1 Transportation and Economic Development Zone TEDZ an Innovative Highway Funding Option March 2012

2 What is Transportation and Economic Development Zone TEDZ? The Transportation and Economic Development Zone TEDZ proposed legislation would: n Be used throughout the state for major highway projects that will lead to significant economic and sales tax both inside and outside of the TEDZ boundary n Used for state highway projects of $100 million or more n Sales tax and economic impacts are measured over the base year the preceding 12 month period n Sets up two threshold tests to be evaluated by an economist hired by Idaho Transportation Department Board and the Idaho Department of Commerce: 1. The project must have Revenue Positive Sales Tax Impacts which is new sales tax on a cumulative basis over the base year which pays for the debt service and meets the appropriate debt service coverage ratio 2. The project must have Revenue Positive Economic Impacts which measures the cumulative state revenues within the TEDZ zone over the life of the financing; the economic impacts must be a minimum of 2 times the project cost n Requires the majority of local jurisdictions within a TEDZ boundary to approve of the formation of the TEDZ n Creates a continuously available source of funding debt service so the project can obtain an investment grade rating to minimize the borrowing costs n Unused funds after a 10 year period are distributed to the general fund n Puts in place checks and balances involving ITD, Commerce, the Idaho State Tax Commission and independent economic studies 2

3 Why TEDZ Legislation This Session? n The 2013 Federal Highway Bill may create incentives using the Transportation Infrastructure Finance and Innovation Act TIFIA $1 billion in funding for rural state projects Below market rate interest 2%+/- Increase participation from 33% to 49% of total project cost n A continuously appropriated repayment source is necessary to enable a qualified bond issuing agency to secure an investment grade rating and meet the requirements of TIFIA n Every year we delay funding of important infrastructure projects, the price tag goes up n Creates billions in new state revenue and thousands of new jobs n Allows ITD to use its federal highway funds for other state needs n Creates a financing vehicle to allow growth to pay for growth n The state is getting ahead of the curve 3

4 What is the Central Valley Expressway Coalition? March 2012

5 THE CENTRAL VALLEY EXPRESSWAY COALITION n The Central Valley Expressway Coalition is a grassroots Coalition formed in 2010 to emphasize the importance of SH-16 to Idaho's economic recovery and to show the growing support behind efforts to complete the SH-16 extension to I-84. Its goals are to: Consolidate efforts/support for the completion of the Central Valley Expressway (SH-16) Project all the way from Emmett to I-84 and speak with one voice Illustrate the economic impact of this project to the Treasure Valley and ultimately to the entire State of Idaho Explore all available options for alternative means of funding in order to see the project to completion Put Idahoans back to work by providing construction jobs and commercial opportunities along the new Central Valley Expressway Corridor (Emmett to I-84) 5

6 ABOUT THE CVE n SH-16 is a 21.5 mile corridor, from Emmett to I-84, which has been identified as the Central Valley Expressway or CVE n Two Environmental Impact Statements have been completed covering the entire CVE. The southern 6.5 mile extension from SH-44 to I-84 was completed in 2011 and the segment north of SH-44 was completed in 2006 n The design for the CVE includes four lanes, gradeseparated interchanges and full access control n Total project cost is approximately $700M. Approximately $140M has been funded to date by the State of Idaho. The cost to complete the CVE is $560M estimated in 2006 Existing 2 lane Connecting cities and counties; creating an Employment Super Corridor n The CVE will connect seven cities to I-84 - Nampa, Caldwell, Meridian, Eagle, Star, Middleton, and Emmett. Four of these cities currently have limited Interstate access n The CVE will connect three counties to I-84 - Ada, Canyon, and Gem Counties and two highways - SH-44 and US 20/26 the largest growth corridor around an existing highway in the Treasure Valley 6

7 SUPPORT FOR THE CVE I view the extension of Highway 16 critical to my Project 60 plan to grow Idaho's Gross Domestic Product to $60 billion. [It] will provide a valuable marketing tool to our Department of Commerce and will help get Idahoans back to work. Gov. C.L. Butch Otter This project represents the first of its kind in Idaho, demonstrating a vision for transportation improvements that are critical to the economic vitality of the region. This expressway will provide a critical north-south connection at the heart of the valley and should be pursued David W. Turnbull, President Brighton Corporation As a lifelong Idahoan, I believe that the economic value of [the CVE] will extend far beyond the Treasure Valley and will reap benefits to the entire state of Idaho Let's work together to find the funds necessary to get this road built! Harry Bettis, Cattle Rancher This is the project through which Idaho will achieve economic recovery and address its strategic mobilization needs. Sen. Chuck Winder, Asst. Majority Leader 7

8 CVE COALITION STAKEHOLDERS Cities & Local Government City of Caldwell City of Eagle City of Emmett City of Meridian City of Middleton City of Nampa City of Star Ada County Commissioners Canyon County Commissioners Gem County Commissioners COMPASS Economic Development Organizations & Chambers Boise Valley Economic Partnership (BVEP) Idaho Chamber Alliance Boise Metro Chamber of Commerce Gem County Chamber of Commerce Star Chamber of Commerce Gem County EDC Eagle-Emmett-Star Technology Corridor (ESTech) The CORE in Meridian Industry Associations Ada County Association of REALTORS (ACAR) Emmett Valley Association of REALTORS Idaho Association of REALTORS Idaho Associated General Contractors (AGC) Idaho Building Contractors Association (IBCA) Building Contractors Association of Southwest Idaho (BCASWI) Caldwell Association of REALTORS Private Businesses The M3 Companies, LLC Benchmark Construction Dynamis Energy, LLC The Land Group, Inc. Micron Hewlett-Packard Brighton Corporation College of Western Idaho (CWI) CH2M Hill Evans Realty Co. (Emmett & Eagle) Lee & Associates Harry Bettis Syringa Bank URS Camille Beckman 3 Horse Ranch Vineyards Idaho Distributing Company Idaho Legislative Support Gov. C.L. Butch Otter Lt. Gov. Brad Little Rep. Mike Moyle, District 14, House Majority Leader Rep. Reed DeMordaunt, District 14 Sen. Chuck Winder, District 14, Senate Asst. Majority Leader Sen. Melinda Smyser, District 11 Rep. Carlos Bilbao, District 11 Advisory Capacity Idaho Transportation Dept. Idaho Department of Commerce 8

