ASSESSMENT

SUMMARY FINANCIAL MANAGEMENT ASSESSMENT A. Introduction Emergency Assistance for Relief and Recovery from Typhoon Yolanda (RRP PHI 47337) UMMARY FINANCIAL MANAGEMENT AEMENT 1. This financial management assessment was prepared in accordance with

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower Name Implementing

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

Afghanistan Public Financial Management Performance Assessment. Executive Summary. May 2008

Afghanistan Public Financial Management Performance Assessment. Executive Summary. May 2008 Afghanistan Public Financial Management Performance Assessment Executive Summary May 2008 Acknowledgements This is the second PFM Performance Assessment, based on the information as of December 2007, two

More information

GOOD PRACTICE CASE STUDY BANGLADESH: CAPACITY DEVELOPMENT IN PUBLIC FINANCIAL MANAGEMENT 1 BACKGROUND

GOOD PRACTICE CASE STUDY BANGLADESH: CAPACITY DEVELOPMENT IN PUBLIC FINANCIAL MANAGEMENT 1 BACKGROUND GOOD PRACTICE CASE STUDY BANGLADESH: CAPACITY DEVELOPMENT IN PUBLIC FINANCIAL MANAGEMENT 1 BACKGROUND 1. This case study reviews the efforts of Government of Bangladesh (GoB) to develop capacity in and

More information

MEASURING THE INTEGRATION OF CLIMATE CHANGE IN PFM SYSTEMS

MEASURING THE INTEGRATION OF CLIMATE CHANGE IN PFM SYSTEMS Draft for piloting purpose MEASURING THE INTEGRATION OF CLIMATE CHANGE IN PFM SYSTEMS THE OBJECTIVE OF THE PAPER The objective of the paper is introduce a methodology to assess the level of integration

More information