9 CENTRAL VALLEY EXPRESSWAY ECONOMIC AND JOB GROWTH n Dr. John Church, an economist, estimates that there would be $6.2B of new state tax revenue within the CVE corridor for the state over a 30 year period n According to the U.S. Department of Transportation statistics, construction of the CVE will create 16,800 direct construction jobs n In addition to construction related jobs, by its 10th year the SH-16 corridor will have created 17,600 direct permanent jobs n By its 30 th year it will have created 33,100 direct permanent jobs 9

10 Projected Treasure Valley Growth

11 GROWTH PROJECTIONS REQUIRE CONSTRUCTION OF THE CVE n 40% of projected growth will occur near the SH-16 corridor over the next 30 years n Population in Ada and Canyon counties grew 74% and 57%, respectively, between 1980 and 2000 n The population in the Treasure Valley is forecasted to reach 1,046,000 by 2035 from a current population of approximately 600,000 n Historical population growth rates in the Treasure Valley exceed those of the state and nation. From 1980 to mid-2007, US Census data reveals that the population of Ada and Canyon counties rose roughly 115%, compared to increases of approximately 59% for Idaho and 33% for the US n In percentage terms, the growth in these counties was roughly double that of Idaho and 350% of the US growth rate n The CVE corridor must be constructed to provide adequate transportation infrastructure 11

12 THE ECONOMY IN THE BOISE MSA 3,000,000 Ada/Canyon Popula0on Growth Projec0ons 2,500,000 Popula0on 2,000,000 1,500,000 1,000,000 1,100,000 Low Median High 500, , Year NOTE: Population in Ada County between 1980 and 2000 (included a recession of the same magnitude that we have just experienced) grew by 74% or 3.7% per year Source: COMPASS Community Choices Population Forecast, March

13 THREAT OF EPA NON-ATTAINMENT DESIGNATION UNDER THE CLEAN AIR ACT n The Boise MSA is dangerously close to exceeding the EPA's current Non- Attainment air quality standards for ozone: n Non-Attainment repercussions: Idaho DEQ would be required to create a plan to bring the area into compliance within 3 years This plan would include strict restrictions on industrial uses Industrial restrictions would cost existing companies millions and deter new industry Failure to remedy Non-Attainment can result in a loss of highway funding Building permit moratorium n The EPA is considering lowering the standards further: Standards in 2013 could fall to as low as 60 parts per billion, immediately putting the Treasure Valley into Non-Attainment In order to avoid Non-Attainment repercussions, the Treasure Valley must improve its air quality n Reducing congestion on Eagle Rd, Chinden Blvd, and State St, as well as easing congestion on I-84, Garrity Blvd, Meridian Rd and Ten Mile Rd, will help avoid reaching Non-Attainment 13

14 PROJECTED GROWTH IN THE CVE CORRIDOR CVE 14

15 15

16 THE CVE CORRIDOR WILL PROVIDE RELIEF FROM FUTURE CONGESTION 16

17 WITHOUT THE CVE, THE VALLEY S ALREADY CONGESTED ROADS CEASE TO FUNCTION 17

18 An Example of How the SH-16 TEDZ Would Work

19 ECONOMIC ANALYSIS FOR SH-16 TEDZ BOUNDARY Dr. John Church, an Idaho economist with an extensive background in Idaho economic studies, prepared a TEDZ boundary example on slides based upon the TEDZ draft legislation using the following assumption: REVENUE POSITIVE SALES TAX AND ECONOMIC IMPACTS Analysis of the Revenue Positive Sales Tax Impacts and Revenue Positive Economic Impacts for a TEDZ zone with a 5 mile corridor on each side of SH-16 from 1-84 to Emmett FINANCING STRUCTURE Total Project Cost - $700M (including $140M already authorized by GARVEE (Phase 1)); $560M remaining cost for threshold test for Revenue Positive Economic Impacts GARVEE Funding n $140M project cost for phase one included in the total project cost Private Activity Bonds or Governmental Bonds n $358M bonds at 4% interest rate; three years capitalized interest with a 27 year amortization The Transportation Infrastructure Finance and Innovation Act TIFIA n $245M bonds at 2% interest rate; three years capitalized interest with a 27 year amortization 19

20 GARVEE FUNDING FOR SH-16 FROM SH-44 TO US 20/26 n n n n n n The state has already funded $140M or 20% of the total projected CVE cost to date The Idaho Transportation Board was granted a total of $140M in funding under its GARVEE program by the Idaho Legislature in order to complete construction of the first segment (yellow highlight) The first segment includes a new Boise River bridge connecting US 20/26 and SH-44, two major east/west state highways The first segment is the most environmentally sensitive Construction of the first segment of the CVE is starting in If the remainder of the CVE proposal is fully funded, it could be constructed by Environmental work and clearances are completed and right of way acquisition is ongoing 20

21 SH-16 TEDZ BOUNDARY EXAMPLE n The following is a summary of revenue projections within a TEDZ Zone extending 5 miles from SH-16 n The scenario meets both economic development thresholds EXAMPLE TEDZ boundary 21

22 REVENUE POSITIVE SALES TAX: EXAMPLE SH-16 TEDZ n This TEDZ boundary is larger than necessary to meet the Revenue Positive Sales Tax Impact; note years 6-10 has $286,987,864 in Revenue Positive Sales Tax Impact after debt service n The Example SH-16 TEDZ boundary within the first 5 years is projected to produce $61M of Cumulative Revenue Positive Sales Tax after debt service and cumulative net impacts after 10 years of $348,859,917 n There is Cumulative Revenue Positive Tax after debt service during all periods. This means that the projected tax growth in the SH-16 TEDZ boundary produces net positive tax and meets the first economic threshold of the TEDZ Legislation YEAR Revenue Posi/ve Sales 119,201, ,971, ,833,400 Tax Impacts 1,266,731,700 3,290,145,800 Capitalized Interest 54,081,922 Debt Service (111,411,069) (176,983,536) (176,983,536) (176,983,536) (353,967,072) Revenue Posi/ve Sales 61,872, ,987, ,849,864 Tax Impacts aier Debt 1,089,748,164 2,936,178,728 Service Cumula/ve Net Impacts 61,872, ,859,917 1,020,709,781 2,110,457,945 5,046,636,673 22

23 Revenue Positive Economic Impact Summary n Example TEDZ boundary (5 Miles) Meets both economic threshold tests $6,251,525,730 over a 30 Year period Total debt service is only 16% of the Revenue Positive Impact Estimated cumulative positive economic impacts over a 30 year period are approximately 10 times project cost n Bottom Line: TEDZ boundary will be determined by an independent economic analysis ensuring the project will meet the economic development thresholds described in the TEDZ legislation Growth along the SH-16 corridor will pay for the transportation project (Growth Paying for Growth) The proposed TEDZ legislation is a creative way to fund major highway infrastructure projects using the net gains in sales tax which are due to increased economic development activity 23

24 IMPLEMENTATION OF THE TEDZ LEGISLATION

25 HOW IS A TEDZ PROJECT APPROVED? 1. The ITD and Department of Commerce would select an approved state highway project 2. The ITD and the Idaho Department of Commerce would jointly select an economist 3. The economist completes an economic study confirming the economic benefits and sets the boundaries 4. The economic study would be reviewed and approved by the ITD Board and Commerce 5. The TEDZ boundary would be set and a majority of the political subdivisions within the TEDZ boundary would have to approve the formation 6. Idaho Commerce Department would present the TEDZ boundaries and economic study to the Idaho State Tax Commission 7. Within 30 days the Idaho State Tax Commission accepts the economic study and TEDZ boundary 8. Prior to bond issuance the Idaho State Treasurer shall certify to a qualified bond issuing agency that sufficient funds can be continuously appropriated for the financing 9. The qualified bond issuing agency would obtain an approved investment grade bond rating and proceed with the financing 10. ITD would construct the approved state highway project 11. Within 60 days of formation and acceptance the Idaho State Tax Commission shall commence depositing state sales tax into the state highway project account after use of capitalized interest 12. Any deposits into the state highway project account not used for debt service or direct payments within 10 years of deposit revert to the general fund 25

26 Why SH-16 TEDZ Now? The SH-16 TEDZ project will accelerate economic development and growth in the state of Idaho creating billions of dollars in positive economic impacts and thousands of jobs it is a projected 16% of the Revenue Positive Economic Impacts over the term of the financing Growth in the Idaho and the Treasure Valley will happen with or without adequate transportation; it is only a matter of time and over time the total project cost for right of way acquisition and construction of SH-16 will only increase Right of way & construction cost will be lower - a 15% savings could result in a savings of $75,000,000 or more Frees up ITD for other state projects The SH-16 TEDZ zone will create surplus new sales tax which will meet the Revenue Positive Sales Tax test growth paying for growth Significant long term economic benefits over $6.2 billion or times estimated cost will meet the Revenue Positive Economic Impact test A corridor with large land holdings that can be marketed for major employment given its connection to I-84 and the short commute time to the airport Presents new economic development opportunities for the Department of Commerce, BVEP and others to market nationally and internationally JOBS! JOBS! JOBS! CVE will create 16,800 direct construction jobs. 26

27 Thank You! 27

CHAPTER 4 1 Transportation Financial Analysis

CHAPTER 4 1 Transportation Financial Analysis CHAPTER 4 1 Transportation Financial Analysis COMPASS commissioned a financial analysis, finalized in 2012, to support the CIM 2040 update. The analysis, Financial Forecast for the Funding of Transportation

More information

EAGLE COMMONS at OVERLAND

EAGLE COMMONS at OVERLAND For Sale or For Lease EAGLE COMMONS at OVERLAND EAGLE ROAD & OVERLAND ROAD MERIDIAN, ID SCOTT RAEBER, MBA, CCIM 208 472 2817 scott.raeber@colliers.com MIKE CHRISTENSEN 208 472 2866 mike.christensen@colliers.com

More information

EAGLE COMMONS at OVERLAND

EAGLE COMMONS at OVERLAND For Sale or For Lease EAGLE ROAD & OVERLAND ROAD MERIDIAN, ID PENDING PENDING SCOTT RAEBER, MBA, CCIM 208 472 2817 scott.raeber@colliers.com MIKE CHRISTENSEN 208 472 2866 mike.christensen@colliers.com

More information

BOISE, IDAHO - METRO AREA INFORMATION PACKET

BOISE, IDAHO - METRO AREA INFORMATION PACKET , IDAHO - METRO AREA INFORMATION PACKET , IDAHO - Boise is not only the capital of Idaho, but the center of commerce, politics, population, cultural events, and the blue field that personifies the Boise

More information

House Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2.

House Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2. House Bill 20 Implementation Tuesday,, 1:00 P.M. Capitol Extension E2.020 INTRODUCTION In response to House Bill 20 (HB 20), 84 th Legislature, Regular Session, 2015, and as part of the implementation

More information

COMMUNITY PLANNING ASSOCIATION EXECUTIVE COMMITTEE MEETING August 31, :30 pm 800 S. Industry Way, Suite 100, Meridian, Idaho **AGENDA**

COMMUNITY PLANNING ASSOCIATION EXECUTIVE COMMITTEE MEETING August 31, :30 pm 800 S. Industry Way, Suite 100, Meridian, Idaho **AGENDA** COMMUNITY PLANNING ASSOCIATION EXECUTIVE COMMITTEE MEETING August 31, 2005 1:30 pm 800 S. Industry Way, Suite 100, Meridian, Idaho **AGENDA** * A. Approve July 27, 2005, Executive Directors Meeting Minutes

More information

GARVEE Bonds, TIFIA and State Infrastructure Bank. David Tyeryar, CFO, Fiscal Management Division March 14, 2017

GARVEE Bonds, TIFIA and State Infrastructure Bank. David Tyeryar, CFO, Fiscal Management Division March 14, 2017 GARVEE Bonds, TIFIA and State Infrastructure Bank David Tyeryar, CFO, Fiscal Management Division March 14, 2017 Transportation Traditional Financing Techniques 1. Cash to Capital or Pay-as-you-go 2. General

More information

Corridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017

Corridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Corridors of Commerce DRAFT Scoring and Prioritization Process Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Project Purpose To develop and implement a scoring and project

More information

FORMER MACY S DEPARTMENT STORE 1406 N GALLERIA DR NAMPA, ID

FORMER MACY S DEPARTMENT STORE 1406 N GALLERIA DR NAMPA, ID FORMER MACY S DEPARTMENT STORE 1406 N GALLERIA DR NAMPA, ID DAVID CADWELL 208 472 3857 david.cadwell@colliers.com MIKE CHRISTENSEN 208 472 2866 mike.christensen@colliers.com This document has been prepared

More information

Independent Auditors Report 3. Management s Discussion and Analysis 6. Statement of Net Position and Governmental Fund Balance Sheet 17

Independent Auditors Report 3. Management s Discussion and Analysis 6. Statement of Net Position and Governmental Fund Balance Sheet 17 Financial Statements Year Ended: September 30, 2018 Report Number: 05 2019 Report Date: December 13, 2018 Table of Contents Independent Auditors Report 3 Management s Discussion and Analysis 6 Financial

More information

917 S. LUSK STREET BOISE, ID LEW MANGLOS, MBA, CCIM, SIOR

917 S. LUSK STREET BOISE, ID LEW MANGLOS, MBA, CCIM, SIOR 917 S. LUSK STREET BOISE, ID 83607 LEW MANGLOS, MBA, CCIM, SIOR 208 472 2841 lew.manglos@colliers.com 917 S LUSK ST Table of Contents Property Overview Valuation Location Layout Images Demographics Area

More information

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE

TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE Presentation for Texas Transportation Commission March 28, 2018 Purposes of the Workshop The Texas Transportation

More information

COMPASS BOARD OF DIRECTORS MEETING AUGUST 20, 2018 COMPASS, 1 ST FLOOR BOARD ROOM 700 NE 2 ND STREET, MERIDIAN, IDAHO **MINUTES**

COMPASS BOARD OF DIRECTORS MEETING AUGUST 20, 2018 COMPASS, 1 ST FLOOR BOARD ROOM 700 NE 2 ND STREET, MERIDIAN, IDAHO **MINUTES** COMPASS BOARD OF DIRECTORS MEETING AUGUST 20, 2018 COMPASS, 1 ST FLOOR BOARD ROOM 700 NE 2 ND STREET, MERIDIAN, IDAHO ITEM V-A **MINUTES** ATTENDEES: Rebecca Arnold, Commissioner, Ada County Highway District

More information

1300 PENN STATION, MERIDIAN, ID

1300 PENN STATION, MERIDIAN, ID 1300, MERIDIAN, ID This information contained herein is from sources deemed reliable. We have no reason to doubt its accuracy but do not guarantee it. It is the responsibility of the person reviewing this

More information

Contents. Alamo Area Metropolitan Planning Organization. Introduction S. St. Mary s Street San Antonio, Texas 78205

Contents. Alamo Area Metropolitan Planning Organization. Introduction S. St. Mary s Street San Antonio, Texas 78205 Contents Introduction 1 Alamo Area Metropolitan Planning Organization Tel 210.227.8651 Fax 210.227.9321 825 S. St. Mary s Street San Antonio, Texas 78205 www.alamoareampo.org aampo@alamoareampo.org Pg.

More information

SHOWROOM WAREHOUSE BUILDING FOR SALE LEASE

SHOWROOM WAREHOUSE BUILDING FOR SALE LEASE 962 S. ALLANTE PLACE boise 83709 PROPERTY INFORMATION: Submarket: Bldg Type: Bldg Size: Lot Size: Grade Level: Southwest Concrete Tilt-Up 13,862 SF 1.148 Acres 2 (12 x 14 ) Clear Height: Power: Parking:

More information

1 EXECUTIVE SUMMARY. Figure 1-1: SR 156 Study Area & Monterey Expressway Alignment

1 EXECUTIVE SUMMARY. Figure 1-1: SR 156 Study Area & Monterey Expressway Alignment 1 EXECUTIVE SUMMARY The Transportation Agency for Monterey County (TAMC) Board commissioned a Level 2 Traffic and Revenue study on the feasibility of collecting tolls to fund the proposed new SR156 connector

More information

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION

2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION 2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION TEMPO Meeting July 21, 2016 Current Initiatives On-going efforts to address performance-based planning and programming processes as required

More information

Planning Commission Meeting. March 2, 2016

Planning Commission Meeting. March 2, 2016 Planning Commission Meeting March 2, 2016 PRESENTATION Purpose of Planning Role of the Planning Commission Introduction of Madison County Comprehensive Plan Overview of Upcoming Meetings Overview of Existing

More information

Financial Snapshot October 2014

Financial Snapshot October 2014 Financial Snapshot October 2014 Financial Snapshot About the Financial Snapshot The Financial Snapshot provides answers to frequently asked questions regarding MoDOT s finances. This document provides

More information

Transportation Finance Overview. Presentation Contents

Transportation Finance Overview. Presentation Contents Transportation Finance Overview Matt Burress House Research Department matt.burress@house.mn Andy Lee House Fiscal Analysis andrew.lee@house.mn January 5 th & 10 th, 2017 Presentation Contents 2 Part 1:

More information

Offering Memorandum 1041 S. ANCONA AVE EAGLE, ID 83616

Offering Memorandum 1041 S. ANCONA AVE EAGLE, ID 83616 Offering Memorandum 1041 S. ANCONA AVE EAGLE, ID 83616 MIKE CHRISTENSEN 208 472 2866 mike.christensen@colliers.com SCOTT RAEBER, MBA, CCIM 208 472 2817 scott.raeber@colliers.com This document has been

More information

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction FY 2009-2018 Statewide Capital Investment Strategy.. asset management, performance-based strategic direction March 31, 2008 Governor Jon S. Corzine Commissioner Kris Kolluri Table of Contents I. EXECUTIVE

More information

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing TESTIMONY The Texas Transportation Challenge Testimony Before the Study Commission on Transportation Financing Ric Williamson Chairman Texas Transportation Commission April 19, 2006 Texas Department of

More information

CHAPTER 11: Economic Development and Sustainability

CHAPTER 11: Economic Development and Sustainability AGLE AREA COMMUNITY Plan CHAPTER 11 CHAPTER 11: Economic Development and Sustainability Economic Development and Sustainability The overall economy of the Town and the Town government s finances are inextricably

More information

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania

SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN. Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania SOUTHERN BELTWAY US-22 TO I-79 PROJECT 2013 FINANCIAL PLAN Pennsylvania Turnpike Commission Allegheny and Washington Counties, Pennsylvania January 2013 Table of Contents... 1 Introduction... 2 Project

More information

TXDOT CONGESTION RELIEF INITIATIVE, INCLUDING

TXDOT CONGESTION RELIEF INITIATIVE, INCLUDING TXDOT CONGESTION RELIEF INITIATIVE, INCLUDING TEXASCLEARLANES Commissioner J. Bruce Bugg, Jr. February 6, 2017 Highway transportation in Texas: Today and our future 2 Highway transportation in Texas: Today

More information

Joint Appropriations Subcommittee on Transportation

Joint Appropriations Subcommittee on Transportation Joint Appropriations Subcommittee on Transportation Funding Overview February 21, 2013 H. Tasaico, PE 1 NCDOT Funding Overview - Agenda State Transportation Comparative Data Transportation Funding Sources

More information

Finance Tools for Project Advancement

Finance Tools for Project Advancement Florida Department of TRANSPORTATION Finance Tools for Project Advancement Leon Corbett Project Finance Manager NCSL Southern States Fiscal Leaders September 23, 2016 Discussion Topics Public-Private Partnerships

More information

ALL Counties. ALL Districts

ALL Counties. ALL Districts TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation

More information

Appendix D: USING TOLL REVENUE TO FINANCE HIGHWAY AND TRANSIT CAPITAL IMPROVEMENTS

Appendix D: USING TOLL REVENUE TO FINANCE HIGHWAY AND TRANSIT CAPITAL IMPROVEMENTS Appendix D: USING TOLL REVENUE TO FINANCE HIGHWAY AND TRANSIT CAPITAL IMPROVEMENTS WHITE PAPER Prepared by Econsult Corporation September 2011 Michael Baker Jr., Inc. in association with Boles, Smyth Associates,

More information

BOARD OF DIRECTORS MEETING MARCH 19, 2012 COMPASS, 1 ST FLOOR BOARD ROOM 700 N. EAST 2 ND STREET MERIDIAN, IDAHO **MINUTES**

BOARD OF DIRECTORS MEETING MARCH 19, 2012 COMPASS, 1 ST FLOOR BOARD ROOM 700 N. EAST 2 ND STREET MERIDIAN, IDAHO **MINUTES** BOARD OF DIRECTORS MEETING MARCH 19, 2012 COMPASS, 1 ST FLOOR BOARD ROOM 700 N. EAST 2 ND STREET MERIDIAN, IDAHO **MINUTES** ITEM III-A ATTENDEES: Rebecca Arnold, Commissioner, Ada County Highway District

More information

Transportation Planning FAQ s

Transportation Planning FAQ s Transportation Planning FAQ s 1. What is the Master Thoroughfare Plan (MTP)? The Master Thoroughfare Plan defines the network of existing and future roads deemed appropriate to accommodate the various

More information

NCDOT Public Private Partnerships P3 s Financing

NCDOT Public Private Partnerships P3 s Financing NCDOT Public Private Partnerships P3 s Financing Mark Foster, Chief Financial Officer April 4, 2012 1 Public-Private Partnerships (P3 s) provide a new source of capital for state and local governments

More information

Presentation by Joseph R. Krier Greater SA Chamber President/CEO

Presentation by Joseph R. Krier Greater SA Chamber President/CEO Texas Transportation Forum Future of Transportation Financing Presentation by Joseph R. Krier Greater SA Chamber President/CEO June 9, 2006 San Antonio Congestion: Contributing Factors 1 million new residents

More information

DEMOGRAPHIC ADVISORY COMMITTEE August 16, :30 A.M. to 11:00 A.M. Ada County, Commissioner s Hearing Room 200 W. Front Street Boise, ID

DEMOGRAPHIC ADVISORY COMMITTEE August 16, :30 A.M. to 11:00 A.M. Ada County, Commissioner s Hearing Room 200 W. Front Street Boise, ID DEMOGRAPHIC ADVISORY COMMITTEE August 16, 2007 8:30 A.M. to 11:00 A.M. Ada County, Commissioner s Hearing Room 200 W. Front Street Boise, ID Notice: This packet contains only the documents listed with

More information

FY2014 Unified Planning Work Program - Revision 1

FY2014 Unified Planning Work Program - Revision 1 FY2014 Unified Planning Work Program - Revision 1 Report No. 06-2014 Adopted by the COMPASS Board on January 27, 2014 Resolution No. 04-2014 Table of Contents FY2014 Unified Planning Work Program - Revision

More information

Analysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission

Analysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission Analysis of the Alameda County Transportation Expenditure Plan Prepared by Alameda County Transportation Commission Discussion: In 1986, voters approved Measure B, a 1/2 cent sales tax, to fund transportation

More information

If you look closely at our budget, it becomes quite 3. Medicaid s challenge.

If you look closely at our budget, it becomes quite 3. Medicaid s challenge. Thank you for this opportunity to begin our agency s budget presentations. Before I begin, I would like to introduce members of our Board of Health and Welfare who have joined us, Dr. Richard Roberge and

More information

Description of the Submission / Conditions Precedent

Description of the Submission / Conditions Precedent Submittal Relating to the Development of the TxDOT North Tarrant Express Project, Segments 3A and 3B through a Facility Implementation Plan and Facility Agreement Description of the Submission / Conditions

More information

Prioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016

Prioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016 Prioritization and Programming Process NCDOT Division of Planning and Programming November 16, 2016 Today s Roadmap 1. Planning and Programming Division Overview 2. Strategic Investments (STI) Law 3. Prioritization

More information

FOR LEASE Emerald Corporate Park Flex Spaces 600 North Steelhead Way, Boise, Idaho Listing Features

FOR LEASE Emerald Corporate Park Flex Spaces 600 North Steelhead Way, Boise, Idaho Listing Features T.I. ALLOWANCE AVAILABLE Property Highlights Listing Features Suite 100 Lease Rate Roll-Up Doors Lot Size/Parking Zoning LockBox 1,328 SF - Office 3,755 SF - Warehouse 5,083 SF - Total $1.05/SF FSEJ 1

More information

2017 Congestion & Freight Mobility Workgroup. Senator Boquist Senator Johnson Representative Smith Warner Representative McLain

2017 Congestion & Freight Mobility Workgroup. Senator Boquist Senator Johnson Representative Smith Warner Representative McLain 2017 Congestion & Freight Mobility Workgroup Senator Boquist Senator Johnson Representative Smith Warner Representative McLain 1 Presentation Format: Work Group Report: Senator Boquist Director Garrett

More information

Gary Halbrooks Vice Chair. Smith County. Jeff Sandford Bowie County. Robert Murray Bowie County

Gary Halbrooks Vice Chair. Smith County. Jeff Sandford Bowie County. Robert Murray Bowie County 2014 ANNUAL REPORT 1 Chair Remarks Board Members Where Do You Want To Go? 2014 has been a remarkable year! As East Texas grows, so do we. The NET RMA experienced some firsts this year. TxDOT converted

More information

BOISE BENCH AREA URBAN RENEWAL DISTRICT

BOISE BENCH AREA URBAN RENEWAL DISTRICT BOISE BENCH AREA URBAN RENEWAL DISTRICT Discussion Draft Prepared by CCDC 3/17/2016 DOCUMENT DELIVERABLES REQUIRED 1. Bench Area Master Plan 2. Bench Area Eligibility Study 3. Bench Area Specific Plan

More information

Countywide Dialogue on Transportation

Countywide Dialogue on Transportation Countywide Dialogue on Transportation Fairfax Federation November 15, 2012 Fairfax County Background Fairfax County s economic health depends on an efficient transportation system. The County strives to

More information

Regional Transit System Return on Investment Assessment. November 30, 2012

Regional Transit System Return on Investment Assessment. November 30, 2012 Regional Transit System Return on Investment Assessment November 30, 2012 1 EXECUTIVE SUMMARY The Itasca Project has a key goal to advance a comprehensive and aligned transportation system. As a stakeholder

More information

GARVEE Bonds and State Infrastructure Bank November 14, 2016

GARVEE Bonds and State Infrastructure Bank November 14, 2016 House Select Committee GARVEE Bonds and State Infrastructure Bank November 14, 2016 David Tyeryar CFO, NCDOT Traditional Financing Techniques Cash to Capital or Pay-as-you-go General Obligation Debt Backed

More information

Colorado Trans II Referendum Survey. April 8 th - 9 th, 2015

Colorado Trans II Referendum Survey. April 8 th - 9 th, 2015 Colorado Trans II Referendum Survey April 8 th - 9 th, 2015 1 About the Survey 2 Statewide, 704 interviews of likely 2015 general election voters. Margin of error of +/-3.69%. Combination of landline automated

More information

Preliminary Findings and Recommendations

Preliminary Findings and Recommendations Review of the Comprehensive Agreement between the North Carolina Department of Transportation and I-77 Mobility Partners LLC Preliminary Findings and Recommendations July 2017 Overview NCDOT has initiated

More information

SENATE BILL State of Washington 64th Legislature 2016 Regular Session

SENATE BILL State of Washington 64th Legislature 2016 Regular Session S-. SENATE BILL State of Washington th Legislature 0 Regular Session By Senators Nelson, Hasegawa, Jayapal, Liias, Cleveland, Frockt, Rolfes, Hobbs, Billig, Carlyle, Chase, Takko, Keiser, Ranker, Darneille,

More information

Texas Department of Transportation Page 1 of 42 Planning and Development of Transportation Projects

Texas Department of Transportation Page 1 of 42 Planning and Development of Transportation Projects Texas Department of Transportation Page of Proposed Preamble The Texas Department of Transportation (department) proposes amendments to.,.,. -.,.0 -.0, new.0, and amendments to. -.,.,.0, and.0 -.0, all

More information

Prioritizing connection to the metro unfairly handicaps important corridors like Highway 14

Prioritizing connection to the metro unfairly handicaps important corridors like Highway 14 December 20, 2017 Commissioner Charles Zelle Minnesota Department of Transportation 395 John Ireland Blvd. St. Paul, MN 55155 Mr. Patrick Weidemann Director of Capital Planning and Programming Minnesota

More information

FY2013 Unified Planning Work Program Revision 1

FY2013 Unified Planning Work Program Revision 1 FY2013 Unified Planning Work Program Revision 1 Report No. 03-2013 Adopted by the COMPASS Board on December 17, 2012 Resolution No. 08-2013 Table of Contents FY2013 Unified Planning Work Program - Revision

More information

ACTION ELEMENT CONCLUSIONS

ACTION ELEMENT CONCLUSIONS ACTION ELEMENT CONCLUSIONS The Action Element identifies all transportation projects within the horizon of the RTP/SCS and are financially constrained. This Action Element implements the Policy Element

More information

FINANCIAL STATEMENTS FISCAL YEAR 2017

FINANCIAL STATEMENTS FISCAL YEAR 2017 FINANCIAL STATEMENTS FISCAL YEAR 2017 REPORT OF INDEPENDENT AUDITORS AND FINANCIAL STATEMENTS JUNE 30, 2017 AND 2016 INCLUDING SINGLE AUDIT REPORTS FOR THE YEAR ENDED JUNE 30, 2017 PHOTO BY BROOKE SUTTON

More information

Regional Transportation District FasTracks Financial Plan. April 22,

Regional Transportation District FasTracks Financial Plan. April 22, Regional Transportation District FasTracks Financial Plan April 22, 2004 2-1 Executive Summary The Regional Transportation District (the District or RTD ), has developed a comprehensive $4.7 billion Plan,

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway

More information

2017 RISK ASSESSMENT AND PROGRAM EVALUATION AND AUDIT PLAN

2017 RISK ASSESSMENT AND PROGRAM EVALUATION AND AUDIT PLAN 2017 RISK ASSESSMENT AND PROGRAM EVALUATION AND AUDIT PLAN Requirements of the Standards In the Institute of Internal Auditors Standards for the Professional Practice of Internal Auditing, standard 2010

More information

Chapter 10 Equity and Environmental Justice

Chapter 10 Equity and Environmental Justice Chapter 10 Equity and Environmental Justice Introduction An important consideration for the 2040 Transportation Policy Plan is its impact on all populations in the Minneapolis-Saint Paul region, particularly

More information

Chapter 4: Regional Transportation Finance

Chapter 4: Regional Transportation Finance 4.1 Chapter 4: Regional Transportation Finance 2040 4.2 CONTENTS Chapter 4: Transportation Finance Overview 4.3 Two Funding Scenarios 4.4 Current Revenue Scenario Assumptions 4.5 State Highway Revenues

More information

TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY

TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY Texas Transportation Commission September 26, 2018 Governor s Charge for Congestion Relief Initiative The State of Texas is spurring

More information

BOISE COUNTY, IDAHO. Report on Audited Basic Financial Statements and Supplemental Information. For the Year Ended September 30, 2016

BOISE COUNTY, IDAHO. Report on Audited Basic Financial Statements and Supplemental Information. For the Year Ended September 30, 2016 BOISE COUNTY, IDAHO Report on Audited Basic Financial Statements and Supplemental Information Table of Contents Independent Auditor s Report 3 BASIC FINANCIAL STATEMENTS Government-wide Financial Statements:

More information

Public Hearing Tarrant County. April 14, 2009

Public Hearing Tarrant County. April 14, 2009 Public Hearing Tarrant County April 14, 2009 Public Hearing Agenda Welcome and Project Overview Ms. Maribel P. Chavez, P.E. District Engineer Texas Department of Transportation Fort Worth District 2 Public

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

Transportation Infrastructure Finance and Innovation Act (TIFIA)

Transportation Infrastructure Finance and Innovation Act (TIFIA) Slide 1 Transportation Infrastructure Finance and Innovation Act (TIFIA) Reno Rail Corridor Port of Miami Tunnel SH 130 Jorianne Jernberg, Financial Analyst Office of Innovative Program Delivery Federal

More information

MEMO Governor Phil Bryant, Lt. Governor Tate Reeves, Speaker Philip Gunn and the Members of the Mississippi Legislature From: Russ Latino, State

MEMO Governor Phil Bryant, Lt. Governor Tate Reeves, Speaker Philip Gunn and the Members of the Mississippi Legislature From: Russ Latino, State MEMO To: Governor Phil Bryant, Lt. Governor Tate Reeves, Speaker Philip Gunn and the Members of the Mississippi Legislature From: Russ Latino, State Director of Americans for Prosperity Mississippi Subject:

More information

Listed below is a breakdown of specific project economic benefits:

Listed below is a breakdown of specific project economic benefits: Appendix 17 Los Angeles County is requesting that the California Transportation Commission (CTC) secure the other half of the $3.6 billion in needed funding from the $2.7 billion South County portion of

More information

Economic Impacts of Road Project Timing Shifts in Sarasota County

Economic Impacts of Road Project Timing Shifts in Sarasota County Economic Impacts of Road Project Timing Shifts in Sarasota County Prepared for: Prepared by: Economic Analysis Program Featuring REMI Policy Insight and IMPLAN October 22 Introduction Improving traffic

More information

INVESTMENT OFFERING. Fairview Park 6728 W. Fairveiw Ave. Boise, ID N ALLUMBAUGH ST W FAIRVIEW AVE N FRY ST N RAYMOND ST

INVESTMENT OFFERING. Fairview Park 6728 W. Fairveiw Ave. Boise, ID N ALLUMBAUGH ST W FAIRVIEW AVE N FRY ST N RAYMOND ST INVESTMENT OFFERING Fairview Park 6728 W. Fairveiw Ave. Boise, ID 83704 N ALLUMBAUGH ST W FAIRVIEW AVE N FRY ST N RAYMOND ST Confidentiality Agreement Fairview Park 6728 W. Fairview Ave Boise, ID 83704

More information

Idaho State Budgeting: Finding the New Normal

Idaho State Budgeting: Finding the New Normal Boise State University ScholarWorks Political Science Faculty Publications and Presentations Department of Political Science 7-1-2013 Idaho State Budgeting: Finding the New Normal Dick Kinney Boise State

More information

PRIME DEVELOPMENT OPPORTUNITY

PRIME DEVELOPMENT OPPORTUNITY FOR SALE > PARCEL > WHOLE FOODS ANCHORED CENTER PRIME DEVELOPMENT OPPORTUNITY 350 EAST MYRTLE 83702 Development Land > Hotel, Multifamily, Student Housing, Office/Medical This 1.7 acre parcel is located

More information

Financial. Snapshot An appendix to the Citizen s Guide to Transportation Funding in Missouri

Financial. Snapshot An appendix to the Citizen s Guide to Transportation Funding in Missouri Financial Snapshot An appendix to the Citizen s Guide to Transportation Funding in Missouri November 2017 Financial Snapshot About the Financial Snapshot The Financial Snapshot provides answers to frequently

More information

The Quest for Cost-Efficient Local Government in New England: What Role for Regional Consolidation?

The Quest for Cost-Efficient Local Government in New England: What Role for Regional Consolidation? The Quest for Cost-Efficient Local Government in New England: What Role for Regional Consolidation? Yolanda K. Kodrzycki presented at New England Fiscal Leaders Meeting February 23, 2013 The views expressed

More information

CASH MANAGEMENT & CONTRACT AWARDS

CASH MANAGEMENT & CONTRACT AWARDS CASH MANAGEMENT & CONTRACT AWARDS Brian Ragland, Chief Financial Officer Bill Hale, Chief Engineer Randy Hopmann, Director of District Operations Footer Text Date I. Cash Management Practices 2 FY 2018-2019

More information

4.12 POPULATION AND HOUSING

4.12 POPULATION AND HOUSING 4.12 POPULATION AND HOUSING 4.12.1 INTRODUCTION This section describes the existing socioeconomic conditions, including population, housing, and employment, within the Specific Plan Area and provides an

More information

NORTH LUZON, PHILIPPINES. Case Study (Transportation) Project Summary:

NORTH LUZON, PHILIPPINES. Case Study (Transportation) Project Summary: NORTH LUZON, PHILIPPINES Case Study (Transportation) Project Summary: The Republic of the Philippines is an archipelagic nation in Southeast Asia comprised of 7,107 islands. The Philippines is home to

More information

Reviewed and Approved

Reviewed and Approved Action Plan Grantee: Grant: Idaho B-08-DN-16-0001 LOCCS Authorized Amount: Grant Award Amount: $ 19,600,000.00 $ 19,600,000.00 Status: Reviewed and Approved Estimated PI/RL Funds: $ 30,000,000.00 Total

More information

Offering Memorandum DECOY RV PARK RIVERSIDE ROAD CALDWELL, ID 83607

Offering Memorandum DECOY RV PARK RIVERSIDE ROAD CALDWELL, ID 83607 Offering Memorandum DECOY RV PARK 15702 RIVERSIDE ROAD CALDWELL, ID 83607 LEW MANGLOS, MBA, CCIM, SIOR 208 472 2841 lew.manglos@colliers.com This document has been prepared by Colliers International for

More information

Tools to Help States Manage Their Debt

Tools to Help States Manage Their Debt Tools to Help States Manage Their Debt June 28, 2017 The webinar has not yet begun. Audio will be available through the call in information contained in your registration confirmation e mail. Tools to

More information

April 25, Martin Klepper Executive Director

April 25, Martin Klepper Executive Director April 25, 2017 Martin Klepper Executive Director A New Formula for Infrastructure Investment The BUILD AMERICA BUREAU 2 Bureau Credit Programs Transportation Infrastructure Finance and Innovation Act (TIFIA)

More information

Public Policy Issues and Sustainability in Southern California. Financing Infrastructure Development

Public Policy Issues and Sustainability in Southern California. Financing Infrastructure Development Public Policy Issues and Sustainability in Southern California Financing Infrastructure Development University of California Riverside March 3, 2010 Outline What is Infrastructure?; Infrastructure Need;

More information

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative

SOUND TRANSIT STAFF REPORT MOTION NO. M D Street-to-M Street Track & Signal Project Preferred Alternative SOUND TRANSIT STAFF REPORT MOTION NO. M2007-126 D Street-to-M Street Track & Signal Project Preferred Alternative Meeting: Date: Type of Action: Staff Contact: Phone: Board 12/13/07 Discussion/Possible

More information

Transportation Infrastructure Finance and Innovation Act

Transportation Infrastructure Finance and Innovation Act Transportation Infrastructure Finance and Innovation Act Program Expansion Must Not Erode Taxpayer Protections October 27, 2011 The Transportation Infrastructure Finance and Innovation Act 1 (TIFIA) was

More information

Offering Memorandum DECOY RV PARK RIVERSIDE ROAD CALDWELL, ID 83607

Offering Memorandum DECOY RV PARK RIVERSIDE ROAD CALDWELL, ID 83607 Offering Memorandum DECOY RV PARK 15702 RIVERSIDE ROAD CALDWELL, ID 83607 LEW MANGLOS, MBA, CCIM, SIOR 208 472 2841 lew.manglos@colliers.com This document has been prepared by Colliers International for

More information

GENERAL MOBILITY PROGRAM

GENERAL MOBILITY PROGRAM GENERAL MOBILITY PROGRAM Current Proposals: Transit Implications Greater Houston Partnership Transportation Policy Advisory Committee Friday - July 27, 2012 1 Member Entities Spring Valley Village Humble

More information

Introduction P O L I C Y D O C U M E N T P A R T 1

Introduction P O L I C Y D O C U M E N T P A R T 1 P O L I C Y D O C U M E N T P A R T 1 Introduction The 2035 General Plan for San Joaquin County presents a vision for the County's future and a strategy to make that vision a reality. The Plan is the result

More information

SEPTEMBER 2018 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS

SEPTEMBER 2018 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS SEPTEMBER 2018 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS The Airports Authority established the Dulles Corridor Enterprise (DCE) Fund to segregate the financial activity associated with

More information

NORTH CAROLINA GENERAL ASSEMBLY

NORTH CAROLINA GENERAL ASSEMBLY NORTH CAROLINA GENERAL ASSEMBLY HOUSE TRANSPORTATION APPROPRIATIONS SUBCOMMITTEE MONEY REPORT AND SPECIAL PROVISIONS MAY 24, 2012 House Subcommittee on Transportation Highway Fund HIGHWAY FUND Total Budget

More information

FEBRUARY 2015 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS

FEBRUARY 2015 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS FEBRUARY 2015 DULLES CORRIDOR ENTERPRISE REPORT OF THE FINANCIAL ADVISORS The Airports Authority established the Dulles Corridor Enterprise (DCE) Fund to segregate the financial activity associated with

More information

Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012)

Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012) Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012) Summary Description Proposed Project: Light Rail Transit 2.9 Miles, 5 Stations Total Capital Cost ($YOE):

More information

Table of Contents. FY2018 Unified Planning Work Program and Budget

Table of Contents. FY2018 Unified Planning Work Program and Budget FY2018 Unified Planning Work Program and Budget Report No. 08-2017 Adopted by the COMPASS Board on August 28, 2017 Resolution No. 12-2017 Table of Contents FY2018 Unified Planning Work Program and Budget

More information

Foreign Trade Zone # 280 Overview and Advantages

Foreign Trade Zone # 280 Overview and Advantages Foreign Trade Zone # 280 Overview and Advantages On May 12, 2012, the U.S. Department of Commerce granted the Caldwell Economic Development Council (now Southwest Idaho Manufacturers Alliance or SWI-MA)

More information

Central Minnesota Economic and Business Conditions Report Third Quarter 2016

Central Minnesota Economic and Business Conditions Report Third Quarter 2016 Central Minnesota Economic and Business Conditions Report Third Quarter This issue is part of a series for the six planning areas of Minnesota Central, Northeast, Northwest, Southeast, Southwest, and Twin

More information

City Fee Report State of Minnesota Cluster Analysis for Minnesota Cities By Fee Category

City Fee Report State of Minnesota Cluster Analysis for Minnesota Cities By Fee Category City Fee Report State of Minnesota 2001-2004 Cluster Analysis for Minnesota Cities By Fee Category MINNESOTA REVENUE February 2006 MINNESOTA REVENUE February 28, 2006 To: Senate Finance and Tax Committees

More information

Dominion Boulevard Improvements with Toll System VDOT Initial Financial Plan February 1, 2012

Dominion Boulevard Improvements with Toll System VDOT Initial Financial Plan February 1, 2012 VDOT February 1, 2012 Table of Contents Section 1 Summary.2 Project Description. 2 Project Background 2 Current Activities.3 Project Schedule.4 Section 2 Project Cost Estimate..4 Section 3 Project Financing..5

More information

Funding Local Public Transportation

Funding Local Public Transportation Funding Local Public Transportation I. Metro A. SORTA, early history In 1969 the Southwest Ohio Regional Transit Authority was established by Hamilton County with Hamilton County as its jurisdiction. In

More information

BOISE COUNTY. PUBLIC BUDGET HEARING TUESDAY AUGUST 29 th, 2017

BOISE COUNTY. PUBLIC BUDGET HEARING TUESDAY AUGUST 29 th, 2017 BOISE COUNTY PUBLIC BUDGET HEARING TUESDAY AUGUST 29 th, 2017 Department Budget Requests Budget Workshops w/ Board of County Commissioners Budget Officer Requests Board of County Commissioners Tentative

More information

Joint Appropriations Subcommittee on Transportation. North Carolina Turnpike Authority Beau Memory March 14, 2017

Joint Appropriations Subcommittee on Transportation. North Carolina Turnpike Authority Beau Memory March 14, 2017 Joint Appropriations Subcommittee on Transportation North Carolina Turnpike Authority Beau Memory March 14, 2017 Benefits of Tolling: Funding source Supplements traditional transportation funding Can accelerate

More information

Review of FasTracks Status and Future Strategic Direction

Review of FasTracks Status and Future Strategic Direction Review of FasTracks Status and Future Strategic Direction Regional Transportation District August 21, 2008 1 Overview RTD has experienced a dramatic increase in ridership over the past year, showing